This is a Supply Requirement Document for two replacement fiber winders needed by the U.S. Army DEVCOM Soldier Center's Distinctive Material Solutions Branch. The winders must be capable of spooling Nylon 6/6 fibers up to 4000 total denier at 1100 meters per minute to packages of approximately 30 pounds. Key technical specifications include winding speeds up to 3000 m/min, yarn count range of 2800-3500 denier, traverse length of 12-17 inches, maximum tube inside diameter of 5 inches, maximum package diameter of 16 inches, yarn tension of 35-40 psi, and a single-tier double winder frame not exceeding 12 cubic feet. The equipment must feature automatic roll switching, a minimum cycle time of 30 minutes, and include load volume and weight limitation information.
Vendors must provide 2026 pricing, production lead times, estimated delivery dates, shipping terms, installation and training services, warranty information, and spare parts availability schedules with the understanding that 10 months' lead time is required post-order. Deliverables include two fully assembled fiber winders with all hardware, software, controllers, safety equipment, recommended spare parts, and itemized installation/start-up/shipping services. Billing will occur through WAWF after DEVCOM Soldier Center confirms receipt of equipment and services. Equipment should be shipped to U.S. Army DEVCOM Soldier Center, ATTN: Tony Rogers, 15 General Greene Ave, Warehouse 20, Natick MA 01760-5000 (DODAAC: W56YHX), with Tony Rogers (508-206-3039) serving as the WAWF inspection and acceptance point of contact. Responses to the related Sources Sought announcement (W911QY26RFIBR) must be submitted by June 11, 2026 at 5pm EST to kevin.m.morris24.civ@army.mil and trisha.r.scott.civ@army.mil.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements Document 04 May 2026
1. Background:
The DEVCOM Soldier Center Distinctive Material Solutions Branch needs two replacement winders capable of spooling Nylon 6/6 fibers up to 4000 total denier at 1100 meter/min to a package of ~ 30 pounds. These winders are critical to the mission of DMSB supporting an OGA customer for matters of national security. The existing machines are beginning to age out (over 20 years of use) and need to be replaced. Two winders are requested to provide contingency and backup equipment to have a continuous process but also to achieve customer goals of increasing finished product stores for DMSB. Winders provided should include dual switching capabilities, spare parts packages, as well as commissioning and installation to certify the equipment.
2. Requirements:
· Technical Specifications:
· Winding speed = Up to 3000 m/min
· Yarn Count range = 2800 – 3500 den
· Traverse Length = 12 to 17 inches
· Tube inside diameter = Max is 5 inches
· Package diameter = Max is 16 inches
· Package weight = Max is 30 lbs.
· Yarn tension = 35 to 40 psi
· Frame = 1 Tier, Double Winder not to exceed 12 cubic feet.
The following specific information is requested from potential sources:
· Brand name and model number
· Product/item features/description to include the following performance characteristics:
· Automatic Switching of rolls
· Load volume and load weight limitations
· Cycle Time at least 30 minutes.
· Product/item specifications to include:
· Overall Dimensions
· Overall Weight
· Power requirements
· Other utility (e.g., gas, water, air) requirements
· Exhaust requirements
Sources may submit product brochures, pictures, and other product literature. Also include the following information about both equipment systems:
· 2026 Price list with options
· Production lead time and estimated delivery time
· Shipping terms (e.g., FOB Destination)
· Installation services (start-up, training)
· Warranty period and pertinent information
· Spare Parts availability time (e.g., 2-8 weeks)
· Emergency service and/or maintenance information
3. Other Direct Costs (ODCs): OEM installation/start-up/shipping/operation/maintenance training and additional/frequently needed spare parts.
4. Deliverables: Two Fiber winders with all the associated hardware, software, controllers, safety equipment installed as well as recommended spare parts required for immediate use in government facilities. Installation/start-up (if required)/shipping recommended spare parts shall be itemized and included in the Fiber winder contract.
5. Invoicing: The Contractor shall bill in WAWF after DEVCOM Soldier Center confirms receipt of Fiber Winders, installation services and spare parts.
6. Delivery Date: Vendor will need 10 months’ lead time for delivery of the Fiber winders, after receipt of order.
7. Ship to DODAAC and Shipping Address: U.S. Army DEVCOM Soldier Center, ATTN: Tony Rogers, 15 General Greene Ave, Warehouse 20, Natick MA, 01760-5000. DODAAC: W56YHX
8. WAWF Inspection & Acceptance POC: Anthony (Tony) Rogers 508-206-3039