A.02 Capabilities & Experience Worksheet.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- W912GB26X1AX6
- Issued by
-
Department of the Army European Command
About this file
The file is a Capabilities & Experience Worksheet for engineering testing and survey services across European countries. The spreadsheet details specific technical capabilities for tasks including hazardous material testing, destructive and non-destructive structural testing, utility surveys, geotechnical testing, fire flow testing, and UXO (unexploded ordnance) surveys. The worksheet allows vendors to mark their in-house or subcontract capabilities for tasks in countries like Germany, Poland, Belgium, Netherlands, Luxembourg, Norway, Denmark, Romania, Italy, and Hungary, corresponding to a U.S. Army Corps of Engineers planned Blanket Purchase Agreement (BPA) for engineering services. The associated federal contract opportunity indicates a potential $5,000,000 BPA with a solicitation expected in February 2026 and BPA issuance planned for late April 2026, focusing on engineering testing and survey