A.03.09 Exhibits.pdf
PDF 1020 KB Posted
- Solicitation number
- W9123722Q0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.08.02 W9123722Q0010.pdf | ||
| A.02.11 PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A
Contract No.: ____________________ Contractor Name: Braxton County Sheriff Department
Total ________
Notes:
Date
List any additional activities on the back of this sheet.
Signature of Inspector
TIME OF PATROL-(Note EXACT Times) ACTIVITY
(Name-Designated Area-Problem-Action Taken)
Start Time Ending Time Designated Area(s)
Total Hours Worked __________________________ Warnings: ________ Citations: ________ Arrests: ________Contacts: ________
DATE: ________________________________________________
DAILY LAW ENFORCEMENT LOG
Burnsville Lake-USACE
Description of Patrol Vehicle Used:
Beginning Odometer Reading:
Ending Odometer Reading:
Total Miles Driven on Shift:
Officer Identification: Print and Sign Name
Exhibit B
Sun Mon Tue Wed Thu Fri Sat 5 Hrs.
1700-2200
4 Hrs.
1800-2200
1900-2300
6 Hrs.
1800-2400
1900-2400
1900-2300 Open BT Historic Area Restroom and Bulltown Confederate Overlook
1800-2200
1800-2400 Open BT C and E-F Loops
1900-2300 Open BT Entrance Station and A-B Loops
12 Hrs.
1300-0100 Open RR Left Fork and remaining Bulltown Day Use Areas
1300-0100
1200-2400
10 Hrs.
1300-2300
Holiday
May 2022 Law Enforcement Schedule – Burnsville Lake
174 Man Hours 174 Equipment Hours
8 Hrs.
1700-0100
1500-0100
7 Hrs.
1700-2400
1600-2400
9 Hrs.
1500-2400
1500-2400
9 Hrs.
1500-2400
1400-2400
10 Hrs.
1400-2400
9 Hrs.
1500-2400
9 Hrs.
1500-2400
11 Hrs.
1400-0100
13 Hrs.
1200-0100
1400-2400
1400-2400
1500-2400
June
282 Man Hours 282 Equipment Hours
1200-0100
Holiday
July
323 Hours 323 Equipment Hours
1800-2400
1900-2400
1900-2400
5 Hrs.
1900-2400
August
192 Man Hours 192 Equipment Hours
1800-2300
10 Hrs.
1500-0100
1300-0100
Holiday
4 Hrs.
1800-2200 Close RR Left Fork, BT Pic Area, Beach, BT Ent Sta, Loops A-C and E-F
1800-2300
1700-2100
14 15
20 21
26 27 28 29 30
September
123 Man Hours 123 Equipment Hours
1900-2300 Open BT Historic Area Restroom and Bulltown Confederate Overlook
1800-2200
1800-2400 Open BT C and E-F Loops
1900-2300 Open BT Entrance Station and A-B Loops
1300-0100 Open RR Left Fork and remaining Bulltown Day Use Areas
1300-2300
Holiday
4 Hrs.
1900-2300
2023 Law Enforcement Schedule – Burnsville Lake
173 Man Hours 173 Equipment Hours
1500-2400
9 Hrs.
1500-2400
1400-2400
10 Hrs.
1400-2400
9 Hrs.
1500-2400
9 Hrs.
1500-2400
1400-2400
1500-2400
June
290 Man Hours 290 Equipment Hours
Hrs.
