A02 - MPLF VACUUM TUBE_SK1477.pdf
PDF 319 KB Posted
- Attached to
- Vacuum Fill Tubes Federal contract opportunity
- Solicitation number
- W52P1J-22-Q-3051
About this file
This document provides specifications for vacuum fill tubes required by the Department of the Army Materiel Command Joint Munitions Command. The solicitation seeks a one-time fixed price contract to supply vacuum fill tubes in accordance with the included statement of work and drawing. The tubes must achieve and maintain 28.5 inches of mercury vacuum for 10 minutes when assembled and have a minimum 58.13 inch interior diameter and 194.5 inch interior length without the lid. The lid must attach using stainless steel bolts and have lifting eyelets for weight support. Aluminum construction and material thicknesses, as well as a polycarbonate fill plate, o-ring seals, and design review requirements are specified. The response deadline is July 21st, 2022 with performance at the McAlester Army Ammunition Plant in Oklahoma. This procurement is reserved entirely for small businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A02 - SOW_MPLF VACUUM TUBE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
C
.a
194.50
REQUIRED INSIDE
HEIGHT
96.50
) ERENCE
- J
SWING BOLTS & THREADED HANDLE REQUIRED.
DESIGNER WILL DETERMINE THE QTY. TO MEET CRITERIA.
(/)58.13
MINNIMUM ID
(/).80 THRU HOLE
L
4X4XI AN LE
QTY.6 EQUALLY SP
" " /2" G
ACE
185.0 0
HEIGHT REQUIRED
TUBE NEEDS ANCHORING CAPABILITIES
DOUBLE O-RING SEAL Ot THIS FACE
DETERMINED BY DESIGNER
SLOTS SIZE/NUMBER OF DETERMINED BY DESIGNER
THICKNESS DETERMINED BY
r DESIGNER
40.00 SCQO,S[aT==-='====-====1=-=:zi_i
LMINIMUM .50 FLANGE THICKNESS
MINIMUM OF QTY.6, .80 DIAMETER MOUNTING HOLES
"'--, MINIMUM OF I THICK BOTTOM PLATE
NOTE:
I. ALUMINUM 6061-T6 (/)24.00
REQUIRED DIMENSION
NOTE:
I. AL
U
MINUM 6061-T6
VACUUM LID
D
C
VACUUM TUBE
UUM T
U
B
: ____ 7 _____________________ _J_ ____________________________________
REQUIR
�i��
ENSION
VACUUM LID
________________ J_ ________________________ _
QUALIFYING STATEMENT FOR THE VACUUM TUBE
NOTE:
I. MATERIAL CLEAR POLYCARBONATE
(/)23.90
(/)26.87
I-< 12 5)
FILL PLATE ONLY
SCOPE
THE FOLLOWING DOCUMENT PROVIDES THE REQUIREMENTS AND SPECIFICATIONS FOR VACUUM TUBE CHAMBER TO SUPPORT THE FILL AREA OPERATIONS.
1. GENERAL REQUIREMENTS
THIS SECTION PROVIDES REQUIREMENTS THAT ARE COMMON TO EACH OF THE VACUUM CHAMBERS.
A. MUST ACHIEVE AND HOLD 28.5 IN/HG OF VACUUM FOR 10 MINUTES WHEN WELDED AND ASSEMBLED.
B. 58.13" INSIDE MINIMUM DIAMETER.
C. 194.5" INSIDE OVERALL LENGTH WITHOUT LID (CHAMBER).
D. LID MUST ATTACH TO VACUUM TUBE USING STAINLESS 300 SERIES SWING BOLTS, HANDLES AND LIFTING EYELETS (CHAMBER LID).SWING-BOLTS SHALL BE ADEQUATE TO MAINTAIN VACUUM.
E. ALUMINUM CONSTRUCTION ON TUBE & LID.
F. 3/8" MINIMUM MATERIAL THICKNESS ON ALL COMPONENTS UNLESS OTHERWISE SPECIFIED ON DRAWING.
G. LIFTING EYELETS (QTY. 6 EQUALLY SPACED) AROUND VACUUM TUBE OPENING 48" DOWN TO SUPPORT WEIGHT OF VACUUM TUBE.
H. (QTY. 6 EQUALLY SPACED) 4" X 4" X ½" THICK TAB WELDED AROUND TUBE OPENING.
I. BUILD A POLYCARBONATE FILL PLATE TO FIT IN THE 24" DIAMETER HOLE. 1/4" VITON 0-RING SEALS (FILL PLATE).
J. PRELIMINARY APPROVAL/TECHNICAL DRAWINGS ARE REQUIRED FOR APPROVAL PRIOR TO AWARD, BUILD DRAWINGS TO BE SUBMITTED FOR APPROVAL WITHIN 4 WEEKS OF AWARD.
