This document is a performance work statement for preventive maintenance and repair services of multi-purpose equipment for the 403rd Army Field Support Brigade Logistics Readiness Center in the Republic of Korea. The contractor shall provide semi-annual, annual, and biennial maintenance as well as unscheduled repairs for multi-purpose vehicles, construction equipment, tactical vehicles, and trailers at Camp Humphreys, Camp Casey, Camp Henry, and Camp Carroll. The contractor must have experience maintaining this type of equipment and hold the necessary licenses. The contract is for one base year with four option years. The contractor shall inspect equipment upon delivery, prepare itemized lists of required parts and tools, perform maintenance and repairs according to technical manuals, and conduct inventories daily. The government will evaluate the contractor's performance according to a quality assurance surveillance plan.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

PREVENTIVE MAINTENANCE AND REPAIR SERVICES OF MULTI PURPOSE EQUIPMENT

FOR 403RD AFSB LOGISTICS READINESS CENTER (LRC)

PART 1

GENERAL

1. GENERAL: This is a non-personnel services contract to provide Preventive Maintenance and Repair of Multi-Purpose Vehicle (Special Equipment Vehicle), Construction Equipment, Wheeled Tactical Vehicle and Trailers for Logistics Readiness Center (LRC), 403rd Army Field Support Brigade (AFSB). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1. Description of Services/Introduction: The Contractor shall provide all necessary skilled personnel, master mechanic tools sets (general hand tools), personnel safety equipment (safety glasses, shoes, coveralls, and gloves), and other items and services necessary to conduct semi-annual, annual and biennial maintenance services and unscheduled maintenance and repairs in accordance with manufacture specifications as a majority of the items are locally purchased vehicles.

1.2. Background: In order to provide world-class service to more than 20,000 Service Members on the Peninsula, the customers need assistance maintaining specialized equipment. The customers are requesting additional maintenance support through contracted maintenance teams. Lack of specialized Table of Distribution and Allowances (TDA) authorized manpower decreases the ability for the customers to properly program maintenance timelines and service schedules. In a sense, we are in the “reactive mode” and not the “proactive mode” in the maintenance arena. The contract maintenance will give the customers the ability to program maintenance and establish continuity of Base Operations and increase the Readiness for the Garrison mission.

1.3. Objectives: The contractor shall keep inoperable or malfunctioning equipment listed in Attachment 8.3.3. or similar equipment in good working condition and improve operational safety through repair and maintenance effort.

1.4. Scope of Work:

1.4.1. The contractor shall conduct semi-annual, annual, biennial maintenance and unscheduled repair of Multi-Purpose Vehicles, Construction Equipment, Tactical Vehicles and Trailers listed in Attachment 8.3.3. and similar equipment for the customers in accordance with manufacture specifications and technical manuals. The equipment listed in the Attachment 8.3.3. is currently owned by all Garrisons and serves as illustrative examples for vendors’ better understanding of requirements. The contractor shall maintain and repair similar equipment even not listed in the attachment.

1.4.2. The Government will revoke its assumption of risk regarding individual tools used under this effort. At no time will the Government be responsible for the replacement of lost, damaged or broken individual tools.

1.4.3. Scheduled and Unscheduled Preventive Maintenance Service: A contractor shall perform both of Scheduled and Unscheduled maintenance service under the same Contract Line Item, which means government will not separately pay for unscheduled service. Unscheduled maintenance is will be performed during the normal duty day. Monthly payment amount set up by this contract will cover both of the Scheduled and Unscheduled preventive maintenance service.

1.5. Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years. The period of Performance reads as follows:

Base and Option Years
Period of Performance
Base Year
TBD – 31 December 2021
1st Option Year
1 January 2022 – 31 December 2022
2nd Option Year
1 January 2023 – 31 December 2023
3rd Option Year
1 January 2024 – 31 December 2024
4th Option Year
1 January 2025 – 31 December 2025

1.6. General Information

1.6.1. Quality Control (QC): The contractor shall follow all Quality Control Plan (QCP) to ensure services are performed in accordance within this PWS as well as the QA procedures that are in-place currently at the LRCs. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The initial quality control plan shall be submitted to the KO and COR within 15 days of contract award. The KO and COR will review the plan and provide written approval/acceptance of the plan (after any requested changes are incorporated) within 30 days of award. After the written approval of the quality control plan is provided back to the contractor, any changes to the plan shall be immediately provided to the KO and COR for concurrence for the remaining duration of this contract base period and any option periods thereafter.

1.6.2. Quality Assurance:

The government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3. Recognized Holidays: U.S. and Korean legal Holidays

1.6.3.1. U.S government legal holidays in accordance with 5 U.S.C 6103 as amended are as follows:

Date
Name of Holiday
*1 January
New Year's Day
3d Monday, January
Dr. King's Birthday
3d Monday, February
Washington Birthday
Last Monday, May
Memorial Day
*4 July
Independence Day
1st Monday, September
Labor Day
2d Monday, October
Columbus Day
*11 November
Veterans Day
4th Thursday, November
Thanksgiving Day
*25th December
Christmas Day

* If any of the specified dates falls on a Saturday or Sunday, the holiday shall be observed on the following Monday.

** Any other calendar day designated as a U.S government legal holiday by federal statute or executive order.

1.6.3.2. Korean legal holidays are as follows:

Date
Name of Holiday
1 and *2 January
New Year's Day
**Last day of December and 1&2 January (Lunar Calendar Year)
Lunar New Year Day
1 March
Independence Movement Day
8 April (Lunar Calendar Year)
Buddha's Day
1 May
Labor Day
**5 May
Children's Day
6 June
Memorial Day
15 August
Liberation Day
**14, 15 and 16 August (Lunar Calendar Year)
Chusok
3 October
National Foundation Day
9 October
Hangeul Day
25 December
Christmas Day

*2 January is not actual ROK legal public holiday but is listed in USFK Regulation 690-1 as official Korean holidays.

