A.03.09 Exhibits.pdf

PDF 1020 KB Posted

Attached to
Burnsville Lake Law Enforcement Services 2022-2026
Solicitation number
W9123722Q0010
Issued by

View the file

Other files

File Type Posted
B.08.02 W9123722Q0010.pdf PDF
A.02.11 PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A

Contract No.: ____________________ Contractor Name: Braxton County Sheriff Department

Total ________

Notes:

Date

List any additional activities on the back of this sheet.

Signature of Inspector

TIME OF PATROL-(Note EXACT Times) ACTIVITY

(Name-Designated Area-Problem-Action Taken)

Start Time Ending Time Designated Area(s)

Total Hours Worked __________________________ Warnings: ________ Citations: ________ Arrests: ________Contacts: ________

DATE: ________________________________________________

DAILY LAW ENFORCEMENT LOG

Burnsville Lake-USACE

Description of Patrol Vehicle Used:

Beginning Odometer Reading:

Ending Odometer Reading:

Total Miles Driven on Shift:

Officer Identification: Print and Sign Name

Exhibit B

Sun Mon Tue Wed Thu Fri Sat 5 Hrs.

1700-2200

4 Hrs.

1800-2200

1900-2300

6 Hrs.

1800-2400

1900-2400

1900-2300 Open BT Historic Area Restroom and Bulltown Confederate Overlook

1800-2200

1800-2400 Open BT C and E-F Loops

1900-2300 Open BT Entrance Station and A-B Loops

12 Hrs.

1300-0100 Open RR Left Fork and remaining Bulltown Day Use Areas

1300-0100

1200-2400

10 Hrs.

1300-2300

Holiday

May 2022 Law Enforcement Schedule – Burnsville Lake

174 Man Hours 174 Equipment Hours

8 Hrs.

1700-0100

1500-0100

7 Hrs.

1700-2400

1600-2400

9 Hrs.

1500-2400

1500-2400

9 Hrs.

1500-2400

1400-2400

10 Hrs.

1400-2400

9 Hrs.

1500-2400

9 Hrs.

1500-2400

11 Hrs.

1400-0100

13 Hrs.

1200-0100

1400-2400

1400-2400

1500-2400

June

282 Man Hours 282 Equipment Hours

1200-0100

Holiday

July

323 Hours 323 Equipment Hours

1800-2400

1900-2400

1900-2400

5 Hrs.

1900-2400

August

192 Man Hours 192 Equipment Hours

1800-2300

10 Hrs.

1500-0100

1300-0100

Holiday

4 Hrs.

1800-2200 Close RR Left Fork, BT Pic Area, Beach, BT Ent Sta, Loops A-C and E-F

1800-2300

1700-2100

14 15

20 21

26 27 28 29 30

September

123 Man Hours 123 Equipment Hours

1900-2300 Open BT Historic Area Restroom and Bulltown Confederate Overlook

1800-2200

1800-2400 Open BT C and E-F Loops

1900-2300 Open BT Entrance Station and A-B Loops

1300-0100 Open RR Left Fork and remaining Bulltown Day Use Areas

1300-2300

Holiday

4 Hrs.

1900-2300

2023 Law Enforcement Schedule – Burnsville Lake

173 Man Hours 173 Equipment Hours

1500-2400

9 Hrs.

1500-2400

1400-2400

10 Hrs.

1400-2400

9 Hrs.

1500-2400

9 Hrs.

1500-2400

1400-2400

1500-2400

June

290 Man Hours 290 Equipment Hours

Hrs.

