A.02 Statement of Work Blood Bank Reagents , Manual Testing Ortho WorkStation FY 2023.docx

DOCX document 20 KB Posted

Attached to
Synopsis for Ortho Workstation Manual Blood Bank testing reagents Sole Source
Solicitation number
W91YTZ22Q0059
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for Blood Bank Manual testing Supplies

1. SCOPE OF WORK

1.1. The Vendor shall provide non-personal services to include, but not limited to, all reagents. QC materials, training, and all other items and services necessary in order to support manual Blood Bank testing, using tube and gel methodologies, for ABO/Rh, ABO/Rh discrepancy, antibody screen, antibody ID, DAT (to include both IgG and complement testing) and Fetal Bleed screen testing. The gel testing reagents must be compatible with the five Ortho Workstations that are currently owned by the facility. This testing is for the Department of Pathology, WAMC, Building 4-2817 Reilly Road, Fort Bragg, NC 28310. The period of performance is shown in the Table below:

Base Period
01 October 2022 - 30 September 2023
First Option Year
01 October 2023 - 30 September 2024
Second Option Year
01 October 2024 - 30 September 2025
Third Option Year
01 October 2025 - 30 September 2026
Fourth Option Year
01 October 2026 - 30 September 2027

1.2. The contract pricing must be all-inclusive pricing.

2. REAGENTS

2.1 Contractor shall guarantee delivery of the reagents listed below as a standing order of every 28 days

DescriptionPart # Quantity/delivery schedule
ORTHO CONFIDENCE SYSTEM KIT69020963/KT-28 DAYS
AFFIRMAGEN7192102/BX-28 DAYS
COOMBS CONTROL7198102/BX-28 DAYS
SURGISCREEN7191002/BX-28 DAYS
RESOLVE PANEL A7195101/KT-28 DAYS
HBS C3 COATED CONTROL CELLSH90001/BX-28 DAYS
ORTHO A2 CELLS7193101/BX-28 DAYS
FETAL SCREEN II FMH KITZ4881/BX-28 DAYS
0.8% RESOLVE PANEL A69023171/KT-28 DAYS
0.8% RESOLVE PANEL B69023181/KT-28 DAYS
0.8% RESOLVE PANEL C69023191/KT–28 DAYS
0.8% SURGISCREEN69023162/BX-28 DAYS
0.8% AFFIRMAGEN7192112/BX-28 DAYS

2.2. All reagents/reagent packs will be provided as follows:

· Be marked with the required storage temperature.

· Be maintained at the proper storage temperature during transportation from the Contractor’s storage facility to the Government acceptance site and be delivered on time at the appropriate storage temperature.

· Fetal Screen kit must include a positive and negative control with each kit.

2.3. In the event that the supplies are found to be defective and unsuitable for use or the Contractor has failed to comply with the requirements, the Contractor shall replace the supplies within 48 hours of receipt of the order.

2.4. Safety Data Sheets (SDS). For all products the Contractor must provide a mechanism for the laboratory to meet local discharge requirement. The Contractor shall provide a means to obtain the SDS of all reagents and consumables. In cases where the SDS cannot be pulled from a website due to security issues with government computers, the contract will provide a paper copy or email the SDS to the facility.

2.5 When entering invoice in WAWF, the Contractor will attach their invoice so the COR can trouble shoot discrepancies (shortage, overage, and/or pricing).

3. INTIAL SET UP

3.1 Use of the Fetal Screen II FMH Kit will require a method validation. Method Validation will be conducted in accordance with method validation protocols established by the Clinical Laboratory Standards Institute (CLSI) and/or required by the College of American Pathologists (CAP). Method Validation will include but not be limited to correlation with current methods (comparison of methods study). All reagents and quality control materials used in the Method Validation Study will be provided by the Contractor at no cost to the Government. These materials will not be used in the analysis of specimens for patient care.

4. TRAINING.

The Contractor will provide initial on-site operator training if site determines that on-site training is required for any reagent or kit listed on the contract.

5. SPECIAL TASKS.

5.1. The Contractor will provide one paper and one CD copy of Standard Operating Procedures (SOPs) for each and every methodology included under the Proposal. The SOPs will include all relevant technical information regarding the methodology and shall be provided in Microsoft Word, capable of being customized/modified by the end user.

File details come from the government source that posted it. Updated .