A02 - PWS OD-S Prairie Flower South Custodial.docx

DOCX document 844 KB Posted

Attached to
Saylorville Lake Prairie Flower South Custodial Contract
Solicitation number
W912EK24CCUSTODIAL
Issued by

About this file

This performance work statement outlines custodial services required at the Prairie Flower South Campground within Saylorville Lake Project in Iowa. The contractor must provide a two-person team to clean five shower buildings, 135 campsites with associated picnic tables and fire rings, four playgrounds, ten trash cans, fourteen drinking fountains, and one trailer dump station seven days a week between late April and mid-October 2024 through 2026. Services include daily cleaning and disinfecting of facilities, litter pickup, refuse removal, and evening spot checks. The contractor must reside on-site and supply their own RV for housing. The government provides utilities, cleaning supplies, and an RV site with storage shed. The quality assurance plan establishes monitoring methods to ensure a satisfactory service level.

View the file

Other files

File Type Posted
A02 - Schedule of Pricing (SOP) OD-S PF South Custodial .docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

PARK CUSTODIAN

PRAIRIE FLOWER “SOUTH” CAMPGROUND

SAYLORVILLE LAKE PROJECT, IOWA

SECTION TITLE

1. GENERAL INFORMATION

2. GOVERNMENT-FURNISHED PROPERTY

3. CONTRACTOR-FURNISHED ITEMS AND SERVICES

4. CUSTODIAL CLEANING SERVICES

5. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY

6. QUALITY ASSURANCE SURVEILLANCE PLAN

TE-1 TECHNICAL EXHIBIT #1 “WORK AREA SCHEDULES AND FACILITY LIST”

TE-2 TECHNICAL EXHIBIT #2 “PRAIRIE FLOWER “SOUTH” CAMPGROUND CUSTODIAL SERVICE AREA MAP”

TE-3 TECHNICAL EXHIBIT #3 “ANNUAL RECREATION AREA SCHEDULES”

ATT-1 ATTACHMENT 1 “QUALITY ASSURANCE MONITORING FORM”

1. GENERAL INFORMATION

1.1 BACKGROUND. Saylorville Lake is a flood control reservoir in Des Moines, Iowa, with numerous parks and access areas managed by or leased from the U.S. Army Corps of Engineers. Park areas at Saylorville Lake Project offer a wide variety of recreation facilities including boat launching ramps, campgrounds, full service marinas, picnic areas, and sand swimming beaches.

1.2 SCOPE OF WORK. The Contractor shall provide all labor, materials/supplies, transportation, and equipment to perform custodial and minor maintenance duties at the Prairie Flower “South” Campground at the Saylorville Lake Project, near Des Moines, Iowa as defined in this Performance Work Statement (PWS). A map of Saylorville Lake can be found at the website: https://www.mvr.usace.army.mil/Missions/Recreation/Saylorville-Lake/

1.3 REQUIRED INSURANCE. In accordance with the FAR Clause 52.228-5 titled “Insurance Work on a Government Installation” the Contractor shall obtain and maintain during the period of performance under this contract the following kinds and minimum amounts of insurance*:

Workmen’s Compensation . . . . . .Coverage complying with applicable State statute**
Employer’s Liability . . . . . . . . . . .Minimum $100,000
General Liability/Bodily Injury. . .Minimum $500,000 per occurrence
Automobile Liability . . . . . . . . . . .Minimum $200,000 per person
$500,000 per occurrence
$ 20,000 property per occurrence

* Reference FAR 28.307-2 Liability, subparagraphs (a), (b), and (c).

** Iowa Insurance Division, telephone # (515) 281-5705 Iowa Division of Workers Compensation, telephone # (800) 562-4692

1.4 TWO PERSON TEAM. Park Custodian Contractor at minimum shall consist of a two person team, each possessing a valid driver's license. Prairie Flower Campground is Saylorville Lake’s most visited campground so a two person team is required to handle the area. Both persons shall perform all specified contract services daily, including weekends and Federal holidays. The term Contractor as used herein shall refer to both members of the Contractor team and all Contractor employees.

1.5 PERSONNEL REQUIREMENTS. Contractor shall be physically qualified to perform all work as specified in this Performance Work Statement. Such work includes but is not limited to providing services outdoors under varied and sometimes severe weather conditions, repeated bending and stooping, heavy lifting, standing and walking for long periods, reaching, pulling and climbing on a step ladder. The work shall also include providing information and interacting with the public.

1.6 PRE-WORK TRAINING CONFERENCE. Contractor shall attend, in person, a training and orientation meeting at the Saylorville Administration Building on the dates and times specified in the Custodial Service Area Schedule. At this meeting Contractor will be provided with a handbook listing Project information, policies and procedures. Government furnished supplies will be distributed at or prior to this. The Contractor shall provide at this meeting the following plans.

1.6.1 ACCIDENT PREVENTION PLAN: An accident prevention plan is a safety and health policy and program document that is contract specific. The accident prevention plan shall comply with the requirements set forth in the Abbreviated Accident Prevention Plan in the USACE EM 385-1-1 in Appendix A.

1.6.2 CONTINGENCY PLAN: A contingency plan for how the Contractor will accomplish the work in the event of illness and emergencies.

1.6.3 QUALITY CONTROL PLAN: A quality control plan is the Contractor’s management plan for executing the contract. It describes the way in which the Contractor will produce deliverables, and the step-by-step approach that will be taken to ensure the quality of the service.

These plans must be submitted electrioncally and approved by the Contracting Officer Representative (COR) before any work may begin.

1.7 MONTHLY MEETING. During the contract term, Contractor shall attend, in person, monthly safety / information meetings at times and locations as determined by the COR. Purpose of the monthly meetings is to present a short safety briefing and to discuss project policies, procedures and information relevant to the Contractor's operation.

1.8 TEMPORARY LIVING QUARTERS.

1.8.1RESIDENCY REQUIREMENT: The physical presence of a person who can
contact authorities is often a strong deterrent to vandalism and rowdy behavior. For this reason, Park Custodians are required to Live on Site. Contractor shall use their RV as a regular domicile and shall live on site for the duration of the performance period. Living on site includes consuming meals, sleeping and otherwise spending a minimum of 18 hours daily within the contract area. On weekends and Federal holidays, absences from contract area shall be limited. Live On Site requirements do not apply to Contractors scheduled days off.

1.8.2 CONTRACTOR SUPPLIED RECREATION VEHICLE (RV): The contractor shall furnish a factory-built, “self-contained” recreation vehicle (RV) of the travel trailer or motor home type to serve as temporary living quarters for the duration of the contract. Pickup shell-type campers, pop-up tent trailers, tents, mini-travel trailers, mobile homes, converted school buses, or other RV’s, which do not meet requirements or the self-contained” classification as determined by inspection of the COR, will not be acceptable. Note: The contractor team shall be the sole occupants of their site.

1.8.3 GOVERNMENT PROVIDED RV SITE: Three designated RV sites will be provided by the Government at no cost to the Contractor. The sites will be supplied with 110 volt electrical service, potable water, sewer hook-up, picnic table, fire ring, garden plot and a wooden yard type storage shed. The contractor shall supply a padlock for the storage shed; such shed shall be used only for storage of materials and supplies required to perform the duties of the position. The contractor will be responsible for providing all labor and materials for making connection between their RV and Government supplied utilities (electrical, water and sewer). The Government assumes neither responsibility nor liability for losses resulting from any interruption or outage of utility services, regardless of duration of outage. The contractor shall place RV on site at least one day but no more than three days prior to start of contract performance period; and shall remove the RV along with all personal property no later than three days after end of performance period; unless prior approval for variation is obtained from the COR. Contractor shall keep their site clean and orderly during the duration of the contract.

1.9 SPECIAL REQUIREMENTS FOR LIVING ON GOVERNMENT PROPERTY.

1.9.1 SITE APPEARANCE: Temporary living site shall be maintained in a clean, sanitary, orderly and uncluttered condition at all times. This site cannot be altered in any way. Washers, dryers and/or other appliances (i.e. refrigerators, freezers etc.) must be kept inside the contractor’s living quarters.

1.9.2 ANIMALS: Cages, pens or similar facilities for housing pets or raising animals will not be allowed. Contractor's pets shall be confined to the RV or kept on a leash 6 feet or less in length.

1.9.3 FIREARMS: Contractors shall not carry or possess firearms in their RV or anywhere on Government property.

1.9.4 PROHIBITED ACTIVITIES: Contractor shall not be engaged in any commercial activities on Government property; nor be involved in other activities including child care and outside employment that conflicts or interferes with the performance of this contract.

1.9.5 OPERATION OF CONTRACTOR VEHICLES: Contractor shall comply with all provisions of Title 36 Code of Federal Regulations pertaining to Corps of Engineers areas and all other local, state and federal regulations as apply. All vehicles shall be properly licensed, insured and maintained in a safe, clean condition. At the pre-work orientation and training meeting the Contractor shall provide a copy of vehicle insurance for all vehicles that will be used to provide contract services. All vehicles operating on project roads shall be registered for street use. Contractors shall not operate any motor vehicle (including golf carts/UTV’s) off road, around gates or barricades, on sidewalks, trails or driving the wrong way on a one way street while performing services under this contract; unless prior written approval is obtained from the COR.

1.9.6 VISITORS: Contractors are allowed to have visitors stay with them in the Contractor's RV. However, visitors with their own RV will be required to stay at a regular campsite and pay the normal camping fee. At no time will any visitor be allowed to connect to utilities provided for the use of the Contractor.

1.10 PERSONAL APPEARANCE AND CONDUCT.

1.10.1 PROFESSIONAL IMAGE: Contractors shall at all times promote a positive, professional image of themselves and the Corps of Engineers. At no time shall Contractors through their personal appearance, actions or demeanor discredit the Government.

1.10.2 ENFORCEMENT OF REGULATIONS: Surveillance of recreation areas is an important part of the Park Custodian's job. However, enforcement of Federal Regulations is the responsibility of the Corps of Engineers personnel and not part of the duties or responsibilities of this contract.

1.10.3 VIOLATIONS: Contractors shall not attempt to apprehend violators or enforce regulations; nor argue with or directly accuse a member of the public of wrong doing; nor commit Corps employees to any type of action.

1.10.4 PROHIBITED CONDUCT: Contractors shall not consume nor be under the influence of alcohol, drugs or medications (except with doctor prescription) during on-duty hours; nor conduct themselves at any time in a manner unbecoming their position or as so to bring discredit to themselves or the Corps of Engineers.

1.11 REPORTING REQUIREMENTS.

1.11.1 DISTURBANCES: Contractors shall immediately report all emergency situations, accidents, vandalism, public disturbances and violations of Title 36 CFR to Corps Park Rangers or local law enforcement personnel as soon as possible.

1.11.2 DAMAGE, REPAIRS AND MAINTENANCE: Contractors shall report all malfunctions of utilities, damaged facilities or fixtures, vandalism, and general area maintenance and repair needs on the same day as discovered by contacting the COR or the Corps Administration Office and submitting a written Work Order Form.

1.11.3 LOST AND FOUND ARTICLES: Contractor shall report all information concerning either lost or found property on forms provided by the Government. Found property shall be safeguarded by the Contractor and promptly turned in to the COR or an authorized Corps employee.

1.12 ENVIRONMENTAL CONTROLS.

1.12.1 COMPLIANCE WITH LAWS AND REGULATIONS: The Contractor shall be knowledgeable of, and shall comply with, all applicable Federal, State, and Local laws, environmental requirements, and instructions. The Contractor shall ensure policies and procedures are followed that protect the health and safety of employees and the community to minimize or eliminate the risk of environmental pollution.

1.12.2 NOTIFICATION OF ENVIRONMENTAL SPILLS: If the Contractor or employee(s) of the Contractor spills or releases any substance into the environment, the Contractor shall immediately report the incident to the COR, or in his or her absence the Contracting Officer. The Contractor shall be liable for containment and environmental cleanup of the spill or release of such substance.

1.13 PAYMENT PROCEDURES.

1.13.1 MONTHLY INVOICE: The Contractor shall submit a monthly invoice to the Saylorville Lake Administration Office, 5600 NW 78th Avenue, Johnston, Iowa 50131 for the work completed during the billing period. Payment will be made in accordance with contract provisions and the Prompt Payment Act. The Contractor shall include on the invoice, a total of labor hours worked under this contract which will be used for a Contractor Man Hour Accident Exposure Report.

1.13.2 CLOSING OF AREAS: Major storm damage, floods, high lake pool level, other natural causes, major construction activities, National Security or Federal Government shutdown may result in the partial or total closure of contract recreation areas at times. During such times it may be necessary for the Government to suspend the Contractors operations on part or all of a contract area and suspend payment or renegotiate the contract bid price. Notice of such termination or stop work orders will be made by the Contracting Officer.

2. GOVERNMENT-FURNISHED PROPERTY.

2.1 BACKGROUND. GOVERNMENT SUPPLIED ITEMS: During the term of this contract the Government will furnish only the following supplies, materials, and items for the performance of contract duties and services. All Government furnished chemicals and supplies will be distributed on Tuesday and Thursday 12:30PM - 1:00PM from the Maintenance Building located on the west end of Saylorville Dam.

2.2 CHEMICALS. All chemical cleaners, detergents, disinfectants, deodorizers, wasp and other over the counter pest control agents and weed control herbicides.

2.3 FACILITY SUPPLIES. All toilet paper, trash can liners, light bulbs, soap, and toilet paper holders.

2.4 UTILITIES. All water, lighting, electricity and off-Project trash hauling/disposal.

2.5 GOVERNMENT PROVIDED RV SITE AND STORAGE SHED. As defined in section 1.8.3.

2.6 EQUIPMENT FOR OCCASIONAL USE. A high pressure sprayer/washer.

2.7 MISCELLANEOUS SUPPLIES. All forms for submitting required reports, gate and building keys, identifying cap, magnetic mount vehicle safety light and miscellaneous repair parts/hardware.

3. CONTRACTOR-FURNISHED ITEMS AND SERVICES.

3.1 BACKGROUND. CONTRACTOR SUPPLIED ITEMS: During the term of this contract the Contractor shall furnish all of the following equipment, supplies and materials as listed and all other items as may be necessary to perform the duties and services of this contract.

3.2 SELF-CONTAINED RV. As defined in section 1.8.1.

3.3 TELEPHONE. A telephone and message recording service/device at their RV Site and pay all connection and monthly service charges. A cellular phone with voice mail messaging is also acceptable.

3.4 SUITABLE VEHICLE(S) AND FUEL. Contractor shall furnish suitable vehicle(s) and fuel for personal transportation, work area use, pickup and delivery of supplies and transport of refuse from trash cans to bulk storage dumpsters. All vehicles shall be properly licensed and maintained in a safe, clean condition. Contractors will be required to drive from their RV Site to daily work site as often as required to perform the specified services and should consider fuel cost for vehicle operation when providing a quote.

