A02 - SOW_Sensors - Big Lake North End Control Structure.pdf

PDF 4 MB Posted

Attached to
Sensors - Big Lake North End Control Structure Federal contract opportunity
Solicitation number
W912EQ20T0024
Issued by
Department of the Army Corps of Engineers Engineering District Memphis

View the file

Other files for this federal contract opportunity

Other files attached to Sensors - Big Lake North End Control Structure, newest first.
File Type Posted
Solicitation W912EQ20T0024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARMY CORPS OF ENGINEERS

BIG LAKE NORTH END AND DIVERSION CHANNEL WATER LEVEL SENSOR

REPLACEMENT

MISSISSIPPI COUNTY, AR

TABLE OF CONTENTS

SECTION C – WORK STATEMENT/DESCRIPTION/SPECIFICATIONS

SECTION D – CONTRACT ADMINISTRATION DATA

SECTION E – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

SECTION F – SPECIAL CONTRACT REQUIREMENTS

APPENDIX A – LOCATION, CONDUIT RUNS, AND PLC INPUTS/OUTPUTS UNDER

PREVIOUS CONTRACT

SCOPE OF WORK

SECTION C – WORK STATEMENT/DESCRIPTION/SPECIFICATIONS

C-1 GENERAL

C-1.1 SCOPE OF WORK

The work consists of furnishing all plant, labor and materials and equipment to install three (3) submersible water level pressure transducers, 2” PVC stilling tubes, electrical enclosures, support frames, wiring, and all accessories necessary to provide needed input and output to monitor a total of 6 gates. Work shall also include all necessary reprogramming of existing PLC to change operational logic of gate control from existing to the new parameters specified herein. All equipment provided shall be standard products of a manufacturer regularly engaged in the manufacturing of such products, which are of a similar material, design and workmanship.

C-1.2 LOCATION

The work is located at the Big Lake Wildlife Management Area, located 2 miles east of Manila, Arkansas on HWY 18 in Mississippi County, Arkansas. The structures are located inside the wildlife management area, Lat. 35.992213, Long. -90.120897. The Contracting Officer's Representative will be available to show the exact location of the work at the organized site visit.

C-1.3 EXISTING WORK

Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remains.

b. Repair or replace portions of existing work which are damaged by the Contractor during fabrication to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

c. All repairs/replacements needed due to damage by the Contractor shall be performed at no additional cost to the Govt.

C-1.4 COMMENCEMENT OF WORK

Within 10 days of contract award, the Contractor shall submit a proposed production schedule for Contracting Officer approval. Approval by the Contracting Officer of the schedule is necessary to begin work. The Contractor shall begin work NLT 10 calendar days after approval of schedule. Contractor shall make delivery of the parts within the schedule submitted by the Contractor. The Contractor shall install all equipment in accordance with the submitted shop drawings. The Contractor shall provide sufficient manpower to effectively install and test all supplied equipment and shall be finished and demobilized by the time specified. All work shall be complete no later than 06 August 2021. The stated time for completion shall include final cleanup of the premises.

A preconstruction conference is mandatory. The Contracting Officer's notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

C-1.5 PROJECT TIMING

The critical function of flood control mandates the installation of the water level sensors and programming of the PLC, etc., be conducted during a time period when the water level is low and gates are not operating. This is typically during the months of June through October.

C-1.6 DELIVERY SCHEDULE

All equipment including, but not limited to, sensors, electrical enclosures, support frames, associated wiring, conduit, and stilling tubes shall be delivered and installed in the Big Lake North End and Diversion Channel Control Structures. All work shall be completed by August 6, 2021. Any change in schedule will require notification and approval from the Contracting Officer.

C-1.7 DELIVERY DESTINATION

All materials and equipment to be delivered by the Contractor shall be delivered F.O.B.

destination the Big Lake North End and Diversion Channel Control Structures, at the Big Lake Wildlife Management area near manila, AR.

The Contractor shall notify the Contracting Officer at least five days in advance of any shipment to be made under this contract, and on the date of shipment, a copy of the bill of lading and packing list shall be forwarded to the following address:

U.S. Army Engineer District, Memphis Caruthersville Area Office 706 Harry S. Truman Blvd. Caruthersville, MO 63830-1268

C-2 SYSTEM FUNCTIONAL AND TECHNICAL SPECIFICATIONS

C-2.1 GENERAL

The work covered by this section consists of furnishing all plant, labor and material to install submersible pressure transducer water level sensors (3), stilling wells, support frames, electrical enclosures, conduit, and wiring along with the reprogramming of the Programmable Logic Controllers (PLC), and all accessories necessary to provide needed input and output to monitor and control 6 tainter gates. The PLC controls are located inside the Gate Control House. All equipment provided shall be standard products of a manufacturer regularly engaged in the manufacturing of such products, which are of a similar material, design and workmanship.

The Programmable Logic Controller (PLC) system, as defined in NEMA IA 2 and NEMA ICS 1, shall control gate functions as necessary for automatic, Semi- Automatic and Local Manual mode. The PLC system shall be capable of starting and stopping the various gate motors and other functions as specified herein and shown on the drawings. Unless otherwise noted herein, all equipment covered under this specification shall be installed in accordance with Section C. The Contractor shall use the existing PLC but reprogram it to meet contract requirements. Major items of service are as listed below:

(1) Furnish and install water level transducers which shall include, but not be limited to: the submersible pressure transducer water level sensor, stilling tube, conduit, support frame and wiring. All wiring from the sensors to the Control House shall run underground encased in conduit. The Contractor shall tie new conduit into the existing conduit exiting the building.

