A02.11 PWS Facilities Operations Services BPA 15 September 2022 1114.docx

DOCX document 46 KB Posted

Attached to
ERDC Facilities Operation Services BPA Federal contract opportunity
Solicitation number
W912HZ22R0015
Issued by
Department of the Army Corps of Engineers Engineer Research and Development Center

View the file

Other files for this federal contract opportunity

Other files attached to ERDC Facilities Operation Services BPA, newest first.
File Type Posted
W912HZ22R0015 (002).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FACILITY OPERATION SERVICES

BLANKET PURCHASE AGREEMENT

U.S. ARMY CORPS OF ENGINEERS

ENGINEERING RESEARCH AND DEVELOPMENT CENTER

1. General: The objective of this Blanket Purchase Agreement (BPA) is to obtain facilities operation services for all Engineering Research and Development Centers (ERDC) as well as all facilities and equipment belonging to all ERDC over the next five years. Work will be issued by firm-fixed price Call orders. There is no minimum guarantee for this agreement. Note that an offeror need not have experience in each and every service area to be eligible for an award.

2. Requirement: The Contractor shall furnish all labor, materials, equipment, transportation and cleanup/disposal for all requirements specified in each BPA call. Award of BPA calls will only be made under this BPA at facilities that that do not otherwise have a service contract. Categories of facilities and equipment repairs and maintenance including but not limited to:

a. Plumbing Repair and Maintenance. Domestic, commercial, and industrial plumbing including eliminating leaks such as from loose or broken fittings or broken lines or from inadequately contained condensation or drain features, repairing waterlines, repairing sewer lines, repairing lift-stations, and repairing malfunction of water valves or backflow preventers among others, not otherwise covered by an existing contract at the requiring facility.

b. Electrical and Site Electrical Utilities. Domestic, commercial, and industrial electrical repairs for low, medium, and high voltage systems including interior and exterior lighting features and convenience outlets for a variety of voltages, ground and aerial transformers, substations, and transmission lines as well as utility poles and transmission line architecture among others, not otherwise covered by an existing contract at the requiring facility.

c. HVAC, Facilities Equipment, and Site Mechanical Utilities Repair and Maintenance. All installed HVAC systems including ductwork and installed facilities equipment including consumables utilities metering devices (such as for natural gas, propane, heating oil, potable water, and electricity among others) both analog and digital, among others, not otherwise covered by an existing contract at the requiring facility.

d. Fire Protection Systems Maintenance and Repair. All installed fire protection equipment and system components not otherwise covered by an existing service contract including but not limited to portable or fixed fire extinguishers, sprinklers, fire alarms, and annunciators among others, not otherwise covered by an existing contract at the requiring facility.

e. Exterior and Interior Enclosures Maintenance and Repairs. Maintenance and Repairs for enclosures including all locksmithing capabilities and key duplications, flooring and carpet replacement/repair, ceiling and lighting, doors, windows, and walls replacement/repair; roofing and gutter replacement/repair/cleaning, finishes including brick masonry, concrete masonry, stucco, metals, traditional drywall, flooring, carpet, and mounted partitions among others, , not otherwise covered by an existing contract at the requiring facility.

f. Facility cleaning not otherwise provided by janitorial services such as window cleaning (interior and exterior), power washing, dewatering, deep cleaning, biohazard & crime scene cleanup, mold abatement, special event janitorial services, not otherwise covered by an existing contract at the requiring facility.

g. Equipment Maintenance and Repairs for items including mobile and non-mobile equipment/machinery/generators not otherwise covered under an existing service contract including but not limited to repair, maintenance, adjustment, or replacement of major and minor assemblies, components, and wear parts, among others, not otherwise covered by an existing contract at the requiring facility.

Site visits may be needed prior to issuance of a BPA call for review of site conditions and to consult the Government representatives.

3. Funds Obligation: The Master Blanket Purchase Agreement (BPA) does not obligate any funds. The government shall be obligated only to the extent of authorized purchases actually made via a properly executed BPA Calls.

4. Threshold: The Government estimates, but does not guarantee, that the total volume of purchases through this agreement will be $950,000. Individual service requirements shall not exceed the simplified acquisition threshold. There is no minimum guarantee of work. There is no minimum BPA Call value.

