A01 Berry Bend and Bucksaw Harry S Truman.pdf
PDF 2 MB Posted
- Solicitation number
- W912DQ22R1001
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VENDOR COVER SHEET
FY 22 Mass Solicitation / SW MO Park Attendants
W912DQ-22-R-1001
A.01 Berry Bend and Bucksaw Harry S Truman
OFFEROR’S NAME: _______________________________________________
OFFEROR’S ADDRESS: _______________________________________________
OFFEROR’S PHONE #: _______________________________________________
OFFEROR’S EMAIL: _______________________________________________
OFFEROR’S DUNS #: _______________________________________________
OFFEROR’S CAGE CODE: _____________________________________________
OFFEROR’S SIGNATURE: _____________________________________________
PROPOSAL INSTRUCTIONS:
Instruction to Offers Addendum:
The offeror’s Proposal shall be submitted as an electronic copy to seth.b.balsters@usace.army.mil . The Proposal should be submitted on the attached synopsis/solicitation in pdf (Adobe Acrobat) format. All text must be legible and easily read. The Proposal shall not exceed 10MB in size. If you have any issues in submitting your proposal electronically, coordinate with Seth Balsters immediately at (816) 389-3566.
The due date for the receipt of proposals is listed in Block 8 of the SF 1449.
The final date to submit questions is five (5) days prior to the due date of proposals as listed in Block 8 of the SF 1449.
Please read the following submission requirements carefully.
SUBMISSION REQUIREMENTS:
The offeror’s proposal shall include the following elements to be considered for award:
Attachment 1 – Cover Sheet.
Attachment 1 – Bid Schedule.
Attachment 1 – Related Experience Form.
Attachment 1 – Past Performance Questionnaire.
SF 1449 – Filled out by the offeror:
Block 17a Block 17b (if applicable) Block 30a Block 30b Block 30c
SUPPLEMENTAL BID SCHEDULE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
AMOUNT
0001 Job Base
Relief Park Attendant Services – Base Period FY 22
FFP
The Government's payment for Park Attendant services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.
FOB: Destination
PSC CD: M1PA
NET AMT BASE FY 22 ____________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
AMOUNT
0002 Job
OPTION
Relief Park Attendant Services – Option Period FY 23
FFP
The Government's payment for Park Attendant services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.
FOB: Destination
PSC CD: M1PA
NET AMT OPTION FY 23 __________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
AMOUNT
0003 Job
OPTION
Relief Park Attendant Services – Option Period FY 24
FFP
The Government's payment for Park Attendant services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.
FOB: Destination
PSC CD: M1PA
NET AMT OPTION FY 24 __________________
TOTAL AMOUNT ALL YEARS ___________________
RELATED EXPERIENCE FORM:
This form must be completed by all offerors in order to receive consideration for award. If additional space is needed, this form may be duplicated as necessary, no more than three submissions. Information describing the offeror’s complete contracting background and experience shall be provided. The contractor’s information should only describe experience that directly pertains to the type of work set forth in this in Section C of this solicitation. Include details of any training which would enable you to better perform the work outlined in the specifications. Reference information should include the names and current telephone numbers of all agencies/firms listed.
Experience
Contract Work/Type:
Agency/Firm for Whom the Work Was Performed:
Contact Person at the Site: Telephone:
Month/Year Work Began: Month/Year Work Ended:
Description of Duties/Work: (Please provide details)
Form PPQ-0 (9/30/11)
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information
Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)
Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information
Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information
Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK
TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY
ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE
SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT
RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.
The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an
Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the
Contractor successfully performed a significant event that was a benefit to the
Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the
Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff
(including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E VG S M U N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations
(including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
SEE ADDENDUM
(No Collect Calls)
W912DQ22R1001
b. TELEPHONE NUMBER
816-3893566
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 30 Nov 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
27-Oct-2021
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912DQ9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SETH BALSTERS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USACE, KANSAS CITY +
FEDERAL BLDG CT-H 601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
816-389-2030FAX:
TEL: 816-389-3812 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
721211
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF32
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
THIS PAGE LEFT BLANK
W912DQ-
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
PARK ATTENDANT AND PARK CUSTODIAN
HARRY S. TRUMAN PROJECT
For the following area located at the Harry S. Truman Lake.
