This document is a Justification for Limiting Competition under the Simplified Acquisition Threshold (SAT) for the U.S. Army Contracting Command at Rock Island Arsenal. The procurement is for 5 Geismar Battery Powered Electric Rail Abrasive Saw kits with Activion Systems, utilizing a brand name buy from Geismar North America Inc. The purchase is being made under a fixed-price Purchase Order (W519TC25P2225) with Other Funds for Fiscal Year 25, and is justified because both requested versions run on the same platform and battery system, allowing crossover between old and new systems for batteries, chargers, and blades. The market research was conducted by the end customer on 13 March 2025, and the action is a brand name restriction over $30K, which will be redacted and posted with the solicitation.

View the file

Other files

File Type Posted
B08_SF1449_Solicitation_25Q2225.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For All Actions Over the Micro-Purchase Threshold ($10K*) and Under the Simplified Acquisition Threshold (SAT)

Use for FAR Part 8, 13, or 16, Including Brand Name

MFR – Limiting Competition under SAT

1. Contracting Activity: U.S. Army Contracting Command – Rock Island, Rock Island Arsenal, Rock Island IL 61299-8000.

2. Description of Action:

Nature: New Requirement Follow-on Requirement

Contract Vehicle: Purchase Order Number ______________________ Blanket Purchase Agreement (BPA) Number ______________________ against FSS Contract Number Order/BPA# _______ ______________________ against Multiple Award IDIQ Contract Name or # Order #_______ ________________ against a single award IDC Contract # Order #_______ ______________________ to existing PO/TO/DO/Call Order # Modification # _______ ______________________

Pricing: Fixed Price Time & Materials/Labor Hours Cost Reimbursable

Funds: Operations & Maintenance, Army Other Funds: FY: ________

Name of Proposed Contractor(s): _____________________________________________________________

Yes No Brand Name Buy

3. Description of Services or Supplies: In layman’s terms, briefly describe the services or supplies to be provided, including make & model number where appropriate. Include quantities of supplies or period of performance for services. Provide information for any options included. Include the total estimated value of the proposed action (Do not use abbreviations):

4. Authority: Mark the applicable exception, choose only one

FAR 13.106-1(b)(1): For purchases not exceeding the simplified acquisition threshold, urgency, exclusive licensing agreements, brand name, or industrial mobilization.

Or

FAR 8.405-6(a)(1)(i)(B) and 8.405-6(b)(1)Brand Name FAR 8.405-6(a)(1)(i)(B) Only One Source is Capable FAR 8.405-6(a)(1)(i)(C) Logical Follow-on

Or

FAR 16.505(b)(2)(i)(B) and 16.505(a)(4) Brand Name FAR 16.505(b)(2)(i)(A) Urgency FAR 16.505(b)(2)(i)(B) Only One Awardee is Capable FAR 16.505(b)(2)(i)(C) Logical Follow-on

5. Reasons for Authority Cited:

a. Explain why the intended contractor is the only reasonable source who can provide the required supplies or services. Discuss the unique capabilities, expertise, etc. that support the lack of competition.

b. For a brand name restriction - brand name specifications shall not be used unless the particular brand name, product, or feature is essential to the Government’s requirements. Explain why the brand specified is the only brand that will meet the Government’s needs.

c. Describe the detrimental effects/serious injury to the mission of the requiring activity or to the government, financial or otherwise, that will result if this justification is not approved and the product or service cannot be provided by the intended sole source contractor.

6. Publicizing Contract Actions: For FAR 13 actions, the public display and synopsis requirements of 5.101 and 5.203 do not apply due to the $ threshold, apply and will be followed, or do not apply due to an exception at 5.202 _________________ . Fill in exception.

Requirement to post justification IAW 8.405-6(b)(3), 13.105(c), or 16.505(a)(4)(iii)(A)

Action is NOT a brand name restriction and is under SAT, no posting required Action is a brand name restriction, under $25K, no posting required Action is a brand name restriction, over $30K. It will be redacted and posted with the solicitation.