1300-0100

13 Hrs.

1200-0100

317 Hours 317 Equipment Hours

1800-2400

1900-2400

1900-2400

5 Hrs.

1900-2400

1800-2200

190 Man Hours 190 Equipment Hours

1500-0100

1300-0100

4 Hrs.

1800-2200 Close RR Left Fork, BT Pic Area, Beach, BT Ent Sta, Loops A-C and E-F

13 14

Close BT Historic Area

Confederate Overlook

19 20

21 22

25 26 27 28 29

116 Man Hours 116 Equipment Hours

1900-2300 Open BT Historic Area Restroom and Bulltown Confederate Overlook

1800-2200

1800-2400 Open BT C and E-F Loops

1900-2300 Open BT Entrance Station and A-B Loops

1300-0100 Open RR Left Fork and remaining Bulltown Day Use Areas

1300-2300

Holiday

4 Hrs.

1900-2300

4 Hrs.

1800-2200

2024 Law Enforcement Schedule – Burnsville Lake

177 Man Hours 177 Equipment Hours

1500-2400

9 Hrs.

1500-2400

1400-2400

10 Hrs.

1400-2400

9 Hrs.

1500-2400

9 Hrs.

1500-2400

1400-2400

1500-2400

June

303 Man Hours 303 Equipment Hours

1200-0100 Holiday

1300-0100

13 Hrs.

1200-0100

304 Hours 304 Equipment Hours

1800-2400

1900-2400

1800-2200

1900-2400

5 Hrs.

1900-2400

1800-2200

4 Hrs.

1800-2200

10 Hrs.

1500-0100

200 Man Hours 200 Equipment Hours

12 Hrs.

1300-0100

4 Hrs.

1800-2200 Close RR Left Fork, BT Pic Area, Beach, BT Ent Sta, Loops A-C and E-F

11 12

17 18

19 20

23 24

25 26 27

105 Man Hours 105 Equipment Hours

1900-2300 Open BT Historic Area Restroom and Bulltown Confederate Overlook

1800-2200

1800-2400 Open BT C and E-F Loops

1900-2300 Open BT Entrance Station and A-B Loops

1300-0100 Open RR Left Fork and remaining Bulltown Day Use Areas

1300-2300

Holiday

4 Hrs.

1900-2300

4 Hrs.

1800-2200

2025 Law Enforcement Schedule – Burnsville Lake

183 Man Hours 183 Equipment Hours

1500-2400

9 Hrs.

1500-2400

1400-2400

10 Hrs.

1400-2400

9 Hrs.

1500-2400

9 Hrs.

1500-2400

1400-2400

1500-2400

June

303 Man Hours 303 Equipment Hours

1200-0100

Holiday

1300-0100

13 Hrs.

1200-0100

300 Hours 300 Equipment Hours

1800-2400

1900-2400

5 Hrs.

1900-2400

1800-2200

1900-2400

5 Hrs.

1900-2400

1800-2200

4 Hrs.

1800-2200

10 Hrs.

1500-0100

206 Man Hours 206 Equipment Hours

4 Hrs.

1800-2200 Close RR Left Fork, BT Pic Area, Beach, BT Ent Sta, Loops A-C and E-F

10 11

1700-2300

16 17

Close BT Historic Area

Confederate Overlook

24 25 26

29 30

99 Man Hours 99 Equipment Hours

1900-2300 Open BT Historic Area Restroom and Bulltown Confederate Overlook

1900-2300

1800-2200

1800-2400 Open BT C and E-F Loops

1900-2300 Open BT Entrance Station and A-B Loops

1300-0100 Open RR Left Fork and remaining Bulltown Day Use Areas

1300-2300

Holiday

4 Hrs.

1900-2300

4 Hrs.

1800-2200

2026 Law Enforcement Schedule – Burnsville Lake

191 Man Hours 191 Equipment Hours

1500-2400

9 Hrs.

1500-2400

1400-2400

10 Hrs.

1400-2400

9 Hrs.

1500-2400

9 Hrs.

1500-2400

1400-2400

1500-2400

June

301 Man Hours 301 Equipment Hours

1200-0100

Holiday

1300-0100

13 Hrs.

1200-0100

300 Hours 300 Equipment Hours

1800-2400

1900-2400

5 Hrs.

1900-2400

1800-2200

1900-2400

5 Hrs.

1900-2400

1800-2200

4 Hrs.

1800-2200

185 Man Hours 185 Equipment Hours

1500-0100

1300-0100

5 Hrs.

1800-2300 Close RR Left Fork, BT Pic Area, Beach, BT Ent Sta, Loops A-C and E-F

9 10

15 16

17 18

21 22

23 24 25

1700-2300

28 29 30

115 Man Hours 115 Equipment Hours

Exhibit C

CESO Form A-02 MAR 15

Form A-02

U.S. Army Corps of Engineers

Accident Prevention Plan Checklist

Date of Inspection

Location (Plant or Facility) Contract Number

Contractor Name Project Name

Inspector Name (Print) Inspector Signature

This checklist serves as a guide only, it does not replace or eliminate the need to comply with the requirements set forth in Engineering Manual 385-1-1, Safety and Health Requirements Manual, dated 30 Nov 2014. The references included in this checklist correspond to the applicable sections of EM 385-1-1.