BUCKSAW/BERRY BEND RELIEF – Park Attendant Services
Note: Each contract will be awarded from this solicitation with a base year and two (2) one year options.
Vendors may bid on one or all locations. The unique hours and requirements for each are provided in the specific park PWS and will apply to that specific area and duties.
1. GENERAL INFORMATION
1.1. Background: Truman Reservoir is the largest flood control reservoir in Missouri, with a storage capacity of more than 5 million acre-feet (an acre-foot = 325,000 gal.). Recreational development is extensive.
Twenty parks and access areas, managed by or leased from the U.S. Army Corps of Engineers, are conveniently located around the reservoir. Park areas at Truman Reservoir offer a wide variety of recreation facilities including boat launching ramps, campgrounds, full service marinas, picnic areas, sand swimming beaches, and a regional visitor center. Many routine maintenance items are contracted to the private sector. Mowing, refuse collection, and facility cleanup are just a few of the activities that are performed by private contractors for the Corps.
1.2. Scope of Work: The Contractor shall provide labor, material, and equipment as specified to perform Park Attendant, Park Custodian or Relief Park Attendant duties at the awarded location, as described in this Performance Work Statement (PWS) and elsewhere in the contract. The Contractor shall perform the specific tasks listed in Section 5. Acceptable performance standards and current regulations are provided for each task.
1.3. Period of Performance: The contract shall be effective 15 April 2022 or date of award through 30 September 2022. Effective dates for the option renewal options (if exercised by the Government) shall be from 15 April through 30 September of the following year.
1.4. Additional Requirements:
1.4.1. For the purpose of Pre Award Evaluation, vendors submitting proposals shall provide a telephone number they can be contacted for a period of not less than one (1) week following the closing date of this solicitation. It shall be the responsibility of the proposer to notify the Government of any changes to their proposal. Vendors who have submitted proposals but cannot be contacted by telephone over a two day period during normal office hours (8 a.m. through 4 p.m., C.S.T.)
following the closing date of the solicitation will be considered nonresponsive and removed from further consideration. I CAN BE CONTACTED AT ( ) .
1.4.2. The contractor’s staff shall consist of at least one legal aged adult (18 years or older) who is mentally and physically able to fulfill the terms of the contract.
1.4.3. Prior to site occupancy, the contractor shall possess a presentable mobile travel trailer or motor home with self-contained sanitary facilities. The camping unit shall be in good condition and appearance and shall be subject to the approval of the Contracting Officer. The contractor shall reside at the work site during the Period of Performance and shall remove all personal property from the site at the end of the issued Period of Performance.
1.4.4. During the Period of Performance the contractor shall obtain and maintain Commercial Automobile Liability Insurance in accordance with Missouri State statutes (Missouri Division of Insurance 573- 751-4126). Proof of insurance shall be provided to the Contracting Officer’s Representative prior to commencement of duties.
1.4.5. During the Post Award Conference, the contractor shall furnish a $5,000.00 Surety Bond. The bond will be used to recover funds collected by the contractor, but not properly received by the Finance and Accounting Officer. The bond shall be in the form of a Firm, Original, and Irrevocable Commitment and may include Sureties or Irrevocable Letter of Credit.
1.5. Post Award Conference/Training: The contractor will be required to attend the Post-Award Conference and Orientation training session held at the Harry S. Truman Project Office and Visitor Center.
Meetings will be to discuss and develop an understanding of all contract requirements. The Government will provide training on the use of computer based park reservation systems. ORMS reservation computer training will be conducted at the Orientation. Training dates will be determined prior to April 15th. The Government will give written notification of the scheduled dates for the Post Award Conference and the computer training. The awarded contractor will also be required to attend a refresher training during the option years of the contract if exercised.
1.6. Coordination with the Project Office
1.6.1. Day to day contact with Government personnel, and telephone communication or e-mail shall normally provide adequate information exchange. The Government reserves the right to schedule meetings at the Project Office as necessary to insure strict compliance with the terms of this contract. Such meetings shall be scheduled, to the extent possible, at mutually convenient times.
However, upon notice, the Contractor shall attend meetings regarding matters affecting this contract.
1.6.2. Any evidence of vandalism, instances of facilities not operating properly, or are in need of repair, shall be promptly reported to project personnel.
