A.02 Technical Specifications DRAFT (W9127N23B0006).pdf

PDF 4 MB Posted

Attached to
Columbia River Channel Improvements Pipe Procurement and Installation - Industry Day
Solicitation number
W9127N23B0006
Issued by

About this file

This document outlines specifications for a federal construction project involving the installation of pipes through a levee. The project involves installing three 30-inch inside diameter steel pipes through the Puget Island levee for permanent upland dredge disposal activities. The scope of work includes constructing a temporary pedestrian path, excavating a trench, installing the steel pipes with concrete structures, backfilling with controlled density fill and filter material, replacing the road surface, installing fencing, and constructing a seating berm and weir footing. The project is located at Puget Island, Washington, with contractor access from East Sunny Sands Road. The specifications provide requirements for mobilization, safety, quality control, scheduling, surveying, as-built drawings, and other construction activities.

View the file

Other files

File Type Posted
A.03 Plans-Drawings Solicitation DRAFT (CRCI).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Columbia River Navigation Improvements Disposal Site W-44.0-U

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 10 00.00 25 CONTRACT ADMINISTRATION DATA

01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS

01 11 00.00 25 SUMMARY OF WORK

01 22 00.00 25 MEASUREMENT AND PAYMENT

01 32 01.00 25 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 25 QUALITY CONTROL

01 45 00.15 25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS

01 78 39.10 25 AS-BUILT DRAWINGS

DI VI SI ON 03 - CONCRETE

03 30 00.00 25 CAST-IN-PLACE CONCRETE

DI VI SI ON 05 - METALS

05 50 14.00 25 STRUCTURAL METAL FABRICATIONS

DI VI SI ON 31 - EARTHWORK

31 23 00.00 20 LEVEE EXCAVATION AND FILL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 31 26.00 25 WIRE FENCES AND GATES

DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS

40 05 13.00 25 PIPELINES, LIQUID PROCESS PIPING

40 05 13.96 25 WELDING PROCESS PIPING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 00.00 25

CONTRACT ADMINISTRATION DATA

PART 1 GENERAL

1.1 REFERENCES

1.2 MEANING OF TERMS

1.3 CONTRACTING OFFICER

1.4 SERIAL LETTER CORRESPONDENCE

1.4.1 Numbering

1.4.2 Subcontractors

1.4.3 Transmittals

1.5 EM 385-1-1 SAFETY AND HEALTH REQUIREMENTS MANUAL

1.6 PROJECT-SPECIFIC MANAGEMENT PLAN

1.7 LETTERS OF AUTHORITY

1.8 LABOR STANDARDS

1.8.1 Coverage

1.8.2 Wages

1.8.3 Overtime

1.8.4 Deductions

1.8.5 Apprentices

1.8.6 Payrolls

1.8.7 Supply and Use of Electronic Software for Processing Wage Rate

Requirements

1.8.8 Records

1.8.9 Job Interviews

1.9 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

1.10 PARTNERING

1.11 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

1.12 BASIS FOR SETTLEMENT OF PROPOSALS

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section Table of Contents --

SECTION 01 10 00.00 25 Page 1

SECTION 01 10 00.00 25

CONTRACT ADMINISTRATION DATA

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this Specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual

EP 1110-1-8 (2021) Engineering and Design -- Construction Equipment Ownership and Operating Expense Schedule

1.2 MEANING OF TERMS

a. Specification Sections of this Contract are generally written in the imperative mood. In sentences using the imperative mood, the subject, "the Contractor," is implied. Also implied in this language are "shall," "shall be," "must," or similar words and phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project.

b. Wherever "directed," "required," "prescribed," or other similar words are used, the "direction," "requirement," or "order" of the Contracting Officer (CO) is intended. Similarly, wherever "approved," "acceptable," "suitable," "satisfactory," or similar words are used, the words mean "approved by," "acceptable to," or "satisfactory to" the CO.

c. The word "will" generally pertains to decisions or actions of the

CO.

1.3 CONTRACTING OFFICER

The CO who signed this Contract is the primary CO for the Contract.

Nevertheless, any CO assigned to the Portland District and acting within his/her authority may take formal action on this Contract when a Contract action needs to be taken and the primary CO is unavailable. All correspondence must be through the CO or, upon notification, their authorized Representative (COR).

1.4 SERIAL LETTER CORRESPONDENCE

All letters must be electronically submitted to the Government and must be sent to designated parties via email and exported via the RMS interface.

All letters must be signed in accordance with the letters of authority.

Send any documents requiring original hardcopy/signatures to: Vancouver

SECTION 01 10 00.00 25 Page 2

Resident Office, 4480 SE Columbia Way, Vancouver, WA 98661.

1.4.1 Numbering

All serial letter correspondence must be independently numbered sequentially with no numbers missing or duplicated, commencing with number one. Each letter must show the Contract number, description, and subject matter. Only one subject should be covered in the same letter.

1.4.2 Subcontractors

Subcontractors must not correspond with either the Resident or District offices; the Prime Contractor must handle all correspondence.

