A.02.10 Technical Specifications (W912EF21B0008).pdf

PDF 2 MB Posted

Attached to
W912EF21B0008 LMO & LLA - Turbine Maintenance Platforms
Solicitation number
W912EF21B0008
Issued by

About this file

This document provides technical specifications for turbine maintenance platforms required by the U.S. Army Corps of Engineers, Walla Walla District, at the Lower Granite and Lower Monumental Lock & Dams. The specifications cover fabrication and delivery of turbine maintenance platforms and draft tube access platforms with associated ladders, hatches, scaffolding, personnel hoisting systems, and spare parts for each site. The specifications also require assembly support, training, and storage cart fabrication and delivery. Bids are due by the date specified in the solicitation for the firm fixed price contract. The specifications include design and performance requirements for structural, electrical and mechanical components, along with quality assurance provisions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lower Gr ani t e/ Lower Monument al Tur bi ne Mai nt enance Pl at f or m W912EF21B0008

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15. 00 28 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00. 00 28 GENERAL REQUI REMENTS

01 11 01. 00 28 SUPPLEMENTARY REQUI REMENTS

01 14 00. 10 28 PROJECT SI TE RESTRI CTI ONS

01 14 00. 90 28 I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY

(OPSEC)

01 22 00. 00 28 MEASUREMENT AND PAYMENT

01 33 00 SUBMI TTAL PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 01. 00 28 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)

01 45 04. 00 28 CONTRACTOR QUALI TY CONTROL

01 78 00. 00 28 CLOSEOUT SUBMI TTALS

DI VI SI ON 05 - METALS

05 05 23. 16 26 STRUCTURAL STEEL WELDI NG

05 14 00. 13 26 STRUCTURAL ALUMI NUM WELDI NG

05 50 05. 00 26 TURBI NE MAI NTENANCE PLATFORM - LWR MNUMNTL

05 50 05. 01 26 TURBI NE MAI NTENANCE PLATFORM - LWR GRANI TE

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 41 19. 10 26 PERSONNEL HOI STI NG EQUI PMENT

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1

This page intentionally left blank

SECTI ON TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

SECTI ON 00 01 15. 00 28

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

1. 2 CONTRACT DRAWI NGS

1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es

1. 3 RESOURCE DRAWI NGS ( R)

- - End of Sect i on Tabl e of Cont ent s - -

DOCUMENT 00 01 15. 00 28

SECTI ON 00 01 15. 00 28

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect .

1. 2 CONTRACT DRAWI NGS

Cont r act dr awi ngs ar e as f ol l ows:

FI LE NUMBER SHEET

NUMBER

DESCRIPTION Revision Number

Date

GENERAL

LMP-1.001-0-0/1 G-001 PROJECT LOCATI ON AND

VI CI NI TY MAPS

LMP-1.001-0-0/2 G-002 DRAWI NG I NDEX

LMP-1.001-0-0/3 G-003 TURBI NE MAI NTENANCE

PLATFORM - UPPER AND LOWER

POSI TI ONS - UNI TS 1- 3

LMP-1.001-0-0/4 G-004 TURBI NE MAI NTENANCE

PLATFORM - UPPER AND LOWER

POSI TI ONS - UNI TS 4- 6

STRUCTURAL

LMP-1.001-5-5/2 S-101 TURBI NE MAI NTENANCE PLATFORM

LMP-1.001-5-5/3 S-102 PONTOON

LMP-1.001-5-5/4 S-103 I NTERI OR WELDMENT - AND

PONTOON END DETAI LS

LMP-1.001-5-5/1 S-104 BRACKET AND LI FTI NG HANDLE

- DETAI LS

LMP-1.001-5-5/5 S-105 PI NNI NG EAR - DETAI LS

LMP-1.001-5-5/6 S-106 BEAM DETAI LS - SHEET 1

LMP-1.001-5-5/7 S-107 BEAM DETAI LS - SHEET 2

FI LE NUMBER SHEET

NUMBER

DESCRIPTION Revision Number

Date

LMP-1.001-5-5/8 S-108 PLATFORM DECK SEGMENTS -

ASSEMBLI ES A, B, C AND D

LMP-1.001-5-5/9 S-109 PLATFORM DECK SEGMENT

FRAMES - ASSEMBLI ES A, B,

C AND D

LMP-1.001-5-5/10 S-110 PLATFORM DECK SEGMENTS B1,

C1 AND MI RRORED SEGMENTS

LMP-1.001-5-5/11 S-111 PLATFORM DECK SEGMENT

FRAMES - ASSEMBLI ES B1, C1

& MI RRORED SEGMENTS

LMP-1.001-5-5/10 S-112 PLATFORM DECK - DETAI LS

LMP-1.001-5-5/11 S-113 PLATFORM DECK SEGMENT

FRAMES - ASSEMBLY DETAI LS

LMP-1.001-5-5/12 S-114 PLATFORM DECK SEGMENT BENT

- STI FFENER DETAI LS AND

I NTERI OR - DECK EXTENSI ON

SUPPORT DETAI LS

LMP-1.001-5-5/13 S-115 TURBI NE MAI NTENANCE

PLATFORM - ACCESS HATCH

FRAME AND COVER -

ASSEMBLI ES AND SECTI ONS

LMP-1.001-5-5/14 S-116 TURBI NE MAI NTENANCE

PLATFORM - ACCESS LADDER

AND HAND GRI P - ASSEMBLI ES

AND VI EWS

LMP-1.001-5-5/15 S-117 PLYWOOD EXTERI OR, ALUMI NUM

I NTERI OR - DECKI NG

EXTENSI OI NS, DECKI NG BRACES

- AND WOOD BLOCKI NG DETAI LS

LMP-1.106-5-5/16 S-118 LOWER POSI TI ON RI GGI NG -

AND DECK EXTENSI ON DETAI LS

LMP-1.001-5-5/1 S-201 DRAFT TUBE ACCESS PLATFORM

- ASSEMBLY

LMP-1.001-5-5/2 S-202 DRAFT TUBE ACCESS PLATFORM

- LOWER BRACKET ASSEMBLY -

AND DETAI L

LMP-1.001-5-5/3 S-203 DRAFT TUBE ACCESS PLATFORM

- UPPER BRACKET ASSEMBLY -

AND DETAI LS

LMP-1.001-5-5/4 S-204 DRAFT TUBE ACCESS PLATFORM

- MAI N BEAM - ASSEMBLY AND

SECTIONS

LMP-1.001-5-5/5 S-205 DRAFT TUBE ACCESS PLATFORM

- END BEAM AND SUPPORT

BEAM - ASSEMBLI ES AND

SECTIONS

NUMBER

DESCRIPTION Revision Number

Date

LMP-1.001-5-5/6 S-206 DRAFT TUBE ACCESS PLATFORM

- HANDRAI L - ASSEMBLI ES

AND DETAI LS

LMP-1.001-5-5/7 S-207 DRAFT TUBE ACCESS PLATFORM

- DECKI NG - ASSEMBLI ES AND

SECTI ONS - SHEET 1

LMP-1.001-5-5/8 S-208 DRAFT TUBE ACCESS PLATFORM

- DECKI NG - ASSEMBLI ES AND

SECTI ONS - SHEET 2

LMP-1.001-5-5/9 S-209 DRAFT TUBE PLATFORM -

REVI SED HATCH FRAME AND

DECK PLATES - ASSEMBLY AND

SECTI ONS, SHEET 1

LMP-1.001-5-5/10 S-210 TURBI N MAI NTNANCE PLATFORM

- REVI SED HATCH FRAME AND

DECK PLATES - ASSEMBLI ES

AND SECTI ONS, SHEET 2

LMP-1.001-5-5/11 S-211 DRAFT TUBE ACCESS - PI ANO

HI NGED HATCH

LMP-1.106-5-5/1 S-301 PERSONNEL HOI ST ASSEMBLY -

VI EWS AND I SOMETRI C

LMP-1.106-5-5/2 S-302 PERSONNEL HOI ST - DETAI LS -

SHEET 1

LMP-1.106-5-5/3 S-303 PERSONNEL HOI ST FRAME AND

PARTS - DETAI LS - SHEET 2

LMP-1.106-5-5/4 S-304 TOP FRAME BRACKET

LMP-1.106-5-5/5 S-305 PERSONNEL HOI ST FRAME AND

PARTS - DETAI LS - SHEET 3

LMP-1.106-5-5/6 S-306 FALL PROTECTI ON BEAM

LMP-1.001-5-5/1 S-401 TURBI NE BLADE SCAFFOLD -

SEGMENT PLAN AND ELEVATI ON

LMP-1.001-5-5/2 S-402 TURBI NE BLADE SCAFFOLD -

DETAILS

1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es

a. No Resour ce ( R) ( " For I nf or mat i on Onl y" ) dr awi ngs ar e avai l abl e on

CAD.

b. The Cont r act or assumes al l r i sks associ at ed i n usi ng el ect r oni c CAD drawings.

c. El ect r oni c copi es of CAD dr awi ngs ar e onl y avai l abl e i n Bent l ey DGN format.

d. The cont r act dr awi ngs shal l gover n i f t her e ar e any di scr epanci es bet ween t he el ect r oni c copy and t he cont r act dr awi ng. The Cont r act or shal l pr ompt l y not i f y t he Cont r act i ng Of f i cer of any di scr epanci es.

The Gover nment wi l l not be r esponsi bl e t o cor r ect t he el ect r oni c CAD drawing.

1. 3 RESOURCE DRAWI NGS ( R)

These R dr awi ngs ar e i ncl uded wi t h t he dr awi ngs f or i nf or mat i on onl y. The Gover nment does not war r ant t he accur acy of t he R dr awi ngs. The Gover nment r ecommends t hat t he Cont r act or ver i f y t he accur acy of R dr awi ngs.

Resour ce ( R) dr awi ngs ar e as f ol l ows:

FI LE NUMBER SHEET

NUMBER

DESCRIPTION Revision Number

Date

CARTS

6001 R-001 PONTOON CART

6002 R-002 DECKI NG CARTS

6003 R-003 LOWER PLATFORM CART

6003-1 R-004 LOWER PLATFORM CART SECTI ONS

6003-2 R-005 CART UTI LI ZATI ON

6004 R-006 LOWER PLATFORM CART

6004-1 R-007 LOWER PLATFORM CART

6004-2 R-008 CART UTI LI ZATI ON

BALDWIN-LIMA-HAMILTON

43814 R-009 DRAFT TUBE LI NER

43184-A R-010 DRAFT TUBE LI NER DETAI LS, SECTI ONS &

DOOR

43820-A R-011 DI SCHARGE RI NG SECTI ONAL ELEVATI ON

43890-A R-012 ADJUSTABLE BLADE RUNNER ASSY

SECTI ONAL ELEVATI ON

43891-A R-013 RUNNER HUB ELEVATI ON

43893 R-014 RUNNER CONE AND CAP

NUMBER

DESCRIPTION Revision Number

Date

43896-A R-015 ELEVATI ON OF RUNNER BLADE

43897 R-016 DETAI LS OF STAI NLESS STEEL OVERLAY

ALLIS-CHALMERS

1310-00-1 R-017 DRAFT TUBE - MANDOOR FRAME

1310-QR-1 R-018 DRAFT TUBE - MANDOOR ASSEMBLY

3268-zz-1 R-019 STAY RI NG ELEVATI ON

42696-JD-1 R-020 RUNNER HUB SECTI ON

5846-AEA-1 R-021 DRAFT TUBE LI NER ELEV

6529-AO-1 R-022 RUNNER HUB SECTI ON

6529-Ap-1 R-023 RUNNER HUB PLAN

6530-BU-1 R-024 RUNNER BLADE

GOVERNMENT

UNKNOWN R-025 MOUNTI NG FRAME DETAI LS

UNKNOWN R-026 GUI DE FRAME DETAI LS

- - End of Document - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 00 00. 00 28

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS

CONTRACTS

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 00 00. 00 28

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS CONTRACTS

I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13, FAR Pr ovi s i on 52. 222- 38, FAR Cl ause 52. 222- 35, FAR Cl ause 52. 222- 37, DFARS

222. 13 and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each ef f or t s:

Feder al Vet er an Empl oyment I nf or mat i on http://www.fedshirevets.gov/index.aspx

Depar t ment of Labor Vet er ans Empl oyment Assi st ance http://www.dol.gov/vets/

Depar t ment of Vet er ans Af f ai r s- VOW t o Hi r e Her oes Act http://benefits.va.gov/vow/

Ar my Wounded War r i or Pr ogr am -http://wtc.army.mil/modules/employers/index.html

U. S. Chamber of Commer ce Foundat i on- Hi r i ng Our Her oes http://www.hiringourheroes.org/

Gui de t o Hi r i ng Vet er ans - Ref er ence Mat er i al https://duckduckgo.com/l/?kh=-1&uddg=https%3A%2F%2Fwww.ebenefits.va.gov%2Febenefits-portal%2Fdownloads%2Fveterans-hiring-guide-2014.pdf

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 01. 00 28

SUPPLEMENTARY REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 DEFI NI TI ONS

1. 4 PROJECT SCHEDULE

1. 5 CONTRACTOR RESPONSI BI LI TY FOR CONTRACT WORK

1. 6 POST AWARD MEETI NGS

1. 6. 1 Pr e- Wor k Meet i ng

1. 7 RMS OREI NTATI ON MEETI NG

1. 8 ADDI TI ONAL MEETI NGS

1. 9 LOCKOUT/ TAGOUT ( LOTO) - SAFE CLEARANCE OR HAZARDOUS ENERGY CONTROL

PROGRAM ( HECP) PROCEDURE

1. 10 Saf e Cl ear ance Tr ai ni ng

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 11 01. 00 28

SUPPLEMENTARY REQUI REMENTS

PART 1 GENERAL

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS.

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

Compl y wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s sol i c i t at i on.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. Desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t i n accor dance wi t h SECTI ON

01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Pr oj ect Schedul e; G, C

Aut hor i zed I ndi v i dual s; I C

1. 3 DEFINITIONS

a. Qual i f i ed Per son.

As def i ned i n EM 385- 1- 1; " DEFI NI TI ONS" , unl ess ot her wi se specified.

b. F. O. B.

An abbr evi at i on f or f r ee on boar d, whi ch means t hat a vendor or consi gnor wi l l del i ver goods on a r ai l r oad car , t r uck, vessel , or ot her conveyance wi t hout any expense t o t he pur chaser or consi gnee.