Item Description Yes No N/A Remarks (Any NO or N/A item)

a. Signature sheet

1. Includes the name, title, signature, telephone number, and qualifications of the Plan Preparer (Qualified person, i.e. corporate safety staff person, QC)

2. Includes the name, title, signature, telephone number, and qualifications of the Plan Approver (e.g. owner, company president, regional vice president) (HTRW activities require approval of a Certified Industrial Hygienist, a Certified Safety Professional may approve the plan for operations involving UST removal where contaminants are known to be petroleum, oils, or lubricants).

3. Includes the name(s), title(s), signature(s), telephone number(s), and qualifications for Plan Concurrence (provide concurrence of other applicable corporate and project personnel (contractor)) (e.g. Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional, project QC.)

b. Background information

1. Includes the Contractor Name.

2. Includes the Contract Number.

3. Includes the Project Name.

4a. Includes the Brief Project Description.

4b. Includes a Discription of the Work to be Performed.

4c. Includes the Location of the Project (map).

4d. Includes the Equipment to be Used.

4e. Includes the Anticipated High Risk Activities.

5. Includes the Major Phases of Work Anticipated.

(Within these major phases of work identified, activities [includes Definable features of Work (DFOWs) and tasks] to be performed that will require an AHA shall be specifically highlighted. This information can then be used by QC, QA and Safety personnel to track AHA submittals. The AHAs for these activities, tasks of DFOWs are NOT submitted at this time (AHAs created/submitted at this time would not be activity-specific as they are intended to be). > See Sections 01.A.14 and 01.A.15.)

Accident Prevention Plan Checklist (cont’d)

Item Description Yes No N/A Remarks (Any NO or N/A item)

c. Statement of Safety and Health Policy.

1. Provide a copy of current corporate/company Safety and Health Policy Statement, detailing commitment to providing a safe and healthful workplace for all employees. (In addition to the corporate policy statement, a copy of the corporate safety program may provide a portion of the information required by the accident prevention plan.)

2. Includes Contractor’s written safety program goals.

3. Includes Contractor’s written safety program objectives.

4. Includes the Contractor Accident Experience (Copy of OSHA 300 Forms, or equivalent documentation).

d. Responsibilities and Lines of Authority.

1. Includes statement of the employer’s ultimate responsibility for the implementation of his SOH program for his own employees, all sub-contractors and all others on the worksite (includes the strict enforcement of the program).

2. Includes the identification and accountability of personnel responsible for safety and health at both the corporate and project level – including their resumes. Qualifications shall be in accordance with Section 01.A.17. (Only official OSHA 30-Hour cards will be accepted or, if equivalent training is provided, appropriate instructor qualifications.)

3. Includes equivalent training to the OSHA 30-Hour classes is being presented as qualification, the training shall cover, as a minimum, the areas discussed in Appendix A, Section 3.d.3.(a-d).

4. Includes the names of Competent (CP) and/or Qualified Person(s) (QP) and proof of competency/qualification to meet specific OSHA CP/QP requirements. (Must include copies of proof of CP/QP).

5. Includes requirements and details of the employer’s Risk Management Process. (USACE uses the Activity Hazard Analysis (AHA) as part of a total risk management process. Contractors and other individual employer’s may use the AHAs or their own version [Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools]. These documents are considered equivalent to, and acceptable substitutes for, the USACE’s AHA provided the data collected is the same as that required by the AHA.)

6. Includes requirements for initial activity-specific AHAs to be submitted and accepted at preparatory meetings, prior to work being performed;

7. Includes requirements that no work by the Contractor shall be performed unless a designated Competent Person/SSHO is present on the job site.

8. Includes policies and procedures regarding non-compliance with safety requirements (to include disciplinary actions for violation of safety requirements).

9. Lines of authority.

10. Includes written company procedures for holding managers and supervisors accountable for safety.

Item Description Yes No N/A Remarks (Any NO or N/A item)

e. Subcontractors and Suppliers.

1. Includes the list of subcontractors and suppliers.

(If not known at the time of initial APP submittal, the contractor shall include the following statement in their initial APP: “The subcontractors for the following DFOWs/activities are not known at this time, but additional information will be submitted to the APP for acceptance prior to the start of any activities listed”)

2. Includes safety responsibilities of subcontractors and suppliers.

f. Training

1. Includes requirements for new hire SOH orientation training at the time of initial hire of each new employee.

2. Includes requirements for mandatory training and certifications that are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, diver, vehicle operator, HAZWOPER training and certification, PPE) and any requirements for periodic retraining / recertification.

3. Includes procedures for periodic safety and health training for supervisors and employees.

4. Includes the requirements for emergency response training.

g. Safety and Health Inspections

1. Includes specific assignment of responsibilities for a minimum daily jobsite SOH inspection during periods of work activity.

