CHECKLIST FOR INSPECTION OF HYDRAULIC ELEVATORS
GENERAL NOTES:
(a) See ASME A17.2 - 2010 for detailed Code requirements.
(b) OK = meets requirements; NG = no good; NA = not applicable.
Address: ATRIA HIGHLAND CROSSING Periodic Inspection
400 FARRELL DRIVE Periodic Test – Cat-1
FORT WRIGHT, KENTUCKY 41011 Periodic Test – Cat-3 Periodic Test – Cat-5 Acceptance Evaluation/Test
ID No: Code Edition: 2004 Passenger Rated load: 2500 lbs. Inspected by: Date:
Freight class: Rated speed: 125 fpm QEI No: Certifying Organization:
Signature: _____________________________
OK NG NA OK NG NA
1 INSIDE OF CAR 2.32 Control valve X
1.1 Door reopening device 2.33 Tanks X
1.2 Stop switches 2.34 Flexible hose and fitting assemblies X
1.3 Operating control devices 2.35 Supply line and shutoff valve X
1.4 Sills and car floor 2.36 Hydraulic cylinders X
1.5 Car lighting and receptacles 2.37 Pressure switch X
1.6 Car emergency signal 2.38 Roped water hydraulic X
1.7 Car door or gate 2.39 Low oil protection X
1.8 Door closing force 2.40 Maintenance records
1.9 Power closing of doors or gates 2.41 Static control
1.10 Power opening of doors or gates 2.42 Earthquake inspection/test
1.11 Car vision panels and glass car doors 3 TOP OF CAR
1.12 Car enclosure 3.1 Top-of-car stop switch X
1.13 Emergency exit 3.2 Car top light and outlet X
1.14 Ventilation 3.3 Top-of-car operating device X
1.15 Signs and operating device symbols 3.4 Top-of-car clearance and refuge space X
1.16 Rated load, platform area, and data plate 3.5 Normal terminal stopping device X
1.17 Standby power operation 3.6
Final and emergency terminal stopping devices X
1.18 Restricted opening of car or hoistway doors 3.7 Car-leveling and anti-creep devices
X
1.19 Car ride 3.8 Top emergency exit X
1.20 Earthquake inspection/test 3.9
Floor and emergency identification numbering X
2 MACHINE ROOM 3.10 Hoistway construction
2.1 Access to machine space 3.11 Hoistway smoke control X
2.2 Headroom 3.12 Pipes, wiring, and ducts X
2.3 Lighting and receptacles 3.13 Windows/projections/recesses/setbacks X
2.4 Machine space 3.14 Hoistway clearances X
2.5 Housekeeping 3.15 Multiple hoistway X
2.6 Ventilation 3.16 Traveling cables and junction box X
2.7 Fire extinguisher 3.17 Door and gate equipment X
2.8 Pipes, wiring, and ducts 3.18 Car frame and stiles X
2.9 Guarding of exposed auxiliary equipment 3.19 Guide rails fastening and equipment X
2.10 Numbering of elevators, machines, and disconnect switches 3.20 Governor rope
X
2.11 Disconnecting means and control 3.21 Governor releasing carrier X
2.12 Controller wiring, fuses, grounding, etc. 3.22 Wire rope fastening and hitch plate
2.13 Governor, overspeed switch and seal 3.23 Suspension rope X
2.14 Code data plate 3.27 Crosshead & rope data tags X
2.17 Drive machine brake 3.28 Counterweight & buffer X
2.30 Hydraulic power unit 3.29 Counterweight safeties X
2.31 Relief valves 3.30 Speed test X
Post-Wide Elevator Maintenance, Inspection and Repair
TECHNICAL EXHIBIT C
CHECKLIST FOR INSPECTION OF HYDRAULIC ELEVATORS (Back)
OK NG NA ON NG NA
3.31 Slack rope device 5.1 Pit access/lighting/stop switch/condition
3.32 Traveling sheave 5.2 Bottom clearance/runby/refuge space
3.34 Earthquake inspection/test 5.4 Normal terminal stopping device 4 OUTSIDE HOISTWAY 5.5 Traveling cables
4.1 Car platform guard 5.6 Governor rope tension device
4.2 Hoistway doors 5.7 Car frame and platform
4.3 Vision panels 5.8 Car/CW safeties and guiding members
4.4 Hoistway door locking device 5.11 Plunger and cylinder
4.5 Access to hoistway 5.12 Car buffer
4.6 Power closing of hoistway doors 5.13 Guiding members
4.7 Sequence operation 5.14 Supply piping
4.8 Hoistway enclosure 5.15 Overspeed valve
4.9 Elevator parking device 5.16 Earthquake inspection/test
4.10 Emergency doors in blind hoistways 6 FIREFIGHTERS’ SERVICE
4.12 Standby power selection switch 6.1 Phase I
5 PIT 6.1A Phase II
PERFORMANCE DATA
Make: Installation date: # of landings: # of openings: F R Door entrance type: Door entrance size: 84 in X 42 in Typical floor rise: 8 ft
ACTUAL SPEED: EMPTY FULL REMARKS
Up - FPM (feet per minute) 120 Down - FPM (feet per minute) 120 PERFORMANCE TIMES: Time from start of door closing to doors open 32 in. (813mm) at adjacent floor.
Up (1) – Seconds 18.1 Down (1) – Seconds 15.4 MOTION TIME: Start to stop.
Up (1) – Seconds 9.6 Down (1) – Seconds 8.6 DOOR TIMES: Full open to full close – sec. FRONT REAR REMARKS Door Open 3.6 Door Close 3.7 Long (hall call) Dwell 4.5 Short (car call) Dwell 3.3 Detector (door ray) Hold 3.3 Nudging (Time/closing speed/closing force) --- Closing Pressure (between 1/3 & 2/3) - max. 30 lbf. 24 GFR-CAR RIDE QUALITY: g-force rate EMPTY OPTIMAL RANGE REMARKS Start .07 UP .04 DN .03mg’s - .09mg’s Accel .02 UP .03 DN .03mg’s - .09mg’s Decel .07 UP .07 DN .03mg’s - .09mg’s Stop .04 UP .08 DN .03mg’s - .09mg’s Jerk 8.8 UP 11.1 DN <15.0mg’s
ROPE DATA
LOCATION OF ROPES MATERIALS NUMBER
SIZE AND
CONSTRUCTION
USED LIFE
(in months)
EST. LIFE
(in months) REMARKS
HOIST N/A
GOVERNOR N/A
SAFETY TEST DATA
Category 1 Test Date: Category 3 Test Date: Category 5 Test Date: Car Safety Device Type:
Maintenance Provider:
“Elevator Safety Is No Accident”