PRESSURE SUMMARY, THICKNESS SUMMARY, WEIGHT SUMMARY & VACUUM SUMMARY (REQUIRED).
K. VACUUM LID TO MEET DIAMETERS AND HEIGHTS SPECIFIED ON DRAWING, MATERIAL THICKNESS IS DETERMINED BY DESIGNER.
L 40,000 LBS. WILL BE APPLIED TO THE BOTTOM OF VACUUM CHAMBER, MCAAP WILL SUPPLY THE SUPPORT STRUCTURE UNDERNEATH THE TUBE.
M. MANUFACTURE A FILL PLATE PER TUBE.
N. (QTY.1) OPERATIONAL, MAINTENANCE, AND PARTS MANUALS THE CONTRACTOR SHALL FURNISH UNDER THIS PURCHASE DESCRIPTION TWO (2) SETS OF OPERATIONAL, MAINTENANCE, AND PARTS
MANUALS AS NECESSITATED BY THE EQUIPMENT. THE MANUALS SHALL BE SPECIFIC (NOT CANNED STATEMENTS ABOUT THE SYSTEM IN GENERAL) TO THE SYSTEM SUPPLIED. THERE SHALL BE A BRIEF DESCRIPTION CONCERNING THE PURPOSE OF THE SPECIFIC EQUIPMENT SUPPLIED AND THE RATED OPERATING CAPACITIES. THE MANUALS SHALL CONTAIN A COMPLETE PARTS LISTTO INCi LJDF (AT MINIMUM) Al I INFORMATION NFCFSSARY (MANLJFACTLJRFR'S NAMF, ADDRFSS, PHONF NLJMRFR, P/N, S/N, Sl7F, MODFI NlJMRFR, TYPF, FTC.) TO RF-ORDFR THF PART IF NFCFSSARY THE MANUALS SHALL INCLUDE ALL PREVENTATIVE MAINTENANCE PROCEDURES/SCHEDULES SPECIFIC TO THE EQUIPMENT SUPPLIED. THESE MANUALS SHALL BE APPLICABLE TO THE EQUIPMENT PROVIDED ONLY AND SHALL INCLUDE ALL SAFETY PRECAUTIONS/WARNINGS ASSOCIATED WITH THE OPERATION. ALL MANUALS SHALL BE AUTHORIZED FOR REPRODUCTION AND DISTRIBUTION TO END USERS OF THE EQUIPMENT. ONE (1) SET OF HARD COPY VERSIONS OF THE MANUALS SHALL BE PROVIDED WITH THE EQUIPMENT. ONE (1) SET OF THE MANUALS SHALL BE ELECTRONIC IN FORM (ON CD) AND MUST BE CAPABLE OF BEING READ IN EITHER A ".PDF" OR A ".DOC" FORMAT.
0. 30%,60%,90% DESIGN/PROGRESS REVIEW REQUIRED
JMMC-OMP WILL VALIDATE AND VERIFY EQUIPMENT BEFORE AWARD IS GRANTED. POCJASON TUCKER
DISTRIBUTION STATEMENT A.
APPROVED FOR PUBLIC RELEASE:
DISTRIBUTION IS UNLIMITED.
UNLESS OTHERWISE SPECIAEO: MCAAP APPROVAL
TOLERAN CES
>------+------ �R:gJ��A� l/6�
TWOPLACEDECIMAL a.OJ
D AWN T KER
IRECTOROM!fl.'IALAPPROVAL)
DE 21
1------+-----tTHREEPLACEDECIMAL a.
1----------------t
1------+-----t :��it BURRS AND SHA RP
MPLF VACUUM
CHAMBER TUBE
1------+-----t g�!��:fg����U
G C�
UMBER 1-,-0-,0-◊-M-H�O-W�El-L
N
O
T
_--W-EIG-HT
�, �-,-,o-G-. N-0-.---<
1-..::,::'.'.,,,._J _ _::::,:__4,, A:::S:,;S::_P:;:EC::IF_::IE;::D_--lwe-;------r,,c'<«ecc<e"',io;;AC(Y-----i si��E0�N�M
AS SPECIFIED
N/A N/A
MCALESTER ARMY AMMUNITION PLANT A
SHEET I OF I
File details come from the government source that posted it. Updated .