3.5 SUPPLIES. The Contractor shall provide all paper towels, sponges, rags, scratch pads, and/or other wiping, polishing, drying and scraping cloths/materials.

3.6 EQUIPMENT. The Contractor shall furnish all necessary equipment such as brooms, brushes, buckets, mops, squeegees, shovels, hoses, nozzles, step ladders, plunger, dust pans, lock for storage shed, cleaning signs, and all other equipment necessary to accomplish the required work.

3.7 MAIL. Mail service will be at the discretion of the Contractor. If service is desired, it is the responsibility of the Contractor to contact the local Post Office to determine if rural delivery is available to the site. If the Contractor elects to have the service, the Contractor shall provide a mailbox and if necessary a post, and installation of the post, in accordance with U.S. Postal Service requirements. Once service has been established, the contractor shall provide the Project Office with the local mailing address.

4. CUSTODIAL CLEANING SERVICES.

4.1 BACKGROUND. The requirement to perform cleaning services shall apply to all parts of buildings, facilities and recreation area grounds covered under this contract seven days a week. The omission of methods or standards for the cleaning of any parts of facilities or contract area shall not relieve the Contractor from the requirement to perform services to those areas or facilities.

4.2 SCHEDULE OF DUTIES.

4.2.1 PRIMARY CLEANING SERVICES: Primary cleaning services and the frequency they are to be performed are listed for each type of facility cleaned and the service performed. Contractor shall daily begin performing Primary Cleaning Services no later than 6AM and complete them by 12 Noon. Exception: Primary cleaning services for all buildings and shelters shall be completed by 10AM.

4.2.2 EVENING SPOT CHECK SERVICES: Spot checks shall be performed on all buildings and shelters – between 5 p.m. to 8 p.m. Spot checks shall consist of inspecting buildings and shelters for malfunctions and correcting or reporting them as needed; restocking toilet paper, flushing soiled toilets and urinals, removing excess water and debris from floor that may be a safety hazard, emptying full trash cans and cleaning any unsanitary conditions.

4.2.3SHOWER BUILDINGS
a.FREQUENCY: Perform daily primary cleaning items as listed below, 6AM to 10AM.

b. CLEAN AND DISINFECT DAILY: All sinks, faucets, counters, mirrors, hand dryers, handrails, door handles/plates, toilets, seats, urinals, tissue holders, light fixtures/covers, doors/jams, utility supply rooms, vents, windows, ceilings, exterior walls, eaves, entryways and sidewalks and shower stalls (all parts). Polish and dry all fixtures daily. All floors shall be cleaned daily and disinfected with disinfectant. Excess water on floors shall be removed by mop, broom, or squeegee.

c. SERVICE DAILY: Restock toilet tissue by filling all tissue holders. Change out burnt out light bulbs and replace broken tissue holders. Plunge clogged toilets. Empty all trash cans upon completion of building cleaning and replace plastic liners. Clean and disinfect trash cans as needed.

d. CLEAN DAILY; DISINFECT EVERY MONDAY: All interior tile walls, showers, floors, and all toilet stall partitions and doors. Dry all surfaces upon completion of cleaning.

e. DAILY PERFORM EVENING SPOT CHECK: 5PM to 8PM

4.2.4 LITTER PICKUP: Contractors are not required to perform litter pickup services on rip-rapped areas.

a. FREQUENCY: Perform daily primary litter pickup services as listed, 6AM to 12 Noon.

b. SERVICE DAILY: All grounds areas and all facilities within the contract area. Boundary for litter pickup service shall extend 25 feet beyond all mowed edges and/or facility edges. Service area and facilities shall include all buildings, playgrounds, ball fields, boat ramps, boat ways, campsites, picnic sites, tables, fountains, grills, trails, sidewalks, roads, parking lots, road shoulders, curbing, drains, mowed areas and ornamental shrub beds.

4.2.5 REFUSE PICKUP: The collection of refuse from the bulk storage dumpsters and its transport to a solid waste disposal site is performed by others and is not part of the services provided under this contract.

a. FREQUENCY: Perform daily primary refuse pickup services as listed, 6AM to 12 Noon.

b. SERVICE DAILY: All grounds areas, facilities, and trash cans within the contract area. Upon completion of service all trash cans will be empty, clean, disinfected as needed, fitted with a new plastic liner as needed, trash can properly placed on holder with lid in place, and lids to bulk storage dumpsters properly closed. Contractor shall haul all refuse to the contract area bulk storage dumpsters in such a manner so that no refuse or effluent will be lost. Open end of trash liners shall be kept tied closed prior to disposal in the area dumpster.

4.2.6 DRINKING FOUNTAINS

a. FREQUENCY: Perform daily primary cleaning as listed, 6AM to 12 Noon.

b. CLEAN AND DISINFECT DAILY: All parts of all fountains.