1a. Includes the name(s) of individual(s) responsible for conducting safety inspections. (e.g., PM, safety professional, QC, supervisors, employees)

1b. Includes proof of inspector's training / qualifications.

1c. Indicates when inspections will be conducted.

1d. Indicates procedures for documentation. (Furnished sample forms upon which inspections will be recorded.)

1e. Indicates deficiency tracking system and follow-up procedures.

2. Includes any external inspections / certifications which may be required. (e.g., US Coast Guard)

h. Mishap Reporting and Investigation

1. The plan identifies how, when, and who shall complete the Exposure data (man-hours worked).

2a. The plan identifies how, when, and who shall complete mishap investigations, reports, and logs. (The contractor shall report, thoroughly investigate, and analyze all mishaps occurring incidentally to an operation, project or facility for which this manual is applicable.)

2b. The plan identifies how, when, and who shall make immediate notification of major mishaps. (Mishaps shall be reported as soon as possible but not more than 24 hours afterwards to the KO/COR.)

2c. Includes how, when, and who will provide notice to the KO/COR when corrective actions are completed. (Implement corrective actions as soon as reasonably possible.)

Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable safety and occupational health risks and associated compliance plans. Using the EM 385-1-1 as a guide, plans, programs, procedures (assessments and evaluations), may include but not be limited to:

(1)Include a project-specific compliance plan, as applicable to the work being performed, and as identified below. The plans shall incorporate project-wide procedures to control hazards to which the employees of all project employers may be exposed.

(2) These procedures shall be coordinated with all project employers and shall include project-specific, project-wide emergency response and evacuation procedures, PPE requirements, recordkeeping and reporting requirements, and training requirements.

(3) The plans shall be prepared prior to the start of any work activities on the job site (as much as the information can be known at that point in time). The plans shall be updated throughout the life of the project to include changes in personnel, equipment, conditions, etc. Additional revisions shall be incorporated as necessary to reflect changing site conditions, construction methods, personnel roles and responsibilities and construction schedules.

(4) No activity (DFOW) shall be started on site until the APP is revised and submitted to the GDA for acceptance, with the site-specific plans, programs and procedures required to complete the project.

Item Description Yes No N/A Remarks (Any NO or N/A item)

i. Plans (Programs, Procedures, Assessments, and Evaluations) required by the Safety Manual

1. Fatigue Management Plan (01.A.20)

2. Emergency Plans (01.E):

(a) Procedures & Test (01.E.01)

(b) Spill Plans (01.E.01, 06.A.02)

(c) Fire Fighting Plan (01.E.01; 19.A)

(d) Posting of Emergency Telephone Numbers (01.E.05)

(e) Man overboard/abandon ship (19.A.04)

(f) Plan for prevention of alcohol and drug abuse (01.C.02 & Specs)

3. Site Sanitation/Housekeeping Plan (02.B)

4. Medical Support Agreement. Outline on-site medical support and off-site medical arrangements including rescue and medical duties for those employees who are to perform them, and the name(s) of on-site Contractor personnel trained in first aid and CPR. A minimum of two employees shall be certified in CPR and first-aid per shift/site (03.A.01, 03.A.03)

5. Blood-borne Pathogen Program (03.A.05)

6. Exposure Control Plan (03.A.05)

7. Automatic External Defibrillator (AED) Program (03.B.04)

8. Site Layout Plan (04.A)

9. Access/Haul Road Plan (04.B)

10. Hearing Conservation Program (05.C)

11. Respiratory Protection Plan (05.G)

12. Health Hazard Control Program (06.A)

13. Hazard Communication Program (06.B.01)

14. Process Safety Management Plan (06.B.04)

15. Lead Compliance Plan (06.C.02 & Specifications)

16. Asbestos Abatement Plan (06.C.03 & Specifications)

Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans, programs, procedures (assessments and evaluations), may include but not be limited to:

Item Description Yes No N/A Remarks (Any NO or N/A item)

i. Plans (Programs, Procedures) continued.