1.7. Documents and Correspondence: All documents and correspondence related to the performance of the contract shall be routed through the COR at the Harry S. Truman Project Office.
1.8. QUALITY ASSURANCE
1.8.1. Quality Assurance Surveillance Plan: A Quality Assurance Surveillance Plan (QASP) will be used during the life of the contract to ensure that the Service Provider is performing the services required by this PWS in an acceptable manner. The Government develops the QASP and the Project Office administers the Plan through Quality Assurance Evaluators (QAE) s.
1.8.2. The Government will monitor the Contractor’s performance under this contract using quality assurance procedures developed by the Government. Typical procedures might include periodic sampling, checklists, and customer complaints. This should not be considered an exhaustive list. A primary objective of Government Quality Assurance will be to determine the effectiveness of the Contractor’s quality control system.
1.8.3. The Government reserves the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work.
1.8.4. If any of the services do not conform to contract requirements, the Government will request the contractor to perform the services again, where appropriate, in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the Government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
1.8.5. If the contractor fails to promptly re-perform the services or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may by contract, or otherwise: (1) perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or (2) terminate the contract in whole or in part.
1.9. PERSONNEL
1.9.1. The contractor shall exercise tact, diplomacy, and courtesy and present a neat appearance when dealing with the public. A Government-furnished nametag and hat/visor shall be worn while on duty. The contractors name tag shall be worn on the provided vest opposite side of the logo. At no time will the name tag be worn on the hat or visor. The Contractor shall not display or offer for sale, on Government property, personal property items, crafts, or like items.
1.9.2. The contractor shall hold all lost and found articles at the fee booth for a period of two weeks.
Any article unclaimed after the two-week period shall be turned over to project personnel.
1.9.3. The contractor shall not consume any alcohol or drugs (except prescription drugs) during duty hours or when meeting the public. The contractor shall notify the COR of any required prescription drugs which might affect the contractor’s ability to perform the requirements of this contract.
1.10. Other Contractors: The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other contractors and Government employees. All work shall be carefully planned and fitted not to interfere with such other work. The Contractor shall not commit or permit any act that will interfere with the performance of work by other contractors or by Government employees.
1.11. Safety: The contractor shall immediately report any situation that could affect the health or safety of visitors to a park ranger, including maintenance needs, utility problems, accidents, or violations of laws and regulations.
1.11.1. The contractor shall report all disturbances to a park ranger. The contractor will be given an after-hours phone number (at the post award conference) for use by him and his staff only. When emergency situations arise, the contractor shall immediately notify emergency personnel and furnish the responding Park Ranger with detailed information. All communication with law enforcement officers will be documented and reported to a park ranger as soon as possible. The contractor shall not attempt to apprehend any violators nor does the park attendant have any authority to evict.
2. DEFINITIONS AND ACRONYMS: The following definitions and descriptions apply wherever the word, phrase, or acronym is used in this performance work statement.
R1S: Recreation One Stop
ORMS: Outdoor Recreation Management Suite
Performance Work Statement (PWS): A description of duties required to be performed by the contractor.
Quality Control (QC): A method used by the Contractor to control the quality of goods and services provided.
Quality Assurance (QA): A method used by the Government to provide some measure of control over the quality of services received.
Quality Assurance Surveillance Plan (QASP): An organized written document used by Government for quality assurance surveillance. Document contains sampling/evaluation guides, checklists, and the performance requirements summary (PRS).
Contracting Officer’s Representative (COR): An individual designated and authorized in writing by the contacting officer to perform specific technical or administrative functions.
Clean: As used generally, means free of all foreign matter, film, spots, streaks, dirt or impurities. As used for acceptance of work means gleaming, free from dirt, contamination, or impurities, unsoiled, unstained, neat and tidy.
Debris: Any articles, or parts thereof, such as paper, gum, litter, strings, cigarette butts, leaves, and sand.
Dirt: Particles of sand, soil, grit, or pebbles; mud, dust, tar, liquid stains, vomit, and/or ashes.
Trash: Any abandoned articles, or parts thereof, such as paper, gum, used cups, empty cans and bottles, food scraps, litter, strings, cigarette butts, leaves, or similar waste items, as well as dirt, debris, and foreign matter collected during cleaning, and unwanted residues and ashes.