1300-0100
13 Hrs.
1200-0100
317 Hours 317 Equipment Hours
1800-2400
1900-2400
1900-2400
5 Hrs.
1900-2400
1800-2200
190 Man Hours 190 Equipment Hours
1500-0100
1300-0100
4 Hrs.
1800-2200 Close RR Left Fork, BT Pic Area, Beach, BT Ent Sta, Loops A-C and E-F
13 14
Close BT Historic Area
Confederate Overlook
19 20
21 22
25 26 27 28 29
116 Man Hours 116 Equipment Hours
1900-2300 Open BT Historic Area Restroom and Bulltown Confederate Overlook
1800-2200
1800-2400 Open BT C and E-F Loops
1900-2300 Open BT Entrance Station and A-B Loops
1300-0100 Open RR Left Fork and remaining Bulltown Day Use Areas
1300-2300
Holiday
4 Hrs.
1900-2300
4 Hrs.
1800-2200
2024 Law Enforcement Schedule – Burnsville Lake
177 Man Hours 177 Equipment Hours
1500-2400
9 Hrs.
1500-2400
1400-2400
10 Hrs.
1400-2400
9 Hrs.
1500-2400
9 Hrs.
1500-2400
1400-2400
1500-2400
June
303 Man Hours 303 Equipment Hours
1200-0100 Holiday
1300-0100
13 Hrs.
1200-0100
304 Hours 304 Equipment Hours
1800-2400
1900-2400
1800-2200
1900-2400
5 Hrs.
1900-2400
1800-2200
4 Hrs.
1800-2200
10 Hrs.
1500-0100
200 Man Hours 200 Equipment Hours
12 Hrs.
1300-0100
4 Hrs.
1800-2200 Close RR Left Fork, BT Pic Area, Beach, BT Ent Sta, Loops A-C and E-F
11 12
17 18
19 20
23 24
25 26 27
105 Man Hours 105 Equipment Hours
1900-2300 Open BT Historic Area Restroom and Bulltown Confederate Overlook
1800-2200
1800-2400 Open BT C and E-F Loops
1900-2300 Open BT Entrance Station and A-B Loops
1300-0100 Open RR Left Fork and remaining Bulltown Day Use Areas
1300-2300
Holiday
4 Hrs.
1900-2300
4 Hrs.
1800-2200
2025 Law Enforcement Schedule – Burnsville Lake
183 Man Hours 183 Equipment Hours
1500-2400
9 Hrs.
1500-2400
1400-2400
10 Hrs.
1400-2400
9 Hrs.
1500-2400
9 Hrs.
1500-2400
1400-2400
1500-2400
June
303 Man Hours 303 Equipment Hours
1200-0100
Holiday
1300-0100
13 Hrs.
1200-0100
300 Hours 300 Equipment Hours
1800-2400
1900-2400
5 Hrs.
1900-2400
1800-2200
1900-2400
5 Hrs.
1900-2400
1800-2200
4 Hrs.
1800-2200
10 Hrs.
1500-0100
206 Man Hours 206 Equipment Hours
4 Hrs.
1800-2200 Close RR Left Fork, BT Pic Area, Beach, BT Ent Sta, Loops A-C and E-F
10 11
1700-2300
16 17
Close BT Historic Area
Confederate Overlook
24 25 26
29 30
99 Man Hours 99 Equipment Hours
1900-2300 Open BT Historic Area Restroom and Bulltown Confederate Overlook
1900-2300
1800-2200
1800-2400 Open BT C and E-F Loops
1900-2300 Open BT Entrance Station and A-B Loops
1300-0100 Open RR Left Fork and remaining Bulltown Day Use Areas
1300-2300
Holiday
4 Hrs.
1900-2300
4 Hrs.
1800-2200
2026 Law Enforcement Schedule – Burnsville Lake
191 Man Hours 191 Equipment Hours
1500-2400
9 Hrs.
1500-2400
1400-2400
10 Hrs.
1400-2400
9 Hrs.
1500-2400
9 Hrs.
1500-2400
1400-2400
1500-2400
June
301 Man Hours 301 Equipment Hours
1200-0100
Holiday
1300-0100
13 Hrs.
1200-0100
300 Hours 300 Equipment Hours
1800-2400
1900-2400
5 Hrs.
1900-2400
1800-2200
1900-2400
5 Hrs.
1900-2400
1800-2200
4 Hrs.
1800-2200
185 Man Hours 185 Equipment Hours
1500-0100
1300-0100
5 Hrs.
1800-2300 Close RR Left Fork, BT Pic Area, Beach, BT Ent Sta, Loops A-C and E-F
9 10
15 16
17 18
21 22
23 24 25
1700-2300
28 29 30
115 Man Hours 115 Equipment Hours
Exhibit C
CESO Form A-02 MAR 15
Form A-02
U.S. Army Corps of Engineers
Accident Prevention Plan Checklist
Date of Inspection
Location (Plant or Facility) Contract Number
Contractor Name Project Name
Inspector Name (Print) Inspector Signature
This checklist serves as a guide only, it does not replace or eliminate the need to comply with the requirements set forth in Engineering Manual 385-1-1, Safety and Health Requirements Manual, dated 30 Nov 2014. The references included in this checklist correspond to the applicable sections of EM 385-1-1.