(2) Reprogramming of the PLC system. The System shall be programmed to provide all functionality as specified herein or as shown on the contract drawings.

(3) Remove the existing ultrasonic water level sensors (3) to include all wiring. Sensors shall become the property of the Contractor. All mounting brackets and underground conduit, not used, shall be abandoned in-place.

(4) The bubbler system output shall be removed from the PLC input but the bubbler system and compressor shall remain as a stand-alone visual check for water levels.

C-2.1.1 SYSTEM DESCRIPTION

The control systems supplied under these specifications consist of one system to be furnished and installed at Big Lake North End and Diversion Channel Structure. The system will be installed at the North End and Diversion Channel Control Structures and will include all components necessary to measure and transmit the water level elevations from three (3) different sites. At the location there is an existing enclosure containing all motor-controller components and an existing enclosure containing all the bubbler system components. The bubbler system shall remain as a stand-alone unit but shall be disconnected from the control scheme.

The layout of the existing underground conduit is shown on the drawings in APPENDIX A.

C-2.1.1.1 CONTROL SYSTEM FOR NORTH END AND DIVERSION CHANNEL

The existing PLC Control System was installed in 2015 consists of the following:

(1) A Mirologix 1400, Model 1766-L32 AWA) small Programmable Logic Controller (PLC) manufactured by Allen Bradley.

(2) A Panel View Plus 6, Model 700 machine level Human Machine Interface (HMI) manufactured by Rockwell Automation.

(3) A Single Phase, 240W, 24V, 10A Power Supply (model S8VK-G) manufactured by

OMRON

Equipment furnished under this contract will consist of three (3) submersible pressure transducer water level sensors (one upstream of the diversion structure, one downstream of the diversion structure and one downstream of the north end structure). The PLC will control the 6 motor-operated gates. The gates on the control structure are designated Gates North End 1, 2, 3 and Gates Diversion Channel 1, 2, 3. The PLC shall be programmed to never allow more than one of three gates of the North Structure and one of the three gates of the Diversion Channel to operate at any time. The existing three bubbler tubes sense water level in three places. The tube outlet is located at EL 230.8 and provides a 4-20 mA analog signal to the existing PLC. Currently, the water level at each of the three monitoring sites is read by an ultrasonic sensor shooting a signal off the water surface. This system has proven unreliable due to wave action and trash accumulation. These sensors will be replaced with submerged water level sensors. Sensor 1 will determine the water level upstream of the two structures.

Sensor 2 will determine the downstream water level of the Diversion Channel Structure.

Sensor 3 will determine the downstream water level of the North End Structure.

The PLC will have two modes to control both the North End and the Diversion Channel structures. The modes will be Normal and Season 1 (Water Fowl Season). Each Seasonal mode will be a separate screen on the HMI and will have a button to turn the mode on and off, a changeable low set point and a changeable high set point. See Table below for set points and operation modes for both the North End and the Diversion Channel.

Operational Modes:

Mode SETPOINT NORTH END DIVERSION

CHANNEL

NORMAL

Water Level Above

240.0 (Diversion Downstream)

OPENS CLOSES

Water Level Below

237.0 (Diversion Downstream)

CLOSES OPENS

Water Level Above

238.5 (Upstream Sensor)

OPENS OPEN

Water Level Below

236.0 (Upstream Sensor)

CLOSES OPEN

SEASON 1

Water Level Above

236.5 (Upstream Sensor)

CLOSED OPENS (See Note 1)

Water Level Below

235.5 (Upstream Sensor)

CLOSED CLOSES

Water Level Above

238.5 (Upstream Sensor)

OPENS OPEN

Water Level Below

236.0 (Upstream Sensor)

CLOSES OPEN

Note 1:

The Diversion Channel will start opening when the water level is above the seasonal set point and the North End gates (3) are completely closed.

Opening Sequence for both structures will be conducted in 1-FT increments for each gate.

Begin with the middle gate (Gate 2). Initiate the raising of the gate by 1-FT. Forty five seconds after the opening of Gate 2 finishes, initiate 1-FT opening of the outside Gate 1. Forty five seconds after the opening of Gate 1 finishes, initiate the opening of Gate 3.

Closing sequence for both structures will be opposite of the opening sequence. The PLC will check the water level then close the outside gate (Gate 3). Wait 45 seconds after gate 3 closes 1- Foot; then close the other outside gate (Gate 1), Wait 45 seconds after gate 1 closes 1-foot , and then close the middle gate (Gate 2).

Gate upper and lower limits for both structures (Contractor to verify) should be set as follows:

Upper software Limit 10 feet (from the count of the gear)

Upper hard limit 10.5 feet (adjusted in the limit switches)

Lower software Limit 0 feet (from the count of the gear)

Lower Hard limit -0.5 feet (adjusted in the limit switches)

The HMI will display the water level and the height of each gate and controls to switch from auto to semi-auto. This display will be in the form of a graphical representation of the gated structure with controls that can be clicked on for each gate. When the operator selects the gate, the HMI will display a gate control page that s hows the position, water level, auto manual controls, gate status, motor status, and hard limits.

