A02_PWS Appendices.pdf
PDF 5 MB Posted
- Solicitation number
- W912P924R0013
About this file
This solicitation requests proposals for land and vegetation management services at Mark Twain Lake in Missouri. The U.S. Army Corps of Engineers seeks a contractor to provide services including herbicide application, soil testing, quality control plans, and accident reporting. The performance period is five one-year ordering periods. The solicitation is set aside for small businesses and will result in an 8(a) award of an indefinite delivery indefinite quantity contract with firm fixed pricing. Proposals are due by March 1, 2024 and the agency will evaluate pricing and past performance. The solicitation includes appendices outlining pre-use and post-use pesticide forms, accident prevention programs, and definitions for terms used in the contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21 Solicitation 24R0013 signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS for Land and Vegetative Management Contract
Appendix A: Area Map
Appendix B: Data Requirements
Provide the data as indicated below to the COR. All reports, submittals, logs, and information provided to the Government shall be electronic and compatible with Microsoft Office products.
Item Description Reference Format Frequency
1 Herbicide Usage 1.4 Contractor Format and USACE Form
Original and changes as occurring.
2 Quality Control Plan 2.1 Contractor Format
Original and changes as occurring.
3 Personnel Requirements- Supervision 4.6 Contractor
Format Original and changes as occurring.
4 Limestone 4.5.2 Contractor Format
Original and changes as occurring.
5 Soil Test Analysis 1.13 Contractor Format
Original and changes as occurring.
6 Contractor Points of Contact 4.6 Contractor
Format Original and changes as occurring.
7 Accident Prevention Plan 5.13.3 Contractor Format
Original and changes as occurring.
8 Activity Hazard Analysis 5.13.4 USACE Form Original and changes as occurring.
9 Accident Reports 5.13.6.1
USACE
Accident Report Form 3394
As needed.
Appendix C: Definitions
CONTRACTOR. The “Contractor” is the individual whose contract bid was accepted by the U.S.
Army Corps of Engineers, and who has gained the responsibility of performing the duties governed by the specifications of this contract.
CONTRACTOR REPRESENTATIVE. A foreman or superintendent, assigned to represent the interest of the Contractor with regards to all matters involving this contract.
CONTRACTING OFFICER (KO). The term “Contracting Officer” shall mean the person executing this contract on behalf of the Government, and any other officer or civilian employee who is action on his/her behalf.
CONTRACTING OFFICER’S REPRESENTATIVE (COR). An individual designated in writing by the Contracting Officer to be responsible for administration of the contract and Quality Assurance.
QUALITY CONTROL (QC). The term “Quality Control” refers to action taken by the Contractor and/or personnel to document, inspect, and control performance of services to ensure they meet the specifications and requirements of this contract.
QUALITY ASSURANCE (QA). The term “Quality Assurance” refers to action taken by the Government to ensure the Contractor’s Quality Control System is functioning and effective, and the Contractor is providing services in accordance with this contract. Refer to Appendix C.
CONTRACT DEFICIENCY REPORT (C.D.R.). The Contract Deficiency Report is a written record of unsatisfactory performance by the Contractor as observed by the Quality Assurance Inspector.
ACCIDENT REPORTING. An accident constitutes any and all incidents or acts involving the Contractor, which may or may not have caused obvious damage to persons or property. All accidents shall be reported to the Contracting Officer within 24 hours of the occurrence. All serious accidents (those resulting in death or injury requiring medical attention) shall be reported immediately.
HERBICIDE. The term "herbicide" means (1) any substance or mixture of substances intended for preventing, destroying, and/or repelling any herbaceous or woody vegetation (2) any substance or mixture of substances intended for use as a plant regulator, defoliant, or desiccant
DIAMETER AT BREAST HEIGHT (D.B.H.). The term d.b.h. is an acronym for diameter at breast height and represents the standard tree diameter measurement taken at four and a half (4.5’) feet above the ground.
Appendix D - 1: Pre-Use Pesticide Form
U. S. ARMY CORPS OF ENGINEERS
ST. LOUIS
CLARENCE CANNON DAM AND MARK TWAIN LAKE
CHEMICAL USAGE WORK SHEET
PRE-USE PESTICIDE APPLICATION FORM
CONTRACT / LEASE NO. DACW43-________________ TRACT NO.___________
CONTRACTOR/LESSEE___________________________
Address:
City: _________________ ST__________ Phone_____________________________
APPLICATOR’SNAME____________________ STATE LICENSE NO.__________
Address: __________________________________ Category Title: _________________ City: __________________ ST__________ Date of Expiration:_____________Phone:_____________________________
TARGET PEST______________________________________________________
DESCRIPTION OF TREATED AREA___________________________________
PESTICIDES (TRADE NAME) _____________________________________________
FORM APPLIED_________________________________________________________
ACTIVE INGREDIENTS _________________________________________________
EPA REGISTRATION _____________________EPA CLASSIFICATION__________
(SINGLE WORD)
ADDITIONAL REMARKS ________________________________________________
DISAPPROVED BY: __________________________ DATE: ____________________
Operations Manager
APPROVED BY: ______________________________DATE:____________________
Operations Manager
• Pesticides must be approved by the Mark Twain Lake Project Office before pesticides are applied.
Appendix D– 2: Post Use Pesticide Form
U. S. ARMY CORPS OF ENGINEERS
ST. LOUIS
CLARENCE CANNON DAM AND MARK TWAIN LAKE
CHEMICAL USAGE WORK SHEET
POST-USE PESTICIDE APPLICATION FORM
CONTRACT / LEASE NO. DACW43-_________ APPLICATION DATE _________
CONTRACTOR/LESSEE________________ APPLICATOR’SNAME____________
Address: _____________________________ Address: ___________________________
City: __________________ST___________ City: __________________ST__________ Phone: ______________________________Phone_____________________________
TARGET PEST__________________________________________________________
DESCRIPTION OF TREATED AREA________________________________________
PESTICIDES (TRADE NAME) ______________________________________________
FORM APPLIED_________________________________________________________
ACTIVE INGREDIENTS__________________________________________________
EPA REGISTRATION _____________________EPA CLASSIFICATION___________
(SINGLE WORD)
POST APPLICATION
HOW THE PESTICIDE WAS MIXED: APPLICATION RATE DATE TREATED
TIME OF AIR RELATIVE CLOUD WIND DIRECTION ACREAGE
DAY TEMP HUMIDITY COVER AND SPEED TREATED
__: __ _____ __________ _______ __________MPH ______AC
APPLICATION EQUIPMENT USED_____________________ AMOUNT APPLIED
____________________________________________________I _________________
DISPOSAL INFORMATION
DISPOSAL DATE ___________
METHOD_______________________________________________________________
LOCATION_____________________________________________________________
ADDITIONAL REMARKS ________________________________________________
*Post-use pesticide application forms must be completed and submitted to the Mark Twain Lake Project Office within 48 hours of completion of application.
Appendix E-1 Accident Prevention Program
Appendix E-2 Accident Prevention Program
Appendix E-3 Accident Prevention Program
Appendix E-4 Accident Prevention Program
| 3. Government-Furnished Facilities, Material, Equipment and Service. |
| 6. Appendices |
| PRE-USE PESTICIDE APPLICATION FORM |
| EPA REGISTRATION _____________________EPA CLASSIFICATION__________ |
| POST-USE PESTICIDE APPLICATION FORM |
| POST APPLICATION |
| HOW THE PESTICIDE WAS MIXED: APPLICATION RATE DATE TREATED |
| DISPOSAL INFORMATION |
DISPOSAL DATE ___________
File details come from the government source that posted it. Updated .