[A]_EXHIBIT_A_Scope_of_Work.pdf

PDF 157 KB Posted

Attached to
Hall Neighborhood House
Solicitation number
CGB01227A
Issued by
Fairfield County, Bridgeport City, Connecticut

About this file

This is a Scope of Work document for the City of Bridgeport, Connecticut's renovation project at Hall Neighborhood House located at 52 George E Pipkin's Way in Bridgeport, CT. The project encompasses interior renovation of lower-level bathrooms, including demolition and installation of new plumbing fixtures, wall partitions, ceilings, finishes, and upgrades to electrical, mechanical, plumbing, fire alarm, and HVAC systems. Three bathrooms are included in the scope: Bathroom #1 (Boys), Bathroom #2 (Girls), and Bathroom #3. Each bathroom requires installation of specific fixtures including LUXSHERY dual flush elongated white toilets, Glacier Bay grab bars (36 inches and 42 inches), Marazzi Travisano Trevi porcelain floor and wall tiles (18 inches x 18 inches), Claire rectangular wall-mounted sinks, Glacier Bay mirrors, paper towel dispensers, soap dispensers, toilet paper dispensers, and urinal partitions as applicable. All work must comply with ADA standards, OSHA requirements, and applicable building, electrical, mechanical, plumbing, fire, and energy codes. Electronic bid submissions are due to the City of Bridgeport Department of Public Purchases by 2:00 pm on Wednesday, October 21, 2026, through the OpenGov Procurement Portal. The question cut-off date for clarifications is 5:00 pm on Tuesday, October 6, 2026.

The Scope of Work document provides separate cost line items for Bathroom #1, Bathroom #2, Bathroom #3, Fire Alarm System modifications, Electrical upgrades, HVAC system upgrades, and Plumbing system upgrades, with blank spaces designated for contractor pricing. The document requires contractors to provide all labor, materials, equipment, supervision, protection, disposal, permits, inspections, testing, and coordination necessary to complete the renovation work. Contractors must field-verify existing conditions prior to commencing work and comply with manufacturer specifications for all materials and equipment specified in the detailed scope. No information regarding funding sources, award dates, contract terms, or renewal options is included in this Scope of Work document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HALL NIEGHBORHOOD HOUSE

AT 52 GEORGE E PIPKIN’S

WAY IN BRIDGEPORT, CT

SCOPE OF WORK

Interior renovation of lower-level bathrooms by removing bathroom plumbing fixtures, partitions, ceilings, walls, finishes and installing new wall partitions, new plumbing fixtures. In addition, upgrading the electrical, mechanical, plumbing, fire and hvac equipment.

Provide all labor, materials, equipment, supervision, protection, disposal, and coordination required to renovate the existing lower-level bathrooms. Work shall include demolition of existing bathroom components and installation of new finishes, partitions, plumbing fixtures, and upgraded building systems.

BATHROOM#1 BOYS

1. Contractors shall remove plumbing fixtures and install new plumbing fixtures and accessories to connect according to drawing’s specifications.

2.

3. Apply Versa Bond 50lbs Gray Professional Polymer modified thinset over plumbed concrete surface using

Alino Waterproof Membrane.

4. Fix in place Marazzi Travisano Trevi 18 Inches x 18 inches Porcelain Floor Tile on plumbed concrete surface with thinset mortar at areas indicated on Architectural Drawings.

5. Contractors shall field verify dimensions before doing selective demolition outlined on architectural plan and according to OSHA standards, local laws and local ordinances.

6. Install ADA compliant, fireproof, water resistant, insulated hollow metal door that are self-closing with hardware set includes locks, closers, hinges and door stops ANSI/BHMA standards.

7. Field vary door frame measurement and Install UV labelled fire rated door and door frame ADA compliant.

8. Clean all surfaces and apply two coats of Semi-Gloss paints according to manufacturer instructions.

9. Contractor shall install two Hanekes 0.5 GPF wall mounted water efficient Ceramic urinal according to manufacturer instructions.

10. Provide and install 1 Gen 19.5inches x 5.5 inches x 11.25 Transparent Toilet Paper Dispenser and install according to manufacturer’s instructions.

11. Supply and install one San Jamar Classic Commercial Lever Paper Towel Dispenser in black and follow manufacturer’s instructions.

12. Provide two pieces of Numhew black urinal partition with accessories, with toilet protection divider and wall mounted accessories.

13. Placed on plumbed wall VEVOR wall mounted baby changing station Horizontal Foldable Diaper Changing Table with safety Straps and Hanging Rods follow manufacturer’s instruction.

14. Mount and fix to wall one (1) Glacier Bay Grab Bar 36 inches L x 1-1/4 inches Dia, ADA compliant Brushed Stainless Steel according to Architectural Drawings, ADA Codes, and Ordinances.

15. Mount and fix to wall one (1) Glacier Bay Grab Bar 42 inches L x 1-1/4 inches Dia, ADA compliant Brushed Stainless Steel according to Architectural Drawings, ADA Codes, and Ordinances.

16. Furnish and install 40 OZ, Alpine Industries Horizontal Manual Surface Mounted Stainless Steel Liquid Soap Dispenser, mount according manufacturer’s instruction.

17. Fix in place 1 LUXSHERY 12 inches 1.1/1.60 GPF Water Efficient Dual Flush Elongated White Toilet.

18. Supply Glacier Bay 22.2 inches wide x 27.7 inches high Rectangular Polystyrene Framed Wall Bathroom Mirror Brushed Nickel Type.

19. Contractor shall Provide Claire 22.06 inches, Swiss Madison type Rectangular Wall Mounted Bathroom Sink in Glossy White install per manufacturer’s directives.

20. Fix in place Marazzi Travisano Trevi 18 Inches x 18 inches Porcelain Wall Tile on plumbed wall with thinset mortar at areas indicated on Architectural Drawings.

21. Install Alpine industries 38 0z, Wall mounted Automatic Liquid Gel Hand Sanitizer Soap Dispenser in White ADA compliant.

22. Furnish Phenolic Gel high-performance toilet partition system ADA compliant coinciding with Architectural Designs.

COST$ ________________________

BATHROOM# 2 GIRLS

1. Contractors shall remove plumbing fixtures and install new plumbing accessories according to drawing’s specifics.

2. Apply Versa Bond 50lbs Gray Professional Polymer modified thinset over plumbed concrete surface using

3. Fix in place Marazzi Travisano Trevi 18 Inches x 18 inches Porcelain Floor Tiles on plumbed Concrete surface with thinset mortar at areas indicated on Architectural Drawings or Approved equal

4. Contractors shall field verify dimensions before doing selective demolition outlined on architectural plan and

5. Install ADA compliant, fireproof, water resistant, insulated hollow metal door that are self-closing with

6. Field vary door frame measurement and Install UV labelled fire rated door and door frame ADA compliant.

7. Clean all surfaces and apply two coats of Semi-Gloss paint according to manufacturer instructions.

8. Make available 2 Gen 19.5inches x 5.5 inches x 11.25 Transparent Toilet Paper Dispenser and install

9. Supply one San Jamar Classic Commercial Lever Paper Towel Dispenser in black and follow manufacturer’s instructions.

10. Placed on plumbed wall VEVOR wall mounted baby changing station Horizontal Foldable Diaper Changing Table with safety Straps and Hanging Rods follow manufacturer’s instruction.

11. Mount Glacier Bay Grab Bar 36 inches L x 1-1/4 inches Dia, ADA compliant Brushed Stainless Steel according to Architectural Drawings, ADA Codes, and Ordinances.

12. Mount Glacier Bay Grab Bar 42 inches L x 1-1/4 inches Dia, ADA compliant Brushed Stainless Steel

13. Furnish 40 OZ, Alpine Industries Horizontal Manual Surface Mounted Stainless Steel Liquid Soap

14. Fix in place 2 LUXSHERY 12 inches 1.1/1.60 GPF Water Efficient Dual Flush Elongated White Toilet.

15. Supply Glacier Bay 22.2 inches wide x 27.7 inches high Rectangular Polystyrene Framed Wall Bathroom Mirror Brushed Nickel Type.

16. Contractor shall Provide Claire 22.06 inches, Swiss Madison type Rectangular Wall Mounted Bathroom Sink in Glossy White install per manufacturer’s directives.

17. Fix in place Marazzi Travisano Trevi 18 Inches Porcelain Wall Tile in plumbed wall with thinset mortar at areas indicated on Architectural Drawings.

18. Install Alpine industries 38 0z, Wall mounted Automatic Liquid Gel Hand Sanitizer Soap Dispenser in White

19. Furnish Phenolic Gel high-performance toilet partition system ADA compliant coinciding with Architectural Designs.

COST $___________________________________________

BATHROOM #3

1. Contractors shall remove plumbing fixtures and install new plumbing accessories according to drawing’s specifics.

2. Apply Versa Bond 50lbs Gray Professional Polymer modified thinset over plumbed concrete surface using

3. Fix in place Marazzi Travisano Trevi 18 Inches x 18 inches Porcelain Floor Tiles on plumbed Concrete

4. Contractors shall field verify dimensions before doing selective demolition outlined on architectural plan and

5. Install ADA compliant, fireproof, water resistant, insulated hollow metal door that are self-closing with

6. Mount Glacier Bay Grab Bar 36 inches L x 1-1/4 inches Dia, ADA compliant Brushed Stainless Steel

7. Mount Glacier Bay Grab Bar 42 inches L x 1-1/4 inches Dia, ADA compliant Brushed Stainless Steel

8. Furnish 40 OZ, Alpine Industries Horizontal Manual Surface Mounted Stainless Steel Liquid Soap

9. Install Alpine industries 38 0z, Wall mounted Automatic Liquid Gel Hand Sanitizer Soap Dispenser in White

10. Apply Versa Bond 50lbs Gray Professional Polymer modified thinset over plumbed concrete surface using

11. Fix in place Marazzi Travisano Trevi 18 Inches x 18 inches Porcelain Floor Tiles on plumbed Concrete

12. Clean all surfaces and apply two coats of Semi-Gloss paint according to manufacturer instructions.

13. Make available 2 Gen 19.5inches x 5.5 inches x 11.25 Transparent Toilet Paper Dispenser and install

COST $_____________________________

FIRE ALARM SYSTEM

1. Provide all labor, materials, equipment, supervision, programming, testing, inspection, documentation, and coordination necessary to modify and/or install a complete and operational fire alarm system serving the renovated lower-level bathrooms.

2. The fire alarm work shall be coordinated with the existing building fire alarm system and shall comply with the applicable requirements of the building and fire codes, and applicable NFPA requirements.

3. The contractor shall verify existing fire alarm conditions and determine the extent of modifications required to accommodate the renovated bathroom layout.

COST $ ____________________________________

ELECTRICAL

1. Provide all labor, materials, equipment, supervision, tools, testing, permits, inspections, coordination, and incidentals necessary to complete the electrical upgrades associated with the renovation of the existing lower-level bathrooms.

2. The work shall include demolition, modification, relocation, furnishing, installation, connection, testing, and commissioning of electrical systems required for the renovated spaces.

3. All electrical work shall comply with the currently adopted electrical and building codes, applicable NFPA requirements, OSHA requirements, utility requirements, and requirements of the Authority Having Jurisdiction (AHJ).

4. The contractor shall field-verify existing electrical conditions prior to commencing work.

COST $ ____________________________________

HVAC SYSTEM UPGRADE

1. Provide all labor, materials, equipment, supervision, tools, temporary protection, coordination, testing, balancing, commissioning, and incidentals necessary to complete the HVAC and mechanical work associated with the renovation of the existing lower-level bathrooms.

2. The work shall include demolition, modification, relocation, furnishing, installation, connection, testing, and commissioning of HVAC and mechanical systems required to serve the renovated spaces.

3. All work shall comply with the currently adopted mechanical, building, energy, and fire codes, applicable NFPA requirements, manufacturer's requirements.

4. The contractor shall field-verify existing conditions before beginning work.

COST $ _________________________________

PLUMBING SYSTEM UPGRADE

1. Provide all labor, materials, equipment, supervision, tools, temporary protection, demolition, disposal, coordination, testing, commissioning, permits, inspections, and incidentals necessary to upgrade the existing boiler room and associated heating systems.

2. The work shall include evaluation of existing boiler room conditions, demolition of obsolete or deteriorated components, installation or modification of boiler equipment and associated mechanical systems, piping, controls, electrical connections, ventilation, air combustion, safety devices, and related building systems.

3.

4. All work shall comply with the currently adopted mechanical, plumbing, building, fire, fuel-gas, energy, and electrical codes, applicable NFPA requirements, manufacturer's requirements.

COST $ _____________________________