C-2.1.2 RE-PROGRAMMING

The PLC System Integrator shall perform all configuration and re-programming of the PLC system, including any programming necessary to test the PLC system.

PLC shall be programmed with a software feature (e.g. software selector switch) that will allow the operator to select either "Fully-Automatic" mode, "Semi-Automatic" mode or “Manual” mode of operation. In "Fully-Automatic" mode, the PLC will control the gates in response to the 4-20 mA signal supplied from the submersible pressure transducer water level system. In "Semi- Automatic" mode, the PLC will control the gates in response to a command(s) by the operator using the operator interface, Human Machine Interface (HMI) Display. Each "Raise" or "Lower" command will initiate one raise or lower gate movement sequence. In the “Manual” mode of operation, the operator can raise or lower one gate at a time and must be performed at the gate structure only.

C-2.2 STANDARD PRODUCTS

Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening.

The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.

C-2.2.1 ALTERNATIVE QUALIFICATIONS

Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished to the Contracting Officer 30 days prior to installation.

Products manufactured more than 3 years prior to date of delivery to site shall not be used, unless specified otherwise.

C-2.2.2 SUBMERSIBLE PRESSURE TRANSDUCER WATER LEVEL SENSOR

The Contractor shall install three (3) Submersible Pressure Transducer Water Level Sensors.

Water Level Sensor 1 will be mounted on the diversion channel upstream as shown on the drawings. Water Level Sensor 2 will be mounted next to the existing stilling tube as shown on drawing E-112 and measure the water level downstream of the Diversion Channel. Water Level Sensor 3 will be mounted next to the existing stilling tube as shown on the drawing E-111 and measure the downstream of the North End. The bottom of stilling well will shall be placed at EL. 230.5 and the zero reading on pressure transducer shall be placed at EL. 231.0. All control instrumentation must be installed at or above elevation 245.0. The PLC will be programmed to convert the output of transducer to the actual elevation of water by adding reading in feet to

231.0 and then displaying the elevation on HMI. The cable for water level sensor shall include a vent tube which will terminate in the electrical enclosure box and be connected to a dehumidifier module. The electrical enclosure shall be weather tight but shall have a vent on the bottom. A terminal strip shall be included in box for splicing instrument cable to control cable from house.

Grounding will be as recommended by the manufacture of equipment.

(1) Pressure Range: 0-10 feet

(2) Output Signal: 4-20 mA

C-2.2.2.1 WIRING FOR WATER LEVEL SENSOR

Cables for water level sensors, including field cable, shall be of the shielded, twisted-pair type.

Conductors shall be tinned, stranded copper and shall not be smaller than 24 AWG.

All cables shall have a minimum rating for use at 300V.

Insulation shall be polypropylene not less than 2.5mm thick. Individual conductors in cable shall have colored insulation (ICEA Method 1). Other color coding methods will not be accepted.

Shielding shall consist of copper drain wire and an aluminum-mylar foil type having a coverage of not less than 100 percent.

Jackets on cables shall be of flame-retardant polyvinyl chloride (PVC).

All cables shall be tested in accordance with the manufacturer's recommendations.

C-2.2.3 PLC PROGRAMMING SOFTWARE

The Contractor shall reprogram the PLC using the current PLC software. Reprogram the required routines/sub routines within the PLC for each structure/gates to operate as intended for each Operational Mode.

C-2.3 MAINTENANCE

C-2.3.1 ELECTRICAL SYSTEMS

Submit operation and maintenance manuals for the transducers and associated equipment that provide basic data relating to the design, operations, and maintenance. This shall include the manufacturer’s operating and maintenance manuals on all components/equipment.

C-2.3.2 WARRANTY

The equipment items shall be supported by service organizations which are reasonably convenient to the equipment installation in order to rend satisfactory service to the equipment on a regular and emergency basis during the period of the contract. All equipment shall have the manufacturer’s standard warranty.

C-2.4 CONDUITS, FITTINGS, WIRES AND CABLES

C-2.4.1 RIGID STEEL CONDUIT

Rigid steel conduit shall comply with UL 6 and be galvanized by the hot-dip process. Rigid steel conduit and fittings shall be polyvinylchloride (PVC) coated in accordance with NEMA RN 1.

Fittings for rigid steel conduit shall be threaded.

Gaskets shall be solid. Conduit fittings with blank covers shall have gaskets, except in clean, dry areas or at the lowest point of a conduit run where drainage is required.

Covers shall have captive screws and be accessible after the work has been completed.

C-2.4.2 LIQUID TIGHT FLEXIBLE METALLIC CONDUIT

Liquid-Tight flexible metal conduit, steel shall conform to UL 360. Liquid-tight flexible metallic conduit shall be used in wet and oily locations and to complete connection to water level sensors.

Flexible cable shall be Type SO and contain a grounding conductor with green insulation.

C-2.4.3 WIRES AND CABLES

Wires and cables shall meet applicable requirements of NFPA 70 and UL for type of insulation, jacket, and conductor specified or indicated. Wires and cables manufactured more than 12 months prior to date of delivery to site shall not be used.

