Chesapeake and Ohio Canal National Historical Park
FY23-27 Palisades Maintenance District Turf
Management
Performance Work Statement
December 2022
2 | P a g e
TABLE OF CONTENTS
SECTION 1 Description of Work
1. Performance Work Statement
2. Program Overview
3. Period of Performance
4. Security Requirements
5. Requirements
6. Personnel
7. Conduct
8. Hours of Operation
SECTION 2 Quality Assurance
SECTION 3 Government Furnished Property
1. Property
SECTION 4 General Information
1. Contractor Furnished Items
2. Contractor Personnel
3. Contractor Management
4. Damage to Government Property
5. Environmental Concerns and Safety Standards
6. Dispatch
7. Permits and Responsibilities
8. On-Site Supervisor
SECTION 5 Government Furnished Property
1. Site Inspection
2. Trash
3. Mowing L.O.D.
4. Quality Cut
5. Turf
6. Grass Clippings
7. Safety Guards
SECTION 6 Invoicing and Payment
3 | P a g e
Performance Work Statement (PWS)
I. Description Of Work
1. Performance Work Statement. The Chesapeake & Ohio Canal National Historical Park (CHOH) is in need of turf management services in identified areas of the park’s Palisades Maintenance District.
CHOH is responsible for the care and upkeep of the C&O Canal. The Palisades Maintenance District of the C&O Canal has a very high public exposure, as it stretches from Potomac, MD to Georgetown in Washington, DC. This location is often used for recreational and commuter bicycling, hiking, and walking. Turf management services are required to maintain the area for public use. All work is located within the CHOH Palisades Maintenance District.
The contractor shall provide all labor, supervision, materials, tools, supplies, transportation, barricades, signs, and equipment incidental to and necessary to execute mowing services required with-in the boundaries of the C&O Canal National Historical Park.
In addition, the contractor shall comply with the CHOH Superintendent’s Compendium and all Amendments which can be found at: Superintendent's Compendium - Chesapeake & Ohio Canal National Historical Park (U.S. National Park Service) (nps.gov)
1) TASK 1: Maintain turf management in areas identified in the Enclosure 1 attachment.
a. Maintain turf height in a range of three (3) to six (6) inches for all areas excluding canal prism locations and locks.
b. Remediate any ground damage incurred during the performance of operations (e.g. ruts, holes, etc. )
c. c. Perform string trimming around curbs, structures (historical and non-historical), infrastructure, and landscape features.
2) TASK 2: Maintain turf management along the C&O Canal Towpath and Capital Crescent Trail (CCT) from Potomac Street SW to Mile Post 15.
a. Turf height shall be in a range of three (3) to twelve (12) inches. Width of management area shall range from twenty-four (24) to thirty-six (36) inches off shoulders as terrain allows. The contractor is authorized to cut up to 60 inches off the shoulder where it is conducive to efficient operations.
b. Remediate any ground damage incurred during the performance of operations (e.g. ruts, holes, etc.)
c. Turf management of the CCT terminates at Mile Post 3.6 where the Arizona Avenue Bridge (steel bridge) crosses over the canal prism and exits the park boundaries.
3) TASK 3: Maintain turf management in areas identified in Enclosure 1A, Fletcher’s Cove and Abner Cloud House area.
a. Maintain turf height in a range of three (3) to six (6) inches for all areas excluding canal prism locations and locks.
b. Remediate any ground damage incurred during the performance of operations (e.g. ruts, holes, etc. )
c. Perform string trimming around curbs, structures (historical and non-historical), infrastructure, and landscape features.
4) The required number of services is estimated by the government as 15-25 visits per year on a 7-10 day schedule. This is a firm-fixed price contract – the exact number of cuts required will be dependent upon seasonal conditions such as weather and will not be subject to compensation for https://cms.nps.gov/choh/learn/management/superintendent-s-compendium.htm https://cms.nps.gov/choh/learn/management/superintendent-s-compendium.htm sloftus Highlight sloftus Highlight
4 | P a g e additional cutting, or deductions for less cutting. It is the sole responsibility of the contractor to determine the appropriate service cycle that meets the task requirements.
5) Manpower and equipment shall be capable of completing an entire mowing and trimming cycle for the park within 2 (two) working days. Therefore, any items not specifically noted, but necessary for performance in accordance with industry standards and the specifications stated herein, shall be furnished under this contract. Note: The NPS estimates the production for Mowing and Line Trimming based on past experience as follows:
Mowing:
60-inch walk behind 1 acre/hour 7-8 acres/day 72-inch riding mower (1.5-2 mph) 2-2.5 acres/hour 16-20 acres/day 80-inch tractor pulled (3-4 mph) 2-3 acres/hour 16-24 acres/day 121-inch 455D riding mower (2-3 mph) 2.5-4 acres/hour 20-32 acres/day 192-inch 580D riding mower (2-3 mph) 4.5-6 acres/hour 36-48 acres/day Line trimming/edging: 3,000-4,000 linear feet per day/man
6) It is recommended that the Contractor attend the scheduled site visit to inspect the site to verify the estimated quantities provided by the NPS and the complexities of conducting turf maintenance activities in areas containing high densities of vehicles, pedestrians, and structures. This is considered to be a standard requirement for developing, implementing and executing efficient, cost-effective turf maintenance support services.
7) All areas in which work will be performed are under the jurisdiction of National Park Service (NPS), National Capital Region, Chesapeake and Ohio Canal National Historical Park.
Specifically:
• Tide Lock, Canal Mile 0 – Acres: 0.2
• Lock 1 – Acres: 0.23
• Lock 2 – Acres: 0.24
• Lock 3 (Includes GT Visitor Center and Field) – Acres: 0.35
• Lock 4 – Acres: 0.14
• Mule Bridge – Acres: 0.08
• Canal Road Access Ramp – Acres: 0.11
• Washington Canoe Club – Acres: 0.43
• Potomac Aqueduct (Field and top of Aqueduct) – Acres: 0.18
• Abner Cloud House – Acres: 0.99
• Fletcher’s Cove – Acres: 3.89
• Lock 5 (both sides) – Acres: 0.45
• Lock 6 (both sides) – Acres: 0.21
• Lock 7 (both sides) – Acres: 0.25
• Lock 8 (both sides) – Acres: 0.41
• Lock 9 (both sides) – Acres: 0.17
• Lock 10 (both sides) – Acres: 0.11
• Lock 11 (both sides, and areas around lockhouse 11) – Acres: 0.33
5 | P a g e
• Lock 12 (both sides) – Acres: 0.18
• Lock 13 (both sides) – Acres: 0.04
• Lock 14 (both sides) – Acres: 0.15
• Lock 15 (both sides) – Acres: 0.07
• Lock 16 (both sides) – Acres: 0.13
• Lock 17 (both sides) – Acres: 0.10
• Lock 18 (both sides) – Acres: 0.07
• Lock 19 (both sides) – Acres: 0.08
• Great Falls Area (per PWS) – Acres: 5.78
• Carderock (per PWS) – Acres: 4.84
• Towpath from MM 0 – MM 16 – Acres: 10.84
• Capital Crescent Trail – Acres: 5.26
Total Acreage – 36.31
Locations:
• Tide Lock, Canal Mile 0 – Washington, DC 20007
• Lock 1 – Washington, DC 20007
• Lock 2 – Washington, DC 20007
• Lock 3 – Washington, DC 20007
• Lock 4 – Washington, DC 20007
• Mule Bridge – Washington, DC 20007
• Canal Road Access Ramp – Washington, DC 20007
• Washington Canoe Club – 3700 Water ST NW, Washington, DC 20007
• Potomac Aqueduct – Washington, DC 20007
• Abner Cloud House - Washington, DC 20007
• Fletcher’s Cove – 4940 Canal Rd NW, Washington, DC 20007
• Lock 5 – Lock 6 – Bethesda, MD 20816
• Lock 7 – Glen Echo, MD 20812
• Lock 8 – Lock 12 – Cabin John, MD 20818
• Lock 13 – Bethesda, MD 20817
• Lock 14 – Bethesda, MD 20817
• Lock 15 – Lock 19 – Potomac, MD 20854
• Great Falls Area – 11710 Macarthur Blvd, Potomac, MD 20854
• Carderock Area – Potomac, MD 20854
• Towpath from MM 0 – MM 16 – Washington, DC 20007 – Potomac, MD 20854
• Capital Crescent Trail from MM 1.07-3.6 – Washington, DC 20007
All location maps can be found using the search feature at the following website:
https://www.canaltrust.org/
2. Program Overview.
https://www.canaltrust.org/
6 | P a g e
Contract Number:
NAICS Code: 561730 Acquisition: GSA or AbilityOne Procurement List, Base Plus 4 Pre-Bid Site Visit:
Meeting Address: C&O Canal National Historical Park, 11710 Macarthur Blvd, Potomac, MD 20854
Point of Contact: Teresa Rogofsky, Contracting Specialist Teresa_Rogofsky@nps.gov, (202) 619-7390.
3. Period of Performance
The period of performance shall be:
Base Year: May 1, 2023 – November 10, 2023 (27 weeks) Option Year 1: May 6, 2024 – November 15, 2024 (27 weeks) Option Year 2: May 5, 2025 – November 14, 2025 (27 weeks) Option Year 3: May 4, 2026 – November 13, 2026 (27 weeks) Option Year 4: May 3, 2027 – November 12, 2027 (27 weeks)
4. Security Requirements. All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the government worksite, shall abide by all security regulations.
• Identification of Contractor Employees. All contract personnel working in situations where their contractor status is not obvious to third parties are required to identify themselves. This may be accomplished by wearing clothing bearing the name of the company or by wearing clearly written and visible nametags which contain the company name and employee name at all times, as such to avoid creating an impression in the minds of members of the public that they are Government officials.
5. Requirements
• Mowing Lawn Areas – Maintain 3-6” heights
• Mowing Towpath and CCT Areas – Maintain 3-12” heights
6. Personnel. Employees of the contractor assigned for performance of this contract shall be capable employees with sufficient experience and training to assure compliance with the contract requirements.
The employees shall be required by the Contractor to maintain themselves and their clothing in a neat and clean manner. A fully qualified workforce shall be on board no later than the second week of the contract.
The Contractor shall provide the CO and the COR with a list of the names of employees or alternates to be employed in performance of the work within fifteen (15) calendar days of contract award. The contractor shall maintain a list of telephone number for the designed contractor representative which shall be available and provided to the Government to receive and adjust complaints and reports of deficiencies from the CO or COR. The contractor shall also notify the CO or COR with any additions or deletions to the list of employees immediately. Prior approval of the Contracting Officer's Representative (COR) is required before any work may be performed outside of above hours.
7 | P a g e
7. Conduct. Contractor employees shall not loiter in any working or patron area. Upon completion of their assigned work, employees shall promptly depart from the public areas. All contract employees will display professionalism in all interactions with patrons and Government employees.
The Contracting Officer may require the contractor to remove from the job site any employee working under this contract for reasons of misconduct, security, or found to be or suspected to be under the influence of alcohol, drugs, or other incapacitating agent. Contractor employee shall be subject to removal from the premises upon determination by the contracting officer that such action is in the best interests of the Government. Such removal from the job site or dismissal from the premises shall not relieve the contractor of the requirement to provide sufficient personnel to perform this contract as required by the SOW and Specs.
• Prohibited Behavior. All contractor employees are prohibited from any conduct that may be construed as sexual harassment including, but not limited to, the following.
o Any written sexually suggestive or obscene letters, notes, invitations, etc.
o Any verbal sexually suggestive or obscene comments, threats, slurs, epithets, jokes about gender specific traits, sexual positions, etc.
o Any physical contact such as intentional touching, pinching, brushing against another's body, impeding or blocking movement, assault, coercing sexual intercourse or other sexual favors etc.
o Sexual harassment also includes continuing to express sexual or social interest after being informed directly or indirectly that the interest is unwelcome, or using sexual behavior to control, influence, or affect the career or work environment or another employee. It is not permitted to suggest, threaten, or imply that failure to accept a request for a date or sexual intimacy will affect an appointment, promotion, change of assignment, performance report or any other work obligation or benefit.
8. Hours of Operation. Monday - Friday (7AM – 5:30 PM)
• Inclement Weather and Holidays. In the event the project site is closed due to inclement weather or other Acts of God, unanticipated Federal holidays declared by the President, failure of Congress to appropriate funds, etc., the Contracting Officer (CO) will provide guidance.
• Service Schedule. The exact schedule of service required will be dependent upon seasonal conditions such as weather and environmental factors and will not be subject to additional compensation for any service visits necessary to maintain turf within the required specifications throughout the period of performance. It is the sole responsibility of the contractor to determine the appropriate service cycle that meets task requirements
II. Quality Assurance The Government shall inspect the contractor’s performance under this contract on a weekly basis. The Government must do so to ensure that the contractor has performed in accordance with the performance standards outlined in the Quality Assurance Surveillance Plan. If the Government should find any performance deficiencies, the Contractor shall correct the deficiencies within three (3) business days of notification by the COR.
Method Defined
8 | P a g e
Random Sampling
The COR randomly inspects work and provides a record of inspection to stakeholders denoting work quality and any deficiencies. A random inspection may encompass the entirety of work specification or a sample area.
Scheduled Inspection
The COR schedules a work site inspection with the contractor and conducts a walk-through and review. The contractor may chose to send a representative in order to receive immediate performance feedback. A record if inspection is generated detailing work quality and any deficiencies. A scheduled inspection may encompass the entirety of work specification or a sample area. Close out inspections for payment are generally scheduled inspections.
Customer Input
This is a supplemental method used by the COR to target inspection areas, provide valuable feedback to the contractor, and augment information provided in quality assurance records as substantiating evidence. Customer complaints may be received by the COR from NPS staff working and impacted in the service areas or members of the public.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
Required Services (Tasks)
Performance Standards
Acceptable Quality Levels
Methods of
Surveillance
Incentive (Positive and/or Negative)
(Impact on Contractor
Payments)
TASK 1: In accordance with specifications in section
1.1.1 of the
PWS
95% of required areas within specification at all times and 100% of required areas at the Great Falls Tavern Complex within specification in
1. Direct Observation
2. Customer Feedback
$100 reduction in payment for documented incident when not remediated within 3 business days of notification. After the third documented offense, penalty increases to $200.00
9 | P a g e accordance with section 1.2.1
TASK 2: In accordance with specifications in section
1.1.2 of the
PWS
90% of required areas within specification at all times and 100% of required areas at the Great Falls Tavern Complex within specification in accordance with section 1.2.2
$100 reduction in payment for documented incident when not remediated within 3 business days of notification. After the third documented offense, penalty increases to $200.00
TASK 3: In accordance with specifications in section
1.1.3 of the
PWS
95% of required areas within specification at all times.
$100 reduction in payment for documented incident when not remediated within 3 business days of notification. After the third documented offense, penalty increases to $200.00
Site Maintenance
In accordance with all specifications in section 5.8 of the PWS
95% of required areas within specification at all times and 100% of required areas at the Great Falls Tavern Complex within specification in accordance with section 2.1
$100 reduction in payment for documented incident when not remediated within 1 business day of notification. After the third documented offense, penalty increases to $200.00
Tree Protection Provisions in accordance with PARA
5.9 of the
PWS
Tree Protection Provisions in accordance with PARA
5.9 of the
PWS
Required 100% of the time
Tree damaged caused by the contractor shall be assessed by an NPS ISA Certified Arborist and a report provided utilizing the “Cost Approach” as identified in the Guide for Plant Appraisal, 10th Edition, Council of Tree and Landscape Appraisers. The contractor shall be assessed for the repair (depreciated) or reproduction costs
10 | P a g e depending on the extend of the damage at the park’s discretion
III. GOVERNMENT FURNISHED PROPERTY.
The government shall provide:
1. Property.
• Keys. The Contractor will be issued keys by the Government for access at the time of contract award. No keys shall be duplicated. The supervisor shall issue keys to Contractor employees and be responsible for their return. The Contractor shall report the occurrence of a lost key immediately to the COR. The Contractor shall be required to reimburse the Government for replacement as a result of the Contractor losing keys. The Contractor shall prohibit the use of keys issued by the Government by any persons other than the Contractor's employees.
