VEND OR COVERSHEET
FY 22 Mass Solicitation / EK Park Attendant
W912DQ-22 -R-1003
A.07 Outlet Park, Pomona
OFFEROR'S NAME:
OFFEROR'S ADDRESS:
OFFEROR'S PH ONE#:
OFFEROR'S EMAIL:
OFFEROR'S DUNS#:
OFFEROR'S CAGE CODE:
OFFEROR'S SIGNATURE:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Job Base
Park/Gate Attendant Services – Base Period FY 22
FFP
The Government's payment for Park/Gate Attendant services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.
FOB: Destination
PSC CD: M1PA
NET AMT BASE FY 22 ____________________
0002 Job
OPTION
Park/Gate Attendant Services – Option Period FY 23
FFP
The Government's payment for Park/Gate Attendant services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.
NET AMT OPTION FY 23 __________________
0003 Job
OPTION
Park/Gate Attendant Services – Option Period FY 24
FFP
The Government's payment for Park/Gate Attendant services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.
NET AMT OPTION FY 24 __________________
TOTAL AMOUNT ALL YEARS ___________________
RELATED EXPERIENCE FORM:
This form must be completed by all offerors in order to receive consideration for award. If additional space is needed, this form may be duplicated as necessary, no more than three submissions. Information describing the offeror’s complete contracting background and experience shall be provided. The contractor’s information should only describe experience that directly pertains to the type of work set forth in this in Section C of this solicitation. Include details of any training which would enable you to better perform the work outlined in the specifications. Reference information should include the names and current telephone numbers of all agencies/firms listed.
Experience
Contract Work/Type:
Agency/Firm for Whom the Work Was Performed:
Contact Person at the Site:
Telephone:
Month/Year Work Began:
Month/Year Work Ended:
Description of Duties/Work: (Please provide details)
Form PPQ-0 (9/30/11)
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information
Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)
Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information
Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information
Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK
TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY
ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE
SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT
RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.
The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an
Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the
Contractor successfully performed a significant event that was a benefit to the
Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the
Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff
(including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E VG S M U N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations
(including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
SEE ADDENDUM
(No Collect Calls)
W912DQ22R1003 17-Nov-2021
b. TELEPHONE NUMBER
816-389-3850
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 15 Dec 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912DQ9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
CHRISTOPHER W. ANDERSON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USACE, KANSAS CITY +
FEDERAL BLDG CT-H 601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
816-389-2030FAX:
TEL: 816-389-3812 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
721211
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF33
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
THIS PAGE LEFT BLANK
PERFORMANCE WORK STATEMENT
PARK ATTENDANT SERVICES
OUTLET PARK
C.1 General Information
C.1.1 Background. Pomona Lake is located approximately 7 miles west of Pomona, Kansas on highway 268. The dam was completed in 1963, which creates a reservoir of approximately 70,000 acre-feet of water. Recreational development at Pomona includes 6 parks and access areas managed by the U.S. Army Corps of Engineers. Park areas at Pomona Lake offer a wide variety of recreation facilities including boat launching ramps, campgrounds, marinas, picnic areas, sand swimming beaches, and a visitor center. Outlet Park campground area is an approximately 27-acre park with 1 reservable group shelter, 1 shower building and 34 campsites.
C.1.2 Scope of Work
The contractor shall provide labor, material, and equipment as specified to perform park attendant duties at the Wolf Creek Park public use area as described in this Performance Work Statement (PWS) and elsewhere in the contract. The contractor shall perform the specific tasks listed in Section C.5. Acceptable performance standards and current regulations are provided for each task.
C.1.3 Period of Performance: The contract shall begin April 1 or date of award and continue through October
31. The contractor shall move onto the site location a minimum of two (2) but not more than five (5) days prior to the start of the service period. The contractor shall remove his trailer and all personal property from government furnished campsite not later than seven (7) days after the end of the service period.
Cl.4 Bonding: The Contractor shall furnish a surety bond for the protection of the Government in the amount of $2,000.00 to cover funds not received by the designated government agent as provided for in the specifications. The bonds shall be in the form of firm commitment, supplieded by corporate sureties whose names appear on the list contained in the Treasury Department Circular 570, individual sureties, or by other cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the U.S. Department of Treasury, Financial Management Service, and Washington, DC 20227.
C.1.5 Post Award Conference/Training: The contractor shall attend the post-award conference and computer/credit card training sessions. The meetings will be used to discuss and develop an understanding of all contract requirements and the National Recreation Reservation System.
C.1.6 QUALITY ASSURANCE:
C.1.6.2 The government will monitor the contractor's performance under this contract using quality assurance procedures developed by the government. Typical procedures might include random sampling, checklists, and customer complaints. This should not be considered an exhaustive list. A primary objective of government Quality Assurance will be to determine the effectiveness of the contractor's quality control system.
C.1.6.3 The government reserves the right to inspect and test all services called for by the contract to the extent practicable at all times and places during the term of the contract. The government will perform inspections and tests in a manner that will not unduly delay the work.
C.1.6.4 If any of the services do not conform to contract requirements, the government will request the contractor to perform the services again, where appropriate, in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
C.1.6.5 If the contractor fails to promptly re-perform the services or to take the necessary action to ensure future performance in conformity with contract requirements, the government may by contract, or otherwise: (I) perform the services and charge to the contractor any cost incurred by the government that is directly related to the performance of such service or (2) terminate the contract in whole or in partial.
C.1.7 Personnel:
C.1.7.1 The contractors present a neat appearance and shall exercise tact, diplomacy, and courtesy when dealing with the public.
C.1.7.2 The contractor shall assist the visiting public in reclaiming lost articles by turning in to project personnel all property left by visitors and found during performance of this contract.
C.1.8 Other Contractors:
The government may undertake or award other contracts for additional work, and the contractor shall fully cooperate with such contractors and government employees. All work shall be carefully planned and fitted so as not to interfere with such other work. The contractor shall not commit or permit any act that will interfere with the performance of work by other contractors or by government employees.
C.1.9 Safety:
The contractor shall immediately report any situation that could affect the health or safety of visitors to a park ranger, including maintenance needs, utility problems, accidents, or violations of laws and regulations.
C.1.9.1 The contractor shall report all disturbances that cannot be diplomatically resolved to a park ranger or local law enforcement as directed by the COR.
C.2 Definitions and Acronyms: The following definitions and descriptions apply wherever the word, phrase, or acronym is used in this performance work statement.
COR: Contracting Officer's Representative.
NRRS: National Recreation Reservation System
PWS: Performance Work Statement
Quality Control (QC): A method used by the contractor to control the quality of goods and services provided.
Quality Assurance (QA): A method used by the government to provide some measure of control over the quality of services received.
C.3 Government-Furnished Materials and Supplies. Government-Furnished materials and supplies are provided to the contractor only for use in performing work specified in this contract.
C.3.1 The government will provide a campsite with full utility hookups. In addition, the campsite will include a storage building, picnic table, refuse container, and a small garden plot. The contractor shall maintain these facilities in accordance with park rules.
C.3.2 Government - Furnished Property - The government will furnish to the contractor the following identified prope1ty to be used in performing the contract. When the property is delivered, the contractor must verify its quantity and condition in writing to the Contracting Officer or his authorized representative on Memorandum Receipt ENG 4866, within 24 hours of receipt. Damage or loss while in the contractor’s possessions shall be reported in writing, within 24 hours, to the Contracting Officer or his authorized representative.
Item (description) Quantity
(1) 2-way Radio
(2) Computer (FOR OFFICIAL USE ONLY)
(3) Telephone (local use only)
(4) Credit card scanner/printer
(5) Weather radio
(6) Lawn mower
1 each
1 each
1 each
1 each
1 each
1 each
C.3.3 Government - Furnished Consumable Items - The following consumable items, will be furnished to the Contractor by the Government. The Government will retain control of expendables, to be dispensed on an as- needed basis for use in performance of the Contract.
(I) Trash bags
(2) Maps
(3) Brochures
(4) Necessary office supplies
(5) Keys
(6) Computer paper
(7) Authorized forms
(8) Name tag
C.4 Contractor-Furnished Equipment and Supplies: The contractor shall furnish all equipment and supplies not identified in section C.3 of this PWS as Government-Furnished supplies and equipment. Specifically, the contractor shall furnish:
C.4.1. A mobile travel trailer, motor home or approved equal, containing sanitary facilities and all equipment necessary for habitation. Tents or ‘pop-up’ style type campers are not permitted. If self-propelled units are used, they must remain on jacks or be blocked up for the duration of the contract and not be used for transportation.
C.4.2. A reliable vehicle, other than the one in C.4.1 above, to be used for local transportation.
C.5 Specific Tasks The contractor shall perform park attendant duties 6-days per week, including weekends and federal holidays at the Outlet Park public use area as described in this section and elsewhere in the contract. The contractor's staff shall consist of at least two adults. The contractor will be granted and shall observe one designated day off each week. At least one person on the contractor's staff shall always remain in the park unless the COR has been notified of such absence. The contractor shall retain a qualified substitute park attendant to cover any absences during regular duty hours. The substitute shall be approved by the COR.
C.5.1 R1S – Recreation One Stop The contractor shall perform specific daily duties to implement the Recreation One Stop (R1S) according to established procedures. Duties include, but are not limited to, maintaining current records, posting reserved sites, checking site availability, processing camper registrations, accepting shelter reservations, and receiving daily arrival reports. The contractor shall take reservations at the fee booth for walk-up customers. The contractors shall utilize a government furnished computer and software for this reservation system. This computer is for official use only, any personal use will not be allowed. The contractors shall not accept phone reservations unless authorized by the COR.
C.5.2 Fee Booth Operations The contractor shall staff the fee booth during booth hours designated below. During periods of high registration, it may be necessary for two people to work the booth (e.g. - Fri. and Sat. nights) to avoid long waiting periods for visitors.
The contractor shall keep an open telephone/radio line of communication while on duty. During booth hours, the Corps-furnished radio shall be turned on with the volume up so messages can be transmitted and received. Radio problems shall be reported immediately. The contractor shall be available to the public 24 hours a day (except scheduled days off) to receive and deliver emergency messages and assist the public as directed by the COR.
C.5.2.1 Schedule: The following schedule shall be subject to change with one (1) week's advance notice. Rescheduling will not affect the total number of hours worked per week. The registration booth shall be open during the following hours: NOTE: The contractor may leave the park between the shift hours but must return when the next shift begins EXCEPT on Holidays and those days leading up to a holiday.
Monday:
Tuesday:
Wednesday:
Thursday:
Friday:
Saturday:
Sunday:
Sundays prior to Monday Holidays:
Monday Holidays:
Fridays prior to Monday Holidays:
Day prior to July 4th:
July 4th Holiday:
8:00- 10:00 a.m.
4:00- 8:00 p.m.
REGULAR DAY OFF
4:00- 6:00 p.m.
8:00- 10:00 a.m.
4:00- 8:00 p.m.
1 :00- 9:00 p.m.
1:00 - 9:00 p.m.
1:00 - 6:00 p.m.
8:00- I 0:00 a.m. (Friday Hours) 1:00- 9:00 p.m.
8:00- 10:00 a.m. (Thursday Hours) 4:00- 8:00 p.m.
8:00- 10:00 a.m. (Friday Hours) 1:00- 9:00 p.m.
10:00 a.m. to 10:00 p.m.
8:00- 10:00 a.m. (Thursday Hours) 1 :00- 9:00 p.m.
C.5.2.2 If a federal holiday should fall on the scheduled day-off the contracting officer shall designate an alternate day off. All work shall be accomplished within the time frames specified above. Services rendered outside the time periods specified will not be compensated unless specifically approved in writing by the Contracting Officer or his approved representative.
C.5.2.3 Receive Payments: The contractor shall register campers and collect the required fees according to project policy. The contractor shall have on hand enough change fund for this purpose.
C.5.2.3.2 Encourage Credit Card Payments: The contractor shall encourage the use of credit card payments over personal checks. The contractor shall follow project policy when accepting personal checks.
C.5.2.3.3 Safeguard Collections: The contractor shall take all reasonable precautions to safeguard collections, permits, and other government-furnished property. Outside entrances to the fee booth shall be kept locked, and visitors must not be allowed in the booth.
C.5.2.4 Transmit Fees and Deposit Reports: The contractor shall transmit all collected fees and deposit reports by certified mail as directed by the Contracting Officer. Fees shall be transmitted on Monday of each week (Tuesday after Monday Holiday) or when collections total $1,000.00, whichever occurs first. Money order or cashier's check fees are the responsibility of the contractor.
C.5.2.5 Booth Maintenance: The contractor must always clean and maintain the fee booth in a clean condition.
Smoking, visitors, or pets are not permitted in the park entrance booth.
C.5.3 Park Operations:
C.5.3.1 Provide Information to Visitors The contractor shall hand out informational brochures, pamphlets, and trash bags. The contractor shall explain or clarify policies and regulations (e.g. trash disposal, clothes lines, life jacket loaner program, etc.) for park visitors.
C.5.3.2 Implement Campground Rules and Policies The contractor shall implement all campground rules and project policies in performing their duties, including quiet hours (10 p.m. to 6 a.m.), check out times, and maximum 14 day stay limitations, etc.
C.5.3.3 Tour Park The contractor shall make a minimum of 3 daily tours of the park areas. The first shall be at or about 7:00 a.m., the second shall be at or about 6:00 p.m. and the third shall be at or about 8:00 p.m.
C.5.3.3.1 Identify Campers The Contractor shall identify campers who may have arrived during hours when the fee booth was closed. These individuals shall be contacted and advised to register at the booth and pay required fees. Fees shall be collected at the fee booth only.
C.5.3.3.2 Check Facilities During the morning and evening tours, the contractor shall check park facilities and amenities for vandalism, equipment malfunction, and cleanliness. The contractor shall advise Corps personnel immediately if problems exist.
C.5.3.3.3 Open and Close Facilities The contractor shall open, and close facilities (such as laundry and shower) as requested by COR.
C.6 Applicable Publications and Forms
C.6.1 MAP: Information on Pomona Lake can be found on the Internet at http://www.nwk.usace.army.mil/po/
Section
{Para)
Contract
Requirements
Performance Standard
Lot
Description
ALP
Method of
Surveillance
C.5.1
Implement R1S
In accordance with required post award training
# of NRRS actions per period
(month?)
5%
Validated Customer
Complaint
C.5.2
Fee Booth
Operations
Maintain the booth and assist the public as directed by the COR
Days of performance
1%
100% Inspection
C.5.2.1
Booth Schedule
Staff booth during scheduled hours
# hours per period
1%
Random sampling and validated customer comment
C.5.2.3
Receive Payments
Payments are correctly collected and safeguarded
Daily Receipts
2%
100% Ranger -
Contractor inspection
C.5.2.4
Transmit Fees and
Deposit Reports
Transmit fees weekly or at
$1,000.00 weekly
C.5.3
Park Operations
Monitor campers and visitors
Daily
C.5.3.3
Tour Park
During specified times, check for maintenance needs and unregistered guests
4%
Random Sample
C.5.3.3.3
CS.3.3.4
Park Security and
Beach Gates
Open and Close security gates as directed
4%
Random Sample
Performance Requirements Summary (PRS)
The following lists individual tasks that were considered necessary.
Task #1 - Implement Recreation One Stop (R1S)
I. Check Site Availability
Cross-reference current campers list with sites Occupied.
2. Shelter Reservations
Post shelter reservation signs
3. Receive Daily Arrival Reports Print report
4. Post Resolvable Sites
Print incoming camper report Complete reservation card Post reservation card at campsite
5. Process Camper Registration
Input registration data Collect payment Print receipt
6. Maintain Records Weekly report - Bill for Collection, Operator Shift Management, Operator of cashier’s check.
Customer Receipts for recreation season
Shift Summary, and copy
Task #2 - Fee Booth Operation
I. Register visitors and campers Inform visitors of rules and regulations
2. Collect recreation fees
- Camping
3. Transmit recreation fees weekly Obtain cashier’s check at bank Remit cashier’s check, personal checks, and Bill for Collection to Bank weekly or when totals Reach $1000, whichever occurs first.
- Pay for cost of cashier’s checks, envelopes and Postage.
Task #3 - Park Operations
1. Provide Information to Visitors
2. Tour Park Identify new visitors Monitor facility rese1vations Check for and report vandalism, equipment malfunction and cleanliness of facilities
3. Open and Close Facilities (as directed)
Shower building Laundry room Open and close park security gates
4. Implement Campground Rules and Policies
Title 36 and project brochures
W912DQ22R1003
Section A - Solicitation/Contract Form
SYNOPSIS / SOLICITATION
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart
12.603 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation, proposals are being requested and a written solicitation will not be issued.
The solicitation number for this acquisition is W912DQ22R1003 and it is being issued as a Request for Proposals
(RFP).
Offers are due on 30 November 2021 at 5:00 PM Local Time. Offers shall be submitted in PDF via e-mail to seth.b.balsters@usace.army.mil. All offers must be good for at least 90 days from offer due date.
If you have any questions please contact Mr. Seth Balsters, seth.b.balsters@usace.army.mil , 816-389-3566.
The solicitation documents and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2005-84.
This synopsis/solicitation will be awarded as a 100% Small Business Set-aside and the associated North American Industry Classification system (NAICS) code is 721211 “RV (Recreational Vehicle) Parks and Campgrounds”
Manufacturing and the business size standard is: $8,000,000.00.
Standard Industrial Classification (SIC) Code: 7033: Recreational Vehicle Parks and Campsites
Product/Service Code: 8999 for “Miscellaneous Services”
Description of Services Required: The U.S. Army Corps of Engineers Kansas City District has a need for Park Attendant, Park Attendant/Custodian, Custodian, and Janitor services to support several lakes in the Operations Division of the Kansas City District during the visiting season each year. The contractors shall perform all services in accordance with the Performance Work Statements. The Contractor shall comply with all Federal, state, and local laws, ordinances, statutes and regulations pertaining to the provided services.
Place of Contract Performance: Outlet Park, Pomona Lake Kansas.
Far 52.212-1, Instructions to Offerors- Commercial does apply to this acquisition with no addenda to the provision and is located in Section L of this combined synopsis/solicitation.
Far 52.212-2, Evaluation - Commercial Edited does apply to this acquisition with no addenda to the provision and is located in Section M of this combined synopsis/solicitation.
FAR 52.212-3, Offeror Representations and Certifications -- Commercial Items, does apply to this acquisition with no addenda to the provision, and is located in Section K of this combined synopsis/solicitation.
FAR 52.212-4, Contract Terms and Conditions - Commercial Items, does apply to this acquisition with no addenda to the provision. These specific clauses required are located in Section I of this combined synopsis/solicitation.
FAR 52.212-5, Contract Terms and Conditions - Required to Implement Statutes or Executive Orders- Commercial Items, applies to this acquisition. These specific clauses required are located in Section I of this combined synopsis/solicitation.
Additional contract requirement(s) or terms and conditions are located in Section J of this combined synopsis/ solicitation.
In accordance with FAR 52.212-1(k) the prospective awardee shall be registered and active in https://beta.sam.gov/ for their System Award Management (SAM).
PLEASE NOTE: SAM.GOV procedures have been changed as of 8 November 2019. Interested vendors must go to beta.SAM.gov to register in SAM and to review current notices or announcements.
Contractors may obtain information on registration and annual confirmation requirements via the Internet at https://beta.sam.gov/ or by calling (866) 606-8220.
The beta System for Award Management (SAM) is a Federal Government owned and operated free web site. If you are a small business needing assistance with registering or help with navigating through the website you may contact the Association for Procurement Technical Assistance Centers for help with actions such as beta.SAM.gov registration.
If you have questions about Government procurements in general or need assistance in the preparation of your proposal, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org/sam-registration/
(End)
Section B - Supplies or Services and Prices
LAKE PROJECTS
Pomona Lake, Vassar, Kansas:
A-07 Outlet Park- Park Attendant
Section C - Descriptions and Specifications
PWS
Attachment 1 – PWS
Pomona Lake, Vassar, Kansas:
A-07 Outlet Park- Park Attendant
Section H - Special Contract Requirements
SERVICE WAGE DETERMINATION
Pomona Lake Project, Vassar, Kansas:
Service Contract Act WD # 2015-5339 Osage County https://sam.gov/wage-determination/2015-5339/15
AT/OPSEC
Antiterrorism/Operations Security Requirements
All contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
The Contractor must pre‐screen Candidates using the E‐verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
The contractor and all associated sub‐contractors shall brief all employees on the local iWATCH, Corps Watch, or See Something, Say Something program (training standards provided by government representative). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after contract.
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions JUN 2020 52.204-2 Security Requirements MAR 2021 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2020
52.215-22 Limitations on Pass-Through Charges--Identification of Subcontract Effort
OCT 2009
52.215-23 Limitations on Pass-Through Charges JUN 2020 52.222-42 Statement Of Equivalent Rates For Federal Hires MAY 2014 52.222-43 Fair Labor Standards Act And Service Contract Labor
Standards - Price Adjustment (Multiple Year And Option Contracts)
AUG 2018
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-16 Progress Payments JUN 2020 52.232-18 Availability Of Funds APR 1984 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.237-2 Protection Of Government Buildings, Equipment, And Vegetation
APR 1984
52.246-4 Inspection Of Services--Fixed Price AUG 1996 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7007 Alternate A, Annual Representations and Certifications MAY 2021 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2021
252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.244-7000 Subcontracts for Commercial Items JAN 2021 252.247-7023 Transportation of Supplies by Sea FEB 2019
CLAUSES INCORPORATED BY FULL TEXT
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)
(a) Definitions. As used in this clause--
Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public Web sites) or simple transactional information, such as necessary to process payments.
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
(End of clause)
52.212-4 CONTRACT TERMS AND CONDITIONS-- COMMERCIAL ITEMS (OCT 2018)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights (1) within a reasonable time after the defect was discovered or should have been discovered; and
(2) before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes'', as amended (41 U.S.C. 601-613).
Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR
52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement or any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include--
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .