This technical specification document outlines requirements for transformer repair parts for Lower Granite Lock and Dam. The U.S. Army Corps of Engineers seeks 268 radiator gaskets, 5 rectangular manhole gaskets, 5 high voltage bushing gaskets, 20 low voltage bushing gaskets, 5 H-2 neutral bushing gaskets, 5 oil gage gaskets, and 184 radiator valve packing kits from Hitachi/ABB. Bidders must provide product data sheets and warranties for consideration, with a 5-year warranty required. Delivery of all items FOB destination is required within four weeks of contract award to Lower Granite Lock and Dam. The related federal contract opportunity is solicitation number W912EF23Q0031 for transformer repair parts issued by the Department of the Army Corps of Engineers Walla Walla District.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
LOWER GRANITE LOCK AND DAM
Transformer T1 and T2 Overhaul Parts
1.0 INTENT
The following specifications pertain to the purchase of; Hitachi/ABB Gaskets and Radiator Valve Packing Kits. Working closely with the Power Systems Section, at USACE Hydroelectric Design Center (HDC), the parts were selected as an acceptable replacement for the original equipment.
2.0 SCOPE
The successful bidder shall be required to furnish the Transformer Overhaul Parts to Lower Granite Lock and Dam within the timeframe listed in section 8.0 (Shipment and Delivery).
3.0 SYSTEM REQUIREMENTS
3.1 TRANSFORMER SERIAL/SHOP ORDER NUMBERS:
3.1.1 T1-A – S/N 7002007 – SHOP ORDER 9M1408-2
3.1.2 T1-B – S/N 7001968 – SHOP ORDER 9M1408
3.1.3 T1-C – S/N 7002026 – SHOP ORDER 9M1408-3
3.1.4 T2-A – S/N 7002549 – SHOP ORDER 1M1408
3.1.5 T2-B – S/N 7002544
3.1.6 T2-C – S/N 7002547
3.2 ITEM LIST:
3.2.1 Item 0001: Hitachi/ABB Radiator Gaskets. Provide gaskets made of Nitrile NBR (Buna N).
Design gaskets for compression by at least 25% of their original thickness. Do not use O-ring gaskets for gasket grooves of rectangular cross-section. Provide a barrier for oil leaks that meet the manufacturer's original design. Part # 763C035H02. Quantity 268 each.
3.2.2 Item 0002: Hitachi/ABB Rectangular Manhole Gaskets. Provide gaskets made of Nitrile
NBR (Buna N). Design gaskets for compression by at least 25% of their original thickness.
Do not use O-ring gaskets for gasket grooves of rectangular cross-section. Provide a barrier for oil leaks that meet the manufacturer's original design. Part # 763C102HO1. Quantity 5 each.
3.2.3 Item 0003: Hitachi/ABB High Voltage Bushing Gaskets. Provide gaskets made of Nitrile
Do not use O-ring gaskets for gasket grooves of rectangular cross-section. Provide a barrier for oil leaks that meet the manufacturer's original design. Part # 763C036H21. Quantity 5
3.2.4 Item 0004: Hitachi/ABB Low Voltage Bushing Gaskets. Gaskets must be made of Fluor-elastomeric gasket material (Viton Type B) with a Durometer rating between 50 and 70.
Design gaskets for compression by at least 25% of their original thickness. Do not use O-ring gaskets for gasket grooves of rectangular cross-section. Provide a barrier for oil leaks that meet the manufacturer's original design. Part # 769C036H09. Quantity 20 each.
3.2.5 Item 0005: Hitachi/ABB H-2 (Neutral Bushing) Gaskets. Provide gaskets made of Nitrile
Do not use O-ring gaskets for gasket grooves of rectangular cross-section. Provide a barrier for oil leaks that meet the manufacturer's original design. Part # 763C035H15. Quantity 5
3.2.6 Item 0006: Hitachi/ABB Oil Gage Gaskets. Provide gaskets made of Nitrile NBR (Buna
N). Design gaskets for compression by at least 25% of their original thickness. Do not use O-ring gaskets for gasket grooves of rectangular cross-section. Provide a barrier for oil leaks that meet the manufacturer's original design. Part # 763C035H08. Quantity 5 each.
3.2.7 Item 0007: Hitachi/ABB Radiator Valve Packing Kits Part# 584A750G04. Quantity 184
4.0 PRE-AWARD SUBMITTALS
For consideration of an “or approved equal product” bids - descriptive materials (brochures, illustrations, drawings, data sheets, etc.) must be submitted which will allow the Contracting Officer to determine, without discussion with the bidder, whether the products being offered meet or exceed all of the required specifications. Submittals shall include, but not be limited to, copies of manufactures catalog cut sheets, specification sheets, manufacturer certifications, and warranty information. Failure to submit adequate supporting documentation may result in disqualification of proposed quote.
5.0 POST AWARD SUBMITTALS
N/A
6.0 WARRANTY
All transformer instrumentation components shall have a 5-year warranty on all parts, labor and workmanship from factory defects.
7.0 ON-SITE TRAINING
N/A
8.0 SHIPMENT AND DELIVERY
8.1 All items shall be delivered FOB destination to Lower Granite Lock and Dam within Four (4) weeks of contract award.
8.2 The contractor shall be responsible for packing and shipping the components in a manner that will ensure undamaged and complete arrival to Lower Granite Lock and Dam.
8.3 No shipments are allowed other than normal business hours of Monday through Thursday 7:00 a.m. - 4:00 p.m., excluding Federal holidays.
8.4 All shipments shall be delivered to:
US Army Corps of Engineers Lower Granite Lock and Dam 885 Almota Ferry Road Pomeroy, WA 99347-9632
| TECHNICAL SPECIFICATIONS |
| LOWER GRANITE LOCK AND DAM |
| Transformer T1 and T2 Overhaul Parts |