5. Period of Performance: This BPA expires Five (5) years from award date or at reaching the BPA limit ($950,000), whichever is earlier.

6.0 LOCATION AND DESCRIPTIONS OF FACILITIES:

ERDC locations included in this agreement include but are not limited to:

- Engineering Research and Development Center, Vicksburg, MS

- Cold Regions Research and Development Laboratory, Hanover, NH

- Construction Engineering and Research Laboratory, Champaign, IL

- Geospatial Research Laboratory, Alexandria, VA

- Coastal and Hydraulics Laboratory Field Research Facility, Duck, NC

- Lewisville Aquatic Ecosystem Research Facility, Lewisville, TX

- USACE Reach-back Operations Center, Mobile, AL

- Permafrost Tunnel Research Facility, Fox, AK

- Permafrost Experiment Station, Fairbanks, AK

7. CONTRACTOR RESPONSIBILITIES:

A.Period of Performance: Each Call awarded under this agreement will have a period of performance for that specific call.
B.Licensing and Qualifications - The Contractor shall comply with licensing and qualifications requirements of the State work is to be performed.
C.Permits - The Contractor shall obtain all required permits for performance of work, and shall remain in compliance with all applicable federal, state, and local laws and regulations and with the agreement requirements.
D.Personnel Qualifications - Contractor personnel shall be qualified to perform the work described in each Call, and shall perform all work in a neat and workman-like manner in compliance with applicable codes and ordnances. All trade personnel shall be licensed by the State for the level of performance required for the work described.
E.Existing Conditions - The Contractor shall verify all existing site conditions, and shall hold the Government harmless for any conditions unrecognized by the Contractor that affect any part of this agreement.
F.Planning and Execution - The Contractor shall plan, program, administer, manage, execute, and complete the work necessary to provide the services required, pursuant to this agreement, including but not limited to procurement of specific incidental material, quality control, financial control, correspondence, and accurate and complete maintenance of records. Contractor is solely responsible for accurately surveying and calculating quantities of all tasks defined products and materials needed as well as determining all necessary installation details and associated costs.
G.Safety- The Contractor shall adhere to the applicable portions of the current edition of U.S. Army Corps of Engineers, Manual (EM): EM 385-1-1 Safety and Health Requirements Manual, Current Edition in performing the services required.
H.Quality Control Program - The Contractor, and not the Government, will be responsible for management and quality control actions necessary to meet the quality standards set forth by this agreement.
J.Pre-Performance Meeting - Prior to beginning any work under this agreement, the Contractor shall meet formally with the Government’s Technical Point of Contact (TPOC) and/or COR at a mutually-agreed-to date and time to review the specified work and to review the Contractor’s submitted documents.
K.Spills, Leaks, and Hazardous Waste – Any hazardous waste generated by the Contractor in the execution of this agreement shall be properly disposed of by the Contractor at no additional cost to the Government and such disposal shall comply with all applicable federal, state and local regulations. The Contractor shall clean up any spills of oil or hazardous waste resulting from the Contractor’s operations.
L.General Waste and Debris -- During performance of work the Contractor shall control waste and debris to ensure that it stays within the work area. Contractor shall remove waste and debris from the work area and properly dispose of it on a daily basis. Such waste and debris must be periodically removed from the site. Contractor supplied dumpsters may be arranged with the COR or TPOC, but dumpsters must be parked in a manner that does not block normal traffic, access for fire and other emergency equipment, or personnel egress in the event of an emergency. Site access for dumpster delivery and removal must be arranged with the COR or TPOC in advance so that access point security personnel may be timely notified.
M.Stored Tools and Materials – The Contractor may, with the Government’s approval, and at the sole responsibility of the Contractor, store tools, materials, and equipment used in the performance of this agreement on the site. Such tools, materials, and equipment must remain within the work area unless arrangements for storage elsewhere are made with the COR or TPOC.
N.Property Damage – Any property damaged by the Contractor’s employees or Contractor’s operations under this agreement shall be replaced or repaired to original condition by the Contractor at no additional cost to the Government.

8. GOVERNMENT RESPONSIBILITIES:

A.BPA Calls – Upon acceptance of the Contractor’s Quote in response to the Government’s RFQ, the Government shall issue a Call for the work to be accomplished by the Contractor. Each Call, at a minimum, shall describe the desired work, and period of performance.
B.Utilities on Site – The Government will provide the Contractor use of electricity and water without charge for the performance of the requirements of this agreement.
C.Emergency Action Plan – The Government shall brief the Contractor on the Emergency Action Plan. The contractors safety officer shall be responsible for briefing all of Contractor’s personnel and subcontractors performing work under this agreement prior to those personnel performing site work under this agreement.
E.Smoking Areas – Except for designated areas, the campus is designated a “No Smoking Zone”.
9.SAFETY REQUIREMENTS:
A.Rules and Regulations – Safety shall in accordance with the latest version of EM 385-1-1, US Army Corps of Engineers Safety and Health Requirements Manual which may be found at (http://www.usace.army.mil/CESO/Document/EM385-1-1FINAL.pdf), applicable OSHA regulations, and other applicable federal, state, and local regulations, including safety procedures required by the Safety Office. Where regulations differ, the most stringent shall apply.
B.Employee Safety Awareness – The Contractor shall insure that each of its employees working on the site (s) covered by this agreement reviews the applicable APP and AHA prior to beginning work.
C.Accident Reporting – The Contractor shall report all accidents to the COR as soon as possible, but not more than twenty-four hours after the accident occurs. The Contractor shall thoroughly investigate the accident and submit its findings along with appropriate corrective action taken to the COR. The Contractor shall be responsible for OSHA accident reporting and recordkeeping requirements.
10.SECURITY AND ACCESS REQUIREMENTS:
A.Site Security – The Contractor shall report any vandalism, suspicious activities or devices to the COR or local police as soon as possible. The COR will notify the Contractor of any heightened security measures and will expect vigilant monitoring of equipment, grounds and security fencing while working. At a heightened security posture, there may be work areas that are restricted. The COR will notify the Contractor of these restricted areas, and work may be delayed or restricted or will be performed in these areas under the direct supervision of U.S. Army Corps of Engineers personnel.
B.Hours of Operation – Normal hours of operation are are Monday through Friday from 0700 until 1600 excluding Federal holidays. The Contractor shall arrange work during these working hours unless authorized to work during other hours from the KO or COR.
C.Security Requirements –
(1)U.S. Citizens: Contractor personnel must be U. S. citizens. All Contractor personnel are required to sign in with Security to obtain and wear security identification badges. A picture ID is required. Contractor personnel shall follow all sign-in and security regulations as directed by the Security Office and the TPOC.

(2) No Weapons Allowed: All persons and vehicles entering a US Government facility are subject to inspection for firearms, explosives and dangerous weapons, per AR 190-22.

(3) Subcontractor Access/Deliveries: The Contractor shall notify the TPOC the day before or as soon as possible when subcontractors are to arrive or deliveries of equipment and supplies are to occur. This will facilitate access on to the installation and prevent delays at the security gates.

(4) General Protection/Security Policy and Procedures: The Contractor and all associated subcontractor employees shall comply with applicable installation, access and local security policies and procedures. Policies and procedures will be provided by the local Security Office. The Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and local policies. In addition to the changes otherwise authorized by the changes clause of this agreement, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

(5) Access to DoD Facility: For contractors who do not require a Common Access Card (CAC), but may require access to a DoD facility or installation. The contractor will arrange visits via the COR and TPOCs. Visitor requests will be submitted by the government to allow contractor access. Contractors must disclose US citizenship status to the COR/TPOC and must bring proof of identification for security inspection upon visit. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

(6) iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the USACE iWATCH program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 45 calendar days of agreement award and within 45 days of new employees commencing performance on the agreement. The agreement shall provide certification of completion to the COR within 10 days of training completion. Training documents will be provided by the Security Office.

(7) Pre-screen Candidates Using E-Verify Program: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial agreement award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.