1.4.3 Transmittals

Transmittals of signed pay estimates, payrolls, submittals, and other similar correspondence will not require a Serial Letter.

1.5 EM 385-1-1 SAFETY AND HEALTH REQUIREMENTS MANUAL

The latest version in effect on the date of the Solicitation for this Contract (in accordance with EM 385-1-1 Paragraph 4 General, will be contractually binding as part of this Contract. The latest version, including all errata and changes, must be used for this Contract and is obtainable at http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals /EM_385-1-1.pdf .

1.6 PROJECT-SPECIFIC MANAGEMENT PLAN

Submit SD-01, Preconstruction Submittals (listed on the submittal register, Attachment A1, and defined in Section 01 33 00, SUBMITTAL PROCEDURES). The listed components of the Project-Specific Management Plan (PSMP) must be submitted separately under the appropriate specifications section. Upon approval, the components must be combined into a single PSMP binder that will be kept onsite. Update the PSMP whenever the plans contained within are updated or amended. The COR will periodically review the onsite copy of the PSMP. If a current version of the PSMP is not available and up to date, site work may be stopped until deficiencies are corrected. Acceptance of the PSMP is required prior to mobilization.

The PSMP must include:

a. Section I - Accident Prevention Program.

(1) Accident Prevention Plan ( EM 385-1-1 and Section 01 35 26.00 25, GOVERNMENTAL SAFETY REQUIREMENTS).

(2) Drug-free workplace policy.

(3) Global Harmonization program ( EM 385-1-1 ).

(4) Activity hazard analysis ( EM 385-1-1 ).

(5) Equipment certification.

b. Section II - Environmental Protection Plan (Section 01 57 19.00 25, SECTION 01 10 00.00 25 Page 3

TEMPORARY ENVIRONMENTAL CONTROLS).

c. Section III - Construction Quality Control System (Section 01 45 00.00 25, QUALITY CONTROL).

(1) Contractor's quality control (CQC) plan.

(2) CQC Daily Report form.

d. Project Work Plan. The following are examples:

(1) Roadway Access Agreement.

(2) Temporary electrical systems.

(3) Welder qualifications.

(4) Welding procedures.

(5) Bolt pre-tensioning procedure.

e. Schedule for Construction.

f. Submittal Register.

1.7 LETTERS OF AUTHORITY

a. To authenticate actions required under terms of this Contract, furnish a letter of authority to the CO and Resident Engineer that indicates the names of individual or individuals who are authorized to perform the following functions on behalf of the company:

(1) Sign progress payment estimates.

(2) Sign final payment estimate.

(3) Accept Government-furnished property (if applicable).

(4) Sign Contract modifications, supplemental agreements and consent of surety.

(5) Monitor and report on the environmental protection plan, management plan, quality control plan, and safety plan.

(6) Supervise the field activities.

(7) Sign Release of Claims.

(8) Sign Correspondence.

b. This letter of authority must bear the typewritten names and the handwritten signatures of each individual and be signed by the person whose signature appears on the final Contract.

1.8 LABOR STANDARDS

Comply with the following labor standards, statutes, and regulations:

Davis-Bacon Act; Contract Work Hours and Safety Standards Act; Copeland Act; Secretary of Labor's regulations (Parts 3 and 5, Subtitle A, Title

SECTION 01 10 00.00 25 Page 4

29, Code of Federal Regulations). Submit a serial letter identifying the crafts and wage rates for all Prime and subcontractor employees to whom the Contract's construction wage rate requirements apply. The Government will review these crafts and rates for conformance with the wage determination.

1.8.1 Coverage

Contract provisions relating to wages, overtime, payroll deductions, and other labor standards requirements cover foremen, laborers, and mechanics, including owner-operators of other than hauling equipment and other individual enterprises performing the duties of a laborer or mechanic.

Bona fide owner-operators of hauling equipment, such as trucks, who are independent contractors, are not covered, and the certified payrolls, including the names of such owner-operators, need not show hours worked nor rates paid, but only the notation "owner-operator".

1.8.2 Wages

Wages must be paid at least once a week and be computed at hourly rates not less than those set forth in the Contract wage schedule, as set by the Davis-Bacon Act wage determinations, for the particular classifications of work performed.

1.8.3 Overtime

Pay overtime for work in excess of 40 hours in any workweek at not less than 1-1/2 times the basic rate of pay. Rates paid for fringe benefits are excluded in the computations of overtime.

1.8.4 Deductions

Deductions from wages earned may be only those that are permitted by the Copeland Act (Anti-Kickback) regulations.

1.8.5 Apprentices

Comply with the requirements of 29 CFR 5.5(a)(4)(i) with respect to apprentices.

1.8.6 Payrolls

Prepare and submit correct Weekly Payrolls, including those of subcontractors. Incorrect and delinquent payrolls will delay processing of partial payment estimates.

1.8.7 Supply and Use of Electronic Software for Processing Wage Rate Requirements

a. Use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Wage Rate Requirements statute.

b. The Contractor is responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required to comply with the Wage Rate Requirements statute. The electronic payroll service must

SECTION 01 10 00.00 25 Page 5 be used to prepare, process, and maintain the relevant payrolls and basic records during all work under this contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required three years after contract completion.

c. Provision and use of an electronic payroll processing system must meet the following basic functional criteria:

(1) commercially available;

(2) compliant with appropriate Wage Rate Requirements statute payroll provisions in the Federal Acquisition Regulation (FAR);

(3) able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract

(4) capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's RMS;

(5) demonstrated security of data and data entry rights;

(6) ability to produce contractor-certified electronic versions of weekly payroll data;

(7) ability to identify erroneous entries and track the date/time of all versions of the certified Wage Rate Requirements statute payrolls submitted to the government over the life of the contract;

(8) capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic payroll processing system shall be provided to the Government during contract closeout.

d. All incurred costs related to the provision and use of an electronic payroll processing service shall be included in the price for the overall work under the Contract. The costs for compliance with the Wage Rate Requirements statute by using electronic payroll processing services shall not be a separately bid or reimbursed item under this Contract.

1.8.8 Records

Maintain payroll and Employment Records during the course of work and for three years thereafter. They are subject to inspection by the CO and the U.S. Department of Labor.

1.8.9 Job Interviews

A Government representative will interview Contractor and subcontractor employees from time to time during working hours on the job.

1.9 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, SECTION 01 10 00.00 25 Page 6

FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) Contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE Contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant Contract, USACE Contractors are encouraged to seek out highly qualified veterans to perform services under this Contract. The following resources are available to assist USACE Contractors in their outreach efforts:

a. U.S. Department of Labor Veterans employment: www.vets.gov/

b. Federal veteran employment information:

www.fedshirevets.gov/index.aspx

c. Veterans' Employment and Training Service (VETS):

http://www.dol.gov/vets/

d. Veterans Opportunity to Work (VOW) Program:

http://benefits.va.gov/vow/

e. Hiring Our Heroes initiative:

www.uschamberfoundation.org/hiring-our-heroes

1.10 PARTNERING

a. The Government intends to encourage the foundation of a cohesive partnership with the Contractor and its subcontractors. This partnership will be structured to draw on the strengths of each organization to identify and achieve reciprocal goals. Among the objectives are effective and efficient Contract performance and are intended to achieve completion within budget, on schedule, and in accordance with the plans and specifications; and to develop a single cooperative management team focused on the success of the project to mutual benefit of all stakeholders. This partnership will be bilateral in makeup, and participation will be totally voluntary. Any cost associated with effectuating this partnership will be agreed to by both parties, and will be shared equally with no change to the Contract price. An integral aspect of partnering is the resolution of disputes in a timely, professional, and non-adversarial manner through the use of issue clarification and problem solving. Alternate Dispute Resolution (ADR) methodologies will be encouraged in place of the more formal dispute resolution procedures. ADR will assist in promoting and maintaining an amicable working relationship to preserve the partnership. ADR is a voluntary, non-binding procedure available for use by the parties to this Contract to resolve any dispute that may arise during performance.

b. Should the Contractor elect to participate in partnering, key on-site and home office management personnel will be required to attend a full day partnering session as directed by the Government with an outside facilitator. The cost of this facilitated session is anticipated to be around $5,000 and will be shared equally between the Contractor and the Government.

1.11 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

a. This special contract requirement does not apply to terminations.

See FAR Part 49.

SECTION 01 10 00.00 25 Page 7

b. Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8 , Construction Equipment Ownership and Operating Expense Schedule, Region VIII.

Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.

c. Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

d. When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

1.12 BASIS FOR SETTLEMENT OF PROPOSALS

a. Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis.

b. In evaluating a termination settlement proposal using the total cost basis, the following principles will be applied to determine allowable equipment costs:

(1) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.

(2) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.

(3) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.

(4) Ownership costs (depreciation) will be determined using the contractor's depreciation schedule (subject to the provisions of

SECTION 01 10 00.00 25 Page 8

Federal Acquisition Regulation (FAR) 31.205-11).