• Staging. If space is available, a staging area will be assigned on-site for the storage of Contractor-supplied equipment, materials, and supplies, which will be used in the performance of work under the contract. The Government will not be responsible in any way for damage or loss of parts, property, or equipment.
IV. GENERAL INFORMATION
1. Contractor Furnished Items
• Equipment and Supplies. The contractor shall provide all labor, materials, equipment, signage, and supplies needed in order to complete this requirement.
• Vehicles. All vehicles must be identified with Contractor's logo. Contractor personnel operating motor vehicles used in performance of this contract shall have a valid state operator’s license and shall operate all motor vehicles in accordance with applicable laws.
2. Contractor Personnel
• Government Rights. Government reserves the right to restrict the employment under the contract of any contractor employee, or prospective contractor employee, who is identified as a potential threat to the health, safety, security, and general well-being or facilities and the staff/visitors.
Additionally, the contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest. The contractor shall promptly remove any such employee for the premises.
3. Contractor Management. The contractor shall provide an on-site contract manager who will be responsible for the performance of the work. The name of this person and an alternate(s) will act for the contractor when the manager is absent. These individuals shall be designated in writing to the Contracting Officer within fifteen (15) days after award of the contract. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the operation of this contract. The Contract Manager and alternate shall present a neat and clean appearance. The contract manager or alternate shall be available at all times to meet on-site with government personnel to discuss problem areas. The contract manager and alternate must be able to read, write, speak, and understand English. The positions shall at no time be vacant.
11 | P a g e
1. Damage to Government Property.
a. The Contractor shall assume full liability and responsibility for any loss or damage to
Government property caused by their operations and shall assume full responsibility for any and all damages or claims for damage for injury to persons, property, or equipment which might result from any service performed under this contract. The Contractor shall be responsible for the repair or replacement of all damaged government property caused by their operations. The Contractor shall notify the CO and COR, in writing, within eight (8) hours of any damage occurring and include details related to the extent. Details should include any park operations or assets adversely impacted, as well as photographs. Furthermore, the contractor shall take any immediate actions necessary to prevent further damage. The Government, at its sole discretion, may elect to repair or replace the damaged property, and deduct such costs from monies due the Contractor.
b. Historical buildings and other structures and items of cultural/historical significance shall be preserved from damage using appropriate protective measures. In the event of damage, the CO and COR shall be notified immediately by whatever means available to the contractor.
The Contractor shall notify the CO and COR in writing within 1 hour of the occurrence.
c. The C&O Canal Towpath is a historical asset and active thoroughfare. The Contractor is required to remediate any damage caused by equipment or operations by restoring the towpath to the condition in which existed before project commencement.
d. The contractor shall be issued any necessary key(s) required to complete the work specifications. In the case of task orders, the contractor may already possess the necessary keys. Regardless, no work may begin on the project until all government furnished keys have been accounted for on an official hand receipt, DI-105, (to include keys received previously without a hand receipt). Keys require strict chain-of-custody and control, and the contractor shall have adequate internal control measures to ensure accountability of keys. It is strictly forbidden to duplicate government furnished keys, even if duplicates are destroyed at the end of the project. The contractor shall use keys only when it relates to execution of the specified work and shall at no time relinquish key control to persons that are not employed by the contractor.
5. Environmental Concerns and Safety Standards. Contractor employees must adhere to all safety requirements as outlined by Federal, State & Local regulations. This includes but is not limited to OSHA and EPA requirements. The contractor shall operate in accordance with ANSI Z133.2. In addition, the contractor shall ensure compliance with ANSI/OPEI B71.1-2017, the American National Standard for Consumer Turf Care Equipment – Pedestrian-Controlled Mowers and Ride-On Mowers – Safety Specifications.
a. Due to the importance of maintaining a culture of safety for the public, staff, and contractor employees, the C&O Canal shall assess safety in accordance with the provisions in the PWS. Serious violations, injuries resulting from negligence, failure to report qualifying injuries, or patterns of safety infractions may result in the issuance of a Stop Work letter until a joint safety stand-down meeting is performed and a recommencement plan is approved. Safety concerns that are unable to be corrected through remediation processes may result in termination for cause and an unfavorable rating in the Contractor Performance and Assessment System (CPARS).
b. Contractors are required to provide a stocked and accessible trauma kit at each crew location.
c. The contractor and each of their employees shall work in compliance with all applicable OSHA, Federal, state, and local safety laws and regulations.
d. The contractor shall provide and ensure that all personnel at the work site use the proper Personal Protective Equipment (PPE) required by OSHA regulations and ANSI standards.
12 | P a g e
e. The contractor shall not leave any tools, parts, and/or supplies unattended in the public area at any time while performing work.
f. The contractor shall report public safety hazards noted during the performance of normal duty of care to the COR or NPS staff.
6. Dispatch. In the event of an emergency the contractor should first call 911 and then immediately call the parks 24 hour dispatch emergency number – 1-866-677-6677. The dispatch will immediately send out information to all on-duty Rangers/Park Police in the area and contact 911 for further assistance. All injuries incurred by contractor employees requiring medical care or any injuries (regardless of severity) sustained by the public as a result of contractor work performance shall be reported in writing, via email, to the CO and COR/COTR within four (4) hours of the incident. Correspondence shall contain a summary of the incident as well as prudent notes/details. Personally Identifiable Information such as names and dates of birth shall be excluded.
7. Permits and Responsibilities.
a. The contractor shall, without additional expense to the Government, be responsible for obtaining and renewing all necessary licenses and permits.
b. The contractor shall be responsible for all damages to persons or property that occur as a result of the contractor’s negligence and shall take proper safety and health precautions to protect the work, the workers, the public and the property of others.
c. The contractor shall be responsible for all materials delivered and work performed until completion and acceptance of the entire work.
8. On-Site Supervisor
a. As a minimum, the contractor must provide one on-site supervisor to direct all contract personnel and maintenance operations.
b. The on-site supervisor shall be fluent in the English language to effectively communicate with the contractor’s employees and/or subcontractors as well as the COR and other Government personnel.
c. If the on-site supervisor is not present or absent due to illness or other reasons, the contractor shall provide an alternate supervisor to manage and direct all contract personnel and operations. The alternate supervisor shall possess the same qualifications as the on-site supervisor.
d. The on-site supervisor shall have means of direct communication available such as phone or personal electronic device. The supervisor shall be able to respond to communications relayed through the contractor’s management channels.
e. The contractor is required to establish a primary point of contact for communication with the
COR. The point of contact shall be responsible for coordinating with the COR and shall possess the managerial authority to make decisions and act on behalf of the contractor. The primary point of contact shall be reasonably available during business hours to field calls and correspondence from the COR and shall be responsive. The primary point of contact is not required to be on-site during work execution.
V. MOWING
1. Site Inspection. The Contractor shall remove litter and debris from mowed areas prior to each mowing and dispose of offsite.
13 | P a g e
2. Trash. All trash shall be collected, stockpiled and transported offsite in plastic bags.
2. Mowing L.O.D.’s. Refer to aerials provided with solicitation.
3. Quality Cut. To ensure a high quality cut, all mower blades shall be sharpened before each mowing and shall be adjusted to a height of three (3) inches. Mowing heights may be adjusted at the discretion of the COR as necessary to adapt to seasonal conditions.
4. Signage. Cones and signage shall be deployed in order to ensure all work zones are clearly defined and that visitors and staff are sufficiently aware of the boundaries of the operational area, and potential for hazards.
5. Turf. The turf shall be cut to a uniform height; skips and patches of uncut grass or windrowing shall not be permitted.
6. Grass Clipping. All grass clippings and mower discharges shall be directed away from roadways, walkways, and mulched areas. Grass clippings shall be blown or cleared from roadways and walkways.
7. Safety Guards. Mower guard safety shields shall be operable and in place at all times.
8. Site Maintenance. The contractor shall follow the specified site maintenance guidelines:
a. The contractor shall maintain the work site in a safe, neat and orderly manner. All supplies and equipment on the project site shall be stored to preclude any damage.
b. All mud, dirt, debris, foreign objects or spills of any kind from the contractor’s operations shall be cleaned up daily or as requested by the COR.
c. All contractor generated refuse and waste shall be hauled from the work site daily. Refuse and waste material shall be hauled in trucks with tight fitting covers to prevent spillage on roadways.
d. It shall be the contractor’s responsibility to take whatever measures are necessary to assure the protection of the Government assets and to perform the work so as to cause minimal disruption of ongoing activities near occupied areas.
e. The contractor assumes the risk and responsibility for the loss or damage to the Government furnished property.
9. Tree Protection. The contractor shall follow the specified tree protection guidelines:
a. String trimmers shall not contact tree trunks, especially on young trees and smooth/thin bark species.
b. Contractor equipment and vehicles shall not be parked on the critical root zone of mature trees (1.5 times the circumference of the canopy). Equipment and vehicles shall be parked in open areas, curb sides, and designated parking lots.
c. Mowing shall be performed in a manner that prevents machine impacts to tree trunks.
VI. Invoicing and Payment
14 | P a g e
1. Invoicing and payment must be broken down into two separate line items. Areas included for service in Enclosure 1 are considered a single service cycle but must be broken down into two line items or sub-areas. The first line item shall include the following locations: Areas identified on page 7 of Enclosure 1 - Fletchers Cove and Abner Cloud House locations as identified in Task 3 of this Performance Work Statement. These items must be applied to the specific Fletcher’s Cove funding account. The second line item shall include the remainder of sites in Enclosure 1, and the contractor shall invoice these to the general mowing fund.
2. All invoicing is based on the completion of a full cycle. The invoice shall receive appropriate payment action based on the contractor’s completion of the service in accordance with the requirements (see PARA 2.1.2). The contractor shall estimate the number of cycles required through-out the period of performance based on the contractor’s independent judgement and calculations and divide the estimated number of cycles by the overall task order award amount in order to ascertain the cycle invoice amount. A total of fifteen percent (15%) of the total contract award amount shall be ineligible for invoicing and billing until the end of the period of performance. Because this is a firm fixed price contract, the contractor is responsible for execution throughout the period of performance, without additional compensation beyond the original award amount.
3. The contractor shall provide a notification when a mowing cycle is complete. The COR will inspect the work on-site in consultation with other NPS staff members. The close-out inspection shall be documented in writing, and must clearly convey any deficiencies and remedial action required. In the event that the work is not acceptable, the contractor shall record a list of items noted by the Government to be corrected. A subsequent inspection may take place in order to review the corrected items.
4. Invoices submitted without a close-out inspection shall be rejected, therefore it is imperative that the contractor notify the COR when a mowing cycle is complete.
5. The Contractor shall submit all invoices through www.ipp.gov within 30 days of work performed.
Failure of the contractor to upload an attached copy of the invoice and any requested documentation through IPP.gov will result in invoice being rejected. This is the only authorized invoicing mechanism.
| TABLE OF CONTENTS |
| SECTION 1 Description of Work |
| 1. Performance Work Statement |
| 2. Program Overview |
| 3. Period of Performance |
| 5. Requirements |
| 6. Personnel |
| 7. Conduct |
| 8. Hours of Operation |
| SECTION 2 Quality Assurance |
| SECTION 3 Government Furnished Property |
| 1. Property |
| SECTION 4 General Information |
| 1. Contractor Furnished Items |
| 2. Contractor Personnel |
| 3. Contractor Management |
| 4. Damage to Government Property |
| 5. Environmental Concerns and Safety Standards |
| 6. Dispatch |
| 7. Permits and Responsibilities |
| 8. On-Site Supervisor |
| SECTION 5 Government Furnished Property |
| 1. Site Inspection |
| 2. Trash |
| 3. Mowing L.O.D. |
| 4. Quality Cut |
| 5. Turf |
| 6. Grass Clippings |
| 7. Safety Guards |
| SECTION 6 Invoicing and Payment |
| Performance Work Statement (PWS) |
| II. Quality Assurance |
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
File details come from the government source that posted it. Updated .