11.ENVIRONMENTAL REQUIREMENTS:
A.Environmental Protection – The Contractor shall be in compliance with Federal, State, and local environmental laws, regulations, and ordinances applicable to this agreement. The Contractor is responsible for being currently informed of changes in environmental laws, regulations and ordinances. Violations or delays resulting from the Contractor’s failure to comply with environmental laws, regulations, and ordinances shall not affect the approved performance schedule. Where laws, regulations, and/or regulations differ, the most stringent shall apply.
B.Spill Containment – The Contractor shall have containment material in the immediate location of the work when performing work involving liquids. In the event of a spill, the Contractor shall contain spillage with corrective countermeasures, and once the spill is contained, notify the TPOC or COR. Spills shall be stopped from entering the environment.
C.Material Safety Data Sheets – The Contractor shall provide Material Safety Data Sheets to the TPOC or COR for products or materials delivered to or transported onto the Campus for use in performance of this agreement. No hazardous product may be used without the prior approval of the COR. Applicable Material Safety Data Sheets shall be maintained at each site for the duration of this agreement.
E.Labeling Hazardous Materials – The Contractor shall ensure that all hazardous materials delivered to or transported by it onto the Campus are properly labeled in accordance with Federal regulation 29CFR1910.1200.

12. Quality Control – The Contractor shall meet identified performance standards as listed in the Table below. The Government will assure compliance with the identified standards as noted in the Table.

Requirement Performance Objective
Performance Standard
Method of Surveillance
Acceptable Quality Level (AQL)
Incentives/Disincentives for Meeting or Not Meeting the Performance Standards
Licenses, Permits, Certificates
Personnel shall meet all minimum legal requirements to perform work
Verification of Documentation
100% Compliance
Withhold RFQs
Identification of Personnel
List of personnel to work on project to TPOC prior to start of work
Verification of Documentation
100% Compliance
Personnel not allowed to work on project

Personal Protective Equipment (PPE)

Provide required PPE for employees
Observation of PPE
100% Compliance
Contractor not allowed to work on campus until requirement met
Visitor Requests and Badging
Arrange visits via COR/TPOC
Verification of security notifications
100% Compliance
Contractor’s employees not allowed access to campus
Environmental Requirements Compliance
Contractor is in compliance with applicable laws and regulations and can accommodate spill containment
Observation of Contractor’s work area
100% Compliance
Contractor shall stop work until compliance is observed, and shall remediate spills at Contractor’s expense
Quality of Work
Work to be performed in a neat and workman-like manner, and without defects
Daily inspections of the work
95% Compliance
Correct defects at Contractor’s expense
Maintain Clean Work Space
Work areas maintained clean and free of debris and rubble on a daily basis
Daily inspections of work area
95% Compliance
Clean work area as required before resuming work
Damaged Property Repaired or replaced
Repair damage caused by Contractor or replace damaged facilities
Daily inspections of work area
95% Compliance
Repair or replace damaged facilities at Contractor’s expense prior to acceptance of work
Calls completed in a timely manner in accordance with the PWS
Work completed in accordance with Call
Daily inspections of work area
95% Compliance
Correct defects at Contractor’s expense
13.INSPECTION AND JOB COMPLETION -- This agreement is subject to routine Government inspections throughout the performance of contractor work and a final Government inspection upon completion of each job.
A.Inspections -- Routine inspections by the COR and/or TPOC will be performed to help ensure continuous quality assurance and more quickly identify defects. The Contractor shall repair defects, whether identified by the Government or the Contractor as directed by the Government at the Contractor’s expense.
B.Job Completion -- Upon completion of the work in each BPA Call, the Government will make a final inspection to confirm that:
(1)Required work has been completed and complies with the PWS and applicable State and local codes and regulations.
(2)There are no Defects, and any defects have been corrected as directed.
(3)Work areas are neat, clean, and free of debris and rubble.
(4)Debris and rubble have been removed from the site or disposed of in a manner compliant with the Call and applicable rules and regulations.
(4)Badges issued to contractor employees have been returned to the Security Office.

14. BPA CALL SUBMITTALS -- This agreement requires the submittal of some items for approval by the Government before work may commence. The Government also requires submittals for information only before individual jobs are judged as complete.

Contractor shall submit the following to the TPOC/COR.

A.General Submittals for Government Approval:
(1)Permits, Licenses, Certifications – The Contractor shall submit copies of required licenses and permits, and shall document the qualification level of employees who are to perform work on an as needed basis when requested by the Government.

(2) Identification of Workers – The Contractor shall submit a complete list of personnel who will perform site work under this agreement, identifying each person by their full legal name. All such personnel shall be U.S. citizens, shall have a current driver’s license or other state-issued photo identification. Before each individual job (BPA call), the contractor shall supply the TPOC with the names of his personnel who will work on that specific job.