1. 4 PROJECT SCHEDULE

a. Fur ni sh a schedul e f or t he compl et e pr oj ect s wi t hi n 15 days af t er r ecei pt of Not i ce of Awar d.

b. Emai l an el ect r oni c copy of t he schedul e, i n t he or i gi nal f or mat t he schedul e was devel oped i n ( e. g. . xer , . x l s. , . mpp, et c. ) , t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) . Each schedul e shal l have a uni que f i l e name as det er mi ned by t he Cont r act or . See SECTI ON 01 33 00 SUBMI TTAL PROCEDURES par agr aph " El ect r oni c Copi es" f or emai l addr ess.

1. 5 CONTRACTOR RESPONSI BI LI TY FOR CONTRACT WORK

The Cont r act or i s r esponsi bl e f or cor r ect i ng al l damage and def ect s t o wor k cover ed by t hi s cont r act , unt i l f i nal accept ance by t he Gover nment .

1. 6 POST AWARD MEETI NGS

1. 6. 1 Pr e- Wor k Meet i ng

Wi t hi n Thi r t y ( 30) cal endar days af t er r ecei pt of Not i ce of Awar d , at t end a Pr e- Wor k Meet i ng. Seni or Level member s of t he Cont r act or ' s st af f and t he Cont r act or ' s Pr oj ect Super i nt endent and QC syst em manager shal l at t end t hi s meet i ng. The Gover nment wi l l l ead t hi s meet i ng and t ake t he meet i ng mi nut es. The Gover nment wi l l di cuss t he over al l cont r act r equi r ement .

1. 7 RMS OREI NTATI ON MEETI NG

a. An RMS ( Resi dent Management Syst em) Or i ent at i on Meet i ng wi l l be hel d wi t hi n Fi f t een ( 15) cal endar days af t er r ecei pt of Not i ce t o Pr oceed. See SECTI ON 01 45 01. 00 28 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM) f or addi t i onal i nf or mat i on. Or i ent at i on meet i ng wi l l be v i r t ual or at Di st r i c t Headquar t er s, and may occur i n conj unct i on wi t h, but not at t he same t i me as, t he Pr e- Wor k meet i ng.

Coor di nat e meet i ng dat e and t i me wi t h t he Cont r act i ng Of f i cer a mi ni mum of 7 cal endar days pr i or t o t he meet i ng.

b. At a mi ni mum, t he Cont r act or ' s RMS- CM Admi ni st r at or and QC syst em manager shal l at t end t he RMS Or i ent at i on meet i ng. A Gover nment Repr esent at i ve wi l l l ead t he or i ent at i on. Ant i c i pat e t he f ol l owi ng at t he meet i ng:

1. Al l ow f or a maxi mum 4 hour dur at i on.

2. Cover t he f ol l owi ng t opi cs, at a mi ni mum, i n RMS Cont r act or Mode ( CM) :

i . Cont r act or use of RMS ( CM) syst em.

i i . Cont r act or Dat a.

i i i . Qual i t y Cont r ol Repor t s.

i v . Submi t t al s.

v. RFI s.

v i . Payment .

3. Recei ve a f ol l ow- up handout / gui de f or r ef er ence on t he above items.

c. Cont r act or empl oyees shal l br i ng a comput er wi t h Wi - Fi capabi l i t y ( t o gai n access t o t he I nt er net ) , wi t h RMS pr e- l oaded.

d. The RMS Or i ent at i on Meet i ng i s r equi r ed f or Cont r act or s wi t h no pr i or RMS exper i ence. The RMS Or i ent at i on Meet i ng, i s opt i onal , but may be r equest ed, f or al l ot her Cont r act or s.

1. 8 ADDI TI ONAL MEETI NGS

Recor d t he mi nut es of al l meet i ngs, i ncl udi ng al l conf er ence cal l s, t hat occur bet ween t he Cont r act or and Gover nment . Send mi nut es el ect r oni cal l y wi t hi n 24 hour s of t he meet i ng t o t he Cont r act i ng Of f i cer f or concur r ence.

E- mai l subj ect l i ne shal l i ncl ude pr oj ect name and meet i ng t opi c.

1. 9 LOCKOUT/ TAGOUT ( LOTO) - SAFE CLEARANCE OR HAZARDOUS ENERGY CONTROL

PROGRAM ( HECP) PROCEDURE

Al l Cont r act or wor k on s i t e shal l meet t he r equi r ement s of " Saf et y and Occupat i onal Heal t h Of f i ce; Saf e Cl ear ance Pr ogr am f or t he Cont r ol of Hazar dous Ener gy, NWWP 385- 1- 20" . A di gi t al copy may be obt ai ned at t he web addr ess shown bel ow i n par agr aph, Saf e Cl ear ance Tr ai ni ng. Saf e Cl ear ance pr ocedur es ar e used by Pr oj ect and Cont r act or per sonnel t o pr ot ect per sonnel , equi pment and t he envi r onment as wel l as ensur i ng cont i nui t y of ser vi ce. Any wor k per f or med by t he Cont r act or t hat r equi r es t aki ng pr oj ect oper at ed equi pment out of ser vi ce shal l be done onl y af t er a f or mal c l ear ance i s obt ai ned t hr ough t he Gover nment . Vi ol at i ons wi l l be r epor t ed t o t he I ssui ng I ndi v i dual and vi ol at i ons may r esul t i n di sci pl i nar y act i on r angi ng f r om r et r ai ni ng t o r emoval of saf e c l ear ance authorization

The f ol l owi ng appl i es t o LOTO and HECP pr ocedur es:

a. The Gover nment wi l l pr ovi de Saf e Cl ear ance Tags and wi l l i ssue I sol at i on Locks t o Cont r act or f or c l ear ances usi ng t he Gover nment Saf e Cl ear ance Pr ocedur es. Pr ovi de per sonal saf et y l ocks, meet i ng OSHA st andar ds, f or use wi t h t he Gover nment ' s saf e c l ear ance pr ocedur es.

See NWWP 385- 1- 20, Chapt er 6 - Locks and Tags, and Chapt er 10 - Cont r act or Per sonnel f or f ur t her gui dance.

b. Gover nment HECP pr ocedur es shal l be used on equi pment / syst ems owned by t he Gover nment . I t shal l al so be used on al l poi nt s i nt er f aci ng wi t h Gover nment owned equi pment / syst ems. I n i nst ances wher e equi pment i s owned by t he Cont r act or , not yet t ur ned over t o t he Gover nment , or equi pment whi ch i s not t i ed i nt o Gover nment ener gy sour ces, t he Cont r act or may use t hei r own Lockout / Tagout Pr ogr am.

Cont r act or Pr ogr ams shal l be pr e- appr oved by t he Responsi bl e Of f i c i al .

c . Submi t t he names of Aut hor i zed I ndi v i dual s t o t he Cont r act i ng

Of f i cer pr i or t o t he Pr e- f abr i cat i on Meet i ng. Pr oj ect - speci f i c t r ai ni ng wi l l be gi ven by t he Oper at i ons Chi ef or desi gnee and wi l l be appr oxi mat el y 30 mi nut es i n l engt h. Pr oj ect - speci f i c t r ai ni ng wi l l be pr ovi ded f or ever y cont r act and onl y t o t he Cont r act or ' s Aut hor i zed I ndi v i dual s. The Aut hor i zed I ndi v i dual s shal l be r equi r ed t o br i ef t hei r wor k cr ews and subcont r act or s of any pr oj ect - speci f i c c l ear ance i nf or mat i on. Tr ai ni ng i s onl y r equi r ed once per year and i s, wi t h t he except i on of pr oj ect - speci f i c t r ai ni ng, val i d f or ever y f aci l i t y wi t hi n t he Wal l a Wal l a Di st r i c t . I f t he Responsi bl e Of f i c i al or Gover nment desi gnee det er mi nes t hat t he Aut hor i zed I ndi v i dual ' s knowl edge of t he HECP pr ocedur es ar e i nadequat e t he Responsi bl e Of f i c i al may admi ni st er a r et est . See NWWP 385- 1- 20 Chapt er 5 - Tr ai ni ng f or f ur t her gui dance.