(5) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section --

SECTION 01 10 00.00 25 Page 9

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 10.00 25

CONTRACTOR'S OPERATIONS AND REQUIREMENTS

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

1.2 REFERENCES

1.3 SUBMITTALS

1.4 SCHEDULE FOR CONSTRUCTION

1.5 INCLEMENT WEATHER CONSTRUCTION

1.6 WORK BY THE GOVERNMENT CONCURRENT WITH CONTRACTOR WORK

1.7 WEEKLY COORDINATION MEETINGS

1.8 CONTRACTOR EMPLOYEES

1.9 ACCESS AGREEMENTS AND WORK AREAS

1.9.1 Access Agreements

1.9.2 Work Areas

1.9.3 Employee Access and Parking

1.10 GOVERNMENT PROJECT ENGINEER'S OFFICE

1.11 SECURITY PROCEDURES

1.11.1 Contractor's General Personnel

1.11.2 Verification of Employment Eligibility

1.11.3 Identification of Employees

1.11.4 Non-US Citizens

1.11.5 Safeguarding of Information

1.12 PROJECT SECURITY

1.13 CONSTRUCTION PROJECT IDENTIFICATION SIGN

1.14 UTILITIES

1.14.1 Sanitary Facilities

1.14.2 Water

1.15 CONTRACTOR'S EQUIPMENT

1.15.1 Contractor's Planned Equipment Methods

1.15.2 Plant and Equipment List

1.16 WORKING HOURS

1.17 CONTRACTOR USE OF GOVERNMENT CRANES

1.18 DAMAGED EQUIPMENT OR ABNORMAL CONDITIONS

1.19 USE OF EXPLOSIVES

1.20 DAILY CLEANUP AND DISPOSAL

1.21 DISPOSAL OF EQUIPMENT AND MISCELLANEOUS MATERIALS

1.22 PROTECTION OF MATERIAL AND WORK

1.23 PROTECTION OF EXISTING UTILITIES

1.24 RESTORATION OF PROJECT ROADS

1.25 CONTRACTOR SURVEY DATA

1.25.1 SURVEYS

1.25.1.1 Pre-Construction Survey

1.25.1.2 Post-Construction Survey

1.25.2 Survey Field Notebooks

1.25.3 Data Storage

PART 2 PRODUCTS - NOT USED

SECTION 01 10 10.00 25 Page 1

PART 3 EXECUTION - NOT USED

SECTION 01 10 10.00 25 Page 2

SECTION 01 10 10.00 25

CONTRACTOR'S OPERATIONS AND REQUIREMENTS

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

This Section covers general requirements applicable to specific Contractor's operations and equipment.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual

EP 310-1-6A (2006; 2019 Change 2) Project Operation -- Sign Standards Manual, VOL 1

EM 1110-1-1005 (2007) Control and Topographic Surveying

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00, SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Schedule for Construction; G

Contractor's Planned Equipment Methods; G

Plant and Equipment List; G

Access Agreements And Work Areas

Security Procedures

SD-06 Test Reports

Survey Field Notebooks

Data Storage

1.4 SCHEDULE FOR CONSTRUCTION

a. In accordance with Section 00 72 00 Contract Clause 52.236-15, SCHEDULES FOR CONSTRUCTION CONTRACTS, submit a detailed schedule for accomplishing the work in this Contract. The schedule will not be

SECTION 01 10 10.00 25 Page 3 used by the Government to select a Contractor; rather it will be used to ensure that the Contractor is capable of accomplishing the necessary work in the allotted time periods. The schedule must be consistent with the completion dates as specified in Section 00 73 00 Contract Clause 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. Other Contractor's work must also be coordinated in accordance with Contract Clause 52.236-8, OTHER CONTRACTS.

b. Submit an updated schedule for Government approval on a monthly basis. The updated schedule will be used as a basis to evaluate the Contractor's progress for purposes of payment. Lack of an updated schedule will result in an inability of the Contracting Officer to perform a full evaluation of the Contractor's progress and will result in the Contracting Officer withholding payment until an updated schedule has been submitted and approved.

1.5 INCLEMENT WEATHER CONSTRUCTION

The Contractor's schedule must reflect adverse weather days in all weather dependent activities as defined in Contract Clause 52.236-4, PHYSICAL DATA. Protect work areas from inclement weather, wind damage, and precipitation so that no delay in the prosecution of critical work items, or damage to USACE property occurs. No time extensions will be authorized for materials, work in place, or equipment damaged due to negligence during periods of inclement weather.

1.6 WORK BY THE GOVERNMENT CONCURRENT WITH CONTRACTOR WORK

The Government will limit interference with the Contractor's work to the maximum reasonable extent and the Government and Contractor shall coordinate as necessary.

1.7 WEEKLY COORDINATION MEETINGS

Weekly coordination meetings must be held between the Contractor and the Government. This meeting will be used to discuss Contractor's safety, Quality Control Program, joint risk management, submittals, deficiencies, Contract administration, schedule, actual progress in the last week, and work planned in the upcoming two weeks. Any work requiring Project support or potential impacts to Project operations or maintenance must be noted. During the Preconstruction Meeting, the Government will determine responsibility of running this meeting. If the Government elects to run the coordination meeting, the Contractor must provide a two week look ahead, with the previous week as-builts, 48 hours before each weekly meeting to the Government representative. The responsible party must prepare and distribute, by e-mail, the coordination meeting agenda with a two week look ahead no later than 24 hours before each meeting. A meeting time and place will be mutually agreed upon for the same time each week.

Distribute weekly coordination meeting minutes no later than the close of business the next business day.

1.8 CONTRACTOR EMPLOYEES

Ensure that all employees are capable of demonstrating adequate knowledge of tools, supplies, equipment, and techniques necessary to competently perform the work. All personnel employed by the Contractor must be fully qualified in their respective fields to render the services necessary.

The Government may require the Contractor to discontinue using any employee in the performance of the work specified in this Contract

SECTION 01 10 10.00 25 Page 4 determined by the Government to be unsatisfactory. Contractor employees will not be permitted to bring guests, family members, or non-employees to the job site at any time.

