SOLE SOURCE JUSTIFICATION

(Simplified Acquisition Procedures under FAR Part 13)

Agency/Contracting Activity: U.S. Army Corp of Engineer, Portland District, 333 SW 1st Ave #200, Portland, OR 97204

Description of Action: Contract needed for

Nature: New Requirement Follow-on Requirement Mod to Existing Purchase Order/Contract Number

Pricing: Firm-Fixed Price Time & Materials Funds: OMA Other Funds:

Name of Proposed Contractor(s): Hamilton Jet, Inc.

Street Address: 14680 NE N Woodinville Way, STE 100 City, State, Zip: Woodinville, WA 98072-4456 Phone: 425-527-3000

3. Description of Services or Supplies:

The total estimated value of the proposed action is

Background: Dredge Essayons uses a proprietary steering system designed and manufactured by Jastram Engineering of Vancouver, BC. The parts under this procurement are replacement parts needed to ensure the dredge can continue operations should the once currently installed fail.

S : This contract is to procure two (2) replacement carrier/radial bearing housings to include the bearing liners.

4. Authority:

Action using simplified acquisition procedures (select one):

FAR 13.106-1(b)(1): For purchases not exceeding the simplified acquisition threshold (SAT), contracting officers may solicit from one source if the contracting officer determines that the circumstances of the contract action deem only one source reasonably available (e.g. urgency, exclusive licensing agreements, brand name, or industrial mobilization)

FAR 13.501(a)(1): For actions for commercial supplies or services greater than the SAT but not exceeding $6.5M, the requirements of FAR 13.501(a) apply to sole-source acquisitions conducted pursuant to Subpart 13.5 (Reference: FAR 13.106-1(b)(2)). Subpart 13.5 is the Test Program for Certain Commercial Items (see 41 USC 1901; or for contingencies see 41 USC 1903)

5. Reasons for Authority Cited:

v4, 5 Jan 2015; previous version obsolete

6. Actions to Increase Competition:

7. Market Research:

8. Procurement History:

Previous Purchase Order(s) or Contract(s): Yes No

If "Yes", for each purchase order or contract provide:

Purchase order or contract number:

Was action competed? Yes No

If action was not competed, state the cited authority, summarize rationale:

Additional Facts and/or Information to support the justification.

10. Technical / Requirements Certification: I certify that the supporting data under my cognizance which is included in this abbreviated J&A is accurate and complete to the best of my knowledge and belief.

Submitted By: Chris Gibbons Position Title: Project Manager/Port Engineer Email address: T.Chris.Gibbons@usace.army.mil

Signature:____________________________

Justification: Jastram Engineering LTD is the OEM. They confirmed that the authorized dealers listed on their website are the only dealers able to sell and service their equipment. For Alaska, Washington, Oregon, and Hawaii that dealer is Hamilton Jet.

Impact: OEM parts are required for safety of personnel and continued operation of the dredge should the parts currently installed fail.

Alternatives: There are no practical alternatives. If the decision to replace the dredge or steering system ever be made, other manufacturers may be considered.

If the dredge steering system is ever replaced/upgrades, efforts to increase competition using more commercially available parts may be considered.

Given the specific nature of the parts, coupled with Jastram’s requirement to utilize regional dealers, requires the usage of Hamilton Jet to ensure compatibility with existing system and continuity of dredging operations should the parts fail.

N/A

GIBBONS.TIMOTHY.CHR

ISTOPHER.1515576122

Digitally signed by

GIBBONS.TIMOTHY.CHRISTOPHER.1

515576122 Date: 2020.05.14 16:16:27 -07'00'

11. Fair and Reasonable Price Determination: As contracting officer, I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable. Basis for the determination is as follows:

Costs are verified and the price is expected to be fair and reasonable. In accordance with FAR 13.106-3(a)(2)(ii) and FAR 13.106-3(a)(2)(vi), the Government will compare the proposal to the Independent Government Estimate to ensure price reasonableness.

12. Contracting Officer’s Approval (actions less than $ 0K): I hereby certify that this justification is accurate and complete to the best of my knowledge and belief. Based on the foregoing, I approve this sole source justification subject to availability of funds, and provided that the services and supplies herein described have otherwise been authorized for acquisition.

SIGNATURE: __________________________ DATE:

NAME: Mitchell J. Johnson TITLE: Procuring Contracting Officer

Digitally signed by

JOHNSON.MITCHELL.JEFFREY.1366665095

Date: 2020.05.27 08:37:40 -07'00'