1. 10 Saf e Cl ear ance Tr ai ni ng

Cont r act or , subcont r act or , vendor s and vi s i t or s shal l t ake t he appr opr i at e l evel of HECP Pr ocedur e t r ai ni ng commensur at e wi t h t hei r j ob dut i es. Onl y HECP cer t i f i cat es gener at ed f r om Wal l a Wal l a Di st r i c t or t he pr oj ect ar e acceptable.

Based on t he scope of wor k and si ze of cr ew, have t he appr opr i at e number of Aut hor i zed I ndi v i dual s t r ai ned t o ensur e t hat t her e ar e no del ays. Al l Cont r act or per sonnel wor ki ng i n ar eas under a Saf e Cl ear ance shal l be t r ai ned as Af f ect ed Per sons. Any non- wor ki ng per sonnel , vendor s and vi s i t or s, t hat wi l l be ent er i ng an ar ea under Saf e Cl ear ance shal l t ake Awar eness Level t r ai ni ng. Tr ai ni ng and wr i t t en t est s f or t he modul es bel ow shal l be compl et ed on- l i ne pr i or t o commenci ng on- si t e wor k. Ti me est i mat es f or t r ai ni ng f ol l ow:

a. Awar eness Level Tr ai ni ng: Appr oxi mat el y 1 hour ( non- wor ki ng per sonnel , vendor s and vi s i t or s) .

b. Af f ect ed Per sons: Appr oxi mat el y 2 hour s i n addi t i on t o Awar eness Level t r ai ni ng.

c. Aut hor i zed I ndi v i dual s: Appr oxi mat el y 3 hour s i n addi t i on t o Awar eness Level t r ai ni ng and Af f ect ed Per sonnel Tr ai ni ng.

A copy of t he Saf e Cl ear ance Pr ogr am f or t he Cont r ol of Hazar dous Ener gy ( NWWP 385- 1- 20) can be f ound on t he Wal l a Wal l a Di st r i c t I nt er net s i t e at :

http://www.nww.usace.army.mil/Portals/28/docs/contracting/OP385120.pdf.

Al l cost s f or t hi s t r ai ni ng shal l be consi der ed i nci dent al t o t he wor k, and t her ef or e, no addi t i onal payment wi l l be made. Tr ai ni ng i s an annual r equi r ement and wi l l expi r e one year f r om compl et i on dat e. Tr ai ni ng i s pr ovi ded by Vi v i d Lear ni ng Syst ems and i s avai l abl e on l i ne at ht t p: / / Hecp. vi v i dl ms. com. Cost f or t he t r ai ni ng i s di spl ayed on t he home page. Submi t t he t r ai ni ng compl et i on cer t i f i cat i on a mi ni mum of Seven ( 7) cal endar days pr i or t o t he i ndi v i dual ' s ar r i val at s i t e. Mai nt ai n t r ai ni ng document at i on on s i t e, i ncl udi ng t he i ndi v i dual ' s name and dat e of t r ai ni ng compl et i on, i n accor dance wi t h NWWP 385- 1- 20.

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00. 10 28

PROJECT SI TE RESTRI CTI ONS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 SI TE CONDI TI ONS AND OPERATI ONAL RESTRI CTI ONS

1. 4 LOWER MONUMENTAL PROJECT SECURI TY

1. 4. 1 Cont r act or Vehi c l e Access

1. 4. 2 I dent i f i cat i on of Empl oyees - Lower Monument al

1. 5 LOWER GRANI TE PROJECT SECURI TY

1. 5. 1 Cont r act or Vehi c l e Access

1. 5. 2 I dent i f i cat i on of Empl oyees

1. 5. 2. 1 Lower Gr ani t e Badgi ng

1. 5. 2. 2 Lower Gr ani t e Si t e And Saf et y I nf or mat i on

1. 5. 2. 3 Pr oj ect Secur i t y Not i f i cat i on Pager s

1. 6 DELI VERY OF EQUI PMENT

1. 7 FACI LI TY OCCUPANCY CLOSURE

1. 8 WORK SCHEDULES

1. 8. 1 Cont r act or ' s Wor k Schedul e

1. 8. 2 Gover nment ' s Wor k Schedul e

1. 9 USE OF WALLA WALLA DI STRI CT PARKS

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

ATTACHMENTS:

Secur i t y Badge For m

Secur i t y Badge For m

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 14 00. 10 28

PROJECT SI TE RESTRI CTI ONS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

Cont r act or shal l be r esponsi bl e f or compl yi ng wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s sol i c i t at i on.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. A desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:

1. 3 SI TE CONDI TI ONS AND OPERATI ONAL RESTRI CTI ONS

1. 4 LOWER MONUMENTAL PROJECT SECURI TY

The Pr oj ect s i t e i s a secur ed ar ea and access ont o t he Pr oj ect i s r est r i c t ed. The secur i t y measur es af f ect al l of t he Cont r act or ' s vehi c l es and per sonnel . Ther e wi l l be del ays when ent er i ng Pr oj ect s due t o l ocked gat es, vehi c l e i nspect i ons, and per sonnel checks. I nspect i ons and checks may i ncl ude i nspect i on of t ool boxes, br i ef cases, l unch boxes, and ot her containers.

1. 4. 1 Cont r act or Vehi c l e Access

Onl y Cont r act or ' s wor k vehi c l es and equi pment t hat ar e essent i al t o t he conduct of t he wor k wi l l be al l owed i n any wor k ar eas. No pr i vat el y owned vehi c l es ( POV' s) wi l l be al l owed. Al l Cont r act or vehi c l es shal l di spl ay sui t abl e per manent or t empor ar y i dent i f i cat i on. Al l Cont r act or vehi c l es t hat pass t hr ough l ocked gat es wi l l be subj ect t o bei ng sear ched.

1. 4. 2 I dent i f i cat i on of Empl oyees - Lower Monument al

Gover nment Pr oj ect per sonnel wi l l pr ovi de t he Cont r act or ' s per sonnel wi t h i dent i f i cat i on badges as t hey ar r i ve on s i t e. The Cont r act or shal l be r esponsi bl e f or f ur ni shi ng t he Secur i t y Badge For m( at t ached t o t he end of t hi s SECTI ON) and i ni t i al i dent i f i cat i on ( dr i ver ' s l i cense) f or each empl oyee f i ve ( 5) busi ness days pr i or t o t he empl oyee ar r i v i ng t o wor k on t he Pr oj ect s i t e, and upon i ssuance of of f i c i al badges, f or r equi r i ng each empl oyee engaged on t he wor k t o di spl ay i dent i f i cat i on at al l t i mes.

Ensur e each empl oyee' s f ul l name wi t h mi ddl e i ni t i al i s i ncl uded wi t h t he i ni t i al i dent i f i cat i on. Al l pr escr i bed i dent i f i cat i on shal l i mmedi at el y be del i ver ed t o t he Qual i t y Assur ance Repr esent at i ve f or cancel l at i on upon t he r el ease of t he empl oyee or pr oj ect compl et i on. I f r equi r ed by t he Cont r act i ng Of f i cer , empl oyees wi l l be phot ogr aphed by t he Gover nment .