C-2.4.4 INSULATION

Unless specified or indicated otherwise or required by NFPA 70, signal circuits shall be Type TW or TF, conforming to UL 83.

C-2.5 SUBMITALS

Submit manufacturer's specification sheets for each type of equipment to show compliance with the project specification. Highlight each compliance item and reference each item to the relevant specification paragraph number. Submit sufficient manufacturer's information to allow verification of compliance by the reviewing authority. G means Government Approval and FIO means For Information Only. Equipment and instruments specification compliance data to be submitted includes, but is not limited to, the following:

SD-02 Shop Drawings Control System Schematics; G Component Wiring Diagrams; G Connection Drawings; G

Installation drawings; G

Include wiring diagrams and installation details of equipment indicating proposed location, layout and arrangement, control panels, accessories, piping, ductwork, and other items that must be shown to ensure a coordinated installation. Wiring diagrams shall identify circuit terminals and indicate the internal wiring for each item of equipment and the interconnection between each item of equipment. Drawings shall indicate adequate clearance for operation, maintenance, and replacement of operating equipment devices.

SD-03 Product Data

Pressure Transducer Water Level Transmitter; G Conduits and Fittings; G Wire and Cable; G

SD-07 Certificates

PLC Systems Integrator Qualifications; G Electrical Contractor's Qualifications; G Training; FIO

SD-08 Manufacturer's Instructions

Manufacturer's instructions shall be submitted for the following including special provisions required to install equipment components and system packages.

Submersible Pressure Transducer Water Level Transmitter; FIO

SD-10 Operation and Maintenance Data

Pressure Transducer Water Level Transmitter; FIO

SD-11 Closeout Submittals

Operation and Maintenance Manual; G

The O&M manual shall include wiring and control diagrams either under glass or in laminated plastic shall be posted where directed by the Contracting Officer. The instructions shall show wiring and control diagrams and complete layout of the entire system. The instructions shall include, in typed form, condensed operating instructions explaining preventive maintenance procedures, methods of checking the system for normal safe operation and procedures for safely starting and stopping the system. Include catalogs on all equipment provided by the contractor and include servicing organization for warranty issues.

C-3 EXECUTION

C-3.1 EXAMINATION

After becoming familiar with all details of the work, the Contractor shall verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.

C-3.2 INSTALLATION

Work shall be installed as indicated and in accordance with manufacturer's diagrams and written instructions.

C-3.2.1 GENERAL

Each pressure transducers, as specified herein, shall be installed in a 2” PVC stilling tube located as shown on Plate 1 and Plate 2. Output from each of the three (3) transducers shall be input into the existing PLC analog cards located in the Gate Control House. All work shall conform to the applicable portions of Section C.

C-3.2.1.1 WIRING

All wiring used within the PLC system shall conform to the requirements of all portions of Section C. Splices shall not be accepted in internal enclosure wiring.

C-3.2.1.2 INSTALLATION

All internal wiring shall be neatly and carefully installed in bundles and routed in wire ducts mounted on back plate in the Gate Control Enclosure. Each wire shall be plainly marked to facilitate future maintenance. Marking of wires internal to the PLC system shall include the terminal block (TB#-) and terminal numbers. External wire markers shall contain designations and shall be plainly marked to facilitate future maintenance.

C-3.2.1.3 CONTROL WIRING

Control wiring between the pressure transponders and Gate control cabinet and any other equipment, shall be routed neatly and through existing conduits where possible.

C-3.2.1.4 TERMINATIONS

Where suitable, all internal wiring shall be terminated by means of approved pressure grip (solderless) lugs of the indented barrel type. The barrel of the lugs shall be indented into the conductor using a tool especially designed for that purpose. Ring Tongue indented terminals shall be used where applicable on internal and external wiring.

C-3.2.2 SUBMERSIBLE PRESSURE TRANSDUCER WATER LEVEL SENSORS

The Contractor shall mount the three (3) Submersible pressure transducer water level sensors.

Water level sensor 1 will be upstream of the Diversion Channel. Water Level Sensor 2 will be mounted on the southern downstream wing wall of the Diversion Channel. Water Level Sensor 3 will be mounted on the wing wall on the downstream side of the North End Structure. All wiring between the device and the PLC shall be continuous without splices. The pressure probes shall be OTT Type PLS or approved equal. Probes shall have 4 to 20 mA output and be pre-calibrated for the head range specified. They shall be furnished with a humidity absorbing system with a dessicant cartridge. The cable from probe shall be terminated in a metal enclosure at the top of the vertical stilling well. The metal enclosure shall accommodate the entrance of signal cable from the control house and contain the humidity absorbing system and any required terminal blocks. The probe cable shall be secured at the top of the stilling well and shall have means to raise and lower cable, such that the probe can be positioned accurately and precisely. The metal enclosure shall be vented on the bottom to allow for the vent tube from probe to sense atmospheric pressure.

C-3.2.3 I/O ADDRESSING AND PROGRAMMING

The Contractor shall be responsible for all addressing and programming of the PLC systems to provide a properly operating system with the automated gates, alarms, and controls. All final software programming shall be performed at the installation site prior to the final adjustments and acceptance test.

