This is a Performance Work Statement (PWS) for Explosive Safety and Risk Management Assessment Support Services at Tooele Army Depot (TEAD) in Tooele, Utah. The contract is a non-personal services, requirements-type contract with a five-year period of performance consisting of one 12-month base year followed by four 12-month option years. Work shall be performed at the Government facility, specifically at the Ammunition Equipment and Manufacturing (AEMD) test site, with contractor support hours between 0630 to 1700, Monday through Thursday, excluding U.S. federally recognized holidays.

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and services necessary to perform explosive safety and risk management assessment services of energetic and hazardous material processes. Key required services include regulatory compliance, hazard analysis, material characterization testing, facility siting and design for explosive operations, mechanical integrity programs development and assessment, accident investigation, ergonomic analysis, and other risk management services. The contractor must employ explosive test personnel with a minimum of ten years' experience and DOT PHMSA certification per 49 CFR 173.56(b)(1), and must maintain specialized equipment including ESD and friction test machines, a 40-foot drop tower with 800-pound lift capacity, data acquisition systems with minimum 50 channels, high-speed video systems, certified explosive magazines, and standard video recording capability. The contractor shall develop and submit task order proposals within five business days of receipt of Government-provided task orders, test plans within seven days of price agreement, and test reports within ten days of testing completion. The contract requires compliance with all applicable federal, state, and Army safety regulations, environmental regulations, security clearance requirements, background checks, anti-terrorism training, OPSEC training, and iWATCH program training. All deliverables, documents, and materials produced are Government-owned with unlimited rights to the Government.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Safety and Risk Management Support (Explosive Safety and Risk Management Assessment Support Services of Energetic and Hazardous Material Processes)

30 June 2026

TABLE OF CONTENTS

PART 1 - General Information ………………………………………………3
PART 2 - Specific Tasks …………………………………………..…..........17
PART 3 - Government-Furnished Property and Services .………..........23
PART 4 - Contractor Furnished Items and Services ………………..…...24
PART 5 - Definitions & Acronyms ……………………………………........26
PART 6 - Applicable Publications ……..………………………….…….….31
PART 7 - Attachment Listing ………………………………………...…...….33

Attachment 1 – Performance Requirements Summary (PRS) Attachment 2 – Deliverables Schedule and Checklist Attachment 3 – Surveillance Schedule and Inspection Checklist

PART 1

GENERAL INFORMATION

1. General Information: This is a non-personal services contract to provide the Government, Tooele Army Depot (TEAD), with Explosive Safety and Risk Management Assessment Support Services of Energetic and Hazardous Material Processes. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service provides shall be accountable solely to the Contractor who, in turn is responsible to the Government for performance under this Performance Work Statement (PWS).

1.1 Introduction of Services: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other non-personal services necessary to perform Explosive Safety and Risk Management Assessment Support Services of Energetic and Hazardous Material Processes as defined in this Performance Work Statement (PWS). The Contractor shall perform the requirements and standards specified in Part 2, Specific Tasks, except for those items specified in Part 3, Government Furnished Property and Services.

1.2 Background: Tooele Army Depot (TEAD) has a requirement for explosive safety and risk management assessment services of energetic sensitivity and hazardous material processes.

1.3 Objectives: The objective of this contract is to fulfill TEAD's requirement for explosive safety and risk management assessment services for energetic and hazardous material processes through the award of task orders issued against a requirements-type contract.

1.4 Scope: The Contractor shall perform Explosive Safety and Risk Management Assessment Support Services. Services include regulatory compliance, hazard analysis, material characterization testing, facility "siting" and design for explosive operations, mechanical integrity programs development and assessment, accident investigation, ergonomic analysis, and other risk management services. The Contractor shall accomplish all tasks specified in Part 2, Specific Tasks. The Contractor shall complete all tasks at the acceptable quality levels (AQL) specified in Attachment 1, Performance Requirements Summary (PRS) and the Contractor shall provide all applicable items identified in Attachment 2, Deliverables Schedule and Checklist.

