Justification and Approval (J&A) for Other Than Full and Open Competition

CONTROLLED UNCLASSIFIED INFORMATION

April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 4

Was a J&A approved for the preceding acquisition? Yes No

Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )

Is this a Bridge Action as defined at AFFARS 5302.101? Yes No

Dollar Value of this Acquisition: < $750K > $750K and < $15M > $15M and < $100M > $100M

Contracting Activity: 341st Contracting Squadron

Purchase Request (if available): N/A

Program / Project (and PE, if applicable): A&E Architects, P.C.

Program Type (PEO, Enterprise, of Operational): Operational

Authority: 6.302-1 – 10 USC 2304(c)(1), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements

Estimated Contract Cost (including options): $ 748,750.00 J&A Type: Class Individual

COORDINATION ( AFFARS 5306.304(a)) Sign and Save Procedure

** The text in the signature blocks below is editable, including the title.

** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.

Date

22 Jul 2021

Project Lead / Program Mgr / Requiring Activity

FREDERYCK A. CAYER

341 CES/CEN, 406-731-1308

Signature

X

Date

22 Jul 2021

Contracting Officer

DEDRA M. BLOOD

341 CONS/PKA, 406-731-3567

Signature

X

Date

23 Jul 2021

Competition Advocate

CHARLES M. WEIBEL

341 CONS/DBO, 406-731-3123

Signature

X

APPROVAL ( AFFARS 5306.304(a))

Date

02 Aug 2021

Contracting Officer

DEDRA M. BLOOD

341 CONS/PKA, 406-731-3567

Signature

April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 4

I. Agency and Contracting Activity.

341st Contracting Squadron, Malmstrom AFB, Montana.

II. Nature and/or description of the action being approved.

This requirement is to increase the A&E Architectural Services IDIQ ceiling price.

III. Description of supplies/services required to meet agency needs (including the estimated value).

The contract is to provide all personnel, supervision, and any items or services to provide architectural, civil, structural, mechanical, electrical, fire protection, landscape, environmental, and topographical cadastral and geotechnical surveys of existing conditions or facilities and field surveys for topographic or locative purposes; development of documentation and reports for conceptual solutions, design criteria, environmental assessments, and impact analysis; producing economic analysis, detailed cost estimates, construction drawings and specifications, bid schedules, color boards and renderings, and any other documentation necessary to execute a maintenance, repair, alteration, and/or construction project. The area of work shall include, but not limited to, Malmstrom Air Force Base and surrounding areas supported by Malmstrom AFB (Missile Alert Facilities (MAF) and Launch Facilities (LF)). A&E Architects, P.C. currently provides these services and is the only responsible source that can immediately satisfy the Government's requirement.

The estimated value of this increase is $748,750.00.00. The appropriation type that will be used to fund the individual requirements is Operations and Maintenance funding.

IV. Statutory authority permitting other than full and open competition.

10 U.S.C. 2304(c)(1), the property or services needed by the agency are available from only one responsible source or from a limited number of responsible sources and no other type of property or services will satisfy the needs of the agency, as implemented by FAR 6.302-1(a)(2), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements, required by FAR 6.303-2(b)(4).

(2) When the supplies or services required by the agency are available from only one responsible source, or, for DoD, NASA, and the Coast Guard, from only one or a limited number of responsible sources, and no other type of supplies or services will satisfy agency requirements, full and open competition need not be provided for.

(ii) Supplies may be deemed to be available only from the original source in the case of a follow-on contract for the continued development or production of a major system or highly specialized equipment, including major components thereof, when it is likely that award to any other source would result in --

(A) Substantial duplication of cost to the Government that is not expected to be recovered through competition, or

(B) Unacceptable delays in fulfilling the agency's requirements. (See 10 U.S.C. 2304(d)(1)(B).)

AND

(iii) For DoD, NASA, and the Coast Guard, services may be deemed to be available only from the original source in the case of follow-on contracts for the continued provision of highly specialized services when it is likely that award to any other source would result in--

(A) Substantial duplication of cost to the Government that is not expected to be recovered through competition, or

April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 4

(B) Unacceptable delays in fulfilling the agency's requirements. (See 10 U.S.C. 2304(d)(1)(B).)

V. Demonstration that the contractor's unique qualifications or the nature of the acquisition requires use of the authority cited above (applicability of authority).

This procurement has reached half of the estimated ceiling price of $2,995,000.00 and still has two option years remaining.