Item Description Yes No N/A Remarks (Any NO or N/A item)
a. Signature sheet
1. Includes the name, title, signature, telephone number, and qualifications of the Plan Preparer (Qualified person, i.e. corporate safety staff person, QC)
2. Includes the name, title, signature, telephone number, and qualifications of the Plan Approver (e.g. owner, company president, regional vice president) (HTRW activities require approval of a Certified Industrial Hygienist, a Certified Safety Professional may approve the plan for operations involving UST removal where contaminants are known to be petroleum, oils, or lubricants).
3. Includes the name(s), title(s), signature(s), telephone number(s), and qualifications for Plan Concurrence (provide concurrence of other applicable corporate and project personnel (contractor)) (e.g. Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional, project QC.)
b. Background information
1. Includes the Contractor Name.
2. Includes the Contract Number.
3. Includes the Project Name.
4a. Includes the Brief Project Description.
4b. Includes a Discription of the Work to be Performed.
4c. Includes the Location of the Project (map).
4d. Includes the Equipment to be Used.
4e. Includes the Anticipated High Risk Activities.
5. Includes the Major Phases of Work Anticipated.
(Within these major phases of work identified, activities [includes Definable features of Work (DFOWs) and tasks] to be performed that will require an AHA shall be specifically highlighted. This information can then be used by QC, QA and Safety personnel to track AHA submittals. The AHAs for these activities, tasks of DFOWs are NOT submitted at this time (AHAs created/submitted at this time would not be activity-specific as they are intended to be). > See Sections 01.A.14 and 01.A.15.)
Accident Prevention Plan Checklist (cont’d)
Item Description Yes No N/A Remarks (Any NO or N/A item)
c. Statement of Safety and Health Policy.
1. Provide a copy of current corporate/company Safety and Health Policy Statement, detailing commitment to providing a safe and healthful workplace for all employees. (In addition to the corporate policy statement, a copy of the corporate safety program may provide a portion of the information required by the accident prevention plan.)
2. Includes Contractor’s written safety program goals.
3. Includes Contractor’s written safety program objectives.
4. Includes the Contractor Accident Experience (Copy of OSHA 300 Forms, or equivalent documentation).
d. Responsibilities and Lines of Authority.
1. Includes statement of the employer’s ultimate responsibility for the implementation of his SOH program for his own employees, all sub-contractors and all others on the worksite (includes the strict enforcement of the program).
2. Includes the identification and accountability of personnel responsible for safety and health at both the corporate and project level – including their resumes. Qualifications shall be in accordance with Section 01.A.17. (Only official OSHA 30-Hour cards will be accepted or, if equivalent training is provided, appropriate instructor qualifications.)
3. Includes equivalent training to the OSHA 30-Hour classes is being presented as qualification, the training shall cover, as a minimum, the areas discussed in Appendix A, Section 3.d.3.(a-d).
4. Includes the names of Competent (CP) and/or Qualified Person(s) (QP) and proof of competency/qualification to meet specific OSHA CP/QP requirements. (Must include copies of proof of CP/QP).
5. Includes requirements and details of the employer’s Risk Management Process. (USACE uses the Activity Hazard Analysis (AHA) as part of a total risk management process. Contractors and other individual employer’s may use the AHAs or their own version [Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools]. These documents are considered equivalent to, and acceptable substitutes for, the USACE’s AHA provided the data collected is the same as that required by the AHA.)
6. Includes requirements for initial activity-specific AHAs to be submitted and accepted at preparatory meetings, prior to work being performed;
7. Includes requirements that no work by the Contractor shall be performed unless a designated Competent Person/SSHO is present on the job site.
8. Includes policies and procedures regarding non-compliance with safety requirements (to include disciplinary actions for violation of safety requirements).
9. Lines of authority.
10. Includes written company procedures for holding managers and supervisors accountable for safety.
Item Description Yes No N/A Remarks (Any NO or N/A item)
e. Subcontractors and Suppliers.
1. Includes the list of subcontractors and suppliers.
(If not known at the time of initial APP submittal, the contractor shall include the following statement in their initial APP: “The subcontractors for the following DFOWs/activities are not known at this time, but additional information will be submitted to the APP for acceptance prior to the start of any activities listed”)
2. Includes safety responsibilities of subcontractors and suppliers.
f. Training
1. Includes requirements for new hire SOH orientation training at the time of initial hire of each new employee.
2. Includes requirements for mandatory training and certifications that are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, diver, vehicle operator, HAZWOPER training and certification, PPE) and any requirements for periodic retraining / recertification.
3. Includes procedures for periodic safety and health training for supervisors and employees.
4. Includes the requirements for emergency response training.
g. Safety and Health Inspections
1. Includes specific assignment of responsibilities for a minimum daily jobsite SOH inspection during periods of work activity.
1a. Includes the name(s) of individual(s) responsible for conducting safety inspections. (e.g., PM, safety professional, QC, supervisors, employees)
1b. Includes proof of inspector's training / qualifications.
1c. Indicates when inspections will be conducted.
1d. Indicates procedures for documentation. (Furnished sample forms upon which inspections will be recorded.)
1e. Indicates deficiency tracking system and follow-up procedures.
2. Includes any external inspections / certifications which may be required. (e.g., US Coast Guard)
h. Mishap Reporting and Investigation
1. The plan identifies how, when, and who shall complete the Exposure data (man-hours worked).
2a. The plan identifies how, when, and who shall complete mishap investigations, reports, and logs. (The contractor shall report, thoroughly investigate, and analyze all mishaps occurring incidentally to an operation, project or facility for which this manual is applicable.)
2b. The plan identifies how, when, and who shall make immediate notification of major mishaps. (Mishaps shall be reported as soon as possible but not more than 24 hours afterwards to the KO/COR.)
2c. Includes how, when, and who will provide notice to the KO/COR when corrective actions are completed. (Implement corrective actions as soon as reasonably possible.)
Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable safety and occupational health risks and associated compliance plans. Using the EM 385-1-1 as a guide, plans, programs, procedures (assessments and evaluations), may include but not be limited to:
(1)Include a project-specific compliance plan, as applicable to the work being performed, and as identified below. The plans shall incorporate project-wide procedures to control hazards to which the employees of all project employers may be exposed.
(2) These procedures shall be coordinated with all project employers and shall include project-specific, project-wide emergency response and evacuation procedures, PPE requirements, recordkeeping and reporting requirements, and training requirements.
(3) The plans shall be prepared prior to the start of any work activities on the job site (as much as the information can be known at that point in time). The plans shall be updated throughout the life of the project to include changes in personnel, equipment, conditions, etc. Additional revisions shall be incorporated as necessary to reflect changing site conditions, construction methods, personnel roles and responsibilities and construction schedules.
(4) No activity (DFOW) shall be started on site until the APP is revised and submitted to the GDA for acceptance, with the site-specific plans, programs and procedures required to complete the project.
Item Description Yes No N/A Remarks (Any NO or N/A item)
i. Plans (Programs, Procedures, Assessments, and Evaluations) required by the Safety Manual
1. Fatigue Management Plan (01.A.20)
2. Emergency Plans (01.E):
(a) Procedures & Test (01.E.01)
(b) Spill Plans (01.E.01, 06.A.02)
(c) Fire Fighting Plan (01.E.01; 19.A)
(d) Posting of Emergency Telephone Numbers (01.E.05)
(e) Man overboard/abandon ship (19.A.04)
(f) Plan for prevention of alcohol and drug abuse (01.C.02 & Specs)
3. Site Sanitation/Housekeeping Plan (02.B)
4. Medical Support Agreement. Outline on-site medical support and off-site medical arrangements including rescue and medical duties for those employees who are to perform them, and the name(s) of on-site Contractor personnel trained in first aid and CPR. A minimum of two employees shall be certified in CPR and first-aid per shift/site (03.A.01, 03.A.03)
5. Blood-borne Pathogen Program (03.A.05)
6. Exposure Control Plan (03.A.05)
7. Automatic External Defibrillator (AED) Program (03.B.04)
8. Site Layout Plan (04.A)
9. Access/Haul Road Plan (04.B)
10. Hearing Conservation Program (05.C)
11. Respiratory Protection Plan (05.G)
12. Health Hazard Control Program (06.A)
13. Hazard Communication Program (06.B.01)
14. Process Safety Management Plan (06.B.04)
15. Lead Compliance Plan (06.C.02 & Specifications)
16. Asbestos Abatement Plan (06.C.03 & Specifications)
Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans, programs, procedures (assessments and evaluations), may include but not be limited to:
Item Description Yes No N/A Remarks (Any NO or N/A item)
i. Plans (Programs, Procedures) continued.