1.5 Period of Performance: The period of performance (POP) shall be for one (1) 12-month (365 day) Base Year followed by four (4) 12-month (365 day) Option Years, for a total of a 5-year period.

· Base Year: Start date to be determined (TBD) at award.

· Option Year 1-4: The option years will follow consecutively after the base year.

1.6 Place of Performance: The work to be performed under this contract will be performed at Government facility, Tooele Army Depot at the Ammunition Equipment and Manufacturing (AEMD) test site location in Tooele, UT.

1.6.1 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If the submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.

1.6.1.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Friday, Saturday or Sunday, the holiday is observed on the preceding Thursday or following Monday, respectively.

New Years Day1st day of January
Martin Luther King Jr. Day3rd Monday of January
Presidents Day3rd Monday of February
Memorial DayLast Monday of May
Juneteenth National Independence Day19th day of June
Independence Day4th day of July
Labor Day1st Monday of September
Columbus Day2nd Monday of October
Veterans Day11th day of November
Thanksgiving Day4th Thursday of November
Christmas Day25th day of December

1.6.2 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

1.6.2.1 Government Facility Office and Operating Hours: The Government facility office and operating hours occur between the hours of 0630 to 1700, Monday through Thursday. The Government facility is closed for operations during the recognized U.S. Holidays identified in paragraph 1.6.1.1 above. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated to the Contractor.

1.7 Contractor Performance

1.7.1 Contractor Support Hours: The Contractor shall provide support between the hours of 0630 to 1700, Monday through Thursday. The Contractor may submit a request to work hours beyond the Government Facility Operating hours identified in paragraph 1.6.2.1; U.S. Holidays identified in paragraph 1.6.1.1; or when the Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential. For other than firm fixed price contracts, the Contractor will not be reimbursed when the Government facility is closed for the above reasons.

1.7.2 Contractor Work Plan: The Contractor shall develop and submit a task order Work Plan/Test Plan as specified in Part 2, paragraph 2.2.1.2(a). The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.) and, if applicable, how the Contractor intends to address and meet increased operations tempo (e.g. Contractor’s need for overtime or extended work hours). If the need for overtime is anticipated, the Contractor must receive approval from the Contracting Officer prior to execution in accordance with (IAW) FAR 11.4, Delivery or Performance Schedule. Any proposed change to the accepted Work Plan/Test Plan is required to be resubmitted via the COR for review and acceptance by the Contracting Officer at a minimum thirty (30) days prior to the anticipated change and before implementation by the Contractor. The timeline noted above shall apply for review and acceptance of proposed changes.

1.7.3 Quality Control: Quality Control is the responsibility of the Contractor. The Contractor is responsible for the delivery of a quality service/supplies to the Government in accordance with (IAW) FAR 52.246-1, Contractor Inspection Requirements.

1.7.3.1 Quality Assurance System: The Contractor shall develop, implement and maintain an effective Quality Assurance System which includes a written Quality Control Plan (QCP) to ensure services are performed as specified in Part 2. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract. The Contractor’s existing Quality Assurance System and Quality Control Plan shall be utilized IAW FAR 12.208, Contract Quality Assurance.

At a minimum, the QCP must include and answer the following to be acceptable:

(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.

(b) How the Contractor shall monitor work to ensure performance complies with all deliverables (i.e., timelines, deadlines, and goals).

(c) How the Contractor shall monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses.

(d) How the Contractor shall monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance.

(e) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future.

(f) How the Contractor shall file and save all Quality Control related documents for the life of the contract plus 5 years.

(g) How the Contractor shall log and track all Government-Furnished Equipment and Government-Furnished Materials.