C-3.2.4 FIELD TESTING

Contractor shall provide test equipment, labor, and personnel to perform the tests required.

Continuity tests shall be conducted using a dc device with bell or buzzer.

Final acceptance shall depend upon the satisfactory performance of the gate under test. No motor-starter assembly shall be energized until recorded test data has been approved by the Contracting Officer. Final test reports shall be provided to the Contracting Officer.

C-3.2.5 CONDUIT INSTALLATION

Unless indicated otherwise, conduit shall be run in a manner which does not interfere with the functionality of the structure.

C-3.2.5.1 CONDUIT SUPPORT

Support conduit by pipe straps. Fasten by concrete inserts or expansion bolts on concrete and by machine screws on steel work. Threaded C-clamps may be used on rigid steel conduit only. Do not weld conduits or pipe straps to steel structures. Load applied to fasteners shall not exceed one-fourth proof test load. Holes cut to depth of more than 1 1/2 inches in reinforced concrete beams or to depth of more than 3/4 inch in concrete joints shall not cut main reinforcing bars.

Fill unused holes. In partitions of light steel fabrication, use sheet metal screws. Conduit and box systems shall be supported independently of both where conduit crosses structures expansion joints, provide suitable watertight expansion fitting that maintains conduit electrical continuity by bonding jumpers or other means.

C-3.2.5.2 DIRECTIONAL CHANGES IN CONDUIT RUNS

Make changes in direction of runs with symmetrical bends or cast-metal fittings. Make field-made bends and offsets with hickey or conduit-bending machine. Do not install crushed or deformed conduits. Avoid trapped conduits. Prevent water from entering and dirt, or trash from lodging in conduits, boxes, fittings, and equipment during installation. Free clogged conduits of obstructions.

C-3.2.5.3 FLEXIBLE CONNECTIONS

Provide liquid tight flexible steel conduit for equipment subject to vibration, noise transmission, or movement; and for motors. Install flexible conduit to allow 20 percent slack. Minimum flexible steel conduit size shall be 1/2 inch diameter. Provide liquid tight flexible conduit in wet and damp locations for equipment subject to vibration, noise transmission, movement or motors.

Provide separate ground conductor across flexible connections.

C-3.2.5.4 BOXES, OUTLETS AND SUPPORTS

Provide boxes in wiring and raceway systems wherever required for pulling of wires, making connections, and mounting of devices or fixtures. Boxes for metallic raceways shall be cast-metal, hub-type when located in wet locations, when surface mounted on outside of exterior surfaces and when specifically indicated. Boxes in other locations shall be sheet steel, except that aluminum boxes may be used with aluminum conduit, and nonmetallic boxes may be used with non-metallic conduit system. Each box shall have volume required by NFPA 70 for number of conductors enclosed in box. Provide gaskets for cast-metal boxes installed in wet locations and boxes installed flush with outside of exterior surfaces. Fasten boxes and supports with bolts and expansion shields on concrete and with machine screws on steel.

C-3.2.6 GROUNDING

Provide In accordance with NFPA 70 and NFPA 780. Ground exposed, non-current-carrying metallic parts of electrical equipment metallic raceway systems, grounding conductor in metallic and nonmetallic raceways, telecommunications system grounds, and neutral conductor of wiring systems. In addition to the requirements specified herein, provide telecommunications grounding in accordance with TIA J-STD-607. Where ground fault protection is employed, ensure that connection of ground and neutral does not interfere with correct operation of fault protection.

C-3.3 OPERATING AND PERFORMANCE REQUIREMENTS

In the event of a high water event, the contractor shall provide a means by which the gates can be raised or lowered to satisfy water level requirements.

C-3.4 INSPECTIONS AND TESTING

C-3.4.1 GENERAL

All work shall be subject to inspection by the Contracting Officer or his duly authorized representative as set forth in the Contract Clauses. The Contractor shall notify the Contracting Officer, in writing, at least five calendar days in advance of the date that any tests or inspections are to be conducted. Except as provided elsewhere in the specifications costs of all inspections and/or tests, exclusive of the expense of the Government representative, shall be borne by the Contractor and no separate payment will be made therefore. Final inspection and acceptance of the work performed will be at destination.

C-3.4.2 INSPECTION REQUIREMENTS

C-3.4.2.1 QUALITY CONTROL SYSTEM

The Contractor shall submit to the Contracting Officer, for approval, the quality control system he proposes to use, before commencement of work under this contract. Complete facilities for checking the dimensional accuracy of the parts and for assurance of conformity of material requirements shall be furnished, maintained, and operated by the Contractor and/or his subcontractors. These facilities shall be separate from the production facilities to the extent that the parts are checked for compliance with the plans and specifications rather than tooling or production procedures. Certification by ISO 9000 will be taken as evidence the inspection organization and program to be applied during the course of this contract is satisfactory.

C-3.4.3 ACCEPTANCE TESTING

Upon completion, and prior to acceptance of the project, the entire control equipment and monitoring system shall be tested in accordance with manufacturer codes and standards by the Contractor to demonstrate indicated performance. The PLC systems Integrator representative shall be at the site to direct and monitor startup for testing of the control system. The Contracting Officer shall be notified 30 days in advance of the test date.