B.Technical Submittals for Government Approval:
(1)If the contractor proposes to provide an “equal” product to a product specified in the PWS, the “equal” product specifications must be submitted for approval with their RFP. Only products meeting or exceeding the specifications for the listed product can be approved for this agreement. Once an “equal” has been approved, no substitutions by the contractor will be allowed.

(2) Product Data: Copies of written product data describing materials not provided by the Government but specifically listed in the BPA Call. No substitutions by the contractor will be allowed once materials have been approved.

(3) Material Safety Data Sheets (MSDS): MSDS sheets for cleaners or lubrication or any other materials intended for use on this agreement. No substitutions by the contractor will be allowed once materials have been approved.

15.0 ADMINISTRATIVE DATA

Appointed Micro-Purchase Contracting Officers, in good standing, are authorized to place calls against this BPA up to Agency/Organization Program Coordinator (A/OPC) delegated single purchase authority limit, not to exceed the Micro-purchase threshold for services of $2,500 (10 U.S.C. 2338). A cardholder cannot place a call that exceeds their delegated GPC authority/appointment. Additionally, individuals designated by the Contracting Officer with BPA Procurement Authorization may place calls against this BPA up to $25,000.

Actions greater than the thresholds above require a complete Procurement Action Request (PAR) submitted to the Contracting Office for processing. Only a warranted Contracting Officer is authorized to initiate and complete a BPA call greater than $25,000.

The Master BPA’s will expire in five (5) years from date of award or total purchases reaching the BPA limit, whichever occurs first.

Actual purchases will be made via properly executed BPA Call. These orders will be initiated at the time the Services are needed by an authorized representative of the Contracting Office or by a warranted Micro-purchase Contracting Officer.

All BPA calls shall be supported by a delivery ticket or sales slip that must contain the following information at a minimum:

(1)Name of supplier.
(2)BPA number.
(3)Date.
(4)BPA call number and/or PR&C number.
(5)Itemized list of supplies.
(6)Quantity, unit price, and extension of each item; less applicable discounts (unit prices and extensions need not be shown when incompatible with the use of automated systems, provided that the invoice is itemized to show this information).
(7)Date of delivery.

16. INVOICE INSTRUCTIONS

Invoices will be submitted and processed for each delivery of supplies.

(1) A proper invoice must be in accordance with FAR 32.905 (b)(1).

(2) Submit invoice via email to: CEFC.CEFC-payments@usace.army.mil

(3) To avoid delay in payment, a copy must also be emailed to the person ordering the services.

17. INSTRUCTIONS TO OFFERORS

In order for the government to make a determination as to whether an offeror is capable of performing the services described herein, the offeror must submit the following. Proposals shall be limited to no more than 30 pages total. Text should be 12-point, Times New Roman. Pages exceeding the page limit will be removed and not evaluated.

A. RELEVANT EXPERIENCE:

Note that an offeror need not have experience in each and every service area to be eligible for an award. Contractors are requested to submit BPAs/Contracts that are ongoing or have been completed within five (5) years from the date of this solicitation that best represent their experience similar to this requirement. This includes projects of a similar scope, size, and complexity; submittal of Licenses to perform services outlined in this PWS; Resumes and certificates of Key Personnel. Interested vendors response shall include the company Cage Code and/or DUNS number.

B. PAST PERFORMANCE:

The Offeror should provide past performance information for each project provided under relevant experience. The past performance submission should be relevant (similar services to those that are outlined herein) and recent (within the last five (5) years).

C. CERTIFICATE OF INSURANCE:

The contractor shall submit a certificate of insurance in accordance with clause 52.228-5.

D. PRICING:

Interested vendors response should include a web site, pricelist, or catalog which shows representative costs for facilities, operations services (if available). If a web site, pricelist, or catalog is not available please provide the Regular Hourly Rate of a Basic Laborer for your company. There is no requirement for a “pricing bid” associated with this action.

18. PROPOSAL SUBMITTAL:

Proposals shall be submitted via email with the subject line reading “ERDC Facilities Operations Services BPA” to: Zavien.T.Beal@usace.army.mil Only electronic submissions will be accepted. All questions concerning this solicitation must be submitted to the Government via email to: Zavien.T.Beal@usace.army.mil The Government will accept questions up to ten (10) calendar days of the due date.

File details come from the government source that posted it. Updated .