SCOPE OF WORK

October 13, 2020

1. GENERAL

Work shall consist of furnishing all necessary labor, equipment, materials, and supplies required to dismantle and haul off site all wood decks, pre-fabricated trailers and utility poles from the former US Army Corps of Engineers FUSRAP Latty compound located at 8945 Latty Ave Berkeley, MO 63134. The abandoned FUSRAP Latty Ave compound was a radiological cleanup site. All trailers, wood structures and equipment have been surveyed and cleared of any radiological hazards for removal offsite.

2. JOB DESCRIPTION

2.1. CLIN 0001 – WOOD DECKS REMOVAL - Work shall consist of furnishing all necessary labor, equipment, materials, and supplies required to satisfactorily perform dismantling, loading, and hauling of all wood frame decks, wood awnings (wood frame roofing system) and wood entrance steps that are connected to the pre-fabricated trailers from the abandoned FUSRAP Latty Ave compound. There are two decks and one shed constructed with oak and pine wood.

The general demolition services will include maintaining safety standards, maintaining tools and equipment, loading wood and hauling and disposing of materials offsite, operating equipment, assisting heavy equipment operators, clean up jobsite, removal of all debris from demolition operation, and perform demolition duties.

2.2. CLIN 0002 – TRAILERS REMOVAL - Work shall consist of furnishing all necessary labor, equipment, materials, and supplies required to satisfactorily perform demolition and disposal of all pre-fabricated trailers, concrete blocks underneath trailers, supporting HVAC units, and any potential environmental hazards in the abandoned FUSRAP Latty Ave compound. Potential environmental hazards include proper removal and disposal of spent Freon from all HVAC units, removal and recycle fluorescent light bulbs and fixtures, removal and recycle mercury from thermostat switches. There are 2 single wide trailers, 2 double wide trailer, 1 triple wide trailers and 1 former lab (composed of 4 trailers). The general demolition services will include maintaining safety standards, maintaining tools and equipment, demolishing the trailers, removing all metal scrap, and hauling and disposing of all demolition materials and debris from demolition operation offsite, operating equipment, assisting heavy equipment operators, clean up jobsite, and perform demolition duties. Contractor is to disconnect the water service (one small tap), coordinate disconnection of electric service from the property with Ameren, and cap one sanitary sewer.

2.3. CLIN 0003 – LIGHT POLES & FLAGPOLE REMOVAL - Work shall consist of furnishing all necessary labor, equipment, materials, and supplies required to satisfactorily perform dismantling, loading, and hauling of metal light poles and the metal flag pole ( inside the fenced area ) from the abandoned FUSRAP Latty Ave compound. There are ten (10) light poles that needs to be removed. There are sodium vapor light bulbs in the light poles and they should be properly disposed. The electrical concrete bollards need to remain in place disabled and capped.

There is one flag pole on site that needs to be removed, without disturbing the concrete base.

The general demolition services will include maintaining safety standards, maintaining tools and equipment, loading the light poles, flagpole and hauling and disposing of material offsite, operating equipment, assisting heavy equipment operators, clean up jobsite, and perform demolition duties.

3. PRE-DEMOLITION REQUIREMENTS :

3.1. The Demolition Contractor shall obtain all necessary demolition permits prior to commencing the demolition of any structure in the corporate limits of Berkeley and sign-off from St. Louis County Air Pollution Control Program.

3.2. Prior to issuance of the Order to Proceed with Demolition, Contractor shall ensure that all meters, service, loop, lines, cables and instruments shall be disconnected, abandoned and/or removed prior to commencement of any demolition and/or site clearance. If Contractor finds that any such items have not been disconnected, abandoned, and/or removed, Contractor shall not proceed with the demolition and/or site clearance until such items have been disconnected, abandoned, and/or removed. It is the responsibility of USACE to contact all utility companies to coordinate when utilities need to be disconnected.

4. DEMOLITION REGULATIONS:

4.1. All demolition work must be conducted in a safe and sanitary manner, in order to prevent injury to persons and damage to capital improvements, infrastructure, utilities, and street.

4.2. Maintain lot grade to a smooth uniform condition that will provide adequate surface drainage without ponding. All trash is to be removed and surface to be clean of demolition debris.

4.3. After the structures have been demolished, the sanitary sewer lines shall be permanently and securely sealed to prevent escaping sewer gases, influx of surface water, trash, debris, and rodents.

4.4. The demolition contractor must secure prior permission from the Berkeley before the closing of any street, alley, or fire lane.

5. PAYMENT:

5.1 Payment. Payment for all demolition work for the demolition of the wood decks, demolition of the trailers, removal of light poles and flag pole will be made as follow:

5.4.1 Payment – CLIN 0001 Wood Deck Removal - . Payment for all work associated with the deck work (demolition, loading and hauling) under this section 2.1 will be made as SUM JOB “WOOD DECKS REMOVAL”. This price and payment shall constitute full compensation for the cost of equipment, labor, and support equipment necessary to complete the work specified herein.

5.4.2 Payment – CLIN 0002 Trailer Removal - . Payment for all work associated with the trailers work (permits, demolition, loading and hauling) under this section 2.2 will be made as SUM JOB “TRAILERS REMOVAL”. This price and payment shall constitute full compensation for the cost of equipment, labor, and support equipment necessary to complete the work specified herein.

5.4.3 Payment – CLIN 0003 Light Poles and Flagpole Removal - . Payment for all work associated with the dismantling, removal and hauling of the light poles and flagpole under this section 2.3 will be made as SUM JOB “LIGHT POLES & FLAGPOLE REMOVAL”. This price and payment shall constitute full compensation for the cost of equipment, labor, and support equipment necessary to complete the work specified herein.