**Alternate days off for Lunar New Year, Chusok, and Children’s Day will be provided when they fall on Sundays or other Korean public holidays. The alternate days off will be observed on the first non-holiday in the week.

*** Any other day designated as temporary holiday by ROK Government.

1.6.4. Hours of Operation: The contractor is responsible for conducting business, between the hours of 0800 – 1700, Monday thru Friday except Federal holidays and Korean holidays, or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5. Place of Performance: All services required under this contract shall be performed at the U.S Government furnished facilities listed below.

LOCATION
BUILDING NUMBER
AREA
Camp Casey, Dongducheon
1546
I
Camp Humphreys, Pyongtaek
7020
III
Camp Carroll, Waegwan
B915
IV
Camp Henry, Daegu
S1521
IV

1.6.6. Placement of Contractor’s Mechanics by Location: The contractor shall properly line up their mechanics required for performance of this contract at the locations listed in the table at paragraph 1.6.5. based on the status of equipment listed in the Attachment #2, Para 8.3.3 of the PWS.

1.6.7. Type of Contract: The government will award a Firm-Fixed-Price contract.

1.6.8. Security Requirements:

1.6.8.1 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.8.2. Key Control (If applicable): The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons.

NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.8.3. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.8.4. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.8.5. Lock Combinations (If applicable). The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.6.9. Contractor Qualifications:

1.6.9.1. Prime Contractor: The work shall be performed by the prime contractor and cannot be subcontract out. 100% of all work must be completed by the prime contractor and that subcontracting for any work to be performed IAW this PWS is prohibited.

1.6.9.2. Prime Contractor’s Prior Experience: The Contractor shall have a minimum two (2) years of experience within the last seven (7) years in maintenance and repair services of multi-purpose vehicle (Special Equipment Vehicle), construction equipment, wheeled tactical vehicle and trailers or similar type of vehicle and equipment.

1.6.9.3. Prime Contractor’s Business Registration: The offeror shall have both English and Korean version of current and valid documents issued by the ROK Government authorities as follows:

(a) Business Registration (사업자등록증)

(b) Business Type: Professional Motor Vehicle Maintenance Business (자동차전문정비업) in the Automotive Vehicle Maintenance and Repair Business Registration (자동차관리사업등록증) in accordance with Article 53 of Registration of Automotive Vehicle Maintenance and Repair Business (자동차관리사업의 등록) of Automotive Vehicle Management Law (자동차관리법).

1.6.9.4. Contractor Personnel:

1.6.9.4.1. Contract Manager (CM): The contractor shall provide a contract manager who shall be responsible for the performance of the work. The contract manager shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager shall be available between 8:00 a.m. to 5:00 p.m., Monday thru Friday except Federal holidays and Korean holidays listed in paragraph 1.6.3., or when the government facility is closed for administrative reasons. A Contract Manager shall have a minimum two (2) years of experience within the last seven (7) years as a CM in maintenance and repair services of multi-purpose vehicle (Special Equipment Vehicle), Construction Equipment, Wheeled Tactical Vehicle and Trailers or similar type of vehicle and equipment services. The Contract Manager shall be able to speak, read, write, and converse in English.

1.6.9.4.2. Site Managers (SMs): The contractor shall provide site managers at each site among contractor mechanics who meet the contractor mechanics requirements stated at below subparagraph 1.6.9.4. The SMs shall manage their workforces at each site in daily operation, coordinate with the Government representatives, and maintain a close liaison with the Government. The site manager shall have at least two (2) years of experience within the last seven (7) years in maintenance and repair services of multi-purpose vehicle (Special Equipment Vehicle), Construction Equipment, Wheeled Tactical Vehicle and Trailers or similar type of vehicle and equipment services. The Site Manager shall possess the current and valid “Above Craftsman Motor Vehicles Maintenance License (자동차 정비기능사 이상)” issued by the ROK Government authority. The Site Manager shall be able to speak, read, write, and converse in English.

1.6.9.4.3. Mechanics: The Contractor shall provide all mechanics who shall possess current and valid either one of the below listed license. The contractor shall provide mechanics at least below listed two qualified mechanics at each site.

(a) Above Craftsman Motor Vehicles Maintenance License. (자동차 정비기능사 이상)

(b) Above Craftsman Construction Machinery Maintenance License. (건설기계 정비기능사 이상)

And the contractor shall have mechanics with a minimum two (2) years of prior experience within the last seven (7) years in n maintenance and repair of multi-purpose vehicle (Special Equipment Vehicle), Construction Equipment, Wheeled Tactical Vehicle and Trailers or similar type of vehicle and equipment services. The contractor shall not allow any employee that is not certified, trained or licensed for a particular task to perform such work. The contractor, at its own expense shall maintain all qualifications and certifications required to perform the requirements of this PWS.

1.6.10. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings, the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.11. Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.12. Identification of Contractor Employees:

1.6.12.1. All persons hired by the Contractor for performance under this contract requiring entry to a U.S. Government installation shall be processed through the Contracting Officer, or his/her representative, and approved for entry as required by: (1) for Contractors requiring entry onto an U.S. Army installation, AR 604-5, AR 606-15, and USFK Regulation 190-7.

1.6.12.2. In addition, the contractor shall ensure that each of its employees requiring entry possesses an identification badge or pass as may be required: (1) by the Provost Marshall for the area in which the contract work is to be performed, for entry onto U.S. Army installations. Each employee shall be required to wear his badge upon his person at all times while on duty within a U.S. Government installation or at such times and places where identification is required. In the event that the Contractor’s employment of anyone for performance of this contract terminates or is suspended, or that any contractor employee otherwise is removed from performance of this contract, the Contractor shall recover from each such employee all identification items, including passes, that tend to associate the employee with this contract, and shall return to the COR any such identification items and passes that the Government previously issued.

