A02 PWS v4.docx

DOCX document 16 KB Posted

Attached to
Annual ISO 17025 Accreditation of EBML Laboratory
Solicitation number
W91ZLK-21-R-0029
Issued by

View the file

Other files

File Type Posted
Questions and Answers.pdf PDF
Combined SS 072021.docx DOCX document
A03 QASP v3.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

Annual ISO 17025 Accreditation of EBML Laboratory at Aberdeen Proving Ground

1.0 SCOPE. The contractor shall provide all personnel, support the Environmental BioMonitoring Laboratory (EBML) as defined in this Performance Work Statement (PWS). The services to be conducted by the contractor are to include on- and off-site assessments of the laboratory and management system located at CCDC-CBC Building E3401, Aberdeen Proving Ground – Edgewood Area.

1.1 Background. Laboratory accreditation uses criteria and procedures specifically developed to determine technical competence. The criteria are based on the internationally accepted standard (ISO/IEC 17025) requirements developed with regulators and specifiers. Laboratory accreditation bodies use the ISO/IEC 17025 standard specifically to assess factors relevant to a laboratory’s ability to produce precise, accurate test results. These factors include technical competence of staff, validity and appropriateness of test methods, calibration and maintenance of test equipment, and quality assurance of test data. Laboratory accreditation to ISO/IEC 17025 covers the same quality management system principles that are addressed in ISO 9001 registration. Successful accreditation inspires customer confidence and minimizes customer risk knowing the laboratory meets certain standards.

1.2 Objective. The objective of this contract is to provide a yearly assessment and audit of the laboratory and management system and accredit EBML to the ISO 17025 standard.

2.0 APPLICABLE DOCUMENTS.

2.1 ISO 17025:2017 standard found at www.iso.org.

3.0 REQUIREMENTS. The contractor, as an independent contractor and not as an agent of the Government, shall perform the following work:

3.1 Offsite assessment. The EBML management system oversees a 400ft2 BSL-2 screening laboratory. The laboratory performs 2 qualitative analyses (ECL and PCR) for the detection of biological agents. The contractor shall perform an off-site assessment of the EBML management system in accordance to the ISO 17025 standard every other year (years 1, 3, and 5). At the conclusion of the assessment, the contractor will deliver an assessment report detailing any deficiencies found during the assessment, along with the time frame required for correction. Upon successful completion of those deficiencies, the contractor shall deliver a Certificate of Accreditation and accompanying Scope of Accreditation certificate.

3.2 Onsite assessment. EBML consists of a 400ft2 BSL-2 screening laboratory. The laboratory performs 2 qualitative analyses (ECL and PCR) for the detection of biological agents. The contractor shall perform an on-site assessment of both the EBML laboratory and its management system in accordance to the ISO 17025 standard every other year (years 2 and 4). At the conclusion of the assessment, the contractor will deliver an assessment report detailing any deficiencies found during the assessment, along with the time frame required for correction. Upon successful completion of those deficiencies, the contractor shall deliver a Certificate of Accreditation and accompanying Scope of Accreditation certificate.

4.0 TECHNICAL REQUIREMENT.

4.1 The contractor, as an independent contractor and not as an agent of the government, shall provide sufficient personnel possessing the skills, knowledge, training, and experience to perform the required tasks. All training, education and certification will be accomplished outside of this contract.

4.2 All contractor personnel performing services under this contract must be contractor trained in accreditation/auditing before the effective date of this contract. Contractor shall provide proof of this training to the appropriate accreditation standard specified in the contract. Personnel must have a minimum of one (1) year experience performing accreditation/auditing to the appropriate accreditation standard covered in the contract in accordance with the PWS.

5.0 PERIOD OF PERFORMANCE. Base Year and Four (4) One (1) Year Options.

6.0 PLACE OF PERFORMANCE. Aberdeen Proving Ground, MD.

7.0 SAFETY CONSIDERATIONS. While on–site the contractor will follow all applicable Federal and Local regulations. Specifically the contractor will abide by all EBML specific safety and health requirements for entry into and assessment of EBML facilities/laboratories.

8.0 SECURITY CONSIDERATIONS. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility, or area. Contractor and all associated subcontractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. For contractors that do not require a CAC, but require access to a DoD facility or installation. Contractor and all associated subcontractor employees shall comply with adjudication standards and processes using the National Crime Information Center Interstate Identification Index (NCIC- Ill) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/ facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

9.0 Quality Assurance Surveillance Plan (QASP): SEE ATTACHED

File details come from the government source that posted it. Updated .