SCOPE OF WORK (SOW):

BID SCHEDULE

Line Items

Description (All measures are IMPERIAL, NOT Metric)

Quantity Each Total Price FOB Destination received within xx After Receipt of Order (ARO)

0001 Channel HR A36 4 x 7.25 x 20' 20 $ $ 30 Days

0002 Flat HR A36 5/8 x 7 x 20' 20 $ $ 30 Days

0003 Flat SS T304 ½ x 4-½ x 10' 36 $ $ 30 Days

0004 Channel HR A36 6 X 10.5 X 20' 20 $ $ 30 Days

0005 Flat HR A36 ½ X 12 X 20' 20 $ $ 30 Days

0006 Flat SS T304 ½ X 5 X 12' 34 $ $ 30 Days

0007 SS All thread ¾-lO x 12' 70 $ $ 30 Days

0008 SS Hex Nut ¾-10 1000 $ $ 30 Days

0009 SS Flat Washer ¾-10 1000 $ $ 30 Days

0010 SS Lock Washer ¾ 1000 $ $ 30 Days

0011 Angle Stain T304 4 x 4 x 3/8” 20' 20 $ $ 30 Days

0012 Flat HR A36 3/8 X 3 X 20’ 10 $ $ 30 Days

0013 Plate HR A36 ½ X 18 X 20' 20 $ $ 30 Days

0014 Plate HR A36 ½ X 9 X 20' 10 $ $ 30 Days

0015 B-7 All Thread ¾-10x12’ 70 $ $ 30 Days

0016 Heavy hex Nut 2h or DH ¾-10 1500 $ $ 30 Days

0017 Flat HR A36 ½ x 4 x 20’ 30 $ $ 30 Days

0018 Pipe 1 ½” sch 80 20’ 14 $ $ 30 Days

0019 Flat HR ¾” x 5 x 20’ 90 $ $ 30 Days

0020 Angle HR A36 5 x 5 x ½” 20’ 4 $ $ 30 Days

0021 Square bar 5 x 5 x 12’ forged 304 stainless steel

1 $ $ 30 Days

0022 HR plate A36 4-¼” x 3.625 x 68” flame cut with ½” radius on corners (See Diagram A Below) Machine finished to +/- 1/8”

16 $ $ 8-Weeks

0023 HR plate A36 1/8” x 48” x 96” 2 $ $ 30 Days

0024 Flat SS T304 – ½” x 8” x 12’ 30 $ $ 30 Days

0025 FOB Destination – USACE: 257 Grant Street; Peoria, IL 61603 (Please note if prices above include shipping)

1 JOB (30

Day lead time items

0026 FOB Destination – USACE: 257 Grant Street; Peoria, IL 61603 (Please note if prices above include shipping)

1 JOB (8-

week lead time items

0027 Provide Mechanical Properties & Origin Certificates for all items

1 JOB

Grand Total: $

DIAGRAM A:

DELIVERY and COORDINATION: Coordinate all deliveries with the Site Point of Contact (SPOC) to ensure resources are available to offload deliverables. General Hours of Operations are Monday – Thursday

7AM to 3:30 PM Chicago, IL time excluding Government Holidays. Failure to coordinate with the SPOC prior to delivery may result in the return of deliverables and will be at the Contractor’s expense, a non-reimbursable Contractor cost for failure to coordinate acceptable delivery times.

PURPOSE: The U.S. Army Corps of Engineers, Rock Island District, Illinois Waterway Project (USACE) has a requirement for the supply of various materials to support USACE fabrication of the Upstream Wear

Track, Side Wear Track, Seal Angle, Top Seal, Steel Imbedded on the Upstream Side, Miter Gate Seals, Screens, Clevises, and End Slider Shims for the 2023 Illinois River Navigation Closures and their subsequent maintenance, repairs, and upgrades of the lock and dam systems that support commerce and recreation activities.

Will provide Yellow Highlighted Section once Awardee is determined:

SPOC: 2 – Primary & Alternate

POC: 2- Primary & Alternate

Invoices 2 – Primary & Alternate

File details come from the government source that posted it. Updated .