C-3.4.4 RETESTING

If any deficiencies are revealed during test, such deficiencies shall be corrected and the tests re-conducted at no additional cost to the Government.

C-3.5 MANUFACTURER'S FIELD SERVICE

C-3.5.1 INSTALLATION

Services of Systems integrators representative who is experienced in the installation, adjustment, and operation of the specified equipment shall be provided. The representative shall supervise the installing, adjusting, and testing start-up of the equipment. The cost for the Systems Integrators representative shall be borne by the Contractor and included in the bid price.

C-3.5.2 TRAINING

The Contractor must conduct a formal training course for operating staff, as designated by the Contracting Officer. The training period, of at least 40 hours of normal working time, shall start after the system is functionally completed, but prior to final acceptance tests. The field instructions shall cover all of the items contained in the operating and maintenance instructions, as well as demonstrations of routine maintenance operations. The Contracting Officer shall be notified at least 14 days prior to date of proposed conduction of training course.

SECTION D – CONTRACT ADMINISTRATION DATA

D-1 PAYMENT

Payment will be made in accordance with FAR 52.232-1 Payments.

D-2 RENDITION OF INVOICES OR VOUCHERS

Invoices shall be submitted in triplicate, typewritten or with pen and ink. Terms of payment must be stated, including cash discount, if any. When invoices are sent to the Finance Center, a duplicate copy shall be sent to the Caruthersville Area Office so they can prepare documentation of receipt.

D-3 DESIGNATED BILLING OFFICE

Invoices or vouchers for payment shall be sent to the Caruthersville Area Office at the following address:

U.S. Army Engineer District, Memphis Caruthersville Area Office 706 Harry S. Truman Blvd.

Caruthersville, MO 63830-1268

SECTION E – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

E-1 GENERAL

All work shall be subject to inspection by the Contracting Officer or his duly authorized representative as set forth in the Contract Clauses. The Contractor shall notify the Contracting Officer, in writing, at least five calendar days in advance of the date that any tests or inspections are to be conducted.

E-1.1 SITE VISIT

A site visit will be scheduled with the Caruthersville Area Office. For access and site visit, contact Contract Specialist Kirk Middleton at kirk.a.middleton@usace.army.mil by 17 August 2020 at 3:00pm CST. The Area Engineer Mr. Daimon McNew, U.S. Army Engineer District, Memphis Caruthersville Area Office will be available for the site visit.

E-2 DOCUMENTS

On the date of shipment, a copy of the Contractor’s bill of lading, shipping notices and inspection reports will be mailed to the designated billing office as follows:

U.S. Army Engineer District, Memphis Caruthersville Area Office 706 Harry S. Truman Blvd.

Caruthersville, MO 63830-1268

SECTION F – SPECIAL CONTRACT REQUIREMENTS

F-1 REFERENCES

The publications listed below form a part of this section to the extent referenced:

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2003) Safety -- Safety and Health Requirements

F-2 EXCLUSION PERIODS IN COMPUTING COMPLETION SCHEDULES

No work will be required during the period between 1 November and 31 May, inclusive. The Contractor may, however, perform work during all or any part of the non-work period provided that he has received prior approval therefore, in writing, from the Contracting Officer.

F-3 SAFETY RELATED SPECIAL REQUIREMENTS

ALL WORK UNDER THIS CONTRACT SHALL COMPLY WITH THE LATEST VERSION

OF U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS

MANUAL, EM 385-1-1, AND OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)

STANDARDS IN EFFECT ON THE DATE OF THE SOLICITATION. THE MANUAL CAN

BE ACCESSED AT THE FOLLOWING

LINK, HTTP://WWW.USACE.ARMY.MIL/CESO/PAGES/EM385-1-1.ASPX. NO

SEPARATE PAYMENT WILL BE MADE FOR COMPLIANCE WITH EM 385-1-1, NOR

FOR COMPLIANCE WITH ANY OF THE OTHER SAFETY-RELATED SPECIAL

REQUIRE-MENTS.

a. Accident Investigations and Reporting. Refer to EM 385-1-1, Section 1. Accidents shall be investigated and reports completed by the immediate supervisor of the employee(s) involved and reported to the Contracting Officer or his representative within one working day after the accident occurs. Copies of ENG FORM 3394 will be furnished the Contractor upon request by the Area Office.

b. Accident Prevention Program. Refer to the CONTRACT CLAUSE entitled, "Accident Prevention (Alternate I)". Within 21 calendar days after receipt of Notice of Award of the contract and at least seven (7) days prior to the pre-work conference, four copies of the Accident Prevention Program shall be submitted to the Contracting Officer for review and approval. The program shall be prepared in the format available at the following website, http://www.mvm.usace.army.mil/contracting/forms/forms.htm.

The Contractor shall not commence physical work at the site until the program has been approved by the Contracting Officer, or his authorized representative. At the Contracting Officer's discretion, the Contractor may submit his Activity Hazard Analysis for only the first phase of fabrication provided that it is accompanied by an outline of the remaining phases of fabrication. All remaining phases shall be submitted and accepted prior to the beginning of work in each phase. Also refer to Section 1 of EM 385-1-1.

c. Daily Inspections. The Contractor shall perform daily safety inspections and record them on the forms approved by the Contracting Officer. Reports of daily inspections shall be maintained at the jobsite. The reports shall be records of the daily inspections and resulting actions. Each report will include, as a minimum, the following:

(1) Phase(s) of fabrication underway during the inspection.

(2) Locations or areas inspections were made.

(3) Results of inspection, including nature of deficiencies observed and corrective actions taken, or to be taken, date, and signature of the person responsible for its contents.

d. . Safety Sign. The Contractor shall furnish, erect, and maintain a safety sign at the site, as located by the Contracting Officer. The sign shall conform to the requirements of this paragraph and the drawing entitled "SAFETY SIGN", found at the following website:

http://www.mvm.usace.army.mil/contracting/forms/forms.htm. The lettering shall be black and the background white. When placed on floating plant, the sign may be half size. Upon request, the Government will furnish a decal of the Engineer Castle. The sign shall be erected as soon as practicable, but not later than 15 calendar days after the date established for commencement of work. The data required shall be current.

F-4 CERTIFICATES OF COMPLIANCE

Any certificates required for demonstrating proof of compliance of material with specification requirements shall be executed in four (4) copies. Each certificate shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the test to which the report applies. Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.

F-5 SHOP DRAWINGS

The Contractor shall submit to the Contracting Officer for approval 6 copies of all shop drawings as called for under the various headings of these specifications. These drawings shall be complete and detailed. If approved by the Contracting Officer, each copy of the drawings will be identified as having received such approval by being so stamped and dated. The Contractor shall make any correction required by the Contracting Officer. If the Contractor considers any correction indicated on the drawings to constitute a change to the contract drawings or specifications, notice as required under the CONTRACT CLAUSE entitled "Changes", will be given to the Contracting Officer. Five sets of all shop drawings will be retained by the Contracting Officer and one set will be returned to the Contractor. The approval of the drawings by the Contracting Officer shall not be construed as a complete check, but will indicate only that the general method of fabrication and detailing is satisfactory. Approval of such drawings will not relieve the Contractor of the responsibility for any errors which may exist as the Contractor shall be responsible for the dimensions and design of adequate connections, details, and satisfactory fabrication of all work.

F-6 DAMAGE TO WORK

The responsibility for damage to any part of the permanent work shall be as set forth in the CONTRACT CLAUSE entitled "Permits and Responsibilities". However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, tornado, or earthquake, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor shall make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or lump sum prices applicable to any part of such work, an equitable adjustment pursuant to the CONTRACT CLAUSE entitled "Changes" will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or lump sum prices. Except as herein provided, damage to all work (including temporary fabrication), utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense regardless of the cause of such damage.

F-7 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK

At least 7 calendar days before beginning work, the Contractor shall notify Area Engineer Mr.

Christopher Burroughs, U.S. Army Engineer District, Memphis Caruthersville Area Office 706 Harry S. Truman Blvd. Caruthersville, MO 63830-1268 Phone: (573-333-1043) COLLECT

CALLS WILL NOT BE ACCEPTED.

F-8 HOURS OF WORK

Work will be confined to working 5 days per week (Monday through Friday) between the hours of 6:00 am. and 6:00 pm., except for National holidays. Additional work days and/or hours shall be subject to prior approval by the Contracting Officer.

F-9 COMMERCIAL WARRANTY

The Contractor agrees that the building and materials and building hardware fur-nished under this contract shall be covered by the most favorable commercial warranty the Contractor gives to any customer for such products and that the rights and remedies provided herein are in addition to and do not limit any rights afforded to the Government by any other clause of this contract.

The warranty will take effect immediately upon the day of acceptance, by the Government, of the completed work.

F-10 FLOOD EMERGENCY

a. In the event that a threat of flood is considered to exist or to be impending during work under this contract, the Contractor, if ordered, shall perform emergency operations as directed in order to place the pumping plant into operation, and an equitable adjustment in the contract price will be made in accordance with the CONTRACT CLAUSE entitled "Changes" on account of the additional work required.

b. Should the Contractor, after specific notification by the Contracting Officer that a flood emergency is considered to exist, or to be impending, fail to complete, without delay, the emergency operations as specified in paragraph a above, or should the flood emergency be of such nature that, in the opinion of the Contracting Officer, the Contractor is unable to complete the required emergency operations in time to place the pumping plant into operation by the time it is needed, the Contracting Officer shall have the right to prescribe the location and the order of work by the Contractor for the duration of the flood emergency and to employ the necessary equipment and perform all or any part of such work or to cause all or any part of such work to be performed by others. No payment will be made to the Contractor for any work by the Contracting Officer or by others under the terms of this subparagraph or for added expense to the Contractor occasioned by work difficulties arising from operations of the Contracting Officer or others under the terms of this subparagraph

c. Operations for such period or periods of time during threat of impending flood or flood emergency as may be necessary. Intervals during which work is suspended by order of the Contracting Officer under the provisions of this paragraph will not be counted as part of the contract period.

F-11 PROTECTION OF MATERIALS AND WORK

The Contractor shall at all times protect and preserve all materials, supplies, and equipment of every description (including property which may be Government-furnished or owned) and all work performed. All reasonable requests of the Contracting Officer to enclose or specially protect such property shall be complied with. If, as determined by the Contracting Officer, material, equipment, supplies, and work performed are not adequately protected by the Contractor, such property may be protected by the Government and the cost thereof may be charged to the Contractor or deducted from any payments due to him.

F-12 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

All contractors and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility for background checks or background investigation and to meet installation/facility access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection

Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

F-13 PRE-SCREEN CANDIDATES USING E-VERIFY

The contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

F-14 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM

The Contractor Performance Assessment Reporting System (CPARS) is a web-based system used to input data on contractor performance. Once the data is input to the CPARS system, this data is then uploaded to the Past Performance Information Retrieval System (PPIRS) database and is made available for use in performance evaluations. These contractor performance assessment reports (CPARS) will be used as an aid in awarding contracts to contractors that consistently provide quality, on-time products and services that conform to contractual requirements. The CPARS system can be accessed via the Internet website https://www.cpars.gov <https://www.cpars.gov> . The Memphis District point of contact is Mr.

Del Warfield. Mr. Warfield can be contacted at Delwick.E.Warfield@usace.army.mil <mailto:Delwick.E.Warfield@usace.army.mil

APPENDIX A

LOCATION, CONDUIT RUNS, AND PLC INPUTS/OUTPUTS

UNDER PREVIOUS CONTRACT

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

OF ENGINEERS

US ARMY CORPS

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

IDENTIFICATION

SHEET

D A

T E

A P

P R a u t o d a t e t im e

W

N B

Y

M

T

C K

D B

Y

D S

O

R P

F

E

N G

IN

E E

R S

M E

M P

H

IS

T E

N N

E S S E E

U .S

A R

M Y

E

N G

IN

E

R

IS

T R

IC

T

A N

S I

D S

IZ

E

P R

C N

U M

B E

R

C O

N T

R A

C T N

MEMPHIS

A

T E

J A

G-003

IT

E M

A P

S T F

R A

N C

IS

B

A S

IN

P

R O J E

J U

N E

L E

C T

R

IC

A L U

P G

R A

N

T R

O L S

T R

U C

T U

IV

E R

S

IO

N C

H A

N N

N

R

T H E

N D a n d

J A

F W

Q

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

OF ENGINEERS

US ARMY CORPS

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

IDENTIFICATION

SHEET

D A

T E

A P

P R a u t o d a t e t im e

W

N B

Y

M

K

D B

Y

D

R P

E

N G

IN

E E

R S

M E

M P

H

IS

T E

N N

E S S E E

U .S

A R

M Y

E

N G

IN

E

IS

T R

IC

T

A N

S I

D S

IZ

E

P R

C N

U M

B E

R

C O

N T

R A

C T N

A

T E

J A

E-112

1 2

E

C P

O W

E R A

N D C

O N

T R

O L P

L A

N C

O N

T

S T F

R A

N C

IS

B

A S

IN

P

R O J E

J U

N E

NTS

Gate 3Gate2Gate 1 Gate 3 Limit Sw

Gate 2 Limit Sw

Gate 1 Limit Sw

For Water Level Sensor

CONDUIT LAYOUT DIVERSION CHANNEL

C200

C201

C202

C203

C204

C205

C206

C207

C208

C209

C210 C211 C212

C200A

C201A

C202AC203AC204A

C205A C206A

C207A C208A

C209A

C210A

C211A

C212A

C214

Ultrasonic Water Level Sensor (See Mounting Details)

C113A

(New Conduit)

For Water Level Sensor

C213

Water Level Sensor

Existing S 8 x 18.4 Monorail

New C 6 x 10.5

New C 6 x 10.5 x 12" Long

Water Level Sensor

Drill 3/4" hole for Sensor mounting

Existing monorail

NTS

ULTASONIC WATER LEVEL SENSOR 1 MOUNTING DETAIL MONORAIL

C200A Gate Height SensorC204A Gate Height Sensor C208A Gate Height Sensor

NTS

ULTASONIC WATER LEVEL SENSOR 3 MOUNTING DETAIL POLE MOUNT

Water Level Sensor

8 foot 6" square tubing 1/4" thick, 3 foot in ground.

New C 6 x 10.5 x 42

E

C T

R

IC

A L U

P G

R A

N

T R

O L S

T R

U C

T U

IV

E R

S

IO

N C

H A

N N

N

R

T H E

N D a n d

J A

F W

F Q

Install new pull box Nema 3R Stainless Steel

Install new Stainless steel Nema 3R pull box mounted to the side of gate 1 support structure as shown.

mounted next to the wing wall and will be new conduit.

Conduit C214 not shown on this drawing, conduit will go to Ultra Sonic Water Level Sensor 2, extended out 3’ from the pole.

Mount Ultrasonic Water Level Sensor 2 on the outlet side on the wingwall in the curve, Mount Ultrasonic Water Level Sensor 1 on the Monorail as shown

New Conduit added on to existing conduit

Contrator to determine and label conduit runs to each motor, drawing is shown for reference only

Unless noted all conduit shown is existing conduit on the structrure

NOTES

24 x 36 x 8

Section_C
Transponder Elevation
Transponder support frame
Site Plan
Section_D
Section_E
Section_F
Appendix_A
Appendix-A Drawings Big Lake North End Diversion Channel plans

File details come from the government source that posted it. Updated .