1.6.12.3. In the event that services to be performed entail access to restricted areas, all Contractor personnel requiring such access shall be required to have a background investigation, DD Form 441. The Contractor shall submit to the COR (or to the Contracting Officer if a COR is not appointed), within 5 calendar days after date of contract award, a list of its employees who will require a background investigation in accordance with this provision.

1.6.12.4. Conduct of contractor personnel: The contractor personnel shall observe and obey all U.S. Army, and U.S. Army installation laws and regulations while working on U.S Army installations. The contractor personnel shall not wear any military uniforms (U.S or ROK) and shall not wear any clothing that has or depicts derogatory messages to other personnel, U.S. Government, and U.S. Army. The contractor personnel shall not engage in any type of altercation or violent activities with U.S and other personnel. Any personnel in violation of this paragraph shall be promptly removed from the installation under the Military Police escort if applicable, and shall not be permitted to access the U.S Army installations until the matter is resolved and re-entrance is permitted by the servicing COR.

1.6.12.5. Contractor personnel shall at all times clearly identify themselves as contractors while performing any duties under this contract in a government workplace. Contractor personnel shall wear a badge, prominently displayed, that clearly identifies the company that they work for and their name / title. In lieu of this requirement, contractor personnel may choose to wear a contractor uniform that also meets the same identification requirements (at no cost to the government). When conducting (or in attendance of ) any meeting, telephone communication, written communication, or any other correspondence, the contractor employee(s) shall clearly make it known to all other persons involved that they are a contactor representative and in no way represents the government in any manner.

1.6.13. Invoicing:

1.6.13.1. The Contractor shall submit DD Form 250, Material Inspection and Receiving Report, to the COR for review and payment on a monthly basis. The DD Form 250 will serve as an invoice and shall be accompanied by DA Form 2404/5988E.

1.6.13.2. Once COR approves the DD Form 250, the COR will submit the DD Form 250 to acom.yongsan.usfk.mbx.j4-lcs@mail.mil for payment in an email and Cc it to LCS Branch, 19th ESC DMC.

PART 2

DEFINITIONS AND ACRONYMS

1. DEFINITIONS AND ACRONYMS:

2.1. Definitions

“Multi-Purpose Vehicle (Special Equipment Vehicle)” means a vehicle consisting of a general –purpose chassis with special-purpose body and/or mounted equipment designated to meet a specialized requirement. (e.g. pesticide sprayer, water sprayer, crane, earth auger, fuel tank, water tank, boom bucket, sewer cleaner, wrecker, snow blower, road sweeper, scissor lift, tractor, dump truck, mixer concrete and etc.)

“Construction Equipment” means equipment which may be mobile, semi-permanent or permanent, intended for heavy work such as earth moving, lifting containers or materials, drilling holes in earth or rock, or concrete or paving application. (i.e. loader, backhoe, excavator, grader, bulldozer, asphalt paver, asphalt roller, compressor, compactor and etc.)

“Wheeled Tactical Vehicle” means a vehicle having military characteristics resulting room military research and development processes, designed primarily for use by forces in the field in direct connection with, or support of combat or tactical operations.

“Trailer” means a container on wheels which is pulled by a car or other vehicle and which is used for transporting large or heavy items.

2.2. Acronyms:

CORContracting Officer Representative
DLADefense Logistics Agency
GCSS-AGlobal Combat Support System-Army
IAWIn Accordance With
LRCLogistics Readiness Center
MFGManufacturer
QCQuality Control
QCPQuality Control Plan
ROKRepublic of Korea
TBTechnical Bulletin
TDATable of Distribution and Allowances
TMTechnical Manual
U.S.C.United States Code
USFKUnited States Forces Korea

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES: None

PART 4

CONTRACTOR FURNISHED PROPERTY, EQUIPMENT AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. The Contractor shall provide all necessary skilled personnel, master mechanic tools sets (general hand tools) and personnel safety equipment (safety glasses, shoes, coveralls, and gloves). The Government will not provide individual tools to be used by maintenance personnel under repair and maintenance effort.

PART 5

SPECIFIC TASKS

5. CONTRACTOR PERFORMANCE REQUIREMENTS: The contractor shall perform preventive maintenance and repair services on any Multi-purpose vehicle (Special Equipment Vehicle), Construction Equipment and Tactical vehicle or Trailers enclosed in Attachment 2 of this document or similar equipment. All services will be In Accordance With (IAW) manufacturer specification and applicable to each vehicle to determine the extent of service work and replacement parts required. These tables can be found in the technical manual for each perspective vehicle covered under this contract. The maintenance actions will be updated in Global Combat Support System-Army (GCSS-A) by the Government supervisor or motor pool clerk.

5.1. Upon delivery of the vehicles to the delivery points, the contracted personnel shall perform joint technical inspections with the LRC shop foreman or designated representative on the equipment as identified under each maintenance service type in the applicable technical manual and annotate deficiencies on the Department of the Army (DA) form 2404/5988E. The contracted personnel shall identify any problems for inclusion in the maintenance effort that may need to occur to keep the equipment in a good, safe, and properly functioning condition and annotate on DA form 2404/5988E.

5.2. The contracted personnel shall prepare an itemized list of all parts on DA2404/5988E, special tools, and lubricants needed to complete the maintenance action. This list shall be turned in to the co-located Government maintenance supervisor or designated representative within the first two (2) days of receipt of equipment. The Government supervisor or designate will order parts and supplies needed for vehicle repair. The supervisor will also ensure all specialized tooling (outside the basic tool set) is available for the contractor to perform their maintenance mission.

5.3. The contracted personnel shall perform repair and maintenance regarding all problems and deficiencies annotated on DA Form 2404/5988E in accordance with technical manuals and commercial service manuals.

5.3.1. Any areas of the vehicle repaired, welded, or damaged during the repair shall be treated for corrosion prevention and spot painted in accordance with TM 43-0139 and\or TB 43-0242.

5.3.2. Any vehicle markings or stenciling damaged during the repair and maintenance effort shall also be re-applied to original specifications.

5.4. Once notified that the maintenance activity is complete, the Government supervisor (or a designated motor pool personnel) will then inspect the vehicle for acceptance. Any discrepancies, missed repair work, work not done in accordance with the manufacturers repair procedure specification, or contractor damaged items will result in a failed acceptance inspection. Any deficiencies noted on an acceptance inspection shall be corrected within 24 hours, tracked for reporting purposes, and shall incur no additional costs to the Government. The maintenance action shall not be considered complete by the contractor until a passing acceptance inspection has been signed by the Government supervisor or designated motor pool personnel.

5.5. The contractor shall, upon completion of each maintenance action, and at the end of each workday conduct an inventory of all tools, special tools, repair parts, technical publications, and test equipment to ensure that no items are left in the equipment at the time of acceptance inspection. Proper tool control procedures identified within the motor pool area shall be followed at all times. Any special tools, unused lubricants\paint\chemicals, and technical publications used during each workday shall be turned in at the conclusion of each workday to the unit representative or motor pool personnel.

5.6. The following timeliness standards shall apply to the contractor’s maintenance efforts: Upon delivery of the vehicles to the delivery points, the contractor shall start work on the vehicle as soon as possible after an initial acceptance and inspection. The contractor shall complete the service and shall have turned the vehicle in for acceptance inspection within timeframe set by the Government supervisor or designated representative. The co-located Government official or designated representative will provide the vehicles to be serviced by contracted personnel and set priorities of work and timelines for completion.

5.7 CONTRACTOR MANAGEMENT REPORTING (CMR): The contractor shall report ALL contractor labor hours (including subcontractor labor hours) requires for performance of services provided under this contract for PM and Repair Services of Multi-purpose vehicle (Special Equipment Vehicle), Construction Equipment and Tactical vehicle or Trailers.. The contractor is required to completely fill in all required data fields using the following web address: http://www.sam.gov.

The Contractor shall reference FAR clause 52.204-14: Service Contract Reporting Requirements. And follow reporting instruction in accordance with paragraphs (c) and (d) of the clause annually by October 31 for services performed under this contract during the preceding Government fiscal year (October 1-September 30).

(c) The Contractor shall report the following information:

(1) Contract number and, as applicable, order number.

(2) The total dollar amount invoiced for services performed during the previous Government fiscal year under the contract.

(3) The number of Contractor direct labor hours expended on the services performed during the previous Government fiscal year.

(4) Data reported by subcontractors under paragraph (f) of this clause.

(d) The information required in paragraph (c) of this clause shall be submitted via the internet at www.sam.gov. (See SAM User Guide). If the Contractor fails to submit the report in a timely manner, the contracting officer will exercise appropriate contractual remedies. In addition, the Contracting Officer will make the Contractor’s failure to comply with the reporting requirements a part of the Contractor’s performance information under FAR subpart 42.15.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2021. Contractor may direct questions to the help desk at: http://www.sam.gov

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS:

6.1. Publications will be downloaded from internet for each specific type of commercial vehicle and service to be completed. Technical Manuals will be used for tactical equipment.

TM-9-2320-365-10, M1078 SERIES, 2-1/2 TON, 4x4, LIGHT MEDIUM TACTICAL VEHICLES (LMTV) E

QUIPMENT

TM-9-2320-429-10, TRUCK, TANK, 8X8, M978 W/WINCH, NSN 2320-01-097-0249 (EIC B2C)

M978 W/O WINCH, NSN 2320-01-100-7672 (EIC B2H)

TM-9-2320-361-10, 2-1/2-TON, 6 X 6, M44A2 SERIES TRUCKS (MULTI FUEL)

TM-9-2320-366-10, M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TM-9-2320-280-10

PART 7

PERFORMANCE REQUIREMENTS SUMMARY (PRS)

7.1. Performance Requirements Summary

7.1.1. The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

7.1.2. Inspection and Acceptance: As a performance based contract, the Government will evaluate the Contractor’s performance IAW the Quality Assurance Surveillance Plan (QASP) for those tasks listed in the Performance Requirements Summary (PRS) at Section 5 of the Performance Work Statement. The QASP will enable the Government to monitor Contractor performance against the reporting established in the PWS. Inspections will also occur IAW the Contractor’s Quality Control Plan and IAW FAR 52.246-4, Inspection of Services-Fixed Price. The Contractor’s performance will be rated monthly. If the COR or Government Representative at any site finds a contracted employee in violation of any areas within this PWS they will notify the contractor to remove the employee and replace them within (5) days of notice.

7.1.3. PRS Table:

Performance Objective
Para
Standard
Performance Threshold
Method of Surveillance

PRS #1

Joint Technical Inspection

5.1
Joint technical inspection shall be conducted by the contractor personnel and the government personnel. Any problems with the vehicle shall be identified on DA Form 2404/5988E.
95%
Random monitoring and monthly inspection by COR.

PRS #2.

Itemization of Parts, Special Tools, and Lubricants required for repair and maintenance

5.2
The contracted personnel shall prepare an itemized list of all parts, special tools, and lubricants needed to complete the maintenance action. This list shall be turned in to the co-located Government maintenance supervisor within the first two (2) days of receipt of equipment.
95%
Random monitoring and monthly inspection by COR.

PRS #3.

Performance of Repair and Maintenance

5.3
The contracted personnel shall perform repair and maintenance regarding all problems and deficiencies annotated on DA Form 2404/5988E in accordance with technical manuals and commercial service manuals.
95%
Random monitoring and monthly inspection by COR.