1.9 ACCESS AGREEMENTS AND WORK AREAS

1.9.1 Access Agreements

a. Submit access procedures to and from the work site after the Contractor, the Contracting Officer, and the Project's Representative have coordinated and determined the most advantageous access to, and staging of, the Contractor's assets deployed to the work site.

b. The right-of-way for the work (or delivery site) and access thereto will be furnished as stated in this paragraph subject to mutual agreement between the Contractor and the Government concerning the specific route the Contractor is to use. Such mutual agreement must be reached prior to initiation, construction, or delivery.

c. The existing access roadway and any associated access roads on the Project, must not be closed as a result of construction or delivery activities associated with this Contract unless previously coordinated and approved by the Government. Traffic delays will only be permitted in accordance with the provisions of this Section.

d. When necessary to operate on or to cross existing highways or roads, all necessary permits must be obtained from the appropriate private or public authority.

e. In accordance with Section 00 72 00 Contract Clause 52.236-13 Alt I, ACCIDENT PREVENTION - ALTERNATE I, and EM 385-1-1 , flaggers, signs, lights, and/or other safeguards must be provided to safely control and direct the flow of traffic when necessary for equipment to operate on or to cross access roads, arterial roads, or highways.

f. Spillage on Project roads and state or county roads will not be permitted, and the spillage must be immediately cleaned up at the expense of the Contractor.

g. No cleated or crawler-type equipment shall be operated on paved surfaces.

h. Damage to all roads caused by the Contractor's operations must be repaired to pre-existing conditions at the expense of the Contractor.

i. Photograph the existing condition of all staging areas prior to mobilization and submit all photographs in the Access Agreements submittal. Failure to properly document existing conditions will result in a Government determination of necessary repairs.

1.9.2 Work Areas

a. Drawings showing the layout of the area proposed for use must be submitted for review and approval and comply with Contract Clause 52.236-10 OPERATIONS AND STORAGE AREAS. The drawing(s) must show the location of the principal components: offices, access roads, parking, storage facilities and disposal areas, which the Contractor proposes to construct within the designated limits.

SECTION 01 10 10.00 25 Page 5

b. Only Contractor and subcontractor parts trailers and lunch trailers may be allowed in the Contractor work areas and these must be subject to CO and Project approval. All Contractor and subcontractor trailers are required to be adequately and physically anchored to prevent overturning due to high winds.

1.9.3 Employee Access and Parking

Contractor's employee private vehicle parking areas must be restricted to the area as agreed upon before construction or delivery. All Contractor vehicles used for prosecuting the work must have a Contractor sign or other permanent identification and must carry the required insurance.

Private vehicles not owned by the Prime Contractor or subcontractors must not be used for prosecuting the work. Private vehicles of the Contractor and its employees must enter and leave the project as directed. Keep the parking areas free of litter and debris. An adequate number and size of trash receptacles must be placed in the parking areas and emptied, as necessary to avoid overflowing. Trash receptacles must be adequately secured to provide protection from the wind and animals.

1.10 GOVERNMENT PROJECT ENGINEER'S OFFICE

Provide the Government Project Engineer with a temporary office, approximately 200 square feet in floor area; locate where directed and provide space heat, cooling, electric light, and power. Provide a mail slot in the door or a lockable mail box mounted on the surface of the door. Include a 4- by 8-foot plan table, a standard size office desk, and a 5-wheeled, padded, ergonomic desk chair with lumbar support and armrests. All furniture must be in good, working condition. If the Contractor has Internet access installed in the trailer a minimum of one access point must be provided to the Government's office with an Ethernet cable. The office must have a minimum of one window with operable window blinds. The Contractor's drinking water must be available for consumption by onsite Government employees. Provide janitorial services at a minimum of once per week, including emptying of trash cans and sweeping and mopping of floors. Dedicate a minimum of two parking spots as "Government Parking Only" in the office parking area. At completion of the work, the office will remain the property of the Contractor and must be removed from the site. Utilities must be connected and disconnected in accordance with local codes and to the satisfaction of the Contracting Officer and all utility costs must be borne by the Contractor.

1.11 SECURITY PROCEDURES

1.11.1 Contractor's General Personnel

Prepare an organizational chart and revise whatever organizational changes occur. Maintain a complete organizational chart of all positions that will be working on the project.

1.11.2 Verification of Employment Eligibility

The Contractor is responsible to pre-screen Contractor and subcontractor personnel using the E-Verify Program at http://www.uscis.gov/E-verify to meet the established employment eligibility requirements. Two valid forms of Government issued identification will be required per individual to ensure the correct information is entered into the E-verify system.

Submit a roster of Contractor and subcontractor personnel with verified or eligible employment eligibility to the CO within three days of Notice to

SECTION 01 10 10.00 25 Page 6

Proceed.

1.11.3 Identification of Employees

a. Submit a complete, dated and signed, list of all Contractor and subcontractor personnel and their titles who will be working on the project at the Weekly Coordination Meeting. This listing must be revised and resubmitted when personnel changes occur.

b. Personnel Identity Verification (PIV) - All personnel, including visitors, shall provide positive verification of individual identity, in the form of a valid Government-issued photo ID prior to being granted access to non-public areas. Driver licenses that do not comply with the REAL ID Act of 2005 cannot be used as the sole source for identity proofing, and a second form of photo ID will be required. For details and current information, see the Department of Homeland Security website https://www.dhs.gov/secure-drivers-licenses .

c. Personally Identifiable Information (PII) - All transmissions containing PII shall be encrypted or the document(s) containing PII shall be encrypted or password protected. All documents containing PII shall be sent directly to the Project RCC and/or Security Specialist.

1.11.4 Non-US Citizens

Submit a scanned legible color copy of the Permanent Resident Card and passport to the CO of all personnel who are non-US citizens working on this Contract. The CO shall provide the Portland District Security Office the submitted copies at least one month (30 calendar days) in advance of the start of work by the employees. Contractor personnel who are non-US citizens shall not be permitted access to the Project until the Foreign Visitor Authorization is received from HQUSACE. Contractor personnel who are non-US citizens shall not be permitted to work on the Contract at all until Foreign Visitor Authorization is received.

1.11.5 Safeguarding of Information

a. The personnel employed on this Contract may, in the performance of their assigned duties, have access to data and information pertaining to location of goods, supplies, parts, equipment, and vehicles.

Knowledge of this nature is considered restricted security information. This information shall be protected and safeguarded against disclosure to any unauthorized person or party and shall be furnished or used on an official "need to know" basis only.

Safeguarding of information is extended to dependents and guests of employees who may, in any manner, obtain any of the above-specified knowledge.

b. The Contractor shall coordinate with the CO for release of information to the public concerning this Contract or any program related to this Contract. This clause covers Media Relations and Printed Materials.

1.12 PROJECT SECURITY

a. Submit the intended working hours of staff on site and identify any employees working in any capacity in accordance with the Subparagraph Identification of Employees .

SECTION 01 10 10.00 25 Page 7

b. Security of the Contractor's property and items furnished under this Contract, until the Government accepts items, are the Contractor's responsibility.

c. Salespersons, personnel seeking employment, and personal visitors are not authorized to enter non-public areas of the Project.

d. Signs may be erected outside the project containing instructions for personnel seeking the Contractor. The content and location of the signs will be approved by the CO prior to erection. Posts or other means of support, if required, must be provided by the Contractor and removed when the Contract is completed. Any open post holes must be suitably backfilled, prior to the end of the shift in which posts are removed, and any other damage must be repaired to preconstruction conditions.

1.13 CONSTRUCTION PROJECT IDENTIFICATION SIGN

Fabricate and install one construction project identification sign in accordance with EP 310-1-6A , Attachment A3, within three days of beginning site work.

1.14 UTILITIES

Provide utilities required for the performance of work under this Contract and water as described below.

1.14.1 Sanitary Facilities

Provide portable, temporary sanitary facilities in accordance with

EM 385-1-1 .

1.14.2 Water

Provide drinking water/handwashing water for all Contractor personnel working on the project.

1.15 CONTRACTOR'S EQUIPMENT

1.15.1 Contractor's Planned Equipment Methods

Submit proposed methods of transportation and operation of cranes and other heavy equipment for approval prior to commencement of those operations. Submittals must include the type, size, loadings of equipment, placement of outriggers, and the proposed transportation routes and work areas to be used on the project. Operation of heavy equipment adjacent to existing structures must be avoided when possible. Testing requirements and operation of cranes and other heavy equipment must be in accordance with EM 385-1-1 . All cranes, rigging, lifts, operators, vehicles, and other necessary means to move equipment or items must be Contractor-furnished as required to pursue and complete the work and must comply with EM 385-1-1 .

1.15.2 Plant and Equipment List

Within seven days prior to commencing site operations, provide a complete list of all plant and equipment to be used on the job site, exclusive of shop equipment. Throughout the life of the Contract, submit an up-to-date

SECTION 01 10 10.00 25 Page 8 plant and equipment list with each progress payment request. Include rented equipment as well as lease purchase or sale leaseback equipment on the lists. Initial list and the revised monthly lists must indicate dates equipment is assigned to or removed from the project; deadline dates for repairs and returned for use; dates of the most recent and planned inspections; and adequate identification or description of each item of equipment including manufacturer's name (abbreviated), model number, manufacturer's serial number, year of manufacture, and Contractor's assigned serial or record number.

1.16 WORKING HOURS

The site is located adjacent to residences. Construction at the site may take place from 7 AM to 7 PM, Monday through Saturday. Construction must not take place at night (7 PM to 7 AM), on Sundays, or on Holidays.

Idling equipment, material deliveries, and mobilizing or demobilizing equipment are considered construction activities and must fall within the working hours.

1.17 CONTRACTOR USE OF GOVERNMENT CRANES

The Contractor will not be allowed to use Government cranes for any work or access. Use Contractor-furnished equipment to facilitate installation or handling of items and equipment for this Contract.

1.18 DAMAGED EQUIPMENT OR ABNORMAL CONDITIONS

Inform the CO immediately upon finding any damaged equipment or other abnormal conditions involving additional work in which the Contractor believes it has no responsibility. The failure or abnormality must not be disturbed until witnessed by the CO. Prior to proceeding further with work, the Contractor and the Government shall agree in writing as to the responsibility for the damage or abnormality. Any damage or abnormal conditions not reported as specified above must also be corrected.

