A.02PWSServoDrainRepair.pdf

PDF 106 KB Posted

Attached to
Dredge Essayons Servo Box Drain Repair
Solicitation number
W9127N20Q0121
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Essayons FY20 Servo Box Drain Modification

Essayons FY20 Servo Box Drain Modification

01. General

Design modification to existing Servo Boxes. Provide labor, materials, and equipment to modify the Port and Stbd Servo Box Drains on the Essayons Controlled Pitch Propeller (CPP) system per new design.

02. References

Propulsion Systems Inc. Manual 2240.2 (CPP System)

Equipment Information: Propulsion Systems Inc.

ACOE Medium Dredge Shaft Application: CPP System

PSI SER# 377-378

Manuals: PSI Instruction manual J/N 3406

03. GFM

None

04. Safety Precautions

Prior to commencing work, follow vessel’s LOTO policy and procedures.

Follow all applicable state, local, and federal requirements including those specified in EM-385-1-1 latest revision

05. Specifications

Provide labor, materials, and equipment to design and install a drain, pump, tubing, fittings, electrical cable, and motor starters to modify the existing Port and Stbd CPP G65 servo boxes to prevent unsafe oil levels from occurring during times when the ship is heeled over.

06. Testing

Pressure test tubing/piping to verify leak free.

Operationally test system to the satisfaction of COR/Chief Engineer and ABS/USCG.

07. Inspection / Documentation

On satisfactory completion provide three (3) service / repair reports to the COE Representative.

File details come from the government source that posted it. Updated .