PRS #4.

Paint/Corrosion Control

5.3.1
Any areas of the vehicle repaired,

welded, or damaged during the repair shall be treated for corrosion prevention and spot painted IAW TM 43-0139 and\or TB 43-0242.

95%
Random monitoring and monthly inspection by COR.

PRS #5.

Markings/ Stenciling

5.3.2
Any vehicle markings or stenciling damaged during the repair\maintenance effort shall also be re-applied to original specifications.
95%
Random monitoring and monthly inspection by COR.

PRS #6.

Acceptance Inspection

5.4
Contractor's performance shall pass acceptance inspections
Not to exceed two attempts at repair of material.
Random monitoring and monthly inspection by COR.

PRS #7.

Workday Inventory

5.5
The contractor shall, upon completion of each work order, and at the end of each workday conduct an inventory of tools, repair parts, and etc. Any special tools, unused lubricants\paint\chemicals, and technical publications shall be turned into place of issue or motor pool personnel.
No more than two violations of failing to maintain property accountability.
Random monitoring and monthly inspection by COR.

PRS #8.

Timeliness Standards

5.6
The contractor shall complete the service and shall have turned the vehicle in for acceptance inspection within timeframe set by the Government supervisor.
No more two times failure to meet standard on monthly basis.
Random monitoring

PRS #9.

CMR Report

5.7
Contractor shall conduct CMR on an annually basis.
100%
100% inspection annually by COR.

PART 8

ATTACHMENT

8. Attachment

8.1. Attachment 1 - Deliverables Schedule

8.2. Attachment 1 - Estimated Manpower by Location

8.3. Attachment 2 - Status of Equipment

8.3.1. Overview

8.3.2. Status of Equipment by Location

8.3.3. List of Equipment by Location

8.2.3.1. Camp Humphrey

8.2.3.2. Camp Casey

8.2.3.3. Camp Henry

8.2.3.4. Camp Carroll

ATTACHMENT 1

7.1. 8.1. Deliverables Schedule

Deliverable
Frequency
# of Copies
Medium/Format
Submit to
QCP
1 (within 30 days of contract award)
2
Hard Copy
COR and PCO
DA Form 2404/5988E
Monthly
1
Hard Copy
COR and LCS Br.,

19th ESC DMC

DD 250
Monthly
1
Hard Copy
COR and LCS Br.,

19th ESC DMC

8.2. Estimated Manpower by Location

Humphrey
Casey
Henry
Carroll
Total
Contract Manager
1
1
Site Manager
1
1
1
1
4
Mechanics
6
5
2
2
15

ATTACHMENT 2

8.3. Status of Equipment

8.3.1. Overview: Equipment is classified as four categories, Multi-Purpose Vehicle (Special Equipment Vehicle), Construction Equipment, Tactical Vehicle, and Trailers. The performance of maintenance and repair will be conducted at four (4) government facilities located on the following bases: Camp Humphrey, Camp Casey, Camp Henry, and Camp Carroll. The equipment listed in this Attachment is currently owned by the customer and s8679314erves as illustrative examples for vendors’ better understanding of requirements, which means the contractor shall maintain and repair similar equipment, which not listed in this attachment.

8.3.2. Status of Equipment by Location

Types of Equipment

Humphrey
Casey
Henry
Carroll
Total

Multi-Purpose Vehicle

49
35
5
5
94

Construction Equipment

20
19
12
8
59
Tactical Vehicle
8
0
1
0
9
Trailers
4
0
0
0
4
Total
81
54
18
13
166

8.3.3. List of Equipment by Location

Note: A Construction equipment repairman is expected to perform maintenance on any construction equipment. Regardless of the country of manufacture. The majority of the equipment is of Korean Mfg. This is indicated by the serial numbers beginning with “K”. There is also a Grove dealer in Korea as well. The same is applicable with wheel vehicle repair. The LRC will provide the special tools and service manuals required

8.3.3.1. CAMP HUMPHREY

Multi-Purpose Equipment (Humphrey)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG
1
CRANE TRUCK MOUNTED
Unknown
KNCSJY76AJK232281
Unknown
2
CRANE TRUCK MOUNTED
Unknown
KNCWJZ76AJK233241
Unknown
3
CRANE TRUCK MOUNTED
Unknown
KNCWJZ76AJK233243
Unknown
4
CRANE TRUCK MOUNTED
Unknown
KNCWJZ76AJK233661
Unknown
5
CRNE TRK 25T TMS300-5
TMS-300-5
43204
Grove
6
CRNE TRK 25T TMS300-5
TMS-300-5
336329
Grove
7
CRANE TRUCK MOUNTED: RT530E-2
RT530E-2
231304
Grove
8
CRANE, TELESCOPIC TRUCK MOUNTED
Unknown
KLTBC3AH19K000044
Unknown
9
CRANE WHL MTD
LRT110
98360
Terex
10
CRANE WHL MTD
LRT110
98222
Terex
11
CRANE TRUCK MOUNTED:

DHS 870 AERIAL

DHS 870
DH128-0420712
Donghae
12
TRUCK, DUMP 8 TO 8-1
ACVCIK1552
KL3F3DJF15K000007
Unknown
13
TRUCK, DUMP 8 TO 8-1
ACVCIK1552
KL3F3DJF15K000006
Unknown
14
TRUCK, DUMP 8 TO 8-1
ACVCIK1552
KL3F3DJF18K000023
Unknown
15
TRUCK, DUMP 5-1/2 TO
ACVCIK2552
KL3F3DJF16K000013
Unknown
16
TRUCK, DUMP 7-3/4 TO
ACVCIK3552
KMCDB18YPVC106440
Unknown
17
TRUCK, DUMP 7-3/4 TO
ACVCIK3552
KMCDB18TP8C022513
Unknown
18
TRUCK, DUMP 7-3/4 TO
ACVCIK3552
KMCDB18TP8C022510
Unknown
19
TRUCK, DUMP 7-3/4 TO
ACVCIK3552
KMCDB18TP8C022511
Unknown
20
TRUCK, DUMP 8 TO 10
ACVCIK4552
KMCPB18SP4C033185
Unknown
21
SWEEPER ROTARY SELF-P
HIGH SPEED
KLTCH4CK5CK000011
Unknown
22
SWEEPER STREET:

KANGLIM 850MINI DULEVO-I

850MINI
R49440001
Dulevo
23
SWEEPER, STREET COMPACT
Unknown
RTGS1000D1601
Unknown
24
SWEEPER VACUUM WLK BE
VARIABLESP
KLTCH4CK5CK000010
Unknown
25
AUGER EARTH TRK MTD
Unknown
KMFLA18KPBC054384
Kanglim
26
TRUCK, STAKE 5 TO 6-
ACVCI01304
KMFLA18KPBC058564
Unknown
27
TRUCK, STAKE 5 TO 6-
ACVCI01304
KMFLA18KPBC058566
Unknown
28
TRUCK, STAKE 5 TO 6-
ACVCI01304
KLTCC3ATDEK000046
Unknown
29
TRUCK, STAKE 5 TO 6-
ACVCI01304
KLTCC3ATDEK000049
Unknown
30
TRUCK, STAKE 5 TO 6-
ACVCI01304
KLTHC3HT5FK000015
Unknown
31
TRUCK, STAKE 10 TON
ACVCIQ3301
KMFEA18LPCC060766
Unknown
32
TRUCK, CARGO:

TRUCK TRACTOR BUCKET LOAD I

Unknown
KMFLA19JPXC004574
Unknown
33
COMBINED SEWER CLEANER
Unknown
KMFDA18JPJC099681
Unknown
34
CLEANER SEWER TRK MT
1000 GAL
KMFLA19JPXC008102
Unknown
35
TRUCK,UTILITY:

ROAD MARKING MACHINE

Unknown
KMFHA17GPGC010700
Unknown
36
TRUCK,UTILITY:

ROAD MARKING MACHINE

Unknown
KMFH17GPHC023144
Unknown
37
TRUCK, MULTI TASK WATER SPRAYER AND BRUS
Unknown
KMFDA18JPHC095585
Unknown
38
TRUCK, TANK WATER 18
34000GVW
KMFLA18KPBC058497
Unknown
39
TRUCK PLATFORM
KMFHA17GPGC010109
Unknown
40
TRUCK MAINT W
7500GVW
KNCSJZ76ADK825477
Unknown
41
TRUCK, SNOW BLOWER WITH SPREADER
Unknown
KMFDA18JPHC095596
Unknown
42
TRUCK, SPREADER WITH SNOW BRUSH
Unknown
KMFDA18JPHC095595
Unknown
43
TRK TRACTOR 6X4 4
ACVCIQ3505
KLUGL3TC8DK000007
Unknown
44
SWEEPER MAGNETIC SELF
JD 401B
264290
John Deer
45
LIFT, SCISSOR: JC-50 3JTEC
Unknown
3JM-JC-02223
Unknown
46
STRLR LOW BED
ACVCIG6103
HK130302
Unknown
47
SPREADER, SAND: P-7
P-7
01-104
Unknown
48
SPREADER, SAND:

RTS100 RE-N-TECH KOREA

RTS100
100-0701
Unknown
49
SPREADER, SAND:

RTS100 RE-N-TECH KOREA

RTS100
100-0702
Unknown

Construction Equipment (Humphrey)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG
1
LOADER SCP JICASE MW24C
MW24C
9156764
JI Case
2
LOADER SCP JICASE MW24C
MW24C
9160111
JI Case
3
LOADER, SKID
DSL702
SL702-05624
Doosan

Infracore

4
LOADER, SKID
DSL702
SL702-05625
Doosan

Infracore

5
LOADER SCOOP TYPE
HSL850-7
S12310385
Hyundai
6
LOADER SCOOP DSL DRVN
Unknown
HHKHLM01CC0000545
Unknown
7
LOADER, SKID STEER
Unknown
RT1612US0001
Unknown
8
LOADER, SKID STEER
Unknown
RT1612US0002
Unknown
9
LOADER, SKID STEER
Unknown
RT1612US0003
Unknown
10
EXCAVATOR,MULTIPURPOSE,

WHEELED: ROBEX 55

ROBEX 55
M80210766
Hyundai
11
EXCAVATOR,MULTIPURPOSE,

WHEELED: EC210B V

EC210B V
VCEC210BC00024320
Volvo
12
EXCAVATOR, 2017 HX60, CRAWLER,
HX60
HHKHM9A6CH0001425
Hyundai
13
EXCAVATOR, 2017 HW60, BACKHOE,
HW60
HHKHM9A7CH0000839
Hyundai
14
EXCAVATOR, BACKHOE TRACK-S
HW61
HHKHMJ04LF0000107
Hyundai
15
GRADER ROAD CAT 130G
130G
7GB01799
Catapillar
16
GRADER ROAD CAT 130G
130G
7GB01383
Catapillar
17
GRADER ROAD CAT 130G
130G
7GB01506
Catapillar
18
GRADER ROAD CAT 130G
130G
7GB01809
Catapillar
19
TRCTR FT CAT D7G
D7G
3ZD00196
Catapillar
20
COMPACTOR
Unknown
CAT0CC34T34600373
Unknown

Tactical Vehicle (Humphrey)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG
1
FS 2 1/2T M49A2C
M49A2CWW
0528-10034
N/A
2
TRK FS 21/2T M49A2C
M49A2C
0528-10153
N/A
3
TRUCK, TANK M978A2
M978A2
10TGJ6Y183S079210
N/A
4
TRUCK, TANK M978A2R1
M978A2R1WW
10T2K1J22J1033548
N/A
5
TRUCK, TANK M978A2R1
M978A2R1WW
10T2K1J29J1033577
N/A
6
TRUCK WRECKER W/W M1089A1
M1089A1WW
W15034BFFK
N/A
7
TRK UTIL 10000 M1097
M1097
676512
N/A
8
TRUCK TRACTOR
M915A4
1FUJCPBA91PH58840
N/A

Trailer (Humphrey)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG
1
STRLR LOW BED
ACVCIG6103
HK130302
Unknown
2
STRLR LOW BED
KALYNRLP-50
1K9E16243D1005352
Unknown
3
TRAILER, TANK, WATER M149A2
M149A2
9156
Tactical
4
STLR LB 25T M172A1
M172A1
53620
Tactical

8.3.3.2. CAMP CASEY

Multi-Purpose Equipment (Casey)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG
1
TRUCK CRANE, 60 TON HYDRAULIC
JK600T
JK600T-14061
Junjin
2
CRANE, 30TON TRUCK MOUNTED
JK300T
JK300T-15005
Junjin
3
CARGO CRANE 10TON TRK MTD
GT9CC2
KLTGT9CC2DK000014
Daewoo
4
TRUCK, DUMP, 15TON
CL4DY1
KLTCL4DY1FK000030
Unknown
5
TRUCK, DUMP, 15TON
CL4DY1
KLTCL4DY1FK000031
Unknown
6
TRUCK, DUMP, 15TON
CL4DY1
KLTCL4DY1FK000032
Unknown
7
TRUCK, DUMP, 15TON
CL4DY1
KLTCL4DY1FK000033
Unknown
8
SWEEPER ROTARY SP 344-I
RTRS-85A
KLTCH4CK1CK000042
Retech
9
AUGER EARTH TRK MTD
SA-040C
SA040C0151
Junjin
10
AUGER EARTH TRK MTD
SA-040C
SA040C-0159
Junjin
11
TRUCK, FUEL TANK:

2.5TON, MOVEMENT3000L

HDN25-15HL0-

SHAaM5

KMCVK17RPFC299363
Unknown
12
TRUCK, FUEL TANK:

5T,HD050-16TL0-10SGB-T

HD050-16TL0-

10SGb-T

KMCLK18TPGC098995
Unknown
13
TRUCK, CARGO PICKUP
QT2.5CD-6MHM-

FaT5E

KMFHE17GPGC009972
Unknown
14
TRK MAINT W
DHS15AP
KNCWJZ76ADK728717
Donghae
15
TRUCK, BOOM BUCKET MOUNTED

3.5TON

DHT150AS
KMFHA17GPFC003447
Donghae
16
TRUCK, BOOM BUCKET MOUNTED

3.5TON

DHT150AS
KMFHA17GPFC003452
Donghae
17
SERVICING PLATFORM TRK
JW380T
KMFLA18KPDC071088
Unknown
18
TRUCK CAGO,

5TON WITH POWER LIFT DOOR

HD5CT-15EGb- T6E

KMFLA18TPFC097880
Unknown
19
TRUCK, POWER GATE 5TON,

ROAD MAINTENANCE

HD5CT-17EGb- T6E

KMFLA18TPHC104621
Unknown
20
TRUCK, SEWER VACUUM:

DW170 KS MACHINERY

DW170
GB2012VW3025
Unknown
21
TRUCK WATER SPRAY 5 TON

DAEWOO CARGO

TNT-SR85-P5800
KLTCH2CK1EK000061
Unknown
22
TRUCK,

MULTIPURPOSE ROAD MANAGEMENT

KS-KAT8000
KLTDH4CJ3GK000012
Unknown
23
SPRAYER PESTICIDE , TRUCK MOUNTED
HTI-1000SC1
KNCSHZ76LGK017769
Hansung

TNI

24
TRUCK, SELF LOADER 9.5TON
JPFSL-D9.5SL
KLTJL9CJBGK000113
Unknown
25
TRUCK,

SALT SPREADER AND SNOW PLOUGH

UNSSP011
KNCSHX76LDK758336
Unknown
26
SCISSORS LIFT: SSL3370 DJUK IN
SSL-3370
SLPZ-0205-0003
Soosung
27
UTILITY VEHICLE:

3450 4X4 (UTV) BOBCAT

3650D
B3C317215
Doosan

Bobca

28
UTILITY VEHICLE:

3450 4X4 (UTV) BOBCAT

3650D
B3C317259
Doosan

Bobcat

29
UTILITY VEHICLE:

3450 4X4 (UTV) BOBCAT

3650D
B3C317276
Doosan

Bobcat

30
STRLR LOW BED
KALYNRLP-50
1K9E16243D1005352
Unknown
31
SPREADER,

ATTACHMENT SALT/SAND

TNT-100S
T-S-102
Unknown
32
SPREADER, ATTACHMENT SALT/SAND
TNT-100S
T-S-103
Unknown
33
SPREADER,

ATTACHMENT SALT/SAND

1500S
T-S-1501
Unknown
34
SPREADER,

ATTACHMENT SALT/SAND

1500S
T-S-1502
Unknown
35
SPREADER,

ATTACHMENT SALT SAND

SS086
SS2013003
Unknown

Construction Equipment (Casey)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG
1
LOADER, SKID: T190 BOBCAT
T190
A3LN39579
Doosan

Bobcat

2
LOADER, SKID: T190 BOBCAT
T190
A3LN39580
Doosan

Bobcat

3
LOADER, SKID STEER,

COMPACT TRACK : T75

T750
ANKA11767
Doosan

Bobcat

4
LOADER, BOBCAT ALL-

WHEEL STEER: T770 BOB

T770
A3P811604
Doosan

Bobcat

5
LOADER, SKID: S750 BOBCAT
S750
A3P212591
Doosan

Bobcat

6
LOADER SCOOP TYPE: HL770-3
HL770-3
L104GH11195
Hyundai
7
LOADER SCOOP DSL DRVN
HL740-7A
LF0710207
Hyundai
8
LOADER SCOOP DSL DRVN
HL740-9
HHKHLN01PC0000644
Hyundai
9
EXCAVATOR MULTIPURPOS
ROBEX55W
HHIHM904LA0001273
Hyundai
10
EXCAVATOR MULTIPURPOS
ROBEX55W
HHKHM908TC0005357
Hyundai
11
EXCAVATOR, MULTIPUPOSE, WHEELED
HW210
HHKHK602KF0000005
Hyundai
12
EXCAVATOR,MULTIPURPOSE,CRAWLER

: E80 BOBC

E-80
AETB11791
Doosan

Bobcat

13
EXCAVATOR WHEELED AGRICULTURE:

DHO2 DAEW

S55-V
472
Daewoo
14
TRACTOR: DSL 5310
D62C
965300134
Unknown
15
ASPHALT PAVER
AP500E
CATAP500HJWK00252
Caterpillar
16
COLD PLANER
PM102
CATPM102JZ2X00601
Caterpillar
17
BUCKET, SCOOP TYPE LOADER:

7167314 BOBCA

Unknown
AEN100587
Unknown
18
BUCKET, SCOOP TYPE LOADER:

7167314 BOBCA

Unknown
AEN100598
Unknown
19
BUCKET, SCOOP TYPE LOADER:

7167314 BOBCA

Unknown
AEN200290
Unknown

Tactical Vehicle (Casey)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG

None

Trailer (Casey)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG

None

8.3.3.3. CAMP HENRY

Multi-Purpose Equipment (Henry)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG
1
CRANE WHL MTD
LRT110
98201
Terex
2
TRUCK, DUMP 7-3/4 TO
ACVCIK3552
KMCDB18TP8C022508
Unknown
3
TRUCK, VACUUM WASTE:

VC13 VACALL

VC13 VACALL
5SXAANDT28RZ52422
Vacall
4
INGERSOLL RAND BOBCAT

VERSAHANDLER: V723

V723
A8HP12056
Doosan

Bobcat

5
INGERSOLL RAND BOBCAT

VERSAHANDLER: V723

V723
A8HP12064
Doosan

Bobcat

Construction Equipment (Henry)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG
1
LOADER SCP JICASE MW24C
MW24C
9163509
JI Case
2
LOADER SCP JICASE MW24C
MW24C
9156810
JI Case
3
LOADER SCP JICASE MW24C
MW24C
9160121
JI Case
4
LOADER, BOBCAT ALL-

WHEEL STEER: CT450 BO

CT450
ABHM11511
Doosan

Bobcat

5
LOADER, BOBCAT ALL-

WHEEL STEER: CT450 BO

CT450
ABHM11557
Doosan

Bobcat

6
LOADER, BOBCAT ALL-

WHEEL STEER: CT450 BO

CT450
ABHM11557
Doosan

Bobcat

7
BACKHOE: EW55 VOLVO CO
EW55
EW55Y05538
Volvo
8
EXCAVATOR MULTIPURPOS
TRUCKMTDAA
N41314288
Unknown
9
TRCTR WHLD EXCAV
FLU419
Available
Unknown
10
GRADER ROAD CAT 130G
130G
7GB01807
Caterpillar
11
GRADER ROAD CAT 130G
130G
7GB01751
Caterpillar
12
TRCTR FT CAT D7G
D7G
3ZD00184
Caterpillar

Tactical Vehicle (Henry)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG
1
TR C 2 1/2T M1078
M1078
AT8498BDCG
Henry

Trailer (Henry)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG

None

8.3.3.4. CAMP CARROLL

Multi-Purpose Equipment (Carroll)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG
1
CRANE, TRUCK: TL-250E TADANO
TL-250E
336330
Tadano
2
CRANE WHEEL MTD 3 TO
M63 3T
KMFVA17HP8C103263
Unknown
3
TRUCK MOUNTED AUGER CRANE 3 TON: SA-040C
SA-040C
KMFLA18KP8C030483
Junjin
4
TRUCK, VACUUM WASTE:

VC13 VACALL

VC13 VACALL
5SXAANDT98RZ52420
Vacall
5
INGERSOLL RAND BOBCAT

VERSAHANDLER: V723

V723
A8HP12057
Doosan

Bobcat

Construction Equipment (Carroll)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG
1
LOADER, BOBCAT ALL-

WHEEL STEER: CT450 BO

CT450
ABHM11240
Doosan

Bobcat

2
LOADER, BOBCAT ALL-

WHEEL STEER: CT450 BO

CT450
ABHM11518
Doosan

Bobcat

3
LOADER, BOBCAT ALL

WHEEL STEER: CT450 BO

CT450
ABHM11554
Doosan

Bobcat

4
LOADER, WHEEL
Unknown
DHKHLAG0C85005243
Unknown
5
EXCAVATOR,MULTIPURPOSE, CRAWLER
ROBEX 55
2699
Hyundai
6
EXCAVATOR,MULTIPURPOSE,CRAWLER
Unknown
AG3N11031
Unknown
7
EXCAVATOR MULTIPURPOS
TRUCKMTDAA
N41314286
Unknown
8
ATTACHMENT, LOADER,

FRONT ALL-WHEEL: T30

T30
A5GU35284
Unknown

Tactical Vehicle (Carroll)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG

None

Trailer (Carroll)

Ref.

No.

Description of technical object
Model Number
Serial Number
MFG

None