Foreign Matter: Any articles, or parts thereof, not belonging to the place found.
Fully-Clothed: Deemed to mean that a sleeved shirt (or T-shirt), trousers, and shoes shall be worn at all times:
except that this requirement shall not be construed to replace or eliminate the necessity for the wearing of appropriate protective clothing or devices as may be required for the application of various chemicals.
Performance-Based Contract: (FAR 2.101) Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise.
Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable quality level (AQL) for each work requirement.
ALP: Acceptable Level of Performance.
3. GOVERNMENT FURNISHED MATERIALS AND SUPPLIES: Government-Furnished materials and supplies are provided to the Contractor only for use in performing work specified in this Contract.
3.1. The Government will provide a campsite for the Contractor’s trailer, and utility hookups, during the service period, consisting of water, electricity, and sewer. In addition, the campsite will include a storage building and, picnic table. The site will be provided free of charge for a period of 14 days prior and 14 days after the period of performance. If temperatures are below freezing, water may not be available at the Park Attendant pad until temperatures warm up. The Contractor shall maintain these facilities in accordance with Park rules.
3.1.1. Government-Furnished Services/Utilities: The Government will furnish to the Contractor the following:
3.1.2. ELECTRIC, WATER AND SEWER: The Government will furnish electricity, water and sewer hookup to designated Contractor campsite at no charge.
3.1.3. TELEPHONE: The Government will provide telephone pedestal and line to pedestal. The Contractor bears responsibility from the pedestal to the trailer, for contacting the telephone company for connection and in paying for the telephone service.
3.1.4. TRASH PICKUP: The Government will provide refuse collections services from dumpsters within the park. Contractors shall deposit trash in the nearest dumpster.
3.2. Government Furnished Property: The Government will furnish to the Contractor the following identified property to be used in performing the contract. When the property is delivered, the Contractor shall verify its quantity and condition in writing to the Contracting Officer or his authorized representative on Memorandum Receipt, ENG Form 4900-R, (within 24 hours of receipt). Damage or loss while in the Contractor's possessions shall be reported in writing to the Contracting Officer or his authorized representative, within 24 hours.
Item (Description) Quantity Permit Books As Needed Annual Day Use Permits As Needed Computer, Monitor, Printer 1 Each Telephone/Answering Machine 1 Each Credit Card Scanner/Printer 1 Each Radio with Antennae 1 Each
3.3. Government Furnished Consumable Items: The following consumable items shall be furnished to the Contractor by the Government from stock. The Government shall retain control of expendables, to be dispensed on an as needed basis for use in performance of the contract.
3.3.1. Trash bags for booth
3.3.2. Maps
3.3.3. Brochures
3.3.4. Baseball cap and name tag
3.3.5. Keys
3.3.6. Computer paper
3.3.7. Self-registration day use supplies
3.3.8. Authorized forms
3.4. A mobile travel trailer, motor home or approved equal, containing sanitary facilities and all equipment necessary for habitation. Tents or ‘pop-up’ style type campers are not permitted. If self-propelled units are used, they shall remain on jacks or be blocked up for the duration of the contract and not be used for transportation.
3.5. Transportation vehicle(s), other than specified in 4.1 above, for use in performing the requirements of this contract.
3.6. A telephone and installation of telephone service at the Government provided hookup at the campsite.
3.7. Office supplies necessary to perform the requirements of this contract (pens, pencils, markers, rubber bands, stapler, staples, etc.)
3.8. Cleaning equipment and supplies for the fee booth
3.9. A sufficient change fund to conduct day to day fee transactions
3.10. If one is necessary pressure water pump and tank for water supply that is approved by the Project
Manager. The pump shall be capable of delivering an adequate stream of water at 150 psi to flush/rinse facilities being serviced. NOTE: The use of a pressure water pump is not mandatory if the Contractor is able to obtain satisfactory results by hand. The Government reserves the right to require the use of a pressure water pump, at any time, if it becomes apparent that satisfactory results are not being maintained.
4. SPECIFIC TASKS - Park Attendant
BUCKSAW/BERRY BEND RELIEF - Attendant
The Contractor shall perform Park Attendant duties 4-days per week as described in this section and elsewhere in the contract. The Contractor’s staff shall consist of at least one adult. The contractor will be granted and shall observe three designated days off each week. If the contractor needs to be absent from the park the COR shall be notified as soon as possible. The contractor shall retain a qualified substitute Park Attendant to cover such absences. The substitute shall be approved by the COR.
4.1. Recreation one Stop (R1S): The contractor shall perform specific daily duties to implement the R1S system, according to established procedures through the use of ORMS software (that will be taught during pre-performance training.) Duties include, but are not limited to, maintaining current records, posting reservable sites, checking site availability, processing camper registrations, accepting shelter reservations, and receiving daily arrival reports. The contractor shall take reservations at the fee booth for walk-up customers. Under no circumstances will Park Attendants take advance reservations over the phone. Contractors shall not accept phone reservations, unless authorized by the COR. During holiday weekends the contractor shall set aside administrative hold sites as directed by the COR. These sites will be marked with a reservation card reading “Admin Hold”. Coordination with the COR should be made the Monday before the holiday weekend to determine what sites to mark.
4.2. Fee Booth Operations: The contractor shall staff the fee booth during booth hours designated below. If necessary, a minimum of two people shall work the booth during high registration periods (e.g. – Fri. and Sat. nights) to avoid long waits for visitors. The contractor shall keep an open telephone/radio line of communication while on duty. During booth hours, the Corps-furnished radio (see Section 3 Government Furnished Property) shall be turned on with the volume up so messages can be transmitted and received.
Radio problems shall be reported immediately. The contractor shall be available at all times (except scheduled days off and approved time away from the park) to receive and deliver emergency messages.
4.2.1. Schedule: The following schedule is subject to change with one (1) week’s advance notice. The fee booth shall be open and occupied during the following hours and the contractor shall be available for business. All nightly close outs and weekly bill for collection close outs shall be done after booth hours and not while booth is open.
Bucksaw/Berry Bend Park Attendant Services
Actual Period of Service: 15 April through 30 September Daily Booth Hours
Friday - Sunday Days Off
Monday and Tuesday Bucksaw Campground
3:00PM – 8:00 PM
Wednesday and Thursday Berry Bend Campground
3:00PM – 8:00 PM
Checkout: Checkout of contractor will be conducted within 4 days of the last scheduled work day of the contract for the calendar year.
4.2.2. Receive Payments: The contractor shall register visitors, campers, and sightseers, Annual Passes and collect the required fees according to project policy. The Contractor shall determine and have on hand sufficient change for this purpose.
4.2.2.1. Remit Washer and Dryer Fees Collected: The contractor shall count washer and dryer monies collected from laundry room at least once a week or as needed. The money will be counted and verified with a park ranger. The contractor shall transmit washer and dryer money with all other collected fees in their weekly remittance.
4.2.2.2. Encourage Credit Card Payments: The contractor shall encourage the use of credit card payments over personal checks. The contractor shall follow project policy when accepting personal checks.
4.2.2.3. Safeguard Collections: The contractor shall take all reasonable precautions to safeguard collections, permits, and other Government-furnished property. All collections shall be deposited in the fee safe provided, outside entrances to the fee booth shall be kept locked, and visitors shall not be allowed in the booth.
4.2.3. Transmit Fees and Remittance Registers: The contractor shall transmit all collected fees and remittance registers to Recreation One Stop, P.O. Box 979127, St. Louis, MO 63197-9000 through a Bill for Collection. It is required that the contractor shall mail collections within 2 days after creating a Bill for Collection. At a minimum, fees shall be transmitted once per week, every Saturday on holiday weekends, or when collections total $5,000.00, whichever occurs first.
4.2.4. Booth Maintenance: The contractor shall maintain the fee booth in a clean condition at all times. Pens, corrals, cages, and other animal confinement facilities are not permitted. Smoking, visitors, pets, or baby-sitting is not permitted in the park entrance booth.
4.3. PARK OPERATIONS
4.3.1. Provide Information to Visitors: The contractor shall hand out informational brochures and pamphlets and explain or clarify policy and regulations for park visitors.
4.3.2. Implement Campground Rules and Policies: The contractor shall implement all campground rules and project policies in performing their duties, including quiet hours (10 p.m. to 6 a.m.), check out times, and maximum 14 day stay limitations, etc.