4.2.7 CAMPING SITES, TABLES, GRILLS, AND ELECTRICAL BOXES

a. FREQUENCY: Perform daily primary cleaning as listed, 6AM to 12 Noon.

b. INSPECT AND CLEAN DAILY AS AVAILABLE; DISINFECT AS NEEDED: Contractor will not be required to service occupied campsites, picnic sites, tables, grills or electrical boxes. Picnic tables shall be scrubbed clean, disinfected, rinsed and dried at a minimum of once annually. Grills shall normally be cleaned without the use of water. Litter and food residue shall be removed daily. All ashes shall be removed and placed in area dumpsters by Thursday of every week. Contractor shall take proper care to insure that no hot coals or ashes are placed in area dumpsters. Electrical boxes shall be looked over for issues and kept clean.

4.2.8 PLAYGROUNDS

a. FREQUENCY: Perform daily primary cleaning items as listed, 6AM to 12 Noon.

b. INSPECT AND CLEAN DAILY: All facilities, all parts. Pea gravel portion of facilities shall be raked at minimum once weekly to more evenly distribute the material, remove material from rubber surface tiles, reduce compaction and cover heavily used areas.

4.2.9 TRAILER DUMP STATIONS

a. FREQUENCY: Perform daily cleaning as listed, 6AM to 12 Noon.

b. CLEAN AND DISINFECT DAILY: Entire concrete slab drain area, drain cover, hoses, faucets, and water towers.

4.3 SPECIAL REQUIREMENTS FOR PERFORMING CLEANING SERVICES.

4.3.1 CONVENIENCE TO THE PUBLIC: Contractor shall perform all work in such a manner as so to minimize the inconvenience to the public. All facilities shall remain open to the public during the cleaning process unless prior approval for their closure has been obtained in writing from the COR.

4.3.2 PROPER AND SAFE USE OF EQUIPMENT AND CHEMICALS: Contractor shall use all equipment, disinfectants, detergents, and other chemical agents in a safe manner and in accordance with all manufacturers. Contractor shall take extreme care while performing cleaning services to insure that corrosive or abrasive chemicals do not mar, discolor, remove or harm the finish in any way on any facility or fixture.

4.3.3 SECURING GATES, FACILITIES, UTILITY ROOMS, EQUIPMENT AND SUPPLIES: Contractor shall keep all equipment and supplies secure at all times and safeguard the public by insuring that only the Contractor has access to storage areas and utility rooms. Utility/ storage rooms shall be kept locked except when in actual use while servicing buildings. All supplies in utility rooms shall be stored on shelf units provided by the Government and maintained in an orderly manner. No supplies shall be stored on the floors or on water heaters.

4.3.4 LANDFILL RESTRICTED ITEMS AND RECYCLING PROGRAMS: Contractor shall not place any items whose disposal in landfills is restricted in any of the public trash cans or dumpster units. A disposal container for hazardous items such as tires, batteries, paint cans, etc. is located at the Project Maintenance Compound or other suitable location. Contractor shall dispose of hazardous items weekly during cleaning supply pickup day or as needed. Non-hazardous restricted items such as leaves, limbs, rocks, and other yard debris shall be disposed of at sites designated in each area, as needed.

4.3.5 MOVING PICNIC TABLES: Contractor will not be required to remove picnic tables from shelters to perform cleaning duties; although it may at times be necessary for the Contractor to move individual tables to perform required services. Contractor shall report missing or displaced tables.

4.3.6 GREEN CLEANING: Green cleaning is a planned and organized approach to cleaning specifically designed to protect building occupants and worker health, while at the same time reducing environmental impacts. Unlike a traditional cleaning program, a green custodial program takes a holistic approach to grounds and building cleaning and goes beyond simple appearances to focus on health and the environmental impacts. This contract requires that the Contractor use Government supplied products identified as non-toxic; non-petroleum based; water-based; free of ammonia; phosphates, dye, or perfume; readily biodegradable; diluted; and using recyclable containers. Several green cleaning practices are built into the scope of the contract to meet the requirements of green cleaning.

a. Schedules for cleaning are built in to the contract to reduce chemical use and electricity for nighttime cleaning.

b. Orientation is provided in sustainable methods including chemical management, proper dilution, and waste minimization.

c. Waste management solutions and recycling programs are provided.

d. Reporting procedures are set in place for clogged drains, leaking pipes, and dripping faucets immediately.

e. Supply of “Green” cleaning products certified by reputable sources.

f. Electronic document sharing.

5.1 ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

Antiterrorism (AT) Level I training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).

For Access and General Protection Policy and Procedures. All Contractors and sub-contractor employees shall comply with installation and facility access guidelines and rules as stated herein. Contractor workforce must comply with all personal identity verification requirements as directed by Department of Defense, Department of the Army Headquarters, Rock Island District and/or local policy. In addition to the changes otherwise authorized by the Changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.

In support of Rock Island District evaluation of personnel authorized for access to federal facilities, the Contractor shall submit background checks that have been conducted by a bonded third party within the last 6 months of Notice to Proceed date and authorize reports to be provided to the Rock Island District Security and Law Enforcement Office by the third party. The background check will cover, at a minimum, the ten years covering states the employee has lived in, national criminal records check which includes felony and misdemeanor offenses, Department of Motor Vehicles records, and a national sex offender registry check, submitted 14 days prior to accessing the project site.