Option Year 2 is expected to have FY21 and FY22 CTO projects awarded against it, almost exhausting the remaining ceiling price.

As the incumbent contractor, A&E Architects, P.C. is the only firm capable of providing the requirement described in Section III above within the time frame provided. The Government must have these mission-critical operations without delay or interruption of performance in order to meet its mission. It would be cost prohibitive to have another company perform this requirement for such a short period. The cost would not be recovered through competition.

Consequently, an increase to the ceiling price of the current contract must be awarded IAW FAR Part 6.302-1 in order to provide sufficient time to complete the follow-on contract solicitation and award thereby avoiding duplication of costs.

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable, including whether a notice was or will be publicized as required by subpart 5.2 and, if not, which exception under FAR 5.202 applies.

Not applicable as this is an increase to the ceiling price of the current contract.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

Fair and reasonable cost will be based upon historical contract cost IAW FAR 15.404-1 and an independent government estimate developed utilizing historical data and current option year pricing.

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

Upon recognizing the unanticipated need for an increase in the ceiling, 341 CONS and 341 CES worked diligently to address the issue, but in the end there was insufficient time (40 days or less) to compete the requirement and ensure the mission-essential operations are continued until the follow-on contract award process is complete.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

The follow-on requirement will be fully competed under full and open procedures which will result in the award of a new contract.

X. List of any sources that expressed, in writing, an interest in the acquisition.

See Section VI above.

April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 4

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

Not applicable as this is an increase to the ceiling price of the current contract that has not expired.

XII. Certification by the Contracting Officer.

As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.

XIII. Certification by the technical/requirements personnel.

As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.

Remove the Guidance pages below. Remove the IACR pages below.

April 2021 Page of International Agreement Competitive Restrictions (IACR) Page of April 2021 Was a J&A approved for the preceding acquisition?

!! Attach the preceding J&A in the staff package for this J&A. The preceding J&A will be used as a reference document.

Is this a new or amended J&A Document?

Is this a Bridge Action as defined at AFFARS 5302.101?

Dollar Value of this Acquisition:

J&A Type:

!! Provide estimated cost of all contracts.

COORDINATION ( AFFARS 5306.304(a)) ** The text in the signature blocks below is editable, including the title.

** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.

APPROVAL ( AFFARS 5306.304(a)) NOTE: A signature block will appear here based on the "Dollar Value of this Acquisition" selected above.

(See "Specific Guidance for Completing this Template" below.)

I. Agency and Contracting Activity.

II. Nature and/or description of the action being approved.

III. Description of supplies/services required to meet agency needs (including the estimated value).

IV. Statutory authority permitting other than full and open competition.

V. Demonstration that the contractor's unique qualifications or the nature of the acquisition requires use of the authority cited above (applicability of authority).

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable, including whether a notice was or will be publicized as required by subpart 5.2 and, if not, which exception under FAR 5.202 applies.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

X. List of any sources that expressed, in writing, an interest in the acquisition.

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

XII. Certification by the Contracting Officer.

XIII. Certification by the technical/requirements personnel.

Specific Guidance for Completing this Template I. Agency and Contracting Activity.

II. Nature and/or description of the action being processed. (FAR 6.303-2(b)(2)) State whether the action is a new contract or a modification to an existing contract (identify contract number) and identify the contract type planned (e.g., firm-fixed-price, cost-plus-incentive-fee, hybrid etc.). If exception 2 is cited (unusual or compelling urgency), include the date of UCA/contract/modification issuance and amount.

For class J&As, where the number of contracts in the class can be identified: Provide the nature and/or description of each contract action and contract type. If the same information applies to more than one contract, it need only be stated once.

III. Description of the supplies/services required to meet agency needs (including the estimated value).

(FAR 6.303-2(b)(3)) Describe the supplies and/or services to be acquired and include the total estimated value of the acquisition and, for class J&As, by contract action, and the estimated periods of performance.

For ID/IQ or requirements contracts, use the maximum dollar value of the total estimated orders as the estimated J&A dollar value.

IV. Statutory authority permitting other than full and open competition. (FAR 6.303-2(b)(4)) 10 USC 2304(c)(?) (see Note 1), as implemented by FAR 6.302-? (see Note 2), and required by FAR 6.303-2(b)(4).

Note 1: Complete the 10 USC 2304(c) citation with the statutory subparagraph cited in the (a) Authority (1) Citations portion of the Competition exception used for your J&A. Do not provide more than one citation.

Note 2: Complete the FAR citation with the appropriate subparagraph.

Note 3: For class J&As, all contracts within the class must fall within the same statutory authority.

V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above. (FAR 6.303-2(b)(5)) Provide an explanation to support the use of the authority cited. The explanation should tie back to the conditions described in the FAR for using the particular authority cited.

A. Only One Responsible Source (FAR 6.302-1) (DFARS 206.302-1 and DFARS PGI 206.302-1) When using this authority, thoroughly describe the contractor's unique/highly specialized capabilities and/or qualifications (e.g., facilities, personnel, special tooling acquired), and why no other type of supplies or services will satisfy the agency requirements. This authority shall be used, if appropriate, in preference to the authority in FAR 6.302-7. This authority shall not be used when any of the other authorities apply.

For example, in the case of a follow-on contract for continued development or production of a major system or highly specialized equipment/services, the rationale must first justify the supplies/services as being a “major system” or “highly specialized.” The rationale must then justify “either” substantial duplication of cost to the government that is not expected to be recovered through competition, or unacceptable delays in fulfilling the agency's requirements, whichever situation applies.

In accordance with DFARS 206.302-1(c)(2) Application for brand-name descriptions. Notwithstanding FAR 6.302-1(c)(2), in accordance with section 888(a) of the National Defense Authorization Act for Fiscal Year 2017 (Pub. L. 114-328), the justification and approval addressed in FAR 6.303 is required in order to use brand name or equal descriptions.

B. Unusual and Compelling Urgency (FAR 6.302-2, DFARS 206.302-2, and DFARS PGI 206.302-2) Contracting Officers must notify SAF/AQC as soon as practicable when contemplating the use of this authority for a J&A requiring SPE approval.

Provide an explanation why (1) the supplies or services are needed at once and/or (2) essential equipment or repairs to that equipment are needed at once to preclude the ability to meet critical mission needs of the USAF and Defense of the Nation. In other words, identify the anticipated serious injury to the Government, the nature of the urgency, the reasons for it occurring and why it is “urgent and compelling” to preclude adverse impact to military readiness. Merely citing a Joint Urgent Operational Need (JUON), Force Activity Designator (FAD) rating, Program Management Directive (PMD)/Program Action Directive (PAD) guidance, or DX priority rating is not in and of itself sufficient reason to use this exception from the requirement to obtain full and open competition. Note that only the minimum quantity required to satisfy the unusual and compelling urgency qualifies for this exception. In addition, the period of performance may not exceed one year, including all options [FAR 6.302-2(d)(ii)]; thus, the inclusion of options, when using this authority, is not advised.

Note: This statutory authority requires that agencies request offers from as many potential sources as is practicable under the circumstances.

C. Industrial Mobilization; or Engineering, Developmental, or Research Capability (FAR 6.302-3) Justifications citing this authority must demonstrate the need to establish or maintain an essential capability, or a contract for supplies or services incidental to establishing or maintaining an essential capability, possessed by the identified source(s). Some form of market survey must support the need to establish or maintain the capability being procured.

D. Authorized or Required by Statute (FAR 6.302-5) Identify what is being acquired and the applicable statute authorizing other than full and open competition in accordance with FAR 6.302-5(b).

Note: Some statutes do not require a written J&A.

E. National Security (FAR 6.302-6) This authority may be used for any acquisition when disclosure of the Government's needs would compromise the national security (e.g., would violate security requirements); it shall not be used merely because the acquisition is classified, or merely because access to classified material will be necessary to submit a proposal or to perform the contract. Full and open competition need not be provided for when the disclosure of the agency's needs would compromise the national security unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. This statutory authority requires that agencies shall request offers from as many potential sources as dis practicable under the circumstances.

F. Public Interest (FAR 6.302-7 and DFARS 206.302-7) The use of this authority requires a written Determination and Finding (D&F) in accordance with FAR 1.7 in lieu of J&A. The D&F shall not be made on a class basis.

This authority may only be used when none of the other authorities apply. Provide detail addressing the reasons full and open competition is not in the public interest and why no other authority is appropriate for use.

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable, including whether a notice was or will be publicized as required by FAR 5.2 and, if not, which exception under FAR 5.202 applies. (FAR 6.303-2(b)(6)) Describe all efforts taken, or to be to be taken, to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although market research is covered in Section VIII, the information in Section VI should correlate with the market research described in Section VIII. To ensure completeness, it is best to provide information such as the following:

If a sources sought synopsis or an RFI was issued, provide the date the synopsis was issued along with a brief description of its content. Identify the number of responses received, the results of the screening process, and the rationale for determining the unacceptability of any respondents. Note: An RFI or Sources Sought Synopsis is mandatory IAW DFARS PGI 206.303-2(b)(i) when citing the authority of 10 USC 2304(c)(1), “Only one (or a limited number of) responsible source(s)”.

Specify whether this acquisition will require a Notice of proposed Contract Action (NOCA) IAW FAR 5.201 and if not, provide the exception IAW FAR 5.202. If a NOCA was or will be publicized provide the dates or expected dates of publication of the NOCA. Address any other actions taken or planned to facilitate competition for this acquisition.

Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.

VII. Determination by the contracting officer that the anticipated cost to the government will be fair and reasonable. (FAR 6.303-2(b)(7)) Provide the basis for this determination.

VIII. Description of the market research conducted and the results, or explain why market research was not conducted. (FAR 6.303-2(b)(8)) Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research.

When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.

If market research was not conducted, so state and provide the rationale.

IX. Any other facts supporting the use of Other Than Full and Open Competition. (FAR 6.303-2(b)(9)(i)) X. List of sources, if any, that expressed interest in the acquisition. (FAR 6.303-2(b)(10)) If a sources sought synopsis or RFI was issued and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. (FAR 6.303-2(b)(11)) If no actions are planned, provide rationale (i.e., sole-source to OEM, unable to compete due to inability to procure data rights, etc.) IAW DFARS PGI 206.304(a)(S-70)(ii), for a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a J&A citing the authority at FAR 6.302-1. Include a copy of the previous J&A and include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions; and The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see DFARS 206.304). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.

XII. Certification by the Contracting Officer. (FAR 6.303-2(b)(12)) As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief.

XIII. Certification by the technical/requirements personnel. (FAR 6.303-2(c)) As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.

Do You Need to "REDACT" Text?

This template is interactive and has special features. In its current state, it cannot be redacted. In order to redact any portion of this template, you must first convert it to a normal PDF file. Click here for instructions.

The following page contains a suggested template for “International Agreement Competitive Restrictions (IACR)”.

The authority to prepare an IACR has been delegated from the HCA to the Contracting Officer.

(AFFARS 5306.302-4)

IV. Statutory Authority: 10 USC 2304(c)(4) as implemented by FAR 6.302-4, International Agreement.

VI. Certification of Accuracy and Completeness:

As evidenced by his/her signature, the contracting officer has determined the IACR to be both accurate and complete to the best of his/her knowledge and belief. The CO also approves the IACR.

As evidenced by his/her signature, the program/technical/requirements manager(s) have/has determined that any supporting data contained in the IACR, which is his/her responsibility, is both accurate and complete.

9.0.0.2.20120627.2.874785

security_markings: CONTROLLED UNCLASSIFIED INFORMATION
CurrentPage:
PageCount:
Security_Markings:
Yes:
No:
new:
amended-with-original:
range_under-750K:
range_750K-15M:
range_15M-100M:
range_over-100M:
Contracting-Activity: 341st Contracting Squadron
PR-ID-Number: N/A
Program-Project: A&E Architects, P.C.
Program-Project: 748,750.00
Program-Type: Operational
Authority: 6.302-1 – 10 USC 2304(c)(1), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements
class:
individual:
Sign_and_Save_1:
Date: 22 Jul 2021
Date: 22 Jul 2021
Date: 23 Jul 2021
Date: 02 Aug 2021
Name:
Signature:
Hide-PM-Coord:
Hide-CO-Coord:
Hide-CSO-Coord:
Hide-Legal-Coord:
Hide-COCO-Coord:
Hide-CA-Coord:
Hide-SCO-Coord:
Hide-PEO-Coord:
Hide-AQC-Coord:
Hide-Blank-1-Coord:
Hide-Blank-2-Coord:
Section-I-Text:
Section-II-Text:
Section-III-Text:
Section-IV-Text:
Section-V-Text:
Section-VI-Text:
Section-VII-Text:
Section-VIII-Text:
Section-IX-Text:
Section-X-Text:
Section-XI-Text:
Section-XII-Text:
Section-XIII-Text:
Remove-Guidance-Pages: 1
Remove-IACR-Pages: 1
Remove-Pages-Above: 0
Section-I:
Section-II:
Section-III:
Section-V:

File details come from the government source that posted it. Updated .