A01 SOW- TRI ATCT FS Damper Replacement.pdf
PDF 144 KB Posted
- Attached to
- Replace Fire Smoke Dampers and Actuators, Tri-Cities Air Traffic Control Tower (TRI ATCT), Blountville, TN
- Solicitation number
- 697DCK-25-R-002364
About this file
This Statement of Work (SOW) details the replacement of fire smoke dampers and actuators at the Tri-Cities Air Traffic Control Tower in Blountville, Tennessee, for the Federal Aviation Administration (FAA). The project requires replacing ten existing fire smoke dampers across various levels of the facility, including locations in elevator lobbies, lavatories, stairs, and mechanical rooms. The contractor must provide all labor, materials, and supervision, and submit a comprehensive set of documents including a project schedule, safety plan, material submittals, and installation strategy for FAA Contracting Officer's Representative (COR) approval.
The work must be performed between 12:00 AM and 6:00 AM Monday through Friday, with the contractor's workforce continuously escorted by FAA personnel. Key requirements include developing a site-specific safety plan meeting OSHA regulations, maintaining a clean work environment, and ensuring all newly installed equipment is tested prior to final government acceptance. The contractor must provide warranties for parts and components, coordinate closely with facility management to prevent disruptions to aircraft control operations, and be prepared for potential night work with 3-5 business days needed for schedule coordination.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Aviation Administration
STATEMENT OF WORK
Replace Fire Smoke
Dampers and Actuators
Tri-Cities Air Traffic Control Tower
2711 Highway 75, Blountville, TN 37617
1.0 Background:
The need to remove and replace the original fire smoke dampers and actuators in the Tri-Cities Air Traffic Control Tower (TRI ATCT) has been identified by the Federal Aviation Administration (FAA). This requirement emerged during a fire alarm maintenance project. Although the fire alarm inspector identified the issue, they were unable to perform the mechanical work needed during the inspection.
These components are vital to the Fire Alarm System (FAS) to ensure compliance with the Agency’s Fire Life Safety standards.
2.0 Scope of Work:
Supply all labor, materials, transportation, customization, and supervision necessary to replace ten (10) existing fire smoke dampers with new ones at the locations listed below. Provide a plan for the customization, installation, and operation of equipment and/or control strategies to the FAA Contracting Officer's Representative (COR) before commencement of work. Ensure the actuator functions correctly and is properly connected to the Fire Alarm System (FAS).
Note: Fire Alarm System programming and testing will be conducted by another party.
Locations:
1. Level 1 Elevator Lobby Room FS10
2. Level 1 Elevator Lobby FSD9
3. Level 2 Lavatory Room 208 FSD8
4. Level 3 Stair FSD7
5. Level 3 Lavatory Room 405 FSD6
6. Level 5 Lavatory Room 506 FSD5
7. Level 6 Stair FSD4
8. Level 6 Foyer 604 FSD3
9. Level 6 Mechanical Room 604 FSD2
10. Level 6 Mechanical Room 604 FSD1
2.1 Submittals:
All products, materials, and equipment to be used to accomplish the preceding scope must be submitted to and approved by the FAA COR prior to commencement of work.
A. Contractor must submit a list of proposed submittals and shop drawings for approval, referred to as the Submittal Register. At minimum, submittals are required for:
SOW, Replace Fire Smoke Dampers and Actuators, TRI ATCT, Blountville, TN
1. Project Schedule
2. Contractor's Safety Plan
3. Safety Data Sheets’s
4. Material Submittals
5. Installation and operation of equipment and/or control strategies Plan.
B. Contractor must submit shop drawings or documentation for each material or system on the
Submittal Register. Submittals must include one (1) copy provided electronically of product cut sheets or shop drawings, where applicable and except when physical samples are required. One (1) copy will be returned to the contractor with disposition and comments within 21 days of receipt.
Possible responses are as follows:
• Approved
• Approved as Noted
• Approved as Noted, Resubmission Required
• Disapproved
• If a resubmission is required, the contractor may need to delay procurement based on the nature of the noted issues.
3.0 Site Access:
Contractor Work hours will be 12:00 AM to 6:00 AM Monday thru Friday.
Coordinate all work activities with the Contracting Officer's Representative (COR). The contractor is advised that the work area is located on the site of an aircraft control facility. Construction work around this facility must be closely coordinated with the COR to prevent adverse impacts on the control of aircraft. The contractor’s workforce will be continually escorted by FAA personnel. Night work is anticipated. Be prepared to allow 3 to 5 business days for the coordination of schedules with
Facility Principles.
3.1 Site Safety:
Contractor must supply a site-specific safety plan for project implementation. The plan must at a minimum include:
1. Site address, project name, short description of work.
2. Author of and certifications for site specific safety plan.
3. Relevant safety measures as required by OSHA:
• CFR Part 1926 – Safety and Health Regulations for Construction
• CFT Part 1910 – General Industry Standards Applicable to Construction Industry.
• Must include provisions for working from heights including Fall Restraint and Arrest.
4. Method of implementing Safety Plan for access to equipment.
5. Personnel name(s), Position(s), and Qualifications
6. Where heavy equipment is used, certification/license for operation of vehicle.
SOW, Replace Fire Smoke Dampers and Actuators, TRI ATCT, Blountville, TN
7. Staging plan and site map with markings indicating high risk areas.
8. Emergency rescue contact numbers and nearest relevant hospital.
9. List of tools/hand-tools to be used, and appropriate PPE.
Perform work in a manner that does not adversely impact the operation of the facility. The contractor must ensure complete protection of existing equipment.
3.2 Available Facilities:
The contractor must provide temporary facilities as required, including lighting for construction needs, temporary platforms, and scaffolds, ensuring a safe working environment. The contractor is permitted to use facility utility power, subject to coordination with the COR, for small power tools. Restroom facilities are available for contractor personnel’s use during the project. Running water is available for the contractor’s use at this facility.
3.3 Waste Disposal and Clean Up:
The Contractor must maintain a clean work environment. The Contractor should not expect to use
FAA dumpsters. All materials requiring disposal during construction must be removed from the site by the contractor and recycled or disposed of in a responsible manner. Location of Construction
Dumpsters and Schedules for placement and removal must be coordinated with the FAA COR.
4.0 Acceptance:
All newly installed equipment must be tested prior to the Government’s final acceptance. All hard copies of commissioning performance testing reports, and all new equipment and control technical manuals, including specification documents, must be provided to the FAA COR for review and comment prior to the Government’s final acceptance.
4.1 Warranties:
Warranties for parts, components, and systems supplied by manufacturers extending beyond one year period must be provided to the FAA COR.
End of Statement of Work