Identification Badges: The Contractor shall be responsible for furnishing a photo identification badge/card to each employee prior to the employee's work on-site, and for requiring each employee engaged on the work to display identification. At a minimum, the badge shall have the following items shown, the employee’s picture, employee’s name, and company name working for. The badge will be prominently displayed unless restricted for safety concerns, in which case it will be available for immediate display upon request (carried on person).

As employees are added or deleted from the submitted and approved Access Control List (ACL), this information will be reported immediately to the Contracting Officer (KO). Added employees will not be permitted on-site until requirements of this paragraph are completed, submitted, and approved.

Disqualifying factors include, but are not limited to:

(1) Criminal conduct, in particular violent crime and sex offenders;

(2) Habitual use of intoxicating beverages to excess as evidenced by Driving under the influence or public intoxication records; or

(3) Any illegal activity or other disqualification which makes the individual unfit for service (e.g. drug trafficking or procurement fraud).

In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of the Rock Island District security personnel. The Contractor agrees to cooperate and ensure that Contractor personnel provide any documentation required to complete these checks. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the Contract. The Rock Island District retains the right to deny any Contractor and sub-contractor employee from working on a contract awarded by the Rock Island District based on final background investigation results. All information received as a result of a background check will be handled according to Privacy Act regulation.

In the event that an unexpected change in personnel is required, due to sudden absence of a critical path employee, the Contractor shall immediately contact the Contracting Officer to coordinate obtaining written approval from the Security Office for new/additional personnel to be brought on site prior to background check acceptance. Contractor shall submit Personnel Change Request Form and will receive written authorization from the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

In the event of an unforeseen change in work site conditions which may require a contract modification, and the contractor is required to immediately add personnel, a Personnel Change Request Form will be submitted to and approved by the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

Subcontractor personnel not expected to be on the worksite for more than 15 days may be allowed on site with the following conditions:

1. Employee will be on site a total of 15 days or less, for the duration of the project.

1. Employee is added to the ACL as a short term employee.

1. Employee is escorted while on site. This is defined as being in the line of sight of an identified contractor employee who has a background check on file with the Rock Island District (as noted on the ACL).

1. Each contractor employee can sponsor only five short term employees at a time.

Foreign National employees: Due to a difference in background check procedures for long term foreign national employees, all such employees must provide a photocopy of their passport to the Rock Island District Security Office NLT 30 days prior to arrival on site. Short term foreign national employees (e.g. specialists with a two week period of performance) may work on site with the following conditions:

1. Foreign national employee will be on site a total of 15 days or less, for the duration of the project.

1. Foreign national employee will comply with E-verify requirements E-verify paragraph).

1. Approved and identified contractor employee shall escort the foreign national employee at ALL times while on site.

1. Each contractor employee can sponsor only one short term foreign national at a time.

Personnel Change Request Form Contract #_______________ Date___________ We, _____________________, respectfully request to add/replace (circle one) personnel to the jobsite due to the following situation:

Personnel to be conditionally added to the ACL (escorted by):

Background checks (if required for a long term employee) shall be submitted by close of business on (insert proposed date): ________________

__________________________
(Insert signature block)

Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

To protect the privacy of the Contractor, all Contractor employees, and all sub-contractor employees, background checks, OPSEC SOPs, E-verify, and I-9 forms shall be submitted with a coversheet stating the contract number (e.g. W912EK-15-C-XXXX), title of project, and the company's point of contact information, in a sealed envelope/container and mailed to:

U.S. Army Corps of Engineers Rock Island District Security Office 1500 Rock Island Drive Rock Island, IL 61201

6. QUALITY ASSURANCE SURVEILLANCE PLAN.

Purpose: This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract. The intent is to ensure that the contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract, and that the Government only pays for the acceptable level of services received.

1. Critical performance processes and requirements. Critical to the performance of the contract, the contractor shall provide all personnel equipment, tools, materials, supervision, transportation, other items and services necessary to perform as defined in this Performance Work Statement (PWS). The contractor shall provide accurate transaction processing to ensure that material accountability comply with safety and security requirements, in accordance with this PWS. Additionally, the contractor shall be accountable for all auditable documents, establish/maintain effective quality, and perform required within prescribed timeframes. The performance process is the timely, accurate, and thorough completion of all contract requirements.

2. Performance Standards

a. Schedule. The dates for services and the actual accomplishment of the services in accordance with the schedule will be assessed against original dates of services and milestones established for the contract.

b. Service. The services required to be performed will be assessed against the PWS detailed in the contract, for the required content, quality, timeliness, and accuracy.

c. Past Performance. In addition to schedule and services, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.

3. Surveillance methods. The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to: random or planned sampling, periodic inspection, Contractor Self Reporting, and validated customer complaints.

a. Random/Scheduled Monitoring. Random and/or scheduled monitoring will be conducted if and when deemed necessary by the COR to ensure compliance with the terms of the contract. Using the attached matrix the COR will determine whether the contractor is in compliance with the terms of the contract.

b. Contractor Self-Reporting. The contractor shall provide as needed status reports that document significant problems/issues and potential resolutions.

c. Customer Feedback. Customer feedback will be obtained from valid customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint; must be signed and must be forwarded to the COR by the contractor. The contractor shall maintain a log of all customer complaints as well as a copy of each complaint in a documentation file. The COR may request to review the log and/or documentation file at any time.