Empl oyees who f ai l t o submi t t o bei ng phot ogr aphed wi l l not be al l owed on t he pr oj ect s i t e.

Ever y Cont r act or empl oyee ( pr i me or subcont r act or ) shal l have a har d hat meet i ng t he r equi r ement s of EM 385- 1- 1. Har dhat s shal l di spl ay t he Pr i me Cont r act or name, subcont r act or name, and t he empl oyee' s name. Cont r act or empl oyee har dhat s shal l not be whi t e wi t h r ed mar ki ngs. I t shal l be t he r esponsi bi l i t y of t he Pr oj ect Super i nt endent t o enf or ce t hi s r equi r ement .

1. 5 LOWER GRANI TE PROJECT SECURI TY

The Pr oj ect s i t e i s a secur ed ar ea and access ont o t he Pr oj ect i s r est r i c t ed. The secur i t y measur es af f ect al l of t he Cont r act or ' s vehi c l es and per sonnel . Ther e wi l l be del ays when ent er i ng Pr oj ect s due t o l ocked gat es, vehi c l e i nspect i ons, and per sonnel checks. I nspect i ons and checks may i ncl ude i nspect i on of t ool boxes, br i ef cases, l unch boxes, and ot her containers

1. 5. 1 Cont r act or Vehi c l e Access

Onl y Cont r act or ' s wor k vehi c l es and equi pment t hat ar e essent i al t o t he conduct of t he wor k wi l l be al l owed i n any wor k ar eas. No pr i vat el y owned vehi c l es ( POV' s) wi l l be al l owed. Al l Cont r act or vehi c l es shal l di spl ay sui t abl e per manent or t empor ar y i dent i f i cat i on. Al l Cont r act or vehi c l es t hat pass t hr ough l ocked gat es wi l l be subj ect t o bei ng sear ched

1. 5. 2 I dent i f i cat i on of Empl oyees

1. 5. 2. 1 Lower Gr ani t e Badgi ng

Gover nment Pr oj ect per sonnel wi l l pr ovi de t he Cont r act or ' s per sonnel wi t h i dent i f i cat i on badges as t hey ar r i ve on s i t e. For each empl oyee, compl et e t he Secur i t y Badge For m ( at t ached t o t he end of t hi s SECTI ON) , and send t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve and Qual i t y Assur ance Repr esent at i ve. I ncl ude each empl oyee' s f ul l name wi t h mi ddl e i ni t i al .

The i nf or mat i on must be r ecei ved at l east 30 cal endar days bef or e t he empl oyee ar r i ves at t he s i t e t o gi ve Pr oj ect per sonnel t i me t o make up t he badges. Cont r act or shal l be r esponsi bl e f or f ur ni shi ng i ni t i al i dent i f i cat i on f or each empl oyee, and upon i ssuance of of f i c i al badges, f or r equi r i ng each empl oyee engaged on t he wor k t o di spl ay i dent i f i cat i on at al l t i mes. Al l pr escr i bed i dent i f i cat i on shal l i mmedi at el y be del i ver ed t o t he Qual i t y Assur ance Repr esent at i ve f or cancel l at i on upon t he r el ease of t he empl oyee or pr oj ect compl et i on. I f r equi r ed by t he Cont r act i ng Of f i cer , empl oyees wi l l be phot ogr aphed by t he Gover nment . Empl oyees who f ai l t o submi t t o bei ng phot ogr aphed wi l l not be al l owed on t he pr oj ect site.

Ever y Cont r act or empl oyee ( pr i me or subcont r act or ) shal l have a har d hat meet i ng t he r equi r ement s of EM 385- 1- 1. Har dhat s shal l di spl ay t he Pr i me Cont r act or name, subcont r act or name, and t he empl oyee' s name. Cont r act or empl oyee har dhat s shal l not be whi t e wi t h r ed mar ki ngs. I t shal l be t he r esponsi bi l i t y of t he Pr oj ect Super i nt endent t o enf or ce t hi s r equi r ement .

1. 5. 2. 2 Lower Gr ani t e Si t e And Saf et y I nf or mat i on

Al l Cont r act or per sonnel ( i ncl udi ng al l subcont r act or s) wor ki ng on- si t e ar e r equi r ed t o v i ew t he Lower Gr ani t e Si t e and Saf et y I nf or mat i on DVD pr i or t o begi nni ng on- si t e wor k. DVD r uns appr oxi mat el y 30 mi nut es and wi l l be pr ovi ded t o t he Cont r act or by t he COR

1. 5. 2. 3 Pr oj ect Secur i t y Not i f i cat i on Pager s

The Gover nment ( Pr oj ect per sonnel ) wi l l i ssue t he Cont r act or ' s SSHO and/ or Pr oj ect Super i nt endent wi t h pager s t o be car r i ed at al l t i mes whi l e on- si t e t o r ecei ve Pr oj ect Secur i t y Not i f i cat i ons. Al l pager s shal l i mmedi at el y be del i ver ed t o t he Qual i t y Assur ance Repr esent at i ve upon t he r el ease of t he empl oyee or pr oj ect compl et i on.

1. 6 DELI VERY OF EQUI PMENT

Cont r act or shal l be r esponsi bl e f or del i ver y and r ecei pt of al l mat er i al s and equi pment . Gover nment per sonnel wi l l not be avai l abl e t o assi st t he Cont r act or i n t hese act i v i t i es. To t he maxi mum ext ent possi bl e, del i ver i es shal l ar r i ve on t he same si de of t he r i ver as t he Cont r act or ' s wor k ar ea.

Del i ver y vehi c l es wi l l be al l owed t o cr oss t he r i ver over t he dam onl y wi t h Gover nment appr oval . Del i ver y vehi c l es ar r i v i ng on t he opposi t e s i de of t he r i ver as t he wor k ar ea shal l be unl oaded out s i de t he l ocked gat e, equi pment shal l be l oaded ont o Cont r act or ' s vehi c l es, and Cont r act or ' s vehi c l es wi l l t hen be al l owed t o cr oss t he dam t o t he wor k ar ea.

1. 7 FACI LI TY OCCUPANCY CLOSURE

St r eet s, wal ks, and ot her f aci l i t i es occupi ed and used by t he Gover nment shal l not be c l osed or obst r uct ed wi t hout wr i t t en per mi ssi on f r om t he Cont r act i ng Of f i cer .

1. 8 WORK SCHEDULES

1. 8. 1 Cont r act or ' s Wor k Schedul e

At t he Pr e- Wor k Meet i ng, f ur ni sh a schedul e of number of wor ki ng days per week, shi f t s per day, and hour s per shi f t f or cont r act wor k. Fur ni sh not i f i cat i on of any change of schedul e of r egul ar wor k hour s, over t i me wor k hour s, and shi f t s of wor k cr ews and per sonnel at t he s i t e. Thi s not i f i cat i on shal l be pr ovi ded a mi ni mum of 48 hour s pr i or t o any schedul e change t o al l ow sui t abl e schedul i ng of Gover nment per sonnel and i nspect i on. Except i on t o t hi s r equi r ement may be al l owed i n case of schedul e change due t o emer gency condi t i ons.

1. 8. 2 Gover nment ' s Wor k Schedul e

a. The mai nt enance cr ews at t he dam wor k f r om 6: 30 a. m. t o 5: 00 p. m. , Monday t hr ough Thur sday. Cr ews and st af f do not wor k on weekends and Feder al hol i days. I f a Feder al hol i day f al l s on a Fr i day, t he cr ews and st af f do not wor k on t he pr ecedi ng Thur sday. A power house oper at or i s at t he s i t e 24 hour s a day, 7 days a week, i ncl udi ng Feder al hol i days but i s not avai l abl e t o assi st t he Cont r act or .

b. I f t he Cont r act or r equi r es Gover nment suppor t or assi st ance out s i de of nor mal wor k hour s, t he Cont r act or must make a f or mal wr i t t en r equest t o t he Cont r act i ng Of f i cer at l east one week pr i or t o t he dat e t hat suppor t / assi st ance i s needed. The Gover nment wi l l r evi ew t hi s r equest , but t her e i s no guar ant ee t hat Gover nment suppor t or assi st ance can be provided.

1. 9 USE OF WALLA WALLA DI STRI CT PARKS

Speci al consi der at i on f or t he use of t he Wal l a Wal l a Di st r i c t Campi ng Grounds wi l l not be gi ven t o t he Cont r act or i f campi ng at t hese s i t es.

The Cont r act or ' s cr ew may not use Gover nment par ki ng l ot s near t he Lower Monument al Dam or Lower Gr ani t e Lock and Dam f or RV par ki ng.

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used) - - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00. 90 28

I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY ( OPSEC)

PART 1 GENERAL

1. 1 SUBMI TTALS

1. 2 EMPLOYEE ESCORT

1. 3 PRE- SCREEN CANDI DATES USI NG E- VERI FY PROGRAM

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 14 00. 90 28

I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY ( OPSEC)

PART 1 GENERAL

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS. Thi s cont r act does not r equi r e access t o or handl i ng of c l assi f i ed mat er i al .

Thi s cont r act r equi r es access t o secur ed and r est r i c t ed ar eas. Secur ed ar ea i s consi der ed any l ocat i on wher e on- si t e wor k i s per f or med by Cont r act or empl oyees. The r est r i c t ed ar easconsi st s of ever yt hi ng i nsi de t he secur i t y f ence at t he pr oj ect .

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. The desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Pr e- Scr een Candi dat es Usi ng E- Ver i f y Pr ogr am; I , C

1. 2 EMPLOYEE ESCORT

Al l cont r act or empl oyees, i ncl udi ng al l associ at ed sub- cont r act or empl oyees, who ar e not i n possessi on of t he appr opr i at e secur i t y c l ear ance or access pr i v i l eges, wi l l be escor t ed i n sensi t i ve or r est r i c t ed ar eas and/ or ar eas wher e t hey may be exposed t o c l assi f i ed and/ or sensi t i ve materials.

1. 3 PRE- SCREEN CANDI DATES USI NG E- VERI FY PROGRAM

The Cont r act or must pr e- scr een Candi dat es usi ng t he E- ver i f y Pr ogr am ( http://www.uscis.gov/e-verify ) websi t e t o meet t he est abl i shed empl oyment el i gi bi l i t y r equi r ement s. The Vendor must ensur e t hat t he Candi dat e has t wo val i d f or ms of Gover nment i ssued i dent i f i cat i on pr i or t o enr ol l ment t o ensur e t he cor r ect i nf or mat i on i s ent er ed i nt o t he E- ver i f y syst em.

Addi t i onal t i me may be r equi r ed f or f or i egn nat i onal s t o pr e- scr een.

An i ni t i al l i s t of ver i f i ed/ el i gi bl e Candi dat es must be pr ovi ded t o t he cont r act i ng of f i cer , no l at er t han 30 busi ness days af t er r ecei pt of Not i ce of Awar d.

* When cont r act s ar e wi t h i ndi v i dual s, t he i ndi v i dual s wi l l be r equi r ed t o compl et e a For m I - 9, Empl oyment El i gi bi l i t y Ver i f i cat i on, wi t h t he desi gnat ed Gover nment r epr esent at i ve. Thi s For m wi l l be pr ovi ded t o t he Cont r act i ng Of f i cer and shal l become par t of t he of f i c i al cont r act f i l e.

Submi t pr e- scr eeni ng r esul t s t o t he COR vi a emai l as a passwor d pr ot ect ed pdf f i l e.

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00. 00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 RETAI NAGE OF PAYMENT

1. 2 I TEM 0001 LOWER MONUMENTAL TURBI NE MAI NTENANCE PLATFORM AND DRAFT

TUBE ACCESS PLATFORM WI TH LADDER, HATCHES, SCAFFOLDI NG AND

PERSONNEL HOI STI NG SYSTEM, FABRI CATI ON AND DELI VERY

1. 3 I TEM 0002 LOWER GRANI TE TURBI NE MAI NTENANCE PLATFORM AND DRAFT

TUBBE ACCESS PLATFORM WI TH LADDER, HATCHES, SCAFFOLDI NG AND

PERSONNEL HOI STI NG SYTEM, FABRI CATI ON AND DELI VERY

1. 4 I TEM 0003 LOWER MONUMENTAL ASSEMBLY SUPPORT AND TRAI NI NG

1. 5 I TEM 0004 LOWER GRANI TE ASSEMBLY SUPPORT AND TRAI NI NG

1. 6 I TEM 0005 LOWER MONUMENTAL STORAGE CART( S) FABRI CATI ON AND DELI VERY

1. 7 I TEM 0006 LOWER GRANI TE STORAGE CART( S) FABRI CATI ON AND DELI VERY

PART 2 PRODUCTS ( Not Appl i cabl e)

PART 3 EXECUTI ON ( Not Appl i cabl e)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 22 00. 00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

I n each i nst ance, t he cont r act pr i ce f or an i t em shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , and mat er i al s, and f or per f or mi ng al l oper at i ons r equi r ed t o compl et e t he wor k i ncl uded i n t he i t em as her ei n speci f i ed, or as ot her wi se appr oved.

1. 1 RETAI NAGE OF PAYMENT

Ret ai nage i n t he amount of 10 per cent of or i gi nal cont r act awar d amount wi l l be wi t hhel d unt i l t he f i nal submi t t al s, l i s t ed bel ow, have been appr oved by t he Gover nment . The 10 per cent r et ai nage f or f i nal submi t t al s wi l l s t ar t once t he Cont r act or has ear ned 90 per cent of t he or i gi nal cont r act val ue. See SECTI ON 01 78 00. 00 28 " CLOSEOUT SUBMI TTALS" f or addi t i onal i nf or mat i on.

a. Fi nal Shop Dr awi ngs.

b. Fi nal As- bui l t Dr awi ngs.

c. Fi nal Recor d Dr awi ngs.

d. Ret ur n of Gover nment I ssued I t ems.

e. Fi nal Oper at i on and Mai nt enance Manual s and Par t s Cat al ogs.

f . Fi nal Spar e Par t s submi ssi on.

g. Compl et e al l r equi r ed t r ai ni ng.

1. 2 I TEM 0001 LOWER MONUMENTAL TURBI NE MAI NTENANCE PLATFORM AND DRAFT TUBE

ACCESS PLATFORM WI TH LADDER, HATCHES, SCAFFOLDI NG AND PERSONNEL HOI STI NG

SYSTEM, FABRI CATI ON AND DELI VERY

The t ur bi ne mai nt enance pl at f or m and dr af t t ube access pl at f or m f abr i cat i on and del i ver y wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) .

Payment wi l l be made at t he l ump sum pr i ce f or I TEM No. 0001, " TURBI NE

MAI NTENANCE PLATFORM AND DRAFT TUBE ACCESS PLATFORM WI TH LADDER, HATCHES,

SCAFFOLDI NG AND PERSONNEL HOI STI NG SYSTEM, FABRI CATI ON AND DELI VERY, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f abr i cat i on and del i ver y of t he t ur bi ne mai nt enance pl at f or m and dr af t t ube access pl at f or m, compl et e, as speci f i ed and appr oved. Feat ur es i nc l uded wi t h t hi s i t em shal l i ncl ude, but not be l i mi t ed t o t he f ol l owi ng:

a. Ladder s

b. Hat ches

c. Scaf f ol di ng

d. Per sonnel Hoi st i ng Syst em

e. Spar e Par t s

1. 3 I TEM 0002 LOWER GRANI TE TURBI NE MAI NTENANCE PLATFORM AND DRAFT TUBBE

ACCESS PLATFORM WI TH LADDER, HATCHES, SCAFFOLDI NG AND PERSONNEL HOI STI NG

SYTEM, FABRI CATI ON AND DELI VERY

The t ur bi ne mai nt enance pl at f or m and dr af t t ube access pl at f or m f abr i cat i on and del i ver y wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) .

Payment wi l l be made at t he l ump sum pr i ce f or I TEM No. 0002, " LOWER

GRANI TE TURBI NE MAI NTENANCE PLATFORM AND DRAFT TUBE ACCESS PLATFORM WI TH

LADDER, HATCHES, SCAFFOLDI NG AND PERSONNEL HOI STI NG SYSTEM, FABRI CATI ON AND

DELI VERY, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f abr i cat i on and del i ver y of t he t ur bi ne mai nt enance pl at f or m and dr af t t ube access pl at f or m, compl et e, as speci f i ed and appr oved.

Feat ur es i ncl uded wi t h t hi s i t em shal l i ncl ude, but not be l i mi t ed t o t he following:

a. Ladder s

b. Hat ches

c. Scaf f ol di ng

d. Per sonnel Hoi st i ng Syst em

e. Spar e Par t s

1. 4 I TEM 0003 LOWER MONUMENTAL ASSEMBLY SUPPORT AND TRAI NI NG

Assembl y suppor t and t r ai ni ng wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No.

0003, " LOWER MONUMENTAL ASSEMBLY SUPPORT AND TRAI NI NG, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed of t he Tur bi ne Mai nt enance Pl at f or m and Dr af t Tube Access Pl at f or m Assembl y Suppor t and Tr ai ni ng, compl et e, as speci f i ed and appr oved.

1. 5 I TEM 0004 LOWER GRANI TE ASSEMBLY SUPPORT AND TRAI NI NG

Assembl y suppor t and t r ai ni ng wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No.

0004, " LOWER GRANI TE ASSEMBLY SUPPORT AND TRAI NI NG, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed of t he Tur bi ne Mai nt enance Pl at f or m and Dr af t Tube Access Pl at f or m Assembl y Suppor t and Tr ai ni ng, compl et e, as speci f i ed and appr oved.

1. 6 I TEM 0005 LOWER MONUMENTAL STORAGE CART( S) FABRI CATI ON AND DELI VERY

St or age car t ( s) f abr i cat i on and del i ver y wi l l be measur ed as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No. 0005, " LOWER MONUMENTAL STORAGE CART( S) FABRI CATI ON AND DELI VERY, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f abr i cat i on and del i ver y of t he St or age Car t ( s) , compl et e, as speci f i ed and approved.

1. 7 I TEM 0006 LOWER GRANI TE STORAGE CART( S) FABRI CATI ON AND DELI VERY

St or age car t ( s) f abr i cat i on and del i ver y wi l l be measur ed as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No. 0006, " LOWER GRANI TE STORAGE CART( S) FABRI CATI ON AND DELI VERY, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f abr i cat i on and del i ver y of t he St or age Car t ( s) , compl et e, as speci f i ed and appr oved.

PART 2 PRODUCTS ( Not Appl i cabl e)

PART 3 EXECUTI ON ( Not Appl i cabl e)

- - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 33 00

SUBMI TTAL PROCEDURES

PART 1 GENERAL

1. 1 REFERENCES

1. 2 DEFI NI TI ONS

1. 2. 1 Submi t t al Descr i pt i ons ( SD)

1. 2. 2 Revi ewi ng Aut hor i t y

1. 2. 2. 1 Act i on El ement s f or Submi t t al Revi ew

1. 2. 3 Wor k

1. 3 SUBMI TTAL CLASSI FI CATI ON

1. 3. 1 Gover nment Appr oved ( G)

1. 3. 2 I nf or mat i on Onl y ( I )

1. 4 CAD FI LE REQUI REMENTS

1. 4. 1 USACE CAD/ BI M Technol ogy Cent er

1. 5 PREPARATI ON

1. 5. 1 Tr ansmi t t al For m

1. 5. 2 I dent i f y i ng Submi t t al s

1. 5. 3 For mat For El ect r oni c Submi t t al s

1. 5. 4 For mat f or SD- 02 Shop Dr awi ngs

1. 5. 4. 1 Shop Dr awi ng Submi t t al s

1. 5. 5 For mat of SD- 03 Pr oduct Dat a and SD- 08 Manuf act ur er ' s

Instructions

1. 5. 6 For mat of SD- 04 Sampl es

1. 5. 7 For mat of SD- 05 Desi gn Dat a and SD- 07 Cer t i f i cat es

1. 5. 8 For mat of SD- 06 Test Repor t s and SD- 09 Manuf act ur er ' s Fi el d

Reports

1. 5. 9 For mat of SD- 01 Pr econst r uct i on Submi t t al s and SD- 11 Cl oseout

Submittals

1. 6 QUANTI TY OF SUBMI TTALS

1. 6. 1 El ect r oni c Copi es

1. 6. 2 Har d Copi es ( HC)

1. 6. 2. 1 Har d Copy Submi t t al s

1. 6. 3 Of f i c i al Recei pt of Tr ansmi t t al s

1. 6. 4 Number of Sampl es SD- 04 Sampl es

1. 6. 5 Number of Copi es of SD- 10 Oper at i on and Mai nt enance Dat a

1. 7 I NFORMATI ON ONLY SUBMI TTALS

1. 8 VARI ATI ONS REQUESTS

1. 8. 1 Consi der i ng Var i at i ons

1. 8. 2 Pr oposi ng Var i at i ons

1. 8. 3 War r ant i ng That Var i at i ons Ar e Compat i bl e

1. 8. 4 Revi ew Schedul e I s Modi f i ed

1. 9 SUBMI TTAL REGI STER

1. 9. 1 Use Of Submi t t al Regi st er

1. 9. 2 Cont r act or Use of Submi t t al Regi st er

1. 9. 3 Appr ovi ng Aut hor i t y Use of Submi t t al Regi st er

1. 9. 4 Cont r act or Act i on Code and Act i on Code

1. 9. 5 Copi es Del i ver ed t o t he Gover nment

SECTI ON 01 33 00

1. 10 SCHEDULI NG

1. 11 GOVERNMENT APPROVI NG AUTHORI TY

1. 11. 1 Revi ew Not at i ons

1. 12 DI SAPPROVED OR REJECTED SUBMI TTALS

1. 13 APPROVED/ ACCEPTED SUBMI TTALS

1. 14 APPROVED SAMPLES

1. 15 WI THHOLDI NG OF PAYMENT

1. 16 STAMPS

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

ATTACHMENTS:

ENG For m 4025

Submi t t al Regi st er

- - End of Sect i on Tabl e of Cont ent s - -

SUBMI TTAL PROCEDURES

PART 1 GENERAL

The Cont r act i ng Of f i cer ( KO) may r equest submi t t al s i n addi t i on t o t hose speci f i ed when deemed necessar y t o adequat el y descr i be t he wor k cover ed i n t he r espect i ve sect i ons. Make cer t ai n t hat each submi t t al i s compl et e and i n suf f i c i ent det ai l t o easi l y det er mi ne cont r act compl i ance.

a. Use t he same uni t s of wei ght s and measur es as t he cont r act dr awi ngs.

b. Cont r act or ' s Qual i t y Cont r ol ( CQC) Syst em Manager shal l check and appr ove al l i t ems pr i or t o submi t t al and st amp, s i gn, and dat e i ndi cat i ng act i on t aken.

c. Cl ear l y i dent i f y any pr oposed var i at i ons f r om t he cont r act requirements.

d. I ncl ude dr awi ngs; l i t er at ur e ( cat al og cut s, di agr ams, oper at i ng char t s or cur ves) ; t est r epor t s; sampl es; O&M manual s ( i ncl udi ng par t s l i s t ) ; cer t i f i cat i ons; war r ant i es; and ot her necessar y i nf or mat i on.

e. Obt ai n submi t t al appr oval pr i or t o acqui r i ng t he cover ed mat er i al or equipment.

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

ERDC/ I TL TR- 19- 6 ( Aug 2019) A/ E/ C Gr aphi cs St andar d, Rel ease 2. 1

ERDC/ I TL TR- 19- 7 ( Aug 2019) A/ E/ C CAD St andar d - Rel ease 6. 1

1. 2 DEFINITIONS

1. 2. 1 Submi t t al Descr i pt i ons ( SD)

Submi t t al s r equi r ement s ar e speci f i ed i n t he t echni cal sect i ons.

Submi t t al s ar e i dent i f i ed by Submi t t al Descr i pt i on ( SD) number s and t i t l es as f ol l ows:

SD- 01 Pr econst r uct i on Submi t t al s

Submi t t al s whi ch ar e r equi r ed t o be appr oved pr i or t o commenci ng wor k on s i t e. Submi t t al s r equi r ed pr i or t o t he st ar t of t he next maj or phase of t he wor k on a mul t i - phase cont r act . Schedul es or t abul ar l i s t of dat a or t abul ar l i s t i ncl udi ng l ocat i on, f eat ur es, or ot her per t i nent i nf or mat i on r egar di ng pr oduct s, mat er i al s, equi pment , or component s t o be used i n t he wor k.

SD- 02 Shop Dr awi ngs

Dr awi ngs, di agr ams and schedul es speci f i cal l y pr epar ed t o i l l ust r at e some por t i on of t he wor k.

Di agr ams and i nst r uct i ons f r om a manuf act ur er or f abr i cat or f or use i n pr oduci ng t he pr oduct and as ai ds t o t he Cont r act or f or i nt egr at i ng t he pr oduct or syst em i nt o t he pr oj ect .

Dr awi ngs pr epar ed by or f or t he Cont r act or t o show how mul t i pl e syst ems and i nt er di sci pl i nar y wor k wi l l be coor di nat ed.

SD- 03 Pr oduct Dat a

Cat al og cut s, i l l ust r at i ons, schedul es, di agr ams, per f or mance char t s, i nst r uct i ons and br ochur es i l l ust r at i ng s i ze, physi cal appear ance and ot her char act er i st i cs of mat er i al s, syst ems or equi pment f or some por t i on of t he wor k.

Sampl es of war r ant y l anguage when t he cont r act r equi r es ext ended pr oduct war r ant i es.

SD- 04 Sampl es

Fabr i cat ed or unf abr i cat ed physi cal exampl es of mat er i al s, equi pment or wor kmanshi p t hat i l l ust r at e f unct i onal and aest het i c char act er i st i cs of a mat er i al or pr oduct and est abl i sh st andar ds by whi ch t he wor k can be judged.

Col or sampl es f r om t he manuf act ur er ' s st andar d l i ne ( or cust om col or sampl es i f speci f i ed) t o be used i n sel ect i ng or appr ovi ng col or s f or t he pr oj ect .

Fi el d sampl es and mock- ups const r uct ed on t he pr oj ect s i t e est abl i sh st andar ds by whi ch t he ensur i ng wor k can be j udged. I ncl udes assembl i es or por t i ons of assembl i es whi ch ar e t o be i ncor por at ed i nt o t he pr oj ect and t hose whi ch wi l l be r emoved at concl usi on of t he wor k.

SD- 06 Test Repor t s

Repor t s i gned by aut hor i zed of f i c i al of t est i ng l abor at or y t hat a mat er i al , pr oduct or syst em i dent i cal t o t he mat er i al , pr oduct or syst em t o be pr ovi ded has been t est ed i n accor d wi t h speci f i ed r equi r ement s. ( Unl ess ot her wi se speci f i ed t est i ng must have been compl et ed wi t hi n t hr ee ( 3) year s of dat e of cont r act awar d f or t he project.)

Repor t whi ch i nc l udes f i ndi ngs of a t est r equi r ed t o be per f or med by t he Cont r act or on an act ual por t i on of t he wor k or pr ot ot ype pr epar ed f or t he pr oj ect bef or e shi pment t o j ob s i t e.

Repor t whi ch i nc l udes f i ndi ng of a t est made at t he j ob s i t e or on sampl e t aken f r om t he j ob s i t e, on por t i on of wor k dur i ng or af t er installation.

I nvest i gat i on r epor t s.

Dai l y l ogs and checkl i st s.

Fi nal accept ance t est and oper at i onal t est pr ocedur e.

SD- 07 Cer t i f i cat es

St at ement s pr i nt ed on t he manuf act ur er ' s l et t er head and si gned by r esponsi bl e of f i c i al s of manuf act ur er of pr oduct , syst em or mat er i al at t est i ng t hat pr oduct , syst em or mat er i al meet s speci f i cat i on r equi r ement s. Must be dat ed af t er awar d of pr oj ect cont r act and cl ear l y name t he pr oj ect .

Document r equi r ed of Cont r act or , or of a manuf act ur er , suppl i er , i nst al l er or subcont r act or t hr ough Cont r act or , t he pur pose of whi ch i s t o f ur t her qual i t y of or der l y pr ogr essi on of a por t i on of t he wor k by document i ng pr ocedur es, accept abi l i t y of met hods or per sonnel qualifications.

Conf i ned space ent r y per mi t s.

Text of post ed oper at i ng i nst r uct i ons.

SD- 08 Manuf act ur er ' s I nst r uct i ons

Pr epr i nt ed mat er i al descr i bi ng i nst al l at i on of a pr oduct , syst em or mat er i al , i ncl udi ng speci al not i ces and Mat er i al Saf et y Dat a sheet s concer ni ng i mpedances, hazar ds and saf et y pr ecaut i ons.

SD- 10 Oper at i on and Mai nt enance Dat a

Dat a t hat i s f ur ni shed by t he manuf act ur er , or t he syst em pr ovi der , t o t he equi pment oper at i ng and mai nt enance per sonnel , i ncl udi ng manuf act ur er ' s hel p and pr oduct l i ne document at i on necessar y t o mai nt ai n and i nst al l equi pment .