A02 Requirements document.pdf
PDF 144 KB Posted
- Attached to
- QuantStudio Federal contract opportunity
- Solicitation number
- W911QY-22-Q-0053
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A02 Limiting Competiton under SAT KO signed 032422 Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUIREMENTS
List of Salient Characteristics – Quantitative Molecular Diagnostics System for Detection of Pathogens in
Foods
The contractor shall provide:
1) A quantitative PCR Instrument that has the following minimum characteristics:
• 96 well formant to minimize user inputs and maximize sample throughput
• At least 6 independent, programmable temperature zones for sample analysis
• Calibrated for the molecular assays that use dyes FAMTM/SYBR® Green, VIC®/JOETM/HEX/TET, ABY/NEDTM/TAMRATM/Cy3®, JUN, ROXTM/Texas Red™, MUSTANG PURPLE, Cy®5/LIZ™
• Instrument provides 6 excitation filter wavelengths at 470, 520, 550, 580, 640, and 680 nm and 6 emission filter wavelengths at 520, 558, 587, 623, 682, and 711 nm.
• System has AOAC, USDA MLG, or NF Validated methods using commercially available test kits to detect Campylobacter jejuni, Campylobacter coli, Campylobacter lari, Cronobacter species, E. coli O157:H7, shiga toxin-producing E. coli, Listeria monocytogenes, Listeria species, Salmonella species, Staphylococcus aureus, Vibrio cholera, Vibrio parahaemolyticus, and Vibrio vulnificus in various food and water matrices.
• System comes with analysis software to run AOAC, USDA MLG, or NF validated test kits and outputs quantitative results
• System compatible with online primer design tool to develop novel molecular diagnostics assays in support of food and water safety research efforts
• Instrument factory-calibrated for optical and thermal accuracy
• Instrument excluding computers must have a footprint of less 45 cm x 55 cm x 30 cm
• Operate at relative humidity between 20-80% and temperatures from 15 to 30 Celsius.
2. Delivery Date: Contractor shall ship within 60 days of contract award
3. Invoicing: The Contractor shall bill after receipt of the deliverables.
File details come from the government source that posted it. Updated .