4. Performance Measurement. Performance will be measured in accordance with the following table:

Performance-Based Matrix

Performance Element
Performance Requirement
Surveillance Method
Frequency
Acceptable Quality Level
Contract Services
Contract Services furnished as prescribed in the PWS as applicable.
Inspection by the COR
Random inspection of all sampling of contract services.
>95% of services inspected performed timely and without rework required.
Overall Contract Performance
Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR’s annual report on contractor performance
Assessment by the COR
Annual
All service elements rated Satisfactory (or higher) Satisfactory = 95% or above average contract acceptable random sampling
Contractor Self Reporting
Contract Services furnished as prescribed in the PWS as applicable.
Contractor Self Reports
Monthly
>95% of services reported performed timely and without rework required.
Customer Feedback
Customer complaints reviewed by COR
Inspection by the COR
Per Occurrence
100% of valid customer complaints resolved
Invoicing
Monthly invoices per contract procedures are timely and accurate.
Review & acceptance of the invoice by COR
Monthly
100% accuracy

5. Incentives/Disincentives:

For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.

In accordance with the inspection of services provisions of the contract (52.212-4 (a) Inspection/Acceptance), the contractor will provide quality products in a timely manner since the Government can require the contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.

TECHNICAL EXHIBIT #1

CUSTODIAL SERVICE AREA SCHEDULE

SAYLORVILLE LAKE 2024

CONTRACT AREA: PRAIRIE FLOWER “SOUTH” CAMPGROUND

CONTRACT PERIOD OF PERFORMANCE: 27 APRIL – 21 OCTOBER 2024; 7 DAYS PER WEEK; TOTAL DAYS WORKED: 178

PRE-WORK TRAINING CONFERENCE: 9:00 AM - 3:00 PM; 27 APRIL 2024

MINIMUM REQUIRED PERSONNEL: 2 People

CONTRACTOR DUTY SCHEDULE: Contractor will be paid only for the actual days worked during the contract period. Contractor will be required to perform duties 7 days per week.

TYPE OF FACITILTY

SHOWER BUILDINGS5
CAMPSITES**135
PLAYGROUNDS4
TRASH CANS10
DRINKING FOUNTAINS14
TRAILER DUMP STATION1

** A campsite typically includes 1 table and 1 fire ring.

SAYLORVILLE LAKE 2025

CONTRACT AREA: PRAIRIE FLOWER “SOUTH” CAMPGROUND

CONTRACT PERIOD OF PERFORMANCE: 27 APRIL – 25 OCTOBER 2025; 7 DAYS PER WEEK; TOTAL DAYS WORKED: 182

PRE-WORK TRAINING CONFERENCE: 9:00 AM - 3:00 PM; 27 APRIL 2025

CONTRACTOR DUTY SCHEDULE: Contractor will be paid only for the actual days worked during the contract period. Contractor will be required to perform duties 7 days per week.

TYPE OF FACITILTY

SHOWER BUILDINGS5
CAMPSITES**135
PLAYGROUNDS4
TRASH CANS10
DRINKING FOUNTAINS14
TRAILER DUMP STATION1

SAYLORVILLE LAKE 2026

CONTRACT AREA: PRAIRIE FLOWER “SOUTH” CAMPGROUND

CONTRACT PERIOD OF PERFORMANCE: 27 APRIL – 25 OCTOBER 2026; 7 DAYS PER WEEK; TOTAL DAYS WORKED: 182

PRE-WORK TRAINING CONFERENCE: 9:00 AM - 3:00 PM; 27 APRIL 2026

CONTRACTOR DUTY SCHEDULE: Contractor will be paid only for the actual days worked during the contract period. Contractor will be required to perform duties 7 days per week.

TYPE OF FACITILTY

SHOWER BUILDINGS5
CAMPSITES**135
PLAYGROUNDS4
TRASH CANS10
DRINKING FOUNTAINS14
TRAILER DUMP STATION1

TECHNICAL EXHIBIT #2

PRAIRIE FLOWER “SOUTH” CAMPGROUND CUSTODIAL SERVICE AREA MAP

TECHNICAL EXHIBIT #3

ANNUAL RECREATION AREA SCHEDULES

2024 SAYLORVILLE LAKE RECREATION SEASON

CAMPGROUNDS*DATES
CHERRY GLEN15 APR - 21 OCT
BOB SHETLERCLOSED
ACORN VALLEY1 MAY - 21 OCT
PRAIRIE FLOWER1 MAY - 21 OCT

* Open to campers 24 hrs. daily, closed to visitors from 10PM-6AM.

* Open 9AM - first day of season, close NOON - last day of season.

DAY USE AREAS*DATESHOURS
COTTONWOOD PICNIC15 APR - 13 OCTDAILY 6AM-10PM**
CHERRY GLEN PICNIC15 APR - 13 OCTDAILY 6AM-10PM**
WALNUT RIDGE PICNIC15 APR - 13 OCTDAILY 6AM-10PM**
SANDPIPER PICNIC1 MAY - 13 OCTDAILY 6AM-10PM***
BOB SHETLER PICNICCLOSEDDAILY 6AM-10PM***
OAK GROVE PICNIC & BEACH28 MAY - 2 SEPDAILY 6AM-10PM
BOB SHETLER FISHING ACCESSOPEN ALL YEAROPEN 24 HOURS

* Day Use Area gates and buildings are open/closed and locked daily at times indicated; areas close at 8pm on last day of season.

** Cottonwood, Cherry Glen Picnic and Walnut Ridge Picnic open at 7am and close at 8pm during the month of April and the day after Labor Day thru October.

*** Sandpiper and Bob Shetler Picnic Areas open at 7am and close at 8pm the day after Labor Day thru September.

BOAT RAMPSDATESHOURS
LAKEVIEW BOAT RAMPSSEASONAL****OPEN 24 HOURS
CHERRY GLEN BOAT RAMPSSEASONAL****OPEN 24 HOURS
SANDPIPER BOAT RAMPSEASONAL****OPEN 24 HOURS

**** Area closed when snow/ice covered - No winter road maintenance.

2025 SAYLORVILLE LAKE RECREATION SEASON

CAMPGROUNDS*DATES
CHERRY GLEN15 APR - 15 OCT
BOB SHETLER1 MAY - 15 OCT
ACORN VALLEY1 MAY - 1 OCT
PRAIRIE FLOWER1 MAY- 25 OCT

* Open to campers 24 hrs daily, closed to visitors from 10PM-6AM.

DAY USE AREAS*DATESHOURS
COTTONWOOD PICNIC15 APR - 12 OCTDAILY 6AM-10PM**
CHERRY GLEN PICNIC15 APR - 12 OCTDAILY 6AM-10PM**
WALNUT RIDGE PICNIC15 APR - 12 OCTDAILY 6AM-10PM**
SANDPIPER PICNIC1 MAY - 12 OCTDAILY 6AM-10PM***
BOB SHETLER PICNIC1 MAY - 12 OCTDAILY 6AM-10PM***
OAK GROVE PICNIC & BEACH27 MAY - 1 SEPDAILY 6AM-10PM
BOB SHETLER FISHING ACCESSOPEN ALL YEAROPEN 24 HOURS

* Day Use Area gates and buildings are open/closed and locked daily at times indicated; areas close at 8pm on last day of season.

** Cottonwood, Cherry Glen Picnic and Walnut Ridge Picnic open at 7am and close at 8pm during the month of April and the day after Labor Day thru October.

*** Sandpiper and Bob Shetler Picnic Areas open at 7am and close at 8pm the day after Labor Day thru September.

BOAT RAMPSDATESHOURS
LAKEVIEW BOAT RAMPSSEASONAL****OPEN 24 HOURS
CHERRY GLEN BOAT RAMPSSEASONAL****OPEN 24 HOURS
SANDPIPER BOAT RAMPSEASONAL****OPEN 24 HOURS

**** Area closed when snow/ice covered - No winter road maintenance.

2026 SAYLORVILLE LAKE RECREATION SEASON

CAMPGROUNDS*DATES
CHERRY GLEN15 APR - 15 OCT
BOB SHETLER1 MAY - 15 OCT
ACORN VALLEY1 MAY - 1 OCT
PRAIRIE FLOWER1 MAY - 25 OCT

* Open to campers 24 hrs daily, closed to visitors from 10PM-6AM.

DAY USE AREAS*DATESHOURS
COTTONWOOD PICNIC15 APR - 11 OCTDAILY 6AM-10PM**
CHERRY GLEN PICNIC15 APR - 11 OCTDAILY 6AM-10PM**
WALNUT RIDGE PICNIC15 APR - 11 OCTDAILY 6AM-10PM**
SANDPIPER PICNIC1 MAY - 11 OCTDAILY 6AM-10PM***
BOB SHETLER PICNIC1 MAY - 11 OCTDAILY 6AM-10PM***
OAK GROVE PICNIC & BEACH25 MAY - 7 SEPDAILY 6AM-10PM
BOB SHETLER FISHING ACCESSOPEN ALL YEAROPEN 24 HOURS

* Day Use Area gates and buildings are open/closed and locked daily at times indicated; areas close at 8pm on last day of season.

** Cottonwood, Cherry Glen Picnic and Walnut Ridge Picnic open at 7am and close at 8pm during the month of April and the day after Labor Day thru October.

*** Sandpiper and Bob Shetler Picnic Areas open at 7am and close at 8pm the day after Labor Day thru September.

BOAT RAMPSDATESHOURS
LAKEVIEW BOAT RAMPSSEASONAL****OPEN 24 HOURS
CHERRY GLEN BOAT RAMPSSEASONAL****OPEN 24 HOURS
SANDPIPER BOAT RAMPSEASONAL****OPEN 24 HOURS

**** Area closed when snow/ice covered - No winter road maintenance

ATTACHMENT 1

QUALITY ASSURANCE

MONITORING FORM

image2.emf image3.emf image1.jpeg

File details come from the government source that posted it. Updated .