Action is a brand name restriction over $25K but will not be posted due to exception

FAR 8.405-6(a)(1)(i)(A) Urgency

Signature Contracting Officer

After approval by the PCO, include a copy in the contract file. Send approved justification to CONOPS for redacti ng prior to posting, usarmy.ria.acc.mbx.spt-svcs@mail.mil.

7. Market Research: Describe the extent of the market research conducted to identify all qualified sources and the results thereof. Provide month/date market research conducted to ensure it was within the last 12 months. If the requirement is a brand name specification, market research must support that other companies’ similar products, or products lacking the particular feature specified, do not meet, or cannot be modified to meet, the agency’s needs.

8. Approval: I hereby determine that the anticipated cost or price to the Government for this contract action will be fair and reasonable based upon (describe technique to be used, e.g. price analysis, cost analysis, etc).

Based on the foregoing, I approve this justification to limit competition subject to availability of funds, and provided that the services and supplies herein described have otherwise been authorized for acquisition.

MFR – Limiting Competition under $150K
(or under $650K if using FAR Part 13.5)
3. Description of Services or Supplies: In layman’s terms, briefly describe the services or supplies to be provided, including make & model number where appropriate. Include quantities of supplies or period of performance for services. Provide info...
4. Authority: Mark the applicable exception, choose only one
Section 803 of the National Defense Authorization Act of 2002 (PL 107-107); and FAR 8.405-6(a)(1)(i)(B) and 8.405-6(b)(1)Brand Name FAR 8.405-6(a)(1)(i)(A) Urgency
FAR 8.405-6(a)(1)(i)(B) Only One Source is Capable
5. Reasons for Authority Cited:
8. Procurement History:
TB Purchase Order: W519TC25P2225
CB New Requirement: On
CB Followon Requirement: Off
CB Purchase Order Number: On
CB BPA Number: Off
CB Order BPA: Off
CB Order 1: Off
CB Order 2: Off
CB Modification: Off
TB BPA Number:
TB FSS Contract Number:
TB Order BPA:
TB Order 1:
TB Order 2:
TB Modification:
TB IDIQ:
TB IDC:
TB PO TO DO Call Order:
CB Fixed Price: On
CB Time Materials Labor Hours: Off
CB Cost Reimbursable: Off
CB OMA: Off
CB No 1: Off
TB FY: 25
CB FAR 131061b1 For purchases not exceeding the simplified acquisition threshold SAT urgency: On
CB FAR 84056a1iC: Off
CB FAR 84056a1iA Urgency: Off
CB FAR 16505b2iA Urgency: Off
CB FAR 16505b2iC: Off
CB Action is NOT: Off
CB under 25K: Off
CB over 25K 1: On
CB over 25K 2: Off
TB Fill in:
CB apply: On
CB do not apply: Off
CB Yes 1: On
CB FAR 84056a1iB Brand Name: Off
CB FAR 84056a1iB One Sourxe: Off
CB FAR 16505b2iB Brand Name: Off
CB FAR 16505b2iB One Awardee: Off
TB Reason for authority: Since we have two of the requested version, that both run on the same platform as well as the same battery system, ordering the

same brand, Manufacturer Geismar Battery Powered Electric Rail Abrasive Saw with Activion Systems, allows us to crossover the batteries, the chargers, and the blades between both old systems and the new one.

TB Services or Supplys: Manufacturer Geismar Battery Powered Electric Rail Abrasive Saw with Activion Systems will be used to cut rail. Since we have two of the requested version, that both run on the same platform as well as the same battery system, ordering the same brand, Manufacturer Geismar Battery Powered Electric Rail Abrasive Saw with Activion Systems, allows us to crossover the batteries, the chargers, and the blades between both old systems and the new one.

Quantity: 5 Geismar brand rail saw kits with batteries Estimated value: $

TB Name of Proposed Contractors: Geismar North America Inc
TB OF:
TB Exception Fill In: [Select One]
Clear - Reset Fields:
TB Market Research: Market Research was conducted by end customer 13 March 2025.
TB Approval: Price analysis to determine price reasonableness by comparison of an adequate amount of competitive quotes received in response to a brand name only solicitation.