1.7.4 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). The purpose of this Quality Assurance Surveillance Plan (QASP) is to identify the methods and procedures the Government will use to ensure it receives the services under this contract as identified in the Performance Work Statement (PWS). The QASP provides the structure for the Government’s surveillance of the Contractor’s performance to ensure that it meets contract standards. The QASP is not part of the contract, nor is it intended to duplicate the Contractor's quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on Contractor performance. Attachment 1, Performance Requirements Summary (PRS) is the list of key performance objectives and standards that must be performed by the Contractor. The PRS details the method of surveillance the COR will use to validate and inspect these key performance elements. Inspection of each element and performance objective will be documented on Attachment 2, Deliverables Schedule and Checklist and Attachment 3, Surveillance Schedule and Inspection Checklist.

1.8 Security Requirements: The following security-related information and requirements provided covers the full spectrum of potential contractors and services and may not fully apply. The Security Office applicable to the installation associated with this PWS will identify the level of secret requirements, supported by the applicable regulations.

1.8.1 Security Program: Contractor personnel performing work under this contract may require active personnel security clearance at a level in the Defense Information System for Security (DISS) and National Background Investigation Services (NBIS). IAW DISS/NBIS and Trusted Workforce guidance, the Personnel Security Manager will require position information and a copy of the PWS to complete adjudications for uncleared contractors to determine the individuals’ fitness to work in a contract position on behalf of the Department of the Army. The security requirements are IAW with the DD Form 254, DoD Contract Security Classification Specification. Active personnel security clearance level must be completed prior to contract award and the level of security required must be maintained for the life of the contract.

1.8.2 Personnel Security Clearance Requirements: The Contractor shall ensure that Contractor employees and subcontractor employees performing services under this contract comply with Federal Acquisition Regulations (FAR) 52.204-2, Security Requirements when the employee has access to information classified “Confidential,” “Secret,” or “Top Secret.” The Contractor shall ensure the employee complies with DD Form 411, DoD Security Agreement, and the NISPOM, National Industrial Security Program Operating Manual rule at 32 Code of Federal Regulation (CFR) Part 117, effective 24 Feb 2021 to which contractors must implement and comply.

1.8.3 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.

The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.

The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.

1.8.3.1 Installation Pass Log: The Contractor shall provide the COR, an Initial Installation Pass Log within three (3) calendar days after contract award. The log must at a minimum contain the following information: Company Name, Last, First and Middle Names, government issued personal identifier (e.g. Driver’s License, Social Security Number, Federal Identification Number, or Tax Identification Number), and Dates requested. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days of any changes to the log (Deliverable #A.001).

1.8.3.1.1 Individual Termination or Expiration of Employment: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing I & R Office, Building 100 within five (5) days (Deliverable #A.002).

1.8.3.1.2 Contract Completion, Termination, or Cancellation: Upon completion, termination or cancellation of this contract and/or task orders, the Contractor shall collect all outstanding installation access passes and return them to the issuing I & R Office, Building 100 within five (5) days (Deliverable #A.003).

1.8.3.2 Common Access Cards (CAC) and CAC Log: RESERVED

1.8.4 Background Checks: The Personnel Security Manager applicable to the installation associated with this PWS will identify the level of background check required, supported by the applicable regulation(s). The Personnel Security Manager will determine the extent of background checks requirements and conduct such background checks on all Contractor employees, including subcontractor employees, who are employed under the contract, and other individuals associated with this contract requiring installation access. The Contractor employee may begin performance of the contract after receiving a favorable local background check. The Contractor agrees to replace the employee should results of the background check, if required, be unfavorable as determined by the Personnel Security Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Personnel Security Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Personnel Security Manager. The Personnel Security Manager shall forward a copy to the Contractor and the Contracting Office via the COR of each favorable and unfavorable background check identified to the appropriate contract number. When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.

1.8.4.1 U.S. Citizen: The Contractors that work with or teach youth under the age of 18 years are subject to U.S background checks. The Personnel Security Manager will determine the extent of background checks requirements and conduct such background checks on all Contractor employees, including subcontractor employees, who are employed under the contract, and other individuals associated with this contract requiring installation.

1.8.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW AR 190-13, Army Physical Security Program.

1.8.6 Operations Security (OPSEC) Requirements: The Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside designated facilities where visible to the general public.

1.9 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend the post award conference virtual meeting convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5, Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will appraise the Contractor of how the Government views the Contractor's performance and the Contractor shall appraise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.9.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein to provide effective communication and impart necessary information when requested by the Government.

1.10 Key Personnel: The following contractor personnel are considered key personnel by the Government.

1.10.1 Government Key Personnel: The KO is the only person with the authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. The KO is the only person who can legally commit to the Government and only the KO, as the Government’s agent. The COR designated by the KO is required to perform specific tasks and functions monitoring technical aspects of the contract such as monitor Contractor performance, perform inspection, identification of performance problems early, and assists in contract administration. The Contract Program Manager provides primary contracting program oversight, ensures COR compliance and monitors that the COR’s specific tasks and functions are performed. The Project Manager provides project oversight, nominates the COR, and supports the COR's performance assessment activities. Other key Government Personnel including performance monitors, inspectors, or technical experts may be identified in the QASP. Refer to Part 5 of this PWS for key personnel definitions.

1.10.2 Contractor Key Personnel: The Contractor shall appoint a Contract Manager and Task Manager who shall be responsible for the performance of the work. The Contractor shall provide the names and contact information for the Contract Manager, Task Manager, and Other Key Contractor Personnel (i.e. Quality Control Manager, Systems Administrator) to the Contracting Officer in writing no later than five (5) days after the contract award (Deliverable #A.004). The Contract Manager and Task Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. Either the Contract Manager or Task Manager shall be available between the hours of 0630 to 1700, Monday through Thursday as identified in paragraph 1.7.1 throughout the execution of this contract.

1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.11.1 Contractor workspace (staging site, on-site office, or work area, etc.) shall contain identification signifying the space is occupied by Contractor employees to ensure that Government employees and the public know that they are not Government employees. The proposed identification method shall be coordinated with the Contracting Officer via the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings. All Contractor correspondence (written, facsimile, and email display) shall include their company name. Requirements for Contractor vehicles are addressed in Part 4, Contractor Furnished Items and Services.

1.11.2 Contractor personnel shall be easily identifiable through the display of badges IAW AE Reg. 27-715, Contractor Identification. The Contractor (to include subcontractors) shall display an easily readable identification badge. The badge must include the employee’s name, the contractor’s company name, the functional area of assignment, and a recent color photograph of the employee. Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all Government issues badges and installation access passes upon completion of the contract or termination of employee as addressed under paragraphs 1.8.3.1, 1.8.3.1.1, and 1.8.3.1.2.

1.12 Contractor Travel: When applicable, Contractor’s travel and mobilization expenses (transportation, lodging, meals, wages, personal expenses, etc.) during the performance of this contract shall be included in the initial proposal. The proposed travel shall to include the projected listing of travel locations, frequency of travel, and number of people required to travel. The Contractor may be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR), IAW FAR Part 31.205-46, Travel Costs and the limitation of funds specified in this contract. All travel requires Government approval, authorization, and notification to the COR prior to scheduled travel.

1.13 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.13.1 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense Imagery Management Operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.

1.13.2 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be averse to the interests of the Government or others. The Contractor and all Contractor personnel shall not divulge, or release data or information developed, or obtained under performance of this PWS. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.

1.13.3 Non-Disclosure Statements: Contractor personnel may be required to provide a signed non-disclosure agreements to the Government prior to commencement of work under the contract. Disclosure of information by Contractor personnel may result in removal of Contractor personnel from performance under this contract.

1.14 Organizational Conflict of Interest (OCI): The Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5, Organizational Conflicts of Interest. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI (Deliverable #A.005). The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.15 Phase In /Phase Out Period: When applicable, to minimize decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the thirty (30) day phase in/ phase out periods. During the phase in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.

1.16 Safety: The Contractor shall comply with all applicable State, Federal and Army safety regulations. In case of emergency, dial 911 from a Depot phone or (435) 833-2911 from a cellular phone. The following information pertaining to Safety and Accident Prevention requirements covers the full spectrum of potential contractors and service(s) and may not fully apply.

1.16.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention, the references contained therein (e.g. EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual). All contractors performing work or supplying services or equipment for TEAD are required to comply with all applicable State, Federal and Army safety regulations.

All Contractors are expected to understand and comply with on-site requirements before initiation of work at the job site. These requirements may include, but are not limited to the following:

(a) Provide and maintain work environments and procedures which will include:

i. Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities.

ii. Avoid interruptions of Government operations and delays in project completion dates; and

iii. Control costs in the performance of this contract.

(b) Maintain a documented Safety Program, identified in Part 2, paragraph 2.2.5.2(a) for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1 will be reviewed for acceptance by designated Government personnel upon request. Specific requirements for development of the Accident Prevention Plan are found on 01.A.09 and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.

(c) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the non-compliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.

(d) The Contractor shall insert these clauses with appropriate changes in the designation of the parties and subcontracts.

1.16.2 Job Hazard Analysis: The Contractor shall perform a job hazard analysis identified in Part 2, paragraph 2.2.3.3(a) and 2.2.3.3(b) of each major phase of work prior to entering that phase of activity. The analysis shall include major or high-risk hazards, as well as commonly recurring deficiencies that might possibly be encountered for that operation and shall identify proposed methods and techniques to be encountered for accomplishing each phase in a safe manner. The Contractor shall take active participation in the Job Hazard Analysis, including the subcontractor’s work. Prior to start of the actual work, a meeting shall be held with the Contractor, Government, and affected subcontractors to review the Job Hazard Analysis. In addition, job site meetings shall be held to indoctrinate foreman and workers on details of this analysis.

1.16.2.1 Site Safety Plan: Contracts for construction, the Contractor shall have a site-specific safety plan. The plan will be tailored to the project, based on the size and complexity of the construction to be accomplished. A typical safety plan will address such issues as, but will not be limited to:

(a) The company’s safety and health policy.

(b) Company safety inspections of the job site.

(c) Use of personnel protective equipment (PPE).

(d) Safety rules and penalties are associated with not following the rules.

(e) Safety training and frequency (identifying hazards, explaining precautions and proper use of equipment/machinery, and the PPE required for the job (including how to use and maintain PPE).

(f) The steps to be followed are to report unsafe working conditions and practices.

(g) Special hazards.

(h) Hazardous materials (chemical, gases, asbestos, and so on).

(i) Confined spaces.

(j) Lockout tag procedures and so on.

(k) Instruction concerning safe operations and appropriate emergency action in the event of accidental exposure.

(l) Emergency procedures.

(m) Identifying personnel on site who have had first aid training.

(n) Post where communication devices (that is, phones) are located with appropriate phone numbers posted.

(o) Post how to exit the work area in an expeditious and safe manner.

(p) The plan will identify the person with lead responsibility for safety, where protective equipment may be obtained (for example, furnished by the company or required to be provided by the employee, or combination thereof), and the procedures for reporting a safety hazard.

Frequent and regular contractor internal job site inspections should focus on identifying and removing hazards. Whenever possible the inspection will serve as the basis for identifying where hazards have developed or are likely to develop. Based on these inspections the first objective will be to:

(a) Eliminate the hazard or if that is not possible to determine the best means of mitigating the hazard through work procedures, PPE, or other safety equipment.

(b) Observe workers to determine if they are using required safety equipment and that the safety equipment meets OSHA standards. Additional training should be provided for the workers as required to eliminate deficiencies found during the site inspections.

(c) These reports should be required to be retained by the contractor and available for review by the Government as required.

(d) The Contractor’s Safety Plan will explain the disciplinary process that will be followed when the contractor job inspections find violations to the safety rules. The disciplinary process should be included in the employees’ training and reviewed during regular safety briefings.

i. The Government will review the Contractor’s Safety Plan for adequacy, completeness and compliance with OSHA and EM 385–1–1 requirement.

ii. During site visits and inspections, the contractor’s compliance with the safety plan, regulatory safety requirements, and accepted practices will be observed.

iii. Safety violations will be documented and provided to the contracting officer for transmittal to the contractor who will be required to take corrective action.

iv. Depending upon the severity of the findings, follow-up inspections to determine that specific deficiencies have been corrected may be required.

(e) Regular quality assurance inspections by the contracting officer’s representative will include review of the findings to verify that they have been corrected or are progressing on schedule. If it is determined that the contractor is not delivering the level of safety that is required by the contract, the contracting officer will take necessary actions to attain improved contractor performance. All disincentives normally used for nonperformance in other contract areas should be considered for unresolved safety program deficiencies.

(f) A hazard analysis will be performed by the contractor for all major definable phases of work. This analysis will identify all hazards associated with the work progress through the phase and describe how those hazards will be controlled. Normally the analysis is performed by someone knowledgeable of the phase of the work such as the foreman or seasoned journeyman skilled labor. The analysis will be reviewed and signed off by a competent person (when required by OSHA) or a safety and occupational health professional.

(g) The hazard analysis will be the basis for preoperational briefings by supervision to the construction force so that everyone understands the hazards involved and the controls put into place. The hazard analysis will also drive the content of regular safety toolbox meetings as the work progresses.

1.17 Environmental Compliance: The Contractor shall comply with all applicable State, Federal and Army environmental regulations. The following information pertaining to Environmental Compliance requirements covers the full spectrum of potential contractors and service(s) and may not fully apply.

1.17.1 Environmental Compliance Plan and Program: Tooele Army Depot (TEAD) is committed to environmental excellence. This facility maintains an ISO 14001 conformant system. All contractors performing work or supplying services or equipment for TEAD are required to comply with all applicable State, Federal and Army environmental regulations.

All contractors are expected to understand and comply with on-site requirements. These requirements may include, but are not limited to the following:

(a) Air Pollution: Contractors must not release into the atmosphere and shall take all necessary measures to prevent the release of any air contaminants, regardless of source, that may cause a violation of any state or federal regulations or any TEAD policies.

(b) Water Pollution: Contractors must obtain prior approval from the Environmental Management Division (EMD) for discharging any materials into any on-site sanitary sewer system sinks, drains, clean-outs, or sumps.

(c) Storm Water Pollution: Contractors may not discharge any substance or materials into any storm water drain system located at or near TEAD. There are no exceptions. Visitors’ vehicles may not be washed anywhere on site. Storing materials outside must be kept to a minimum. If materials must be stored outside, prior approval must be obtained from the EMD, the storage area must be kept neat and clean with spill containment, containers must be kept closed, and any material that may present a storm water discharge threat must be stored under cover.

(d) Hazardous Materials: Contractor’s handling, storing and/or otherwise utilizing hazardous materials on depot will not do so without approval of the EMD If approval is granted, all containers must be properly labeled, and a Safety Data Sheet must accompany the material. All Hazardous Materials used at TEAD must be reported to the EMD. Hazardous materials will not be stored by the contractor/vendor in 55-gallon containers or larger. Contractors will not use or store Class I Ozone Depleting Chemicals on depot. Contractors will maintain adequate spill response equipment, supplies for the hazardous materials being utilized, and be responsible for the cleanup and containerization of all hazardous material spilled. Excess hazardous materials will be removed from the depot by the Contractor when they are no longer required for the contracted task.