4.3.3. Tour Parks: The contractor shall make daily tours of the park between the hours of 7 a.m. and 8 a.m. and again between 8 p.m. and 9 p.m.
While working as Relief Park Attendant, the contractor shall also make daily tours of that park between 2 p.m. and 3 p.m. and again between 8 p.m. and 9 p.m.
4.3.3.1. Identify Un-registered Visitors: The Contractor shall identify campers who may have arrived during hours when the fee booth was closed. These individuals shall be contacted and advised to register at the booth and pay required fees.
4.3.3.2. Check for and Report Vandalism, Equipment Malfunctions, and Cleanliness: During both the morning and evening tours, the contractor shall monitor all self-pay fee vaults, post shelter and camping reservations, and check all facilities for vandalism, equipment malfunction, and cleanliness. The Contractor shall advise Corps personnel immediately if problems exist.
4.3.4. Open and Close Gates at Facilities: The contractor shall open and close interior park gates and other facilities as requested by project personnel. The contractor shall close the beach gate each night as scheduled.
4.3.5. Self Pay Fee Vaults: The contractor shall exchange the fee vaults at the self-pay stations located at the beach and boat ramp as scheduled and replenish the blank payment envelopes as necessary. The contractor shall be available to total and verify fee receipts daily with a park ranger. Every effort will be made to meet during booth hours, but this may not always be possible.
5. APPLICABLE PUBLICATIONS AND FORMS
5.1. MAP: Information on Truman Lake can be found on the Internet at https://nwk.usace.afpims.mil/Locations/DistrictLakes/HarrySTrumanLake.aspx
Performance Requirements Summary – Park Attendant Duties Section (Para)
Contract Requirement
Performance Standard Lot
Description
ALP
Method of Surveillance
5.2.3
Transmit Fees and Remittance Registers
Submit fees weekly or at $5,000.00
Weekly
100% Inspection
5.3.3
Tour Park
During specified times, check for maintenance needs, unregistered guests
40/Month
4%
Periodic Sampling
5.3.5
Monitor & Collect Fees from Self-Pay Vaults
Exchange fee vaults at beaches and boat ramps and replenish self-pay envelopes
1 per week or as needed
4%
Sampling and Validated Customer Complaint
5.1
Implement R1S
In accordance with required post award training (check site availability, post shelter reservations, receive daily arrival reports, post reservable sites, process camper registration, maintain records
# of R1S actions per month
5%
Validated
5.2.1
Booth Schedule
Staff booth during scheduled hours
# hours per week
1%
Sampling and Validated
5.2.2, 5.2.2.4
Receive Payments
Payments are correctly collected and safeguard collections, permits, and government furnished property
Daily receipts and assigned accountable items
2%
Sampling and Validated
ANTITERRORISM/OPSEC
ANTITERRORISM/OPERATIONAL SECURITY REQUIREMENTS
All contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency
Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
All contractor and all associated sub‐contractors employees will receive a CORPS Watch information paper (provided by the authorized government representative) and provide a written acknowledgement to the COR, no later than 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract.
The Contractor must pre‐screen candidates using the E‐verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements. The vendor must ensure that the candidate has two valid forms of government issued identification to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible candidates must be provided to the COR no later than 3 business days after the initial contract award.
Per the E-Verify Website the following exemptions apply:
Employers whose contracts are exempt from the E-Verify federal contractor rule are not required to enroll in EVerify. A contract is considered exempt if any one of the following applies: (1) It is for fewer than 120 days. (2) It is valued at less than $150,000, the simplified acquisition threshold (Source: http://www.uscis.gov/e-verify/federalcontractors/exemptions-and-exceptions).
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
W912DQ22R1001
Section A - Solicitation/Contract Form
SYNOPSIS / SOLICITATION:
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart
12.603 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation, proposals are being requested and a written solicitation will not be issued.
The solicitation number for this acquisition is W912DQ22R1001 and it is being issued as a Request for Proposals
(RFP).
Offers are due ON THE DATED AND TIME SPECIFIED IN BOX 8. Offers shall be submitted in PDF via e-mail to seth.b.balsters@usace.army.mil. All offers must be good for at least 90 days from offer due date.
