A.03 QASP for Crane Load Testing.pdf

PDF 450 KB Posted

Attached to
BONNEVILLE CRANE LOAD TESTING Federal contract opportunity
Solicitation number
W9127N24Q0093
Issued by
Department of the Army Corps of Engineers Engineering District Portland

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract related to load testing of a crane at Bonneville Dam Powerhouse No. 2 in Washington. The QASP outlines the government's plan to monitor the contractor's performance in completing a 100% crane load rating load test, as described in the Performance Work Statement (PWS). It specifies that the Contracting Officer's Representative (COR) will inspect the work progress, safety requirements, and final installation to ensure all requirements are met. If deficiencies are discovered, they will be communicated to the contractor's Quality Control Inspector for correction. The related federal contract opportunity is a Request for Quote (RFQ) for the crane load testing, with a NAICS code of 238290 - Other Building Equipment Contractors. The solicitation is a 100% small business set-aside, with quotes due by June 3, 2024, and an anticipated award date of June 10, 2024. The period of performance for the testing and final report is 10 weeks from contract award.

View the file

Other files for this federal contract opportunity

Other files attached to BONNEVILLE CRANE LOAD TESTING, newest first.
File Type Posted
A.02 PWS PoP Revision for Crane Load Test - 19July24.pdf PDF
B.08 RFQ W9127N24Q0093 AMND 0004.pdf PDF
B.04 Wage Rates Skamania County 2015-5563 v22 7.19.24.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan for

Bonneville Lock and Dam Crane Load Tests, Bridge Crane No. 3 – Powerhouse No. 2, Washington

PR&C#W66QKZ40601972

INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate Contractor actions while implementing this Performance Work Summary (PWS). It is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective.

The QASP provides a systematic method to evaluate the services the Contractor is required to furnish.

This QASP is cited on the premise the Government desires to maintain a quality standard in operating, maintaining, and repairing facilities and that a service contract to provide the service is the best means of achieving that objective.

The Contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved.

Quality Assurance Surveillance Plan Performance Objective SOW

Line Description Performance Threshold

Bridge Crane No. 3 Load Test Bid Item 0001 100% crane load rating load test

1. SURVEILLANCE: The Contracting Officer’s Representative (COR) will inspect and monitor on a daily basis of work progress, ensuring all safety requirements are met. The representative will also inspect crane rigging setup and water connections prior to the filling of the test load bags. At completion, the COR will inspect final installation to determine if all requirements have been met. If COR discovers deficiencies and/or receives complaints, they will pass them on to the contractor’s Quality Control Inspector (QCI) for correction.

STANDARD: All work to be completed according to SOW/PWS.

2. PROCEDURES: COR will record findings of surveillance. If COR discovers deficiencies and/or receives complaints, they will pass them on to the contractor’s Quality Control Inspector (QCI) for correction.