A.02 SHAPE SAC & YC Construction Capability Statement.docx
DOCX document 37 KB Posted
- Attached to
- SHAPE SAC and YC Construction
- Solicitation number
- W912GB26R0001
- Issued by
-
Department of the Army European Command
About this file
The document is a Capability Statement for the SHAPE SAC and YC Construction project, which aligns with a pre-solicitation opportunity by the U.S. Army Corps of Engineers Europe District. The project involves constructing a combined School Age Center (SAC) and Youth Center (YC) at SHAPE in Mons, Belgium, with an estimated construction value exceeding $10 million and a 15-month performance period. The facility will include technology labs, multipurpose rooms, arts and science spaces, a gym, administrative areas, and support spaces, along with comprehensive systems for fire safety, electronic security, building controls, and utilities.
The project specifications require a Firm-Fixed-Price (FFP), Single Award Definitive Contract with sustainability and energy enhancement measures. Key design requirements include 40-year facility lifespan per DoD Unified Facilities Criteria, disability access, self-contained HVAC systems, and approximately 200 tons of air conditioning. The scope also encompasses site development, utilities connections, landscaping, signage, and demolition of an existing 9,199 square foot building at SHAPE Headquarters. The opportunity is being managed by the Department of the Army European Command, with the solicitation number W912GB26R0001.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912GB26R0001
SHAPE SAC and YC Construction Capability Statement
SECTION 1. GENERAL
1. Business Name: (Insert Business Name)
2. Business Address: (Insert Business Address)
3. Unique Entity ID: (Insert Unique Entity ID)
4. Cage Code: (Insert Cage Code)
(Companies must be SAM registered to be eligible for award of any contracts with the U.S. Army Corps of Engineers)
5. Responsible Point of Contact:
| Name: | (Insert Name) | |
| Telephone: | (Insert Telephone Number) Email: | (Insert Email Address) |
SECTION 2. CONTRACTOR ARRANGEMENT
1. Our firm will be proposing on this project as a: Sole contractor Prime contractor performing at least 50% of the work with subcontractor(s) Prime contractor performing at least 50% of the work with the following team member subcontractor(s) (Insert business name, business size, unique entity ID, cage code, and work which will be subcontracted) Joint venture with (Insert business name, business size, and cage code).
SECTION 3. CAPABILITY
1. If awarded a contract, the maximum capacity our firm can adequately perform and provide a Bank Letter of Guaranty for any single contract is (Insert maximum capacity, in dollars, per single contract annually).
2. Our firm has performed work in Belgium:
Yes No
3. Our firm has the necessary documents/permits/certifications required to perform work in Belgium:
Yes No
4. Briefly list projects your company has performed simultaneously in the past five years (project name, location, dollar value, award date, client).
5. Assuming projects are not co-located, how many projects could your company simultaneously execute throughout the country of Belgium?
6. Briefly describe any projects you have completed in Belgium (project name, location, dollar value, award date, client).
7. What is the minimum and maximum dollar value project for which your firm is likely to consider submitting a proposal?
Minimum:_______________ Maximum:_____________
8. What is the maximum annual capacity of work your firm can reasonably manage while assuring effective and efficient program/project implementation and maintaining quality?
9. What is your firm’s resource availability (staffing and equipment) to perform work in Belgium?
10. What elements of work would your firm consider subcontracting to other firms?
11. Have you ever worked as a Prime Contractor for the U.S. Government? If not, have you worked as a Subcontractor for the U.S. Government?
12. Provide any comments or identify any concerns your company has regarding the proposed solicitation.
SECTION 4. RETURN INSTRUCTIONS
After you have completed all sections of the capability statement, please return the form to Kelsey LaHue, Contract Specialist via email at kelsey.j.lahue@usace.army.mil. Your response needs to be received no later than 1400hrs Central European Time on 21 November 2025.
Information presented is for market research purposes only. Submission of Capabilities is not a prerequisite to any potential future offerings, but participation will assist the U.S. Army Corps of Engineers, Europe District in tailoring requirements to be consistent with industry capabilities.
Note: If you do not intend to submit a proposal for the project when formally advertised for solicitation, please do not submit a response to the capability statement.
File details come from the government source that posted it. Updated .