17. Radiation Safety Program (06.F)
18. Abrasive Blasting Plan (06.I)
19. Heat Stress Monitoring Plan (HSMP) (06.J.02)
20. Cold Stress Monitoring Plan (CSMP) (06.J.04)
21. Indoor Air Quality Management Plan (06.L)
22. Mold Remediation Plan (06.L.04)
23. Chromium (VI) Exposure Evaluation (06.M)
24. Crystalline Silica Assessment (06.N.02)
25. Lighting Plan for Night Operations (07.A.06)
26. Traffic Control Plan (08.C.05)
27. Fire Prevention Plan (09.A.01)
28. Wild Land Fire Management Plan (09.L)
29. Arc Flash Hazard Analysis (11.B)
30. Assured Equipment Grounding Control Program (AEGCP), (11.D.05, Appendix E)
31. Hazardous Energy Control Program and Procedures (12.A.01)
32. Standard Pre-Lift Plan – LHE (16.A.03)
33. Critical Lift Plan – LHE (16.H)
34. Naval Architectural Analysis – LHE (Floating) (16.L)
35. Floating Plant Inspection and Certification (19.A.01)
36. Severe Weather Plan for Marine Activities (19.A.03)
37. Emergency Plan for Marine Activities (19.A.04)
38. Man Overboard/Abandon Ship Procedures (19.A.04)
39. Float Plan for Launches, Motorboats, Skiffs (19.F.04)
40. Fall Protection and Prevention Plan (21.D)
41. Demolition/Renovation Plan (to include engineering survey) (23.A)
42. Rope Access Work Plan (24.H)
43. Excavation/Trenching Plan (25.A.01)
44. Fire Prevention and Protection Plan for Underground Construction (26.D.01)
45. Compressed Air Work Plan for Underground Construction (26.I.01)
46. Erection and Removal Plan for Formwork and Shoring (27.C)
47. Precast Concrete Plan (27.D)
Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans, programs, procedures (assessments and evaluations), may include but not be limited to:
Item Description Yes No N/A Remarks (Any NO or N/A item)
i. Plans (Programs, Procedures) continued.
48. Lift-slab Plans (27.E)
49. Masonry Bracing Plan (27.F.01)
50. Steel Erection Plan (28.B)
51. Explosives Safety Site Plan (ESSP) (29.A)
52. Blasting Plan (29.A; 26.J)
53. Dive Operations Plan (30.A.14, 30.A.16)
54. Safe Practices Manual for Diving Activities (30.A.15)
55. Emergency Management Plan for Diving (30.A.18)
56. Tree Felling/Maintenance Program (31.A.01)
57. Aircraft/Airfield Construction Safety & Phasing Plan (CSPP) (32.A.02)
58. Aircraft/Airfield Safety Plan Compliance Document (SPCD) (32.A.02)
59. Site Safety and Health Plan (HTRW) (33.B)
60. Confined Space Entry Procedures (34.A.05)
61. Confined Space Program (34.A.06)
j. Risk Management Processes (AHAs). Detailed project-specific hazards and controls shall be provided by Activity Hazard Analysis for each activity (DFOW). No work will begin on an activity (DFOW) until the initial AHA has been accepted by the GDA addressing the project-specific hazards. (01.A.14 & 01.A.15) Note: USACE uses the Activity Hazard Analysis (AHA) as part of a total risk management process. Contractors and other individual employer’s may use the AHAs or their own version [Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools].
These documents are considered equivalent to, and acceptable substitutes for, the USACE’s AHA provided the data collected is the same as that required by the AHA.
Remarks:
Other Remarks:
Exhibit D
Safe Work Habits / Equipment
Law Enforcement
Enforcement Actions / Public Contacts
Officer's Appearance / Qualifications
Marked Vehicle
Required Number of Officers on Duty
Officer in Scheduled Area at Scheduled Time
Security of Doors / Gates
Cooperation with Corps
Administration
Signing Log Books / Punching Time Clock
Radio Contact
Notification - Leaving Area / Resumption of Duty
Completion / Submission of Log Sheets
Inspection Checklist Project:
Contractor:
Contract No:
Task Order No.:
Delivery Date:
Weather:
Service Requirement: Rating Code: (1) Acceptable (2) Unacceptable (3) Work in Progress (4) Work Not Started
Specific Task(s) or Item(s)
Work Areas
Complete Following Only If
Deficiencies Noted:
Signature of CR or QCI who Reviewed
Date Time
OR
Signature of CR or QCI who Received a Copy
Date Time
Time
Inspector's Signature Date COR Signature Date
See back for description of deficiencyDefect Acceptable
Law Enforcement
Specific Task(s) or Item(s)
Specific Task(s) or Item(s)
Specific Task(s) or Item(s)
Burnsville Lake
This notice is to advise you of deficiencies found during inspection. The deficiencies found are in the performance and/or quantity of work. The deficiencies are to be corrected as specified.
Comments and deficiencies which shall be corrected before work will be acceptable and satisfactory are as follows:
Location ____________________________________________________________
Comments on correction of deficiencies:
Inspector
Date
| Exhibit A.pdf |
| Law Enforcement Log 2022-26 |
| Exhibit B.pdf |
| BUS-2022 Law Enforcement Calendars.pdf |
| BUS-2023 Law Enforcement Calendars.pdf |
| BUS-2024 Law Enforcement Calendars.pdf |
| BUS-2025 Law Enforcement Calendars.pdf |
| BUS-2026 Law Enforcement Calendars.pdf |
| Exhibit C.pdf |
| NEW CESO Checklist A-02 Accident Prevention Plan.pdf |
| Exhibit D.pdf |
| Inspection Checklist - Law Enforcement 2022-26.pdf |
| Contract No: |
| DATE: |
| Description of Patrol Vehicle Used: |
| Beginning Odometer Reading: |
| Ending Odometer Reading: |
| Total Miles Driven on Shift: |
| Officer Identification Print and Sign Name 1: |
| Officer Identification Print and Sign Name 2: |
| Start Time 1: |
| Start Time 2: |
| Start Time 3: |
| Start Time 4: |
| Start Time 5: |
| Start Time 6: |
| Start Time 7: |
| Start Time 8: |
| Start Time 9: |
| Start Time 10: |
| Start Time 11: |
| Start Time 12: |
| Start Time 13: |
| Start Time 14: |
| Start Time 15: |
| Ending Time 1: |
| Ending Time 2: |
| Ending Time 3: |
| Ending Time 4: |
| Ending Time 5: |
| Ending Time 6: |
| Ending Time 7: |
| Ending Time 8: |
| Ending Time 9: |
| Ending Time 10: |
| Ending Time 11: |
| Ending Time 12: |
| Ending Time 13: |
| Ending Time 14: |
| Ending Time 15: |
| Designated Areas 1: |
| Designated Areas 2: |
| Designated Areas 3: |
| Designated Areas 4: |
| Designated Areas 5: |
| Designated Areas 6: |
| Designated Areas 7: |
| Designated Areas 8: |
| Designated Areas 9: |
| Designated Areas 10: |
| Designated Areas 11: |
| Designated Areas 12: |
| Designated Areas 13: |
| Designated Areas 14: |
| Designated Areas 15: |
| NameDesignated AreaProblemAction Taken 1: |
| NameDesignated AreaProblemAction Taken 2: |
| NameDesignated AreaProblemAction Taken 3: |
| NameDesignated AreaProblemAction Taken 4: |
| NameDesignated AreaProblemAction Taken 5: |
| NameDesignated AreaProblemAction Taken 6: |
| NameDesignated AreaProblemAction Taken 7: |
| NameDesignated AreaProblemAction Taken 8: |
| NameDesignated AreaProblemAction Taken 9: |
| NameDesignated AreaProblemAction Taken 10: |
| NameDesignated AreaProblemAction Taken 11: |
| NameDesignated AreaProblemAction Taken 12: |
| NameDesignated AreaProblemAction Taken 13: |
| NameDesignated AreaProblemAction Taken 14: |
| NameDesignated AreaProblemAction Taken 15: |
| Total Hours Worked: |
| Contacts: |
| Warnings: |
| Citations: |
| Arrests: |
| Notes: |
| Total: |
| Date: |
| Location Plant or Facility: |
| Contract Number: |
| Contractor Name: |
| Project Name: |
| Inspector Name Print: |
| Inspector Signature: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Text11: |
| Check Box4: Off |
| 2 Inc udes the name title s gnature telephone number and qual f cat ons of the P an Approver eg owner company pres dent regional v ce pres dent HTRW act v t es require approval of a Cert f ed Industr al Hygien st a Cert f ed Safety Profess onal may approve the plan for operat ons nvolv ng UST removal where contam nants are known to be petroleum oi s or ubr cants: |
| Check Box5: Off |
| Check Box6: Off |
| Text12: |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Check Box99: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 6: |
| 0: Off |
| 2: Off |
| 1: Off |
| 7: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text21: |
| Check Box100: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text22: |
| Check Box90: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text23: |
| 2 Inc udes Contractor s wr tten safety program goals_4: |
| 3 Inc udes Contractor s wr tten safety program object ves_4: |
| Check Box91: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4 Inc udes the Contractor Acc dent Exper ence Copy of OSHA 300 Forms or equivalent documentat on: |
| Date of Inspection: |
| Check Box92: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text24: |
| Check Box93: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2 Inc udes the ident f cat on and accountabi ty of personnel respons ble for safety and health at both the corporate and project evel nc uding the r resumes Qual f cat ons shal be in accordance w th Sect on 01A17 Only official OSHA 30Hour cards w be accepted or f equ valent training is prov ded appropr ate instructor qual f cat ons_4: |
| 3 Inc udes equivalent training to the OSHA 30Hour classes s being presented as qual f cat on the training shal cover as a m nimum the areas discussed in Appendix A Sect on 3d3ad: |
| Check Box94: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4 Inc udes the names of Competent CP andor Qual f ed Persons QP and proof of competencyqual f cat on to meet spec f c OSHA CPQP requirements Must nc ude copies of proof of CPQP_4: |
| Check Box95: |
| 1: Off |
| 0: Off |
| 2: Off |
| 5 Inc udes requirements and detai s of the employer s R sk Management Process USACE uses the Act vity Hazard Ana ysis AHA as part of a total r sk management process Contractors and other ndiv dual employer s may use the AHAs or their own vers on Job Safety Analyses JSAs Job Hazard Analyses JHAs or s m ar R sk Management assessment tools These documents are cons dered equivalent to and acceptable subst tutes for the USACE s AHA prov ded the data col ected is the same as that required by the AHA_4: |
| 6 Inc udes requirements for nit al act v tyspec f c AHAs to be subm tted and accepted at preparatory meet ngs pr or to work being performed: |
| 7 Inc udes requirements that no work by the Contractor shal be performed unless a des gnated Competent PersonSSHO s present on the job s te: |
| Check Box96: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 8 Inc udes pol c es and procedures regarding noncompl ance w th safety requirements to inc ude disc pl nary act ons for v olat on of safety requirements: |
| Check Box97: |
| 0: Off |
| 1: Off |
| 2: Off |
| 9 Lines of author ty_4: |
| Check Box98: |
| 0: Off |
| 1: Off |
| 2: Off |
| 10 Inc udes wr tten company procedures for holding managers and superv sors accountable for safety: |
| Check Box38: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text25: |
| Check Box39: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2 Inc udes safety respons bi t es of subcontractors and suppl ers_4: |
| Check Box40: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text26: |
| Check Box41: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2 Inc udes requirements for mandatory training and cert f cat ons that are appl cable to this project eg explos ve actuated tools conf ned space entry crane operator diver vehic e operator HAZWOPER training and cert f cat on PPE and any requirements for per odic retraining recert f cat on_4: |
| Check Box42: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3 Inc udes procedures for per odic safety and health training for superv sors and employees: |
| 4 Inc udes the requirements for emergency response training: |
| Check Box43: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text27: |
| 1a Inc udes the names of ndiv duals respons ble for conduct ng safety nspect ons eg PM safety profess onal QC supervisors employees: |
| Check Box44: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1b Inc udes proof of nspector s training qual f cat ons_4: |
| 1c Indicates when nspect ons w be conducted_4: |
| Check Box45: |
| 1: Off |
| 0: Off |
| 2: Off |
| 1d Indicates procedures for documentat on Furnished sample forms upon which inspect ons w be recorded: |
| Check Box46: |
| 1: Off |
| 0: Off |
| 2: Off |
| 1e Indicates def c ency track ng system and fol owup procedures_4: |
| 2 Inc udes any external nspect ons cert f cat ons wh ch may be required eg US Coast Guard: |
| Check Box47: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text28: |
| Text29: |
| Text30: |
| Text31: |
| Check Box48: |
| 1: Off |
| 2: Off |
| 0: Off |
| Check Box49: |
| 1: Off |
| 2: Off |
| 0: Off |
| Check Box50: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box51: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 6: |
| 0: Off |
| 1: Off |
| 2: Off |
| 7: |
| 0: Off |
| 1: Off |
| 2: Off |
| 8: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text32: |
| Text33: |
| Text82: |
| Text83: |
| Text84: |
| Text85: |
| Text86: |
| Text87: |
| Text88: |
| Check Box52: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text89: |
| Check Box53: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text81: |
| Text80: |
| Text79: |
| Check Box54: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 6: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text78: |
| Text77: |
| Text76: |
| Text75: |
| Text74: |
| Text73: |
| Text72: |
| Check Box55: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text71: |
| Check Box57: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text70: |
| Text37: |
| 18 Abras ve B ast ng P an 06I_4: |
| 19 Heat Stress Monitor ng P an HSMP 06J02_4: |
| 20 Cold Stress Monitor ng P an CSMP 06J04_4: |
| 21 Indoor A r Qual ty Management P an 06L_4: |
| 22 Mold Remediat on P an 06L04_4: |
| 23 Chrom um VI Exposure Evaluat on 06M_4: |
| 24 Crystal ne S ca Assessment 06N02_4: |
| 25 Light ng P an for N ght Operat ons 07A06_4: |
| Check Box58: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 6: |
| 0: Off |
| 1: Off |
| 2: Off |
| 7: |
| 0: Off |
| 1: Off |
| 2: Off |
| 8: |
| 0: Off |
| 1: Off |
| 2: Off |
| 9: |
| 0: Off |
| 1: Off |
| 2: Off |
| 26 Traff c Control P an 08C05_4: |
| Check Box59: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 27 F re Prevent on P an 09A01_4: |
| 28 W d Land F re Management P an 09L_4: |
| 29 Arc F ash Hazard Analys s 11B_4: |
| 30 Assured Equ pment Grounding Control Program AEGCP 11D05 Appendix E: |
| Check Box60: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 6: |
| 0: Off |
| 1: Off |
| 2: Off |
| 7: |
| 0: Off |
| 1: Off |
| 2: Off |
| 8: |
| 0: Off |
| 1: Off |
| 2: Off |
| 9: |
| 0: Off |
| 1: Off |
| 2: Off |
| 31 Hazardous Energy Control Program and Procedures 12A01_4: |
| 32 Standard PreLift Plan LHE 16A03_4: |
| 33 Critical Lift Plan LHE 16H_4: |
| 34 Naval Architectural Analys s LHE F oat ng 16L_4: |
| 35 F oat ng P ant Inspect on and Cert f cat on 19A01_4: |
| 36 Severe Weather P an for Mar ne Act v t es 19A03_4: |
| 37 Emergency P an for Mar ne Act v t es 19A04_4: |
| 38 Man OverboardAbandon Ship Procedures 19A04_4: |
| 39 F oat P an for Launches Motorboats Sk ffs 19F04_4: |
| 40 Fal Protect on and Prevent on P an 21D_4: |
| Check Box61: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 41 DemolitionRenovat on P an to inc ude engineer ng survey 23A: |
| 42 Rope Access Work P an 24H_4: |
| Check Box62: |
| 0: Off |
| 1: Off |
| 2: Off |
| 43 Excavat onTrenching P an 25A01_4: |
| Check Box63: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 44 Fire Prevent on and Protect on P an for Underground Construct on 26D01: |
| 45 Compressed A r Work Plan for Underground Construct on 26I01: |
| Check Box64: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 46 Erect on and Removal P an for Formwork and Shor ng 27C_4: |
| 47 Precast Concrete P an 27D_4: |
| Check Box65: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 6: |
| 0: Off |
| 1: Off |
| 2: Off |
| 7: |
| 0: Off |
| 1: Off |
| 2: Off |
| 8: |
| 0: Off |
| 1: Off |
| 2: Off |
| Remarks: |
| Text36: |
| 49 Masonry Brac ng P an 27F01_4: |
| 50 Steel Erect on P an 28B_4: |
| 51 Explos ves Safety S te P an ESSP 29A_4: |
| 52 B ast ng P an 29A 26J_4: |
| 53 D ve Operat ons P an 30A14 30A16_4: |
| 54 Safe Pract ces Manual for D v ng Act v t es 30A15_4: |
| 55 Emergency Management P an for D v ng 30A18_4: |
| 56 Tree Fel ngMaintenance Program 31A01_4: |
| Check Box66: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 57 AircraftAirfield Construct on Safety Phas ng P an CSPP 32A02: |
| 58 A rcraftA rfie d Safety P an Compl ance Document SPCD 32A02: |
| Check Box67: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 59 Site Safety and Health P an HTRW 33B_4: |
| 60 Conf ned Space Entry Procedures 34A05_4: |
| 61 Conf ned Space Program 34A06_4: |
| Check Box69: |
| 0: Off |
| 1: Off |
| 2: Off |
| Row14_4: |
| Other Remarks: |
File details come from the government source that posted it. Updated .