A.02. Performance Work Statement - PWS-AM Support_2026-2028.pdf
PDF 171 KB Posted
- Attached to
- Missouri River Recovery Management Plan Adaptive Management Support Federal contract opportunity
- Solicitation number
- W9128F26QA007
About this file
This Performance Work Statement (PWS) details a non-personal services contract for Adaptive Management (AM) support for the Missouri River Recovery Program (MRRP) by the US Army Corps of Engineers (USACE). The contract has a base year from February 1, 2026 through January 31, 2027, with two optional 12-month extension years through January 2029. Primary objectives include providing technical expertise for developing and assessing MRRMP components, conducting research and monitoring for pallid sturgeon, piping plover, and least tern, and supporting the Missouri River Recovery Implementation Committee (MRRIC).
Key contract tasks include in-person attendance at multiple meetings (MRRIC Plenaries, AM Workshops, Technical Team Meetings), participation in regular webinars and calls, developing annual technical team analyses and reports, and engaging with the Independent Science Advisory Panel (ISAP). The contractor will be responsible for research, modeling, data management, facilitating technical team calls, drafting compliance reports, and providing expertise in guiding the Adaptive Management process. Performance will be assessed based on meeting attendance, call participation, report quality, and adequately addressing technical analysis requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 01 for W9128F26QA007 - Adaptive Management for MRRP.pdf | ||
| W9128F26QA007 - Adaptive Management for MRRP.pdf | ||
| Performance Work Statement - CLIN Schedule-AM Support-2026-2028.pdf | ||
| 52.212-1 - Addendum_ Instructions to Offerors - Commercial Items.docx | DOCX document | |
| B.04. Service Contract Act Wage Determination.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Missouri River Recovery Management Plan Adaptive Management Support US Army Corps of Engineers (USACE)
Missouri River Recovery Program (MRRP) PO Box 710
Yankton, SD 57078
DATE: August 20, 2025
1.0 General Information.
1.1 Background. The impetus for this work is required by law to allow the continued operation of the Missouri River Mainstem Reservoir System, operation and maintenance of the Bank Stabilization and Navigation Project, the operation of the Kansas River Reservoir System, and the implementation of the Missouri River Recovery Management Plan (MRRMP). The effects of those program’s actions, over time, have affected the natural riverine environment and the species that live there. Under the Endangered Species Act (ESA) of 1973, Federal agencies are required to consult with the US Fish and Wildlife Service (USFWS) if their actions cause impacts to ESA listed species and their habitat. The USACE has been operating the aforementioned programs and projects under Biological Opinions (BiOp) to reduce the impacts to ESA listed species since 1990.
Based on findings from the USACE actions, research, and monitoring, the USACE issued a new Biological Assessment (BA) to the USFWS on October 30, 2017, with a new proposed action. This resulted in formal consultation with the USFWS in accordance with the ESA. The result of the consultation is captured in the USFWS 2018 BiOp (issued April 2018) and is described and analyzed in detail in the MRRMP-Environmental Impact Statement (MRRMP-EIS). The BiOp requires that the actions described in the USACE’s October 2017 BA and MRRMP-EIS be implemented under the description and process explained in the Science and Adaptive Management Plan
(SAMP).
Implementation of the overall Missouri River Recovery Program includes collaboration with the Missouri River Recovery Implementation Committee (MRRIC) as authorized in Section 5018 of the 2007 Water Resource Development Act to serve as a basin-wide collaborative forum to develop a shared vision and comprehensive plan for Missouri River recovery. The MRRIC is a multi-stakeholder body composed of representatives from Federal, state, and tribal agencies, and nongovernmental and local governmental stakeholder interests in the basin. The MRRIC is exempt from the requirements of the Federal Advisory Committee Act.
1.2 Scope of Work. This is a non-personal services contract to provide Adaptive Management (AM) support for implementation of the final MRRMP-EIS, implement the USFWS BiOp issued to the USACE, and participate as a member of the Technical Team (TT). The USACE shall not exercise any supervision or control over the contract service providers performing the services herein. The contractor’s staff shall be accountable solely to the contractor who, in turn, is responsible to the USACE. This is a fixed priced, performance-based service contract where the government defines and measures desired outcomes, while contractor methods are generally not constrained or directed.
1.3 Period of Performance. The period of performance shall be for one (1) Base Year of 12 months and two (2) 12-month option years. The Period of Performance reads as follows:
Base Year: 01 FEB 2026 through 31 JAN 2027
Option Year 1: 01 FEB 2027 through 31 JAN 2028
Option Year 2: 01 FEB 2028 through 31 JAN 2029
1.4 Contractor Personnel
1.4.1 The contractor shall perform all work under this contract using his or her own forces except as provided in Paragraph 1.4.2 Subcontracting. Employees who perform this work shall be qualified persons on the contractor’s own payroll.
1.4.2 Subcontracting. The contractor shall not subcontract any work without written approval of the Contracting Officer. Compliance with the provisions of this contract by subcontractors shall be the responsibility of the contractor.
1.5 Quality Control
1.5.1 The contractor shall designate, in writing, an employee who shall serve as the contact for matters involving quality and performance or non-performance of the required work stated in this PWS. The employee(s) shall be qualified and fully competent with full authority to act for, and on behalf of, the contractor as necessary to ensure that the required work is performed in accordance with the standards contained herein. The contractor shall furnish the above written designation to the Contracting Officers Representative (COR), George Williams (George.A.Williams@usace.army.mil), and the Project Manager (PM), Jeff Seim (jeffrey.t.seim@usace.army.mil), no later than the first day of work. The contractor shall include the name(s), address(s), and telephone number(s) of the responsible individual(s).
1.5.2 The Contracting Officer reserves the right to disapprove any individual whom he considers incompetent to perform the work required. The Contracting Officer will provide a written notice of any disapproval to the contractor.
1.6 Quality Assurance. The government will utilize a Quality Assurance Surveillance Plan (QASP) to ensure that the Contractor is performing the services required by this PWS in an acceptable manner. The Government may use Quality Assurance Evaluators (QAE(s)) to provide assistance with the quality assurance methods.
1.6.1 The government has the right to inspect all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The government shall perform inspections in a manner that will not delay the work.
mailto:George.A.Williams@usace.army.mil
1.6.2 If any of the services do not conform to contract requirements, the government may require the contractor to perform the services in conformity with contract requirements and at no increase in cost. If the contract requirements are not met after a second attempt the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
1.6.2.1 Upon verification of a validated customer complaint or corrective action report, the COR will notify the contractor that they are required to re-perform specific services. Services to correct should be performed within 60 days of request by the COR. Upon completion of the correction the Contractor shall provide the products to the PM and notify the COR of completion of the task.
1.6.3 The government may take action, if the contractor fails to perform the services again or to take the necessary action to ensure future performance is in conformity with the contract requirements. The government may (1) by contract, or otherwise, perform the services and charge to the contractor any cost incurred by the government related to the performance of such service or (2) terminate the contract in whole or in part.
1.6.4 The contractor is responsible to replace/repair any damage to government property due to negligence, at his or her own cost. The government may take action, if the contractor fails to replace/repair any damage to government property. The government may by contract, or otherwise, replace/repair damaged government property and charge to the contractor any cost incurred by the government to replace/repair any damage.
1.7 Hours of Operation. The contractor is responsible for conducting business, between the core hours of 0900-1700 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.8 Pre-Work Meeting. Prior to commencing any activities, the contractor shall arrange a Pre-work Meeting with the COR and PM. The Meeting shall discuss the work requirements, scheduling, and submittal process. At least one week prior to commencing work, the Contractor shall coordinate their proposed work schedule with the PM and COR.
1.9. Submittals. Prior to commencement of services, the Contractor shall submit the following documents to the PM and COR for review and approval:
a. List of who will perform work on this contract; and
b. Proof of Insurance for Contractors and Subcontractors.
1.10 Standards and Regulations. The Contractor shall perform to the standards in the contract and comply with all Local, State, and Federal Regulations during the services performed. The Contractor is responsible for ascertaining the extent to which these regulations affect the operations resulting from this contract. The Contractor shall comply will all applicable regulations.
Applicable regulations include, but are not limited to the following:
a. Code of Federal Regulations (CFR), Title 36, Chapter III, Part 327, Rules and Regulations Governing Public Use on Corps of Engineers Water Resource Development Projects EP 1165-2-316 (http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_ 1165-2-316.pdf?ver=2013-08-22-104526-670)
b. Engineering Manual (EM) 385-1-1 (USACE – Safety and Health Requirements Manual), dated November 2014;
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_38 5-1-1.pdf
c. Occupational Safety and Health Standards (29 CFR 1910)
1.11 Physical Security
1.11.1 The contractor shall be responsible for safeguarding all government facilities, property, and materials provided for contractor use. The contractor shall secure at all times all government facilities, property, and materials. Specific security conditions may change based on threats to national defense and based on the risk of specific facilities to these threats. The contractor shall abide by these changing conditions at all times, as applicable.
1.11.2 Key Control. N/A
1.12 Antiterrorism/Operation Security Requirements.
1.12.1 Access and General Protection/Security Policy and Procedures. N/A
1.12.1.1 Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the change clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
1.12.2 Pre-screen candidates using E-Verify Program. The Contractor must pre‐screen candidates using the E‐verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements. The vendor must ensure that the candidate has http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_1165-2-316.pdf?ver=2013-08-22-104526-670 http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_1165-2-316.pdf?ver=2013-08-22-104526-670 http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.ecfr.gov/cgi-bin/text-idx?rgn=div8&node=48:2.0.1.1.1.2.1.28 http://www.ecfr.gov/cgi-bin/text-idx?rgn=div8&node=48:2.0.1.1.1.2.1.28 two valid forms of government issued identification to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible candidates must be provided to the PM and COR no later than three (3) business days after the initial contract award.
1.13 Payment
1.13.1 The government will make payment monthly after the government has inspected and accepted the services, and the government has reviewed, approved, and processed the contractor’s invoice. The contractor shall submit the invoice to the COR and PM.
1.13.2 The contractor must provide the contractor’s name, address, contract number, period of services completed (i.e., for the month of January or for the period of performance of January 1 through February 23), CLIN number and specific quantities of work performed (i.e., 1 Month, 40 days, 100 acres, etc.), and total requested, for an invoice to be considered proper. The contractor shall submit the invoice by the fifth (5th) day of the month for services completed the previous month or submit the invoice upon completion of all services, in accordance with the period of performance stated in the CLIN.
2.0 Definitions. The following definitions and descriptions apply wherever the word(s) or phrase(s) is/are stated in this PWS:
Acceptable Level of Performance (ALP): The maximum percent defective, the maximum number of defects per hundred units, or the number of defects in a lot considered satisfactory on the average. The allowable leeway or variance from a standard before the government will reject the specific service.
Contracting Officer’s Representative (COR): means an individual designated an authorized in writing by the Contracting Officer to perform specific technical or administrative functions.
Performance-Based Contract (FAR 2.101): Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise.
Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable level of performance (ALP) for each work requirement.
Quality Assurance Surveillance Plan (QASP): An organized written document used by the Government for quality assurance surveillance. Document contains sampling/evaluation guides, checklists, and the performance requirements summary (PRS).
3.0 Government Furnished Items and Services
3.1 Services. N/A
3.2 Facilities. N/A
3.3 Utilities. N/A
3.4 Equipment. N/A
3.5 Materials. N/A
4.0 Contractor Furnished Items and Responsibilities
4.1 General. The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
5.0 Specific Tasks
The primary objectives of this contract are as follows:
• Provide expertise in developing technical components and assessments for the MRRMP, SAMP and their implementation of actions, research and monitoring for pallid sturgeon, piping plover and least tern, including:
o Design and assessment of AM fish and bird experiments/actions (experimental design expertise);
o Design and assessment of fish and bird monitoring and assessment programs (statistical expertise);
o Training of Missouri River advection-dispersion modeling and analysis (Year 1);
o Development, design and oversight of the technical components/tools to be used for the implementation and update of data management protocols and data storage (data management expertise); and o Communication and reporting of program findings.
• Provide expert input to AM process and organization through meetings, presentations, written reports, and information management products including:
o Documentation of new components into the SAMP and its revisions, along with previously developed components/tools developed as part of the MRRMP and effects analysis process.
o Author new elements to the SAMP (experimental designs, monitoring strategies).
o Draft the annual Adaptive Management Compliance Report (AMCR).
o Facilitate the Pallid Sturgeon Technical Team (2 calls a month).
o Facilitate AM content at Science Meetings, Workshops and MRRIC Stakeholder
Meetings.
o Provide expertise in guiding direction and strategy regarding AM process.
5.1 Task 1 - In-person presence at MRRIC and AM Meetings / Workshops
The contractor shall attend and participate in-person at the following meetings:
BASE YEAR:
• AM Workshop (April 2026) - assumed to include 4 days (including travel time)
• MRRIC Plenary (May 2026) - assumed to include 5 days (including travel time)
• MRRIC Plenary (November 2026) - assumed to include 5 days (including travel time)
• Technical Team Meeting (April 2026) – assume 4 days (including travel time)
• Winter Pallid Sturgeon Science Meeting in 2026 – assume hosting for 5 days (travel time additional)
OPTION YEAR 1:
• AM Workshop (March 2027) - assume 5 days (including travel time)
• MRRIC Plenary (May 2027) - assume 5 days (including travel time)
• Technical Team Meeting (April 2027) – assume 4 days (including travel time)
• MRRIC Plenary (November 2027) - assume 5 days (including travel time)
• Winter Pallid Sturgeon Science Meeting in 2027 – assume hosting for 5 days (travel time additional)
OPTION YEAR 2:
• AM Workshop (March 2028) - assume 5 days (including travel time)
• MRRIC Plenary (May 2028) – assume 5 days (including travel time)
• Technical Team Meeting (April 2028) – assume 4 days (including travel time)
• MRRIC Plenary (November 2028) - assume 5 days (including travel time)
• Winter Pallid Sturgeon Science Meeting in 2028 – assume hosting for 5 days (travel time additional)
5.2 Task 2 - Participate in regular webinars and calls
The Contractor shall facilitate and participate in regular planning webinars and planning calls as follows:
BASE YEAR:
• Fish Work Group and Joint Work Group Calls – assume 15 calls, 2 hours each
• AM Team calls - assume 20 calls, 1 hours each
• AM Technical Team calls – assume 30 calls, 1 hours each
• Fall Science Meeting in 2026 – assume hosting for 3 days by webinar
• Participate in database management calls in 2026 – 20 calls, 2 hours each
OPTION YEAR 1:
• Fish Work Group and Joint Work Group Calls – assume 15 calls, 2 hours each
• AM Team calls - assume 20 calls, 2 hours each
• AM Technical Team calls – assume 30 calls, 1 hours each
• Fall Science Meeting in 2027 – assume hosting for 3 days by webinar
• Participate in database management calls in 2027 – 20 calls, 2 hours each
OPTION YEAR 2:
• Fish Work Group and Joint Work Group Calls – assume 15 calls, 2 hours each
• AM Team calls - assume 20 calls, 1 hours each
• AM Technical Team calls – assume 30 calls, 1 hours each
• Fall Science Meeting in 2028 – assume hosting for 3 days by webinar
• Participate in database management calls in 2028 – 20 calls, 2 hours each
5.3 Task 3 – Research, analysis, and development of annual AM Technical Team content
The Contractor shall facilitate and participate on the AM team and Technical Team (TT), conducting TT activities as follows:
BASE YEAR:
Contractor shall:
1) Research, analyze and document the content required for the Science Workshop and the AM Workshop in the AM Compliance Report (AMCR).
2) Gather information from various sources to inform and prepare for the Science Workshop.
3) Analyze biological and action effectiveness information to track program progress toward objectives.
4) Facilitate and presentation findings and interpretations during meetings and workshops.
5) Support the development of the annual Strategic Plan.
6) Provide edits, as needed, to the Science and Adaptive Management Plan (SAMP).
7) Facilitate the Pallid Sturgeon AM Technical Team.
8) Research, develop and provide input into data management-relevant discussions and products.
OPTION YEAR 1:
Contractor shall perform all tasks outlined above in the Base Year (5.3 Task 3).
Contractor shall perform all tasks outlined above in the Base Year (5.3 Task 3).
5.4 Task 4 – Engage with the Independent Science Advisory Panel (ISAP) on TT Products Contractor shall engage with ISAP on TT products in Discuss and Feedback processes, and review of products such as: Review of Final Monitoring Plans and Review of AM Framework products.
BASE YEAR:
The MRRP AM processes require numerous web-meetings and/or face-to-face meetings with the ISAP and MRRIC work groups that generate clarification questions, explanation of research projects, and monitoring program outcomes. The contractor shall participate in these engagements (including TT process and ISAP reviews on monitoring plans and AM Report) and provide the USACE with a written report documenting the context of these calls/meetings. The PM or COR will provide the applicable timelines for delivery of these products.
OPTION YEAR 1:
Contractor shall perform all tasks outlined above in the Base Year (5.4 Task 4).
Contractor shall perform all tasks outlined above in the Base Year (5.4 Task 4).
6.0 Performance Requirements Summary. The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
PWS
Para.
Performance Standard Performance Threshold
Method of Assessment
PRS #1
In-person presence at MRRIC and AM Meetings / Workshops
Paragr aph 5.1
Personal attendance at all meetings
Must attend all meetings
Participant or review sign-in sheets at each meeting
PRS #2
Participate in regular webinars and calls aph 5.2
Participation in webinars and calls
Must attend 90% of scheduled calls and webinars
Participant or review attendance logs for calls/webinars
PRS #3
Develop annual AM Technical Team analyses, modeling and reports aph 5.3
Submittal of draft and final content in annual AM Report on the implementation schedule. Timely resolution of agency comments.
Provide draft and final on schedule and meeting quality standards
Review and approval of documents by
PM/COR
PRS#4
ISAP Review Process aph 5.4
Participate in engagement with ISAP of TT products
Adequately address analysis
Review and approval by
PM/COR
7.0 Attachments - None
Abbreviations
AM Adaptive Management
AM PM Adaptive Management Project Managers
AMCR Adaptive Management Compliance Report
BA Biological Assessment
BiOp Biological Opinion
Birds Least tern (Sternum antillarum) and piping plover (Charadrius melodious)
DSS Decision Support System
EA Effects Analysis
EIS Environmental Impact Statement
ESA Endangered Species Act
Fish Pallid sturgeon (Scaphirhynchus albus) or sturgeon species
ISAP Independent Science Advisory Panel
ISP Integrated Science Program
MRRIC Missouri River Recovery Implementation Committee
MRRP Missouri River Recovery Program
MRRMP Missouri River Recovery Management Plan
SAMP Science and Adaptive Management Plan
SDM Structured Decision Making
TT Technical Team
TWG Technical Working Group
USACE United States Army Corps of Engineers
USFWS United States Fish and Wildlife Service
File details come from the government source that posted it. Updated .