17. Radiation Safety Program (06.F)

18. Abrasive Blasting Plan (06.I)

19. Heat Stress Monitoring Plan (HSMP) (06.J.02)

20. Cold Stress Monitoring Plan (CSMP) (06.J.04)

21. Indoor Air Quality Management Plan (06.L)

22. Mold Remediation Plan (06.L.04)

23. Chromium (VI) Exposure Evaluation (06.M)

24. Crystalline Silica Assessment (06.N.02)

25. Lighting Plan for Night Operations (07.A.06)

26. Traffic Control Plan (08.C.05)

27. Fire Prevention Plan (09.A.01)

28. Wild Land Fire Management Plan (09.L)

29. Arc Flash Hazard Analysis (11.B)

30. Assured Equipment Grounding Control Program (AEGCP), (11.D.05, Appendix E)

31. Hazardous Energy Control Program and Procedures (12.A.01)

32. Standard Pre-Lift Plan – LHE (16.A.03)

33. Critical Lift Plan – LHE (16.H)

34. Naval Architectural Analysis – LHE (Floating) (16.L)

35. Floating Plant Inspection and Certification (19.A.01)

36. Severe Weather Plan for Marine Activities (19.A.03)

37. Emergency Plan for Marine Activities (19.A.04)

38. Man Overboard/Abandon Ship Procedures (19.A.04)

39. Float Plan for Launches, Motorboats, Skiffs (19.F.04)

40. Fall Protection and Prevention Plan (21.D)

41. Demolition/Renovation Plan (to include engineering survey) (23.A)

42. Rope Access Work Plan (24.H)

43. Excavation/Trenching Plan (25.A.01)

44. Fire Prevention and Protection Plan for Underground Construction (26.D.01)

45. Compressed Air Work Plan for Underground Construction (26.I.01)

46. Erection and Removal Plan for Formwork and Shoring (27.C)

47. Precast Concrete Plan (27.D)

Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans, programs, procedures (assessments and evaluations), may include but not be limited to:

Item Description Yes No N/A Remarks (Any NO or N/A item)

i. Plans (Programs, Procedures) continued.

48. Lift-slab Plans (27.E)

49. Masonry Bracing Plan (27.F.01)

50. Steel Erection Plan (28.B)

51. Explosives Safety Site Plan (ESSP) (29.A)

52. Blasting Plan (29.A; 26.J)

53. Dive Operations Plan (30.A.14, 30.A.16)

54. Safe Practices Manual for Diving Activities (30.A.15)

55. Emergency Management Plan for Diving (30.A.18)

56. Tree Felling/Maintenance Program (31.A.01)

57. Aircraft/Airfield Construction Safety & Phasing Plan (CSPP) (32.A.02)

58. Aircraft/Airfield Safety Plan Compliance Document (SPCD) (32.A.02)

59. Site Safety and Health Plan (HTRW) (33.B)

60. Confined Space Entry Procedures (34.A.05)

61. Confined Space Program (34.A.06)

j. Risk Management Processes (AHAs). Detailed project-specific hazards and controls shall be provided by Activity Hazard Analysis for each activity (DFOW). No work will begin on an activity (DFOW) until the initial AHA has been accepted by the GDA addressing the project-specific hazards. (01.A.14 & 01.A.15) Note: USACE uses the Activity Hazard Analysis (AHA) as part of a total risk management process. Contractors and other individual employer’s may use the AHAs or their own version [Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools].

These documents are considered equivalent to, and acceptable substitutes for, the USACE’s AHA provided the data collected is the same as that required by the AHA.

Remarks:

Other Remarks:

Exhibit D

Safe Work Habits / Equipment

Law Enforcement

Enforcement Actions / Public Contacts

Officer's Appearance / Qualifications

Marked Vehicle

Required Number of Officers on Duty

Officer in Scheduled Area at Scheduled Time

Security of Doors / Gates

Cooperation with Corps

Administration

Signing Log Books / Punching Time Clock

Radio Contact

Notification - Leaving Area / Resumption of Duty

Completion / Submission of Log Sheets

Inspection Checklist Project:

Contractor:

Contract No:

Task Order No.:

Delivery Date:

Weather:

Service Requirement: Rating Code: (1) Acceptable (2) Unacceptable (3) Work in Progress (4) Work Not Started

Specific Task(s) or Item(s)

Work Areas

Complete Following Only If

Deficiencies Noted:

Signature of CR or QCI who Reviewed

Date Time

OR

Signature of CR or QCI who Received a Copy

Date Time

Time

Inspector's Signature Date COR Signature Date

See back for description of deficiencyDefect Acceptable

Law Enforcement

Specific Task(s) or Item(s)

Specific Task(s) or Item(s)

Specific Task(s) or Item(s)

Burnsville Lake

This notice is to advise you of deficiencies found during inspection. The deficiencies found are in the performance and/or quantity of work. The deficiencies are to be corrected as specified.

Comments and deficiencies which shall be corrected before work will be acceptable and satisfactory are as follows:

Location ____________________________________________________________

Comments on correction of deficiencies:

Inspector

Date

Exhibit A.pdf
Law Enforcement Log 2022-26
Exhibit B.pdf
BUS-2022 Law Enforcement Calendars.pdf
BUS-2023 Law Enforcement Calendars.pdf
BUS-2024 Law Enforcement Calendars.pdf
BUS-2025 Law Enforcement Calendars.pdf
BUS-2026 Law Enforcement Calendars.pdf
Exhibit C.pdf
NEW CESO Checklist A-02 Accident Prevention Plan.pdf
Exhibit D.pdf
Inspection Checklist - Law Enforcement 2022-26.pdf
Contract No:
DATE:
Description of Patrol Vehicle Used:
Beginning Odometer Reading:
Ending Odometer Reading:
Total Miles Driven on Shift:
Officer Identification Print and Sign Name 1:
Officer Identification Print and Sign Name 2:
Start Time 1:
Start Time 2:
Start Time 3:
Start Time 4:
Start Time 5:
Start Time 6:
Start Time 7:
Start Time 8:
Start Time 9:
Start Time 10:
Start Time 11:
Start Time 12:
Start Time 13:
Start Time 14:
Start Time 15:
Ending Time 1:
Ending Time 2:
Ending Time 3:
Ending Time 4:
Ending Time 5:
Ending Time 6:
Ending Time 7:
Ending Time 8:
Ending Time 9:
Ending Time 10:
Ending Time 11:
Ending Time 12:
Ending Time 13:
Ending Time 14:
Ending Time 15:
Designated Areas 1:
Designated Areas 2:
Designated Areas 3:
Designated Areas 4:
Designated Areas 5:
Designated Areas 6:
Designated Areas 7:
Designated Areas 8:
Designated Areas 9:
Designated Areas 10:
Designated Areas 11:
Designated Areas 12:
Designated Areas 13:
Designated Areas 14:
Designated Areas 15:
NameDesignated AreaProblemAction Taken 1:
NameDesignated AreaProblemAction Taken 2:
NameDesignated AreaProblemAction Taken 3:
NameDesignated AreaProblemAction Taken 4:
NameDesignated AreaProblemAction Taken 5:
NameDesignated AreaProblemAction Taken 6:
NameDesignated AreaProblemAction Taken 7:
NameDesignated AreaProblemAction Taken 8:
NameDesignated AreaProblemAction Taken 9:
NameDesignated AreaProblemAction Taken 10:
NameDesignated AreaProblemAction Taken 11:
NameDesignated AreaProblemAction Taken 12:
NameDesignated AreaProblemAction Taken 13:
NameDesignated AreaProblemAction Taken 14:
NameDesignated AreaProblemAction Taken 15:
Total Hours Worked:
Contacts:
Warnings:
Citations:
Arrests:
Notes:
Total:
Date:
Location Plant or Facility:
Contract Number:
Contractor Name:
Project Name:
Inspector Name Print:
Inspector Signature:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Text11:
Check Box4: Off
2 Inc udes the name title s gnature telephone number and qual f cat ons of the P an Approver eg owner company pres dent regional v ce pres dent HTRW act v t es require approval of a Cert f ed Industr al Hygien st a Cert f ed Safety Profess onal may approve the plan for operat ons nvolv ng UST removal where contam nants are known to be petroleum oi s or ubr cants:
Check Box5: Off
Check Box6: Off
Text12:
Check Box7: Off
Check Box8: Off
Check Box9: Off
Text13:
Text14:
Text15:
Text16:
Text17:
Text18:
Text19:
Text20:
Check Box99:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
2:
0: Off
1: Off
2: Off
3:
0: Off
1: Off
2: Off
4:
0: Off
1: Off
2: Off
5:
0: Off
1: Off
2: Off
6:
0: Off
2: Off
1: Off
7:
0: Off
1: Off
2: Off
Text21:
Check Box100:
0: Off
1: Off
2: Off
Text22:
Check Box90:
0: Off
1: Off
2: Off
Text23:
2 Inc udes Contractor s wr tten safety program goals_4:
3 Inc udes Contractor s wr tten safety program object ves_4:
Check Box91:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
2:
0: Off
1: Off
2: Off
4 Inc udes the Contractor Acc dent Exper ence Copy of OSHA 300 Forms or equivalent documentat on:
Date of Inspection:
Check Box92:
0: Off
1: Off
2: Off
Text24:
Check Box93:
0: Off
1: Off
2: Off
2 Inc udes the ident f cat on and accountabi ty of personnel respons ble for safety and health at both the corporate and project evel nc uding the r resumes Qual f cat ons shal be in accordance w th Sect on 01A17 Only official OSHA 30Hour cards w be accepted or f equ valent training is prov ded appropr ate instructor qual f cat ons_4:
3 Inc udes equivalent training to the OSHA 30Hour classes s being presented as qual f cat on the training shal cover as a m nimum the areas discussed in Appendix A Sect on 3d3ad:
Check Box94:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
4 Inc udes the names of Competent CP andor Qual f ed Persons QP and proof of competencyqual f cat on to meet spec f c OSHA CPQP requirements Must nc ude copies of proof of CPQP_4:
Check Box95:
1: Off
0: Off
2: Off
5 Inc udes requirements and detai s of the employer s R sk Management Process USACE uses the Act vity Hazard Ana ysis AHA as part of a total r sk management process Contractors and other ndiv dual employer s may use the AHAs or their own vers on Job Safety Analyses JSAs Job Hazard Analyses JHAs or s m ar R sk Management assessment tools These documents are cons dered equivalent to and acceptable subst tutes for the USACE s AHA prov ded the data col ected is the same as that required by the AHA_4:
6 Inc udes requirements for nit al act v tyspec f c AHAs to be subm tted and accepted at preparatory meet ngs pr or to work being performed:
7 Inc udes requirements that no work by the Contractor shal be performed unless a des gnated Competent PersonSSHO s present on the job s te:
Check Box96:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
2:
0: Off
1: Off
2: Off
8 Inc udes pol c es and procedures regarding noncompl ance w th safety requirements to inc ude disc pl nary act ons for v olat on of safety requirements:
Check Box97:
0: Off
1: Off
2: Off
9 Lines of author ty_4:
Check Box98:
0: Off
1: Off
2: Off
10 Inc udes wr tten company procedures for holding managers and superv sors accountable for safety:
Check Box38:
0: Off
1: Off
2: Off
Text25:
Check Box39:
0: Off
1: Off
2: Off
2 Inc udes safety respons bi t es of subcontractors and suppl ers_4:
Check Box40:
0: Off
1: Off
2: Off
Text26:
Check Box41:
0: Off
1: Off
2: Off
2 Inc udes requirements for mandatory training and cert f cat ons that are appl cable to this project eg explos ve actuated tools conf ned space entry crane operator diver vehic e operator HAZWOPER training and cert f cat on PPE and any requirements for per odic retraining recert f cat on_4:
Check Box42:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
3 Inc udes procedures for per odic safety and health training for superv sors and employees:
4 Inc udes the requirements for emergency response training:
Check Box43:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
Text27:
1a Inc udes the names of ndiv duals respons ble for conduct ng safety nspect ons eg PM safety profess onal QC supervisors employees:
Check Box44:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
1b Inc udes proof of nspector s training qual f cat ons_4:
1c Indicates when nspect ons w be conducted_4:
Check Box45:
1: Off
0: Off
2: Off
1d Indicates procedures for documentat on Furnished sample forms upon which inspect ons w be recorded:
Check Box46:
1: Off
0: Off
2: Off
1e Indicates def c ency track ng system and fol owup procedures_4:
2 Inc udes any external nspect ons cert f cat ons wh ch may be required eg US Coast Guard:
Check Box47:
0: Off
1: Off
2: Off
Text28:
Text29:
Text30:
Text31:
Check Box48:
1: Off
2: Off
0: Off
Check Box49:
1: Off
2: Off
0: Off
Check Box50:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
Check Box51:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
2:
0: Off
1: Off
2: Off
3:
0: Off
1: Off
2: Off
4:
0: Off
1: Off
2: Off
5:
0: Off
1: Off
2: Off
6:
0: Off
1: Off
2: Off
7:
0: Off
1: Off
2: Off
8:
0: Off
1: Off
2: Off
Text32:
Text33:
Text82:
Text83:
Text84:
Text85:
Text86:
Text87:
Text88:
Check Box52:
0: Off
1: Off
2: Off
Text89:
Check Box53:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
2:
0: Off
1: Off
2: Off
Text81:
Text80:
Text79:
Check Box54:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
2:
0: Off
1: Off
2: Off
3:
0: Off
1: Off
2: Off
4:
0: Off
1: Off
2: Off
5:
0: Off
1: Off
2: Off
6:
0: Off
1: Off
2: Off
Text78:
Text77:
Text76:
Text75:
Text74:
Text73:
Text72:
Check Box55:
0: Off
1: Off
2: Off
Text71:
Check Box57:
0: Off
1: Off
2: Off
Text70:
Text37:
18 Abras ve B ast ng P an 06I_4:
19 Heat Stress Monitor ng P an HSMP 06J02_4:
20 Cold Stress Monitor ng P an CSMP 06J04_4:
21 Indoor A r Qual ty Management P an 06L_4:
22 Mold Remediat on P an 06L04_4:
23 Chrom um VI Exposure Evaluat on 06M_4:
24 Crystal ne S ca Assessment 06N02_4:
25 Light ng P an for N ght Operat ons 07A06_4:
Check Box58:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
2:
0: Off
1: Off
2: Off
3:
0: Off
1: Off
2: Off
4:
0: Off
1: Off
2: Off
5:
0: Off
1: Off
2: Off
6:
0: Off
1: Off
2: Off
7:
0: Off
1: Off
2: Off
8:
0: Off
1: Off
2: Off
9:
0: Off
1: Off
2: Off
26 Traff c Control P an 08C05_4:
Check Box59:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
2:
0: Off
1: Off
2: Off
3:
0: Off
1: Off
2: Off
27 F re Prevent on P an 09A01_4:
28 W d Land F re Management P an 09L_4:
29 Arc F ash Hazard Analys s 11B_4:
30 Assured Equ pment Grounding Control Program AEGCP 11D05 Appendix E:
Check Box60:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
2:
0: Off
1: Off
2: Off
3:
0: Off
1: Off
2: Off
4:
0: Off
1: Off
2: Off
5:
0: Off
1: Off
2: Off
6:
0: Off
1: Off
2: Off
7:
0: Off
1: Off
2: Off
8:
0: Off
1: Off
2: Off
9:
0: Off
1: Off
2: Off
31 Hazardous Energy Control Program and Procedures 12A01_4:
32 Standard PreLift Plan LHE 16A03_4:
33 Critical Lift Plan LHE 16H_4:
34 Naval Architectural Analys s LHE F oat ng 16L_4:
35 F oat ng P ant Inspect on and Cert f cat on 19A01_4:
36 Severe Weather P an for Mar ne Act v t es 19A03_4:
37 Emergency P an for Mar ne Act v t es 19A04_4:
38 Man OverboardAbandon Ship Procedures 19A04_4:
39 F oat P an for Launches Motorboats Sk ffs 19F04_4:
40 Fal Protect on and Prevent on P an 21D_4:
Check Box61:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
41 DemolitionRenovat on P an to inc ude engineer ng survey 23A:
42 Rope Access Work P an 24H_4:
Check Box62:
0: Off
1: Off
2: Off
43 Excavat onTrenching P an 25A01_4:
Check Box63:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
44 Fire Prevent on and Protect on P an for Underground Construct on 26D01:
45 Compressed A r Work Plan for Underground Construct on 26I01:
Check Box64:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
46 Erect on and Removal P an for Formwork and Shor ng 27C_4:
47 Precast Concrete P an 27D_4:
Check Box65:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
2:
0: Off
1: Off
2: Off
3:
0: Off
1: Off
2: Off
4:
0: Off
1: Off
2: Off
5:
0: Off
1: Off
2: Off
6:
0: Off
1: Off
2: Off
7:
0: Off
1: Off
2: Off
8:
0: Off
1: Off
2: Off
Remarks:
Text36:
49 Masonry Brac ng P an 27F01_4:
50 Steel Erect on P an 28B_4:
51 Explos ves Safety S te P an ESSP 29A_4:
52 B ast ng P an 29A 26J_4:
53 D ve Operat ons P an 30A14 30A16_4:
54 Safe Pract ces Manual for D v ng Act v t es 30A15_4:
55 Emergency Management P an for D v ng 30A18_4:
56 Tree Fel ngMaintenance Program 31A01_4:
Check Box66:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
57 AircraftAirfield Construct on Safety Phas ng P an CSPP 32A02:
58 A rcraftA rfie d Safety P an Compl ance Document SPCD 32A02:
Check Box67:
0:
0: Off
1: Off
2: Off
1:
0: Off
1: Off
2: Off
2:
0: Off
1: Off
2: Off
59 Site Safety and Health P an HTRW 33B_4:
60 Conf ned Space Entry Procedures 34A05_4:
61 Conf ned Space Program 34A06_4:
Check Box69:
0: Off
1: Off
2: Off
Row14_4:
Other Remarks:

File details come from the government source that posted it. Updated .