1.19 USE OF EXPLOSIVES

Use of explosives will not be permitted.

1.20 DAILY CLEANUP AND DISPOSAL

Keep all work areas reasonably neat on a daily basis. Collect, remove, and dispose of all debris resulting from the work, such as waste metalwork, packing cases, scrap lumber, and other debris off-site at least once per week. Do not use the Government's trash cans, dump boxes, and other containers. Do not dispose of liquid waste in Project drains. All costs of removing debris must be incidental to the work, and therefore, no separate payment will be made.

1.21 DISPOSAL OF EQUIPMENT AND MISCELLANEOUS MATERIALS

Title to all materials and equipment to be disposed of, excepting materials salvaged for the Government, will be vested in the Contractor when beginning disassembly work or when such materials and equipment are designated as scrap. The Government will not be responsible for the condition, loss, or damage to such property after title transfer. The Contractor may retain these items in usable form and take possession of them providing that there is no subsequent cost or inconvenience to the Government. The Government does not guarantee that these items are

SECTION 01 10 10.00 25 Page 9 complete or in working order and the Contractor must assume responsibility for any damages caused by their use immediately upon taking possession of them.

1.22 PROTECTION OF MATERIAL AND WORK

All materials, supplies, tools, equipment and Government property (including all tools, equipment, and special devices supplied by the Contractor and to be turned over to the Government at the end of the Contract) must at all times be protected and preserved in an approved manner. If material, equipment, supplies, and work performed are not adequately protected, such property may be protected by the Government and the cost thereof will be charged to the Contractor or deducted from any payment due.

1.23 PROTECTION OF EXISTING UTILITIES

Protect existing utilities in accordance with Contract Clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS. Repairs must be made immediately and at Contractor's expense.

1.24 RESTORATION OF PROJECT ROADS

Project roads used for construction access will be evaluated and must be restored to their original condition by the Contractor as required.

Repair and restoration must be made at the expense of the Contractor.

1.25 CONTRACTOR SURVEY DATA

1.25.1 SURVEYS

Major survey control points will not be removed by the Contractor.

Preserve all existing and estblished benchmarks and panels onsite. The Contractor assumes full responsibility for detailed dimensions and elevations measured from control. All surveys must also meet the following requirements:

a. Surveys must be performed by a licensed surveyor or civil engineer registered in the state of Washington.

b. Survey must meet the standard for General Construction Site Plan Feature and Topo Detail as outlined in EM 1110-1-1005 .

c. Provide digital CADD files with raw data, processed elevation surface TIN, and contours readable in AutoCAD format.

d. Drawings and digital files must meet all other CADD specifications requirements according to Section 01 78 39.10 25, AS-BUILT DRAWINGS.

e. The project horizontal and vertical datums are WA83-SF and NAVD88, respectively.

f. Provide all geospatial data in the following coordinate systems:

HORIZONTAL COORDINATE SYSTEM:

North American Datum of 1983, 2011 Adjustment (NAD83 2011), Washington State Plane South Zone 4602 Units: U.S. Survey Feet

SECTION 01 10 10.00 25 Page 10

VERTICAL DATUM:

North American Vertical Datum of 1988 (NAVD88), Geoid 12B Units: Feet

g. Positional accuracy standards, measurements, testing, and reporting must follow ASPRS 2014 Positional Accuracy Standards for Digital Geospatial Data meeting the following standards:

HORIZONTAL ACCURACY CLASS:

0.16 ft RMSEx, 0.16 ft RMSEy, 0.23 ft RMSEr, and +/- 0.39 ft at 95% confidence

VERTICAL ACCURACY CLASS:

0.16 ft RMSEz and +/- 0.33 ft at 95% confidence

1.25.1.1 Pre-Construction Survey

Conduct and submit the Pre-Construction Survey to the Government for approval prior to commencement of construction activities. Collect topographic survey data at a density appropriate for the terrain gradient and topographic detail in accordance with EM 1110-1-1005. Extend the survey area to 100 feet beyond the limits of planned construction as shown on the contract drawings. Survey the horizontal location of all visible surface features located in or near the construction limits.

1.25.1.2 Post-Construction Survey

Conduct and submit the Post-Construction Survey upon completion of the project. Collect topographic survey data at a density appropriate for the terrain gradient and topographic detail in accordance with EM 1110-1-1005. Extend the survey area to 100 feet beyond the limits of disturbed area. Include the final pipe location and invert elevations.

The Post-Construction survey will be used to verify the final grades, elevations, and inverts of new and repaired project features are within the specified tolerances of the elevations, grades, and inverts shown on the plans. The Contractor is responsible for reworking or repairing any feature or location that devieates from the plans by more than the specified tolerances.

1.25.2 Survey Field Notebooks

Submit waterproof Survey Field Notebooks written in a legible, sequential manner. No erasures are to be made. Field notes must be reduced and checked with each page initialed by the reviewer. Initial reductions must be made in black pencil; corrections by reviewing personnel must be in red pencil. An electronic data collection device may be used, provided that the resulting field data is submitted on 8 1/2- by 11-inch paper. Written data collector information must contain the offset distance from the location line/preliminary line/base line, the elevation reading, the station, and a brief feature description. Label information submitted to indicate each facet of work and include all computations and coordinates.

Each notebook submitted must bear the signature and seal of a registered land surveyor following the statement: "I certify that the data in this field notebook has been reviewed and checked and is true and correct."

1.25.3 Data Storage

In addition to field notes submit a CD-R using the current version of

SECTION 01 10 10.00 25 Page 11

Microsoft Windows© Operating System. The file must contain coordinates, elevations, and station values relating to control points on the location line/preliminary line/base line and cross sections along the line. The information must be IBM PC compatible, and presented in the American Standard for Information (ASCII) format. Data on the disk must conform to the following format:

a. An 80-column format with 15 columns devoted to Northing coordinates, Easting coordinates, elevations, and location line/preliminary line/base line station values. Reserve the remainder of the 80 columns for additional designations.

b. The Northing (Y) and Easting (X) coordinates and elevation values must be shown to three places to the right of the decimal and be right justified.

c. A point identification abbreviation must be entered in the field immediately right of the station value. Typical points and identifications are: angle point (AP); back tangent (BK TAN); forward tangent (FWD TAN); angle split (A SPLT); point of curve (PC); point of tangent (PT); and other significant features such as top of rock, centerline of road, railroad bridge, edge of pavement, corner of building, etc.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

SECTION 01 10 10.00 25 Page 12

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00.00 25

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUMMARY

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

1.2.2 Location

1.3 CONTRACT DRAWINGS

1.4 EXISTING WORK

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

SECTION 01 11 00.00 25 Page 1

SECTION 01 11 00.00 25

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUMMARY

This Section provides a summary of the various Contract work elements and their relationship to each other. This summary describes work activities within interim construction completion dates. This Section does not provide the technical detail for particular work activities, but describes the work as a whole, providing overall perspective to the separate tasks and their interrelationships. Use this Section in conjunction with all the Specification Sections and the Drawings to establish the total work requirements.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work is to be performed at the Puget Island upland dredge materials disposal site, W-44.0-UP. This project involves the installation of three 30-inch inside diameter (ID) steel pipes through the Puget Island levee for permanent use in upland dredge disposal activities. The work includes a temporary pedestrian path or construction transit, road cut, wide trench excavation, 30-inch steel pipe installation with concrete gravity structures, backfill with controlled density fill/filter material, replace road surface, install wooden fence, seating berm construciton, installation of weir footing and pedestal, and incidental related work.

This effort is to include all associated works required and described within this Contract package.

1.2.2 Location

The work site is located at Puget Island, Washington. Contractor access to the work site will be from East Sunny Sands Road, off of WA-409.

1.3 CONTRACT DRAWINGS

a. The Drawings that accompany these Specifications are a part thereof.

b. Contract drawings, maps, and Specifications will be furnished to the Contractor without charge per Section 00 72 00 Contract Clause 252.236-7001, CONTRACT DRAWINGS AND SPECIFICATIONS. Reference publications will not be furnished.

c. Immediately check furnished drawings, maps, and specifications and notify the Government of any discrepancies.

1.4 EXISTING WORK

In addition to Section 00 72 00 Contract Clause 52.236-9, PROTECTION OF

EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS:

a. Remove or alter existing work in such a manner as to prevent injury

SECTION 01 11 00.00 25 Page 2 or damage to any portion of the existing work to remain.

b. Upon completion of the work, repair or replace portions of existing work, which have been damaged by Contractor's operations, to Preconstruction conditions at the expense of the Contractor.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

SECTION 01 11 00.00 25 Page 3

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 25

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 GENERAL INFORMATION

1.2 JOB PAYMENT ITEMS

1.3 MEASUREMENT AND PAYMENT

1.3.1 Mobilization and Demobilization, CLIN 0001

1.3.2 Installation of Buried Piping System, CLIN 0002

1.3.3 Installation of Perimeter Fencing, CLIN 0003

1.3.4 Installation of Weir Footing and Pedestal, CLIN 0004

1.3.5 Construction of Piping System and Seating Berm, CLIN 0005

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

SECTION 01 22 00.00 25 Page 1 i9/

SECTION 01 22 00.00 25

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 GENERAL INFORMATION

In each instance, the Contract price for an item will constitute full compensation as herein specified, as shown, or as otherwise approved. The Contract price and payment will also constitute full compensation for all work incidental to completion of the item, unless such work is otherwise specifically mentioned for separate payment under another line item. In the event any work is required by the Specifications Sections or by the Drawings and not specifically mentioned in the Measurement and Payment Paragraphs, separate or direct payment will not be made and all costs thereof are incidental to the work and included in the Contract prices and payments for all Contract Line Item Numbers (CLIN) listed in the Price Schedule.

1.2 JOB PAYMENT ITEMS

Payment items for the work of this Contract for which Contract job payments will be made…