S02. RFI Form 02.pdf
PDF 201 KB Posted
- Attached to
- Y1NB--Renovate Operating Rooms - VAMC Cleveland
- Solicitation number
- A0005
About this file
This document contains a Request for Information (RFI) and the corresponding responses from the contracting agency regarding an opportunity to renovate operating rooms at a Department of Veterans Affairs medical center. The RFI poses questions about drawings and specifications for the project and seeks clarification on items including the composition of masonry walls scheduled for demolition, the need for fireproofing of structural steel, allowable work hours, and logistics regarding equipment to be furnished by the owner and installed by the contractor. The contracting agency provides direct responses to each of the questions, noting that walls should be assumed as grouted solid, all beams will require fireproofing, and work must be performed within the specified timeframes and work hours. Clarification is also provided on contractor responsibilities for mobilizing and transporting owner-furnished equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02. RFI Form 03.pdf | ||
| S02. RFI Form.pdf | ||
| S06. 36C25020B0022 Amend 0005.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
TO: Contracting Specialist
RFI NO.: 1 DATE: Aug 19, 2020 REFERENCE:
REPLY NEEDED BY:
INFORMATION NEEDED:
1. Ref drawing 3-A1-1--- During site walk, masonry walls were noted in some areas scheduled for demolition. Are CMU walls grout filled?
2. Ref drawing 1-S1-2--- Does all 2nd floor structural steel, decking and W8 x 18 structural reinforcing beams at new duct openings require spray fireproofing?
3. Ref drawing 2P1-1 --- Weekend work indicated for all plumbing work in SPS. Drawing 0-A3-1 & 0-A3-2 indicates plaster ceilings within soiled receiving, decontamination, preparation and sterilization areas. Infection control note 4 indicates all work to take place 3pm Friday thru 3pm Saturday which does not leave enough time to perform ceiling demo, piping demo, new piping, ceiling patching and painting? Can all ceilings be removed and left out until all demo is complete and new piping is installed? Can any of this work be done during the weekdays?
4. Ref specification 01 00 00 part 1.5- Working hours are called out from 6:00 PM thru 5:30 AM. With short day light hours during certain times of the year various tasks scheduled for the exterior will have higher safety risks and increased logistical control costs. Will any work be allowed to be done during normal working hours?
5. Ref drawing 2A6-2 & 3A6-3- Certain pieces of equipment are called out to be furnished by owner, installed by contractor such as the Operating Tables. Will the contractor have to mobilize the equipment from a location onsite or will they be at an off-site storage location? What are the weights of surgical lights, perfusion boom, Anesthesia booms operating tables and suction system? Can they be transported to 2nd floor in nearest elevator? Will each piece of equipment have self-contained wheels? Will they require any crating or un-crating?
REPLY:
1. Ref drawing 3-A1-1--- For the purposes of this bid assume that the walls are grouted solid.
2. Ref drawing 1-S1-2--- Yes all beams will require fireproofing
3. Ref drawing 2P1-1 --- For the purposes of this bid, assume that all work will be performed within the timeframes indicated in the drawings and specifications.
4. Ref specification 01 00 00 part 1.5—- For the purposes of this bid, assume that all work will be performed within the timeframes indicated in the drawings and specifications.
5. Ref drawing 2A6-2 & 3A6-3-— Contractor will mobilize the equipment from a location at the hospital and transport it to the project location. This equipment will need to be uncrated by the contractor. The equipment will not have self-contained wheels. They can be transported using the nearest elevators only during the specified work periods.
Weights are unknown.
PROJECT NUMBER: 541-19-101 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Operating Room PROJECT LOCATION: Department of Veterans Affairs
VA Medical center
SUBMITTED BY: IMS Contracting City/State: Escanaba MI
PHONE NO.: 906 789 9021
VHACOSBurdiS Cross-Out
VHACOSBurdiS Text Box
VHACOSBurdiS Text Box
VHACOSBurdiS Text Box
REPLY FROM: W John Walkosak
DATE: 8-25-2020
ATTACHMENTS:
COPY TO: