Text version
LOCK & DAM 25
SUPPLY & DELIVER – PURCHASE ORDER
VARIOUS STEEL PRODUCTS
1.0. SCOPE. The contractor shall supply and deliver various steel products in accordance with the specification listed below to Lock & Dam 25, #10 Sandy Slough, Winfield, MO, 63389.
1.1. DELIVERY PERIOD. All items shall be delivered to Lock & Dam 25, #10 Sandy Slough, Winfield, MO, 63389. All items shall be delivered between 0700 hrs. and 1500 hrs. CST Monday through Friday excluding all Federal Holidays. All deliveries shall be coordinated a minimum of 3 working days in advance with George Hilton (George.G.Hilton@usace.army.mil and/or 636-566-8120).
1.2. PERIOD OF PERFORMANCE. The contractor shall have 60 calendar days from the date of award to supply and deliver various steel products in accordance the specifications listed below to Lock & Dam 25, #10 Sandy Slough, Winfield, MO, 63389.
2.0. MATERIAL. The contractor shall supply and deliver the following items in accordance with deliver period and specifications listed below.
2.1. The contractor shall supply and deliver 10,983 linear feet (qty. 523 x 21’ sections) of 2” Schedule 40 A500 structural steel pipe. All contractor provided material shall meet or exceed the following criteria per Government approval.
2.1.1. Nominal Pipe Size (Inches): 2
2.1.2. Outside Diameter (Inches): 2.375
2.1.3. Wall Thickness (Inches): 0.154
2.1.4. Pipe Schedule: 40/STD
2.1.5. Inside Diameter (Inches): 1.939
2.1.6. Stock Length (Feet): 21
2.1.7. Weight Per Foot (Lbs.): 3.653
2.1.8. Grade: ASTM A500
2.2. The contractor shall supply and deliver 260 linear feet (qty. 13 x 20’ sections) of 2” Drawn Over
Mandrel (DOM) A513-Type 5 steel tubing. All contractor provided material shall meet or exceed the following criteria per Government approval.
2.2.1. Outside Diameter (Inches): 2
2.2.2. Wall Thickness (Inches): 0.25
2.2.3. Inside Diameter (Inches): 1.5
2.2.4. Stock Length (Feet): 20
2.2.5. Weight Per Foot (Lbs.): 4.673
2.2.6. Grade: ASTM A513- Type 5
2.3. The contractor shall supply and deliver qty. 1 of ½” x 48” x 96” Hot Rolled (HR) steel plate. All contractor provided material shall meet or exceed the following criteria per Government approval.
2.3.1. Thickness (Inches): 0.5
2.3.2. Width (Inches): 48
2.3.3. Length (Inches): 96
mailto:George.G.Hilton@usace.army.mil
2.3.4. Weight Each (Lbs.): 653
2.3.5. Grade: ASTM A36
3.0. SUSTAINABILITY. The contractor shall adhere to the following sustainability guidelines as applicable.
3.1. Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection
Agency (EPA) designates products that are or can be made with recovered materials, and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program.
Visit http://www.epa.gov/epawaste/conserve/tools/cpg/products for a complete list of designated products and the associated recommended content levels. Offerors must be able to demonstrate that each offered product meets minimum content levels upon request.
4.0. The point of contact (POC) for this order request is the undersigned at 636-899-0066.
KYLE L. WISEMAN
Facility & Safety Specialist, Rivers Project Office
| 2021-05-06T08:48:56-0500 | |