The document is an Experience Worksheet for a potential federal construction project at Rygge, Norway, designed to assess contractor capabilities across multiple technical domains. The worksheet requires contractors to self-evaluate their experience in areas including demolition, environmental remediation, site preparation, civil engineering, site layout, pavement construction, grading, drainage, utility infrastructure, and quality control/safety procedures, specifically noting both prime contractor and subcontractor experience levels. The worksheet is directly related to the U.S. Army Corps of Engineers' (USACE) planned Deployable Airbase System (DABS) and Facilities, Equipment and Vehicles (FEV) construction project, which is anticipated to be a firm-fixed-price design-bid-build contract valued between $25-100 million, with an estimated 830-day construction timeline beginning around October 2026.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Experience Worksheet Complete with ‘Yes’ or ‘No’
| Experience Area |
| Experience as Prime |
| Experience as Subcontractor |
a. Demolition, to include environmental remediation, and site preparation. Clearing and grubbing for brush and preparation of site.
b. Civil includes site layout, grading drainage, and site utilities.
c. Site layout to include standoff distances, circulation of people and vehicles to include parking areas.
d. All new pavement will be Reinforced Concrete or Asphalt.
e. Grading and drainage to allow efficient surface drainage of design storm events.
f. Potable water distribution, fire water distribution and storage, and sewer collection pipes and lift station designed to Norwegian Standards. Utility connections will need to be coordinated with Norwegian Utility Providers.
g. Knowledge of quality control, scheduling, and safety procedures and documentation, especially if similar to those utilized on USACE projects.