A02 M400 lease purchase description_V2_SEP26_Redacted.pdf
PDF 277 KB Posted
- Attached to
- EOS M400-4 Lease
- Solicitation number
- W519TC26QB400
About this file
This document is a Purchase Description for an EOS M400-4 3D Printer Lease solicitation issued by the U.S. Army Joint Manufacturing & Technology Center (JMTC) at Rock Island Arsenal (RIA) in Illinois.
The U.S. Army seeks to lease an EOS M400-4 3D printer with all necessary materials and consumables for production of 17-4 stainless steel components. The lease term is for 52 weeks with two additional one-year continuation options. The contractor must provide the printer, IPCM-M Extras Conveying module and Sieving unit, technical and maintenance support, one required annual machine service, and consumable materials including 2,000 kg of EOS 17-4 powder (1,000 kg initial delivery plus 1,000 kg upon request), 12 ceramic recoater blades, 12 63-micron sieve screens, 20 M400-4 build plates, a Ruwac Wet Separator, 36L Particle Collection Bin Kits, 17-4 PH material parameter set, and EOS Smart Fusion software. All delivery, rigging, installation, electrical connection, and gas connection costs are the contractor's responsibility. Delivery must occur as soon as possible with the final deadline of October 19, 2026. Work location is at Rock Island Arsenal, BLDG 299 DOOR 16A, Rock Island, Illinois 61299. All work shall be performed at the government facility.
The contractor must comply with extensive security requirements including AT Level I awareness training for all employees, background checks, personal identity verification (FAR 52.204-9), Common Access Card (CAC) procedures, iWATCH training, and participation in the Random Antiterrorism Measures Program (RAMP). Additionally, the contractor must adhere to all federal, state, and local safety and environmental regulations, including OSHA requirements, proper personal protective equipment (PPE) standards, electrical lockout/tagout procedures, and proper disposal of hazardous materials in compliance with EPA and Illinois EPA regulations. The contractor must ensure no materials contain Class I ozone-depleting chemicals (ODCs), polychlorinated biphenyls (PCBs), or asbestos. Services may be discontinued or postponed during Force Protection Condition (FPCON) levels Charlie and Delta.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4. PERIOD OF PERFORMANCE: All items must be received as soon as possible. Vendor to provide lead time with quote. All items to be received, and all services to be completed by 10/19/2026.
5. LOCATION: All work shall be performed at the government facility.
6. TRAVEL: Any travel associated with this effort shall be performed in accordance with
Joint Travel Regulations (JTR).
7. SECURITY:
AT Level I Training.
All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training. The COR will be provided a copy of the RIA-JMTC AT Level I awareness training and assuring the training is completed.
The contractor shall sign a Memorandum of Record for each contractor employee and subcontractor employee to the RIA- JMTC Operations Center prior to an RIA-JMTC electronic key and access pass being issued.
Access and General Protection/Security Policy and Procedures.
The contractor and all associated subcontractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Director of Emergency Services.
The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the change clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
For contractors that do not require CAC but require access to a DoD facility or installation.
Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center interstate identification Index
(NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility access and local security policies and procedures (provided by government representative). The COR will provide guidance to complete the Access Control Records Check Request Form thru the RIA Directorate of Emergency Services.
Access Badges and Electronic Keys.
Contractor will acquire and need to return all issued U.S.
Government Common Access Cards, installation badges, and/or access passes. Use FAR 52.204-9 or PADDS Clause IF00015 IF00015 at the end of the contract or the last day of an individual contractor’s employment.
13.4.1. RIA-JMTC electronic keys and access passes are
accountable items and will be returned within 24 hours of no longer being needed. Items will return to the COR or placed in a drop box at an RIA-JMTC access point.
13.4.2 Contractors who routinely fail to return these items will not be issued them in support of any future contract.
IWATCH (See Something, Say Something) Training.
The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program. The iWATCH training will be provided in the RIA-JMTC AT training.
Impact on contractor performance during increased FPCON during periods of increased threat.
During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower. The FPCON descriptions will be provided in the RIA-JMTC AT training.
The COR will keep the contractors informed on the current FPCON or any possible FPCON change.
Random Antiterrorism Measures Program (RAMP) participation.
Contractor personnel working on Rock Island Arsenal are subject to participation in installation RAMP security program (e.g. vehicles search, wearing of ID badges, etc.).
Contractors will comply with any instructions given by the Rock Island Arsenal Police Department.
The RAMP program is discussed in the RIA-JMTC AT training.
Parking: The contractor shall park in designated/approved parking areas only. The COR and/or the Arsenal Police & Security personal may designate other areas to park depending upon the work situation.
SAFETY AND ENVIRONMENTAL:
Safety: When services are performed onsite the contractor is responsible for complying with all federal, state, and local safety and environmental regulations, including, but not limited to: Rock Island Arsenal, Department of the Army (DA), Occupational Safety and Health Act, Environmental Protection Agency (EPA), Illinois Environmental Protection Agency (IEPA). The contractor must adhere to all Rock Island Arsenal Safety requirements, policies and statutes. The contractor shall be responsible for obtaining any hot work/open flame permits required from the Rock Island Arsenal Fire Department. The contractor(s) while working on equipment at the RIA-JMTC will wear proper PPE, to include but not limited to:
safety glasses (with side shields), protective foot wear (steel toe), proper clothing (no shorts, tank tops, etc.), safety harness (when working off the floor), welding and cutting apparel (as needed) and adhere to OSHA NFPA 70E Arch Flash when working on electrical equipment. The contractor shall also have and observe an approved electrical lock-out tag-out procedure. As required by the COR, the contractor may be required to submit a Safety Site Plan in limited and justified circumstances.
• See attachment “Contractor Safety Guide”.
Environmental: When services are performed onsite all hazardous wastes, acid, and contaminated material generated by the execution of this service contract will be disposed of IAW all applicable federal, state, and local laws and regulations. All transport and decontamination will be performed IAW all applicable interstate, federal, state, and local laws and regulations. Any materials and/or wastes generated from this effort shall be labeled with appropriate transportation/disposal documentation for off-site disposal to include but not limited to Hazardous waste manifests and associated Land Disposal Restriction. Prior to discussing any environmental issues with the environmental agency of primacy, the contractor shall contact the Contracting Officer (KO) for direction.
Ozone Depleting Chemicals (ODCs): When services are performed onsite the contractor shall assure that none of the materials used contain Class I ODCs as defined by Public Law 102-484, Section 326 during execution of the tasks outlined in this SOW. Parts and equipment shall not contain polychlorinated biphenyl (PCB), ozone depleting substances (Class I or Class II), or asbestos materials.
File details come from the government source that posted it. Updated .