(e) Solid and Hazardous Waste: Contractors generating solid and/or hazardous waste on depot shall comply with the TEAD Hazardous Waste Management Plan and the TEAD Integrated Solid Waste Management Plan and the conditions listed below:

i. All solid waste will be accumulated in covered containers (dumpsters) provided by the TEAD or in a manner that prevents the release of the waste to the environment. Office or shop containers are to be provided by the contractor. Recyclable material shall be recycled whenever feasible. TEAD will provide bins for recyclable metals.

ii. All contractors generating hazardous waste will accumulate hazardous waste in containers with labels that will be provided by the EMD; at locations approved by the EMD; and transport hazardous waste to the TEAD EMD 90-day yard within 72 hours of the hazardous waste container being filled or exceeding 55 gallons whichever comes first. The EMD will manage and be responsible for the off-site disposal of hazardous waste.

iii. Access to all waste accumulation points shall be provided to the EMD for inspections and/or sampling for waste characterization purposes.

(f) If contract requires the use of hazardous materials/substances, the Contractor shall, prior to mobilization, inform the Contracting Officer (KO)/Contracting Officer Representative (COR) of the types and amount of hazardous materials needed to be brought onto the Garrison in order to fulfill their contractual requirements. Contractors shall also provide the Safety Data Sheets, storage requirements and proposed storage locations for the hazardous material. The KO/ COR shall provide a copy of this information to the Garrison Fire Department and the Environmental Division.

(g) Prior to contract completion, the Contractor shall remove all hazardous materials and dispose of all hazardous waste (HW) generated in accordance with environmental laws/standards. A copy of the HW disposal documents must be forwarded to the HW program manager at the Department of Public Works (DPW) Environmental Division.

(h) The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills to the Garrison Fire Department at CIV 0611-705-117.

(i) The Contractor shall contact the COR or the USAG Wiesbaden Directorate of Public Works-Environmental Division (DPW-ED), DSN 548-4092, CIV 0611143-548-4092, Bldg. 1059, Clay Kaserne for a copy of the Garrison Environmental Policy, Spill Prevention and Response Red Plan, Garrison Solid Waste Policy and German Final Governing Standards.

1.18 Required Training: The Contractor shall comply with the following training requirements.

1.18.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training and submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR within thirty (30) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or thirty (30) calendar days after employment of new personnel. Training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training every twelve (12) months. The Contractor shall provide the COR a copy of the training certificates for its employees no later than five (5) days after completion (Deliverable #A.006).

If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR after completion of the training.

1.18.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC Training and submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR within thirty (30) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or thirty (30) calendar days after employment of new personnel. Training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every twelve (12) months. The Contractor shall provide the COR a copy of the training certificates for its employees no later than five (5) days after completion (Deliverable #A.007).

If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR after completion of the training.

1.18.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training, provided by the Government COR, will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within thirty (30) calendar days after the contract is awarded and within thirty (30) calendar days after new employees commence contract performance, with the results reported to the COR within thirty (30) calendar days after the contract is awarded and within thirty (30) calendar days after new employees commence contract performance (Deliverable #A.008).

1.18.4 Information Assurance (IA) Training: RESERVED

1.18.5 Personally Identifiable Information (PII): RESERVED

PART 2

SPECIFIC TASKS

2. Specific Tasks

2.1 Basic Services: The Contractor shall provide services for explosive safety and risk management assessment of energetic and hazardous material processes and include testing, analysis, reporting, and logistical support in accordance with the standards and requirements cited herein. These services are fulfilled through the issuance of task orders provided by the Government. Upon Government identification of a testing requirement, a task order Performance Work Statement (PWS), including requirements for laboratory-scale, small-scale, and/or full-scale testing, will be provided to the Contractor.

The Contractor must have engineering capabilities in facility siting/code compliance, testing, mechanical integrity, process hazards analysis and regulatory compliance.

The Contractor shall provide the Deliverables identified in Part 1, General Information and Part 2, Specific Tasks as specified in Attachment 2 – Deliverables.

2.2 Tasks: Tasks consist of the following:

2.2.1 Task Order Proposal, Planning, and Preparation

2.2.1.1 Task Order Proposal: The Contractor shall comply with all task order proposal requirements and standards.

(a) STD: Develop and submit a price proposal for performance of the required work within five (5) business days of receipt of the Government provided task order PWS.

AQL: 100% Compliance; Zero Deviation from Standard.

(Deliverable #A.009)

2.2.1.2 Test Plan Development: The Contractor shall comply with all test plan development requirements and standards.

(a) STD: Develop and submit a test plan/Letter of Instruction (LOI) for each identified testing requirement, including a description of all required test equipment and materials, within seven (7) days after Government/contractor agreement on price and task order award.

AQL: 100% Compliance; Zero Deviation from Standard.

(Deliverable #A.010)

2.2.2 Material and Equipment Management

2.2.2.1 Equipment Provision: The Contractor shall comply with all equipment provision requirements and standards.

(a) STD: Upon Government approval of the test plan/LOI, fabricate and/or purchase all required equipment necessary for the testing, handling, and shipping of test material, unless specified in the task order as Government-Furnished Material/ Government-Furnished Equipment.

AQL: 100% Compliance; Zero Deviation from Standard.

(b) STD: Maintain all equipment in a continually available and serviceable condition at the testing location.

AQL: 95% Compliance; No more than one (1) instance of non-serviceable equipment per quarter.

2.2.2.2 Data Rights: The Contractor shall comply with all data rights requirements for contractor-fabricated equipment.

(a) STD: For any equipment designed/fabricated by the contractor, make available to the Government, and grant the Government the right to use without restriction, all drawings, specifications, or other data necessary for fabrication and operation.

AQL: 100% Compliance; Zero Deviation from Standard.

(Deliverable #A.011)

2.2.3 Assessments and Testing Services

2.2.3.1 Personnel Qualifications: The Contractor shall comply with all personnel qualification requirements and standards.

(a) STD: Ensure all testing is directed and witnessed by explosive test personnel with a minimum of ten (10) years' experience and certified by the U.S. Department of Transportation (DOT) PHMSA in accordance with 49 CFR 173.56(b)(1).

AQL: 100% Compliance; Zero Deviation from Standard.

(b) STD: Possess a minimum of two (2) years' experience in the types of work identified in this PWS and specified in subparagraphs 2.2.3.2 through 2.2.3.5.

AQL: 100% Compliance; Zero Deviation from Standard.

2.2.3.2 Material Characterization Testing: The Contractor shall comply with all material characterization testing requirements and standards.

(a) STD: Perform material characterization testing, including sensitivity and reactivity testing of PEP materials for the classification of materials/articles for transportation, storage, and "in-process" conditions.

AQL: 100% Compliance; Performed in accordance with the approved test plan/LOI.

2.2.3.3 Risk and Hazard Assessment: The Contractor shall comply with all risk and hazard assessment requirements and standards.

(a) STD: Conduct risk assessments of normal and abnormal operations, equipment design, human factors, standard operating and contingency procedures, maintenance operations, and facility design and "siting."

AQL: 100% Compliance; Performed in accordance with the approved test plan/LOI.

(b) STD: Perform hazard analysis and assessment for the Decontamination, Disassembly, and Demolition (D3) of equipment and facilities used in the manufacturing or processing of energetic materials.

AQL: 100% Compliance; Performed in accordance with the approved test plan/LOI.

2.2.3.4 Modeling: The Contractor shall comply with all modeling requirements and standards.

(a) STD: Perform consequence modeling to determine the potential effects of thermal flux, fragments, over overpressure on personnel, equipment, and facilities; atmospheric modeling of gaseous releases and analyzing the effects of a release.

AQL: 100% Compliance; Performed in accordance with the approved test plan/LOI.

2.2.3.5 Facility Siting and Mechanical Integrity: The Contractor shall comply with all facility siting and mechanical integrity requirements and standards.

(a) STD: Evaluate siting and orientation of facilities to minimize potential hazards from reactive chemicals and explosives to protect personnel and facilities from explosive or other…