If you have any questions please contact Mr. Seth Balsters, seth.b.balsters@usace.army.mil , 816-389-3566.
The solicitation documents and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2005-84.
This synopsis/solicitation will be awarded as a 100% Small Business Set-aside and the associated North American Industry Classification system (NAICS) code is 721211 “RV (Recreational Vehicle) Parks and Campgrounds”
Manufacturing and the business size standard is: $8,000,000.00.
Standard Industrial Classification (SIC) Code: 7033: Recreational Vehicle Parks and Campsites
Product/Service Code: 8999 for “Miscellaneous Services”
Description of Services Required: The U.S. Army Corps of Engineers Kansas City District has a need for Park Attendant, Park Attendant/Custodian, Custodian, and Janitor services to support several lakes in the Operations Division of the Kansas City District during the visiting season each year. The contractors shall perform all services in accordance with the Performance Work Statements. The Contractor shall comply with all Federal, state, and local laws, ordinances, statutes and regulations pertaining to the provided services.
Place of Contract Performance: Multiple Parks Located in Missouri.
Far 52.212-1, Instructions to Offerors- Commercial does apply to this acquisition with no addenda to the provision and is located in Section L of this combined synopsis/solicitation.
Far 52.212-2, Evaluation - Commercial Edited does apply to this acquisition with no addenda to the provision and is located in Section M of this combined synopsis/solicitation.
FAR 52.212-3, Offeror Representations and Certifications -- Commercial Items, does apply to this acquisition with no addenda to the provision, and is located in Section K of this combined synopsis/solicitation.
FAR 52.212-4, Contract Terms and Conditions - Commercial Items, does apply to this acquisition with no addenda to the provision. These specific clauses required are located in Section I of this combined synopsis/solicitation.
FAR 52.212-5, Contract Terms and Conditions - Required to Implement Statutes or Executive Orders- Commercial Items, applies to this acquisition. These specific clauses required are located in Section I of this combined synopsis/solicitation.
Additional contract requirement(s) or terms and conditions are located in Section J of this combined synopsis/ solicitation.
In accordance with FAR 52.212-1(k) the prospective awardee shall be registered and active in https://beta.sam.gov/ for their System Award Management (SAM).
PLEASE NOTE: SAM.GOV procedures have been changed as of 8 November 2019. Interested vendors must go to beta.SAM.gov to register in SAM and to review current notices or announcements.
Contractors may obtain information on registration and annual confirmation requirements via the Internet at https://beta.sam.gov/ or by calling (866) 606-8220.
The beta System for Award Management (SAM) is a Federal Government owned and operated free web site. If you are a small business needing assistance with registering or help with navigating through the website you may contact the Association for Procurement Technical Assistance Centers for help with actions such as beta.SAM.gov registration.
If you have questions about Government procurements in general or need assistance in the preparation of your proposal, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org/sam-registration/
(End)
Section B - Supplies or Services and Prices
LAKE PROJECT'S:
Harry S Truman Lake Project, Warsaw, Missouri:
A-01 Berry Bend and Bucksaw Public Use Area- Park Attendant
Pomme de Terre Lake Project, Hermitage, Missouri:
A-02 Damsite Park- Park Attendant A-03 Nemo Park- Park Attendant A-04 Wheatland Park- Park Attendant
Stockton Lake Project, Stockton, Missouri:
A-05 Hawker Point- Park Attendant
Section C - Descriptions and Specifications
PWS:
Attachment 1 – PWS Truman Lake Project, Warsaw, Missouri:
A - 01 Berry Bend / Bucksaw – Park Atendant
Pomme de Teree Lake Project, Hermitage, Missouri:
A - 02 Pomme Damsite – Park Atendant A - 03 Nemo - Park Atendant A - 04 Wheatland - Park Atendant
Stockton Lake Project, Stockton, Missouri:
A - 05 Hawker Point – Park Atendant / Custodian
Section H - Special Contract Requirements
SERVICE WAGE DETERMINATION:
Links Provided Below:
Harry S Truman Lake Project, Warsaw, Missouri:
Service Contract Act WD # 2015-5093 Benton County https://sam.gov/wage-determination/2015-5093/16
Pomme de Terre Lake Project, Hermitage, Missouri:
Service Contract Act WD #…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .