1 T - 1
CIVIL
T-1
A
B C D E F G H
SCHEDULE OF DRAWINGS
RING NO. RING NO.DWG. NO. DWG. NO.SHT. NO. SHT. NO.DESCRIPTION OF DRAWINGS DESCRIPTION OF DRAWINGSREF. NO. REF. NO.REVISION STATUS REVISION STATUS
SYMBOL BY
DESIGNED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENERGY MANAGER
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY REPLACEATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
ENVIRONMENT
FORCE PROTECTION
TITLE SHEET - 1
TITLE SHEET - 11 OF 1
PAK, C H
FEWR NO. 249183 JMMT
249183
CHAIN LINK FENCE
PAVEMENT MARKING DETAILS-2
PAVEMENT MARKING DETAILS-1 AND SIGN POST DETAIL
AC PAVEMENT, BOLLAED AND PUZZLE STONE DETAIL
SITE LAYOUT PLAN AND SCOPE OF WORK
LOCATION PLAN AND GENERAL NOTES
C-6
C-5
C-4
C-3
C-2
C-12
REPAIR PARKING AREA AROUND BLDG S-2110, JMMT
AROUND BLDG S-2110, JMMT
REPAIR PARKING AREA
AS SHOWN
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
- 3
E A S T S E ACHUNCHON
PYONGTAEK
KUNSAN
KWANGJU
S E A
W E S T
MUNSAN
DAEGU
CHINHAE
WAEGWAN
BUSAN
45 1
DAEJEON
OSAN 1
UIJONGBU
DONGDUCHEON
SEOUL
TONGYOUNG
MOKPO
JMMT
LOCATION MAP
NOT TO SCALE
C-1UNCMAC.
CONTRACTING OFFICER WITH CONCURRENCE IN THE
AND STORAGE YARD SHALL BE DETERMINED BY THE
THE LOCATION OF THE CONTRACTOR'S OPERATIONS
NOTE :
GENERAL NOTES :
SUBMISSION OF CONTRACT PROPOSAL.
DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND
PRIOR TO COMMENCING WORK ON THE PROJECT.
INDICATED BY THE COR AND SHALL BE APPROVED BY THE COR
UNDETAILED PORTION OF THE JOB INCLUDING OTHER AREAS
2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ANY
EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
DISMANTLING, DEMOLISHING, OR REMOVING AT THE CONTRACTOR'S
TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR/RESTORATION
ITEMS WHICH WILL INTERFERE WITH THE REPLACEION OPERATIONS.
UNDER GROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER
CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS
5. THE SITE INDICATED ON THE DRAWINGS SHALL BE GRADED AND
ADDITIONAL COST.
EXISTING SITE CONDITIONS PRIOR TO START OF WORK AT NO
CHECK THE OTHER REPLACEION REQUIREMENTS IN MEETING THE
FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO
7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY
COVERED WITH TOP SOIL AND SOLID SODDED.
4. ALL UNPAVED AREAS WITHIN THE GRADING LIMIT LINES SHALL BE
REPRESENTATIVE.
A CLEAN CONDITION ACCEPTABLE TO THE OWNER OR OWNER'S
MATERIALS, EQUIPMENT AND DEBRIS AND LEAVE THE PREMISES IN
ALL TIMES AND AT COMPLETION OF WORK, REMOVE ALL SURPLUS
8. THE CONTRACTOR SHALL KEEP THE CONSTRUCTION AREA CLEAN AT
TO THE PROJECT CONTRACT.
TO ACCOMPLISH THE CIVIL SCOPE OF WORK AT NO ADDITIONAL COST
FORM ARE A PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED
OF THE REPLACEATION MANAGEMENT AGENCY, KOREA REGION OFFICE"
DRAWINGS, FOR OM&A PROJECTS, KOREA, OCTOBER 2014, DEPARTMENT
6. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL
LOCATION PLAN AND GENERAL NOTES
PAK, CH C.
AIRPORT
INCHON
S-2110
S-2113
S-2111
S-2112
D xx x x x x x x x x x x x
SFHDR
T-2115
T-2116
T-2117
T-2118
AC
PCC
AC
N
S-2114
8m420
SCALE: 1:200
LOCATION PLAN
SCALE: 1 / 200
PROJECT SITE
249183
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
PAK, C H.
CIVIL
AS SHOWN
PAK, C H.
S-2110
S-2113
S-2111
S-2112
S-2114 x x x x x x x x x x x
T-2115
T-2118 x x x x x x x x xx
8m420
SCALE: 1:200
APPROX. 280 LM
GATES W/ BARBED WIRE AT ALL AROUND JMMT
PAINT EXIST CHAIN LINK FENCE AND SWING
RESTORE EXIST PAVEMENT MARKING
COURSE, APPROX. S=1600 SM
MILL/OVERAY W/ 50MM THK AC SURFACE
RESTORE EXIST PAVEMENT MARKING
COURSE, APPROX. S=1600 SM
MILL/OVERAY W/ 50MM THK AC SURFACE
3.0
APPROX, 8 EA
REPLACE 8 EA BOLLARD W/ NEW
EXIST PCC PAVEMENT AREA
ON EXIST PCC PAVEMENT
PAINT NEW PAVEMENT MARKING
EXIST SHADE SHELTER
EXIST WOOD TABLE AND CHAIRS
APPROX. 280 SM
REPLACE EXIST BRICKS W/ PUZZLE STONE
1:200SCALE
SITE LAYOUT PLAN
SCOPE OF WORK
REPAIR AND MAINTENANCE WORK:
C-2
5.5
ON AC PAVEMENT.
W/ PAINTING HANDICAP MARKING
REPLACE HANDICAP SIGN POST
ON AC PAVEMENT.
8. REPLACE HANDICAP SIGN POST W/ PAINTING HANDICAP MARKING
7. PAINT NEW PAVEMENT MARKING ON EXIST PCC PAVEMENT.
6. REPLACE 8 EA BOLLARD W/ NEW.
5. REPLACE DAMAGED CHAIN LINK FENCE W/ BARBED WIRE.
4. REPLACE EXIST BRINKS W/ PUZZLE STONE.
W/ BARBED WIRE AT ALL AROUND JMMT.
3.PAINT EXIST CHAIN LINK FENCE AND SWING GATES
2. RESTORE EXIST PAVEMENT MARKING.
1. MILL/OVERAY W/ 50MM THK AC SURFACE COURSE.
- 4
- 6
- 3
- 3
- 4
- 5
- 4
- 6
- 3
- 4
- 5
SITE LAYOUT PLAN AND SCOPE OF WORK
249183
- 3
CABLE W/ CONDUIT PIPE
REMOVE/RE-INSTALL EXIST SECURITY
W/ 1 EA BARBED WIRE, APPROX. 27 LM
REPLACE DAMAGED CHAIN LINK FENCE
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
SCALE: NONE
(FEDERAL STANDARD 595a, 30108)
100mm STEEL PIPE
CAST-IN-PLACE
CONC BASE
PAINTED DARK BROWNFNSH GRADE
300 DIA
50mm WIDE STRIPE OF WHITE
REFLECTIVE TAPE
C O
N C
C A P
FILLED W/CONC
PAK, C H.
C-3
- 3
MIN
300TACK COAT
EXISTING PAVEMENT
SAWCUT & BITUMINOUS
PRIME COAT
NEW AC PAVEMENTEXST. AC PAVEMENT
NEW PAVEMENT
EXISTING SUBGRADE
C
2% SLOPE
EXISTING BASE COURSE
EXISTING SUBBASE COURSEC
2% SLOPE
TO REMAIN
VARIES
EXISTING SUBGRADE
TACK COAT
EXISTING BASE COURSE
VARIES
TO REMAIN
EXISTING SUBBASE COURSE
2% SLOPE
2% SLOPE
TO REMAIN
REPLACE EXISTING 50mmTHK. AC PAVEMENT
W/NEW 50mm THK AC
TO REMAIN
EXISTING AC PAVEMENT
REPLACE EXISTING 50mmTHK. AC PAVEMENT
W/NEW 50mm THK AC
PRIME COAT
100% LABORATORY MAX. DENSITY
COMPACTED TO AT LEAST
1C
BASE COURSE NOT EXPOSED
MILLING & OVERLAY
1B
BASE COURSE EXPOSED
MILLING & OVERLAY
1A
(NEW TO EXIST)
AC PAVEMENT JOINT
NOT TO SCALE-
1 TYPICAL AC PAVEMENT SECTION
NOTE:
INSTALL 8 EA BOLLARD 1M FROM FENCE AND EVERY 3M.
249183
NON WOVEN FABRIC(60g/�)
SUBBASE COURSE
NON WOVEN FABRIC(60g/�)
COMPACT SUBGRADE
BOLLARD DETAIL
SCALE: NONE- 3
3 PUZZLE STONE DETAIL
PUZZLE STONE
AND PUZZLE STONE DETAIL
AC PAVEMENT, BOLLAED
CONC CURB
REFLECTIVE
WHITE PAINT
STRIPES (TYP)
CL
CL
TYP PARKING SPACE STRIPING
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
NOT TO SCALE
SIGN POST DETAILS
2A
DIRECTIONAL ARROW
PAINT WHITE
NOT TO SCALE
STOP LINE
225200
WHITE PAINT
1A
1B
NOT TO SCALE
NOT TO SCALE
PARKING
RESERVED
(WHITE)
150mm WIDE
1C
PARKING
RESERVED
"HANDICAP" SIGN & POST
WHITE
BLACK
EXST SIDEWALK
BASE PLATE
150x150x10
GRANITE CURB
STAINLESS ANCHOR BOLT
4 EA-12mm DIA 90MM(L)
STEEL PIPE
50mm DIA GALV
"HANDICAP" SIGN DETAIL
2B
38mm RADIUS
6 T Y P
IC
A L
450mm GAGE GALVANRED STEEL
PAINTED WHITE
PAINTED BLUE
LETTERING SHALL BE UPPER &
LOWER CASE HELVITA MEDIUM,
40mm CAPITAL LETTER
HEIGHT, CENTERED
M
IN
PAK, C H.
AS SHOWN
2PAVEMENT MARKING DETAILS - 1
CIVIL
AND SIGN POST DETAIL
PAVEMENT MARKING DETAILS - 1
C-4
249183
WHITE
TRAFFIC
PAINT
NOTE : SYMBOL TO BE PAINTED WITH WHITE
NON-REFLECTIVE TRAFFIC PAINT.
TYP NO PARKING ZONE STRIPING
NOT TO SCALE
NOTE :
1. PAVEMENT MARKING SHALL BE REFLECTIVE PAINT.
2. DETAIL OF DRAWINGS SHALL SHOW TYPICAL LINE MARKING DETAILS
BECAUSE LINE MARKING SHOWN ON DRAWINGS IS NOT ACCURATE.
THEREFORE CONTRACTOR SHALL COORDINATE THE LINE MARKING WORK
WITH DPW PRIOR TO START OF WORK.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
R
.7
CROSSWALK DETAIL
WHITE STRIPES
SEE PLAN
CENTER LINE
1C
SIDE LINE
15050 150 50
150 mm WIDE REFLRCTIVE WHITE COLOR
NO PARKING ZONE STRIPING
WHITE PAINT STRIPING (TYP)
CONC
CURB
,5
2,700 1,800
1A
1B
1D
1E
150mm WIDE REFLECTION
MARKING DETAIL
1B
PAVEMENT MARKING
T Y P
IC
A L
PAINTED WHITE
PAINTED BLUE
PAK, C H.
AS SHOWN
1 PAVEMENT MARKING DETAILS - 2 PAVEMENT MARKING DETAILS - 2
CIVIL
C-5
249183
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
AS SHOWN
SCALE: NONE
CHAIN LINK
FABRIC
(SEE NOTE 1)
GATE DOUBLE SWING
INSIDE OUTSIDE
WIRE
TIES
SEE DETAIL
CONCRETE BASE
TRUSS ROD BAND
FENCE POST
TRUSS ROD
(10 0 MIN) FENCE POST
BRACE RAIL
BAND
10 TRUSS ROD
FLEXIBLE
COPPER
BRAID
NOT TO SCALE
2.10 H CHAIN LINK FABRIC FENCE AND GATE
STRETCHER
BAR
TRUSS
ROD
PLUNGER
BAR
GATE
LATCH
WIRE
TIES
STRETCHER
BAR
TRUSS ROD
10 0 MIN
TRUSS ROD
10 0 MIN
50 LINE POST
(TYP)
40 0
BRACE
100 0
GATE POST
50 0 PIPE
(GATE FRAME)
60 0
CORNER
POST
CONCRETE
21 MPa
(CAST-IN-PLACE)
#8 AWG SOLID
COPPER WIRE
POST
HINGE
COPPER CLAD STEEL
GROUND ROD
19 0x3050 LENGTH/
10 0 STD
TRUSS ROD
CONNECTOR
FABRIC TOP SELVAGE TO
BE TWISTED AND BARBED
40 0 TOP RAIL-
EXPANSION COUPLING
@ 6000 OC MAX
3 STRANDS
4 POINTS
STRETCHER
BAR
9 GAGE WIRE
FABRIC 50 MESH
STRETCHER
BAR BAND
STANDARD
TRUSS ROD
BAND
TRUSS ROD
10 0 MIN
40 0 TOP RAIL-EXPANSION COUPLING
@ 6000 OC. MAX
13x50x363 STRAP BENT
AS SHOWN
FABRIC
TIE WIRES
TIE WIRE
(375 OC MAX AND
WITHIN 100 FROM
TOP AND BOTTOM
OF FABRIC)
FENCE
POST
FABRIC
9-GAGE TIE WIRES
(600 OC MAX)
FABRIC
TOP & BOTTOM
KNUCKLED
P L A N 5A
ELEVATION
5B
NOT TO SCALE
LINE POST ATTACHMENTS
NOT TO SCALE
WIRE TIES FOR
TOP OR BRACE RAIL
HANDLE
GATE FRAME HANDLE 25x100
STEEL BAR
/32 0 HOLE
(2 EA)
32 0 HOLE
PLUNGER-25x500 MIN
STEEL BAR
M
IN
P L A N 4A
ELEVATION
4B
NOT TO SCALE
PLUNGER BAR
GATE FRAME
(TYP)
013x85 BOLT
W/NUT
7 0 REMOVABLE
PIN (TO LOCK IN
UP POSITION)
CORNER POST
7A
GATE
7B
NOT TO SCALE
GROUNDING DETAILS
NOT TO SCALE
GATE FRAME
NOT TO SCALE
TRUSS ROD & BAND
NOT TO SCALE
CLAMP FOR BRACE RAIL
FABRIC
FENCE POST
TENSION BAND
(375 OC MAX AND
WITHIN 100 FROM
TOP AND BOTTOM
OF FABRIC)
NOT TO SCALE
STRETCHER BAR BAND
6x20
STRETCHER BAR
TO ENGAGE EACH
FABRIC LINK
NOT TO SCALE
LINE POST DETAIL
100 GATE POST
50 PIPE
GATE FRAME
25 PL 100 0
GATE POST
13x25x138 STRAP
13x38 STRAP BENT
AS SHOWN-2EA-LEGEND
VARIES
13 0 HOLE FOR PADLOCK
(EACH SIDE)
LATCH MOVEMENT
DIRECTION
GATE FRAME
(TYP)
GATE FRAME
(TYP)
2 WASHER
(TYP)
LATCH
PEEN END (TYP)
DRILL 14 FOR
013 BOLT
P L A N 2A
ELEVATION
2B
NOT TO SCALE
POST HINGE
P L A N 3A
ELEVATION
3B
NOT TO SCALE
GATE LATCH
013x100 BOLT WITH
NUT & 6 WASHERS
013x88 BOLT WITH
NUT & 3 WASHERS
13x88x50 PLATE
NOTCHED EACH SIDE
013 BOLT USS THREAD
100 LONG, HEX HEAD
W/NUT
6 5
R16
FENCE
FABRIC
NOTES :
1. ALL FABRIC SHALL BE #9 GAGE GALVANIZED STEEL
WOVEN IN A 50 MESH.
2. ALL DIMENSIONS SHOWN HEREON ARE IN MILLIMETERS.
3. FENCE GROUNDING
a. ALL FENCES SHALL BE GROUNDED AT EACH TERMINATION, EACH CORNER (EXCEEDING 60^), EACH SIDE OF EACH
GATE, AND AT 300 METER INTERVALS.
b. FENCE CROSSED BY PRIMARY POWER LINES IN EXCESS OF
600 VOLTS SHALL BE GROUNDED AT A POINT DIRECTLY
BELOW THE CROSSING AND 45 METER ON EACH SIDE
OF CROSSING.
c. FENCES PARALLEL TO OR WITHIN 30 METER OF A PRIMARY
POWER LINE IN EXCESS OF 600 VOLTS SHALL BE GROUNDED
EVERY 150 METER.
4. ALL CHAIN-LINK FENCING MATERIALS SUCH AS FABRIC,
POSTS, RAILS, ETC. SHALL BE GALVANIZED FINISHED,
UNLESS OTHERWISE NOTED.
BOLTED
SOLDERLESS
CLAMP
FUSION WELDING
100 0 GATE POST/
GROUNDING
BAND
WIRE TIES
BAND
LINE POST
GATE
FIN GR
BOT RAIL
MULTIPLES OF 3000SEE PLAN3000
.0
30003000
CHAIN LINK FENCE
PAK, C H.
C-6
249183
CHAIN LINK FENCE
| T-1 |
| C-1 |
| C-2 |
| C-3 |
| C-4 |
| C-5 |
| C-6 |
File details come from the government source that posted it. Updated .