A.02.07_Erbil JA Final Signed - red_Redacted.pdf

PDF 719 KB Posted

Attached to
J&A Posting for North Old Erbil International Airport Building Renovation
Solicitation number
Not on record
Issued by

About this file

This justification document supports two C-type contracts for facilities and infrastructure projects at Erbil Airbase in Iraq. The first contract is for the renovation of the North Old Erbil International Airport building, with a 240-day base period and seven option periods. The second contract is for the construction of the Erbil Airbase Aviation Task Force ramp, with a 150-day base period and a 30-day option period. The total period of performance for the ramp project is 180 days. The justification cites authority under FAR 6.302-1(a)(2) for contracts with only one responsible source to meet the agency's requirements. The preparing agency is the Department of the Army Corps of Engineers for an unspecified solicitation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Control Number: TAE-FY23-0001

“Controlled Unclassified Information”

Justification Review Document for Other than Full and Open Competition - FAR Part 6

Program/Equipment: This J will support two C-Type contracts for Erbil Airbase in Iraq: (1) Repair North Old Erbil International Airport Building, and (2) Construct the Erbil Airbase Aviation Task Force Ramp.

Authority: The statutory authority permitting limited sources as prescribed in 10 U.S.C. § 3204(a)(1) as implemented by FAR 6.302-1(a)(2), when the supplies or services are required by the agency are available from only one responsible source, or, for DoD, NASA, and the Coast Guard, from only one or a limited number of responsible sources, and no other type of supplies or services will satisfy agency requirements, full and open competition need not be provided for.

Amount:

for North Old Erbil International Airbase Building for Erbil Airbase Aviation Task Force Ramp

Period of Performance/Delivery Date:

North Old Erbil International Airbase Building Base period is 240 calendar days, with seven option periods

Erbil Airbase Aviation Task Force Ramp Base period is 150 calendar days, with one 30-day option period. Total period of performance is 180 calendar days including base and all options.

DSN:

Date: 04-May-2023

Prepared by:

Typed Name:

Title: Contract Specialist

E-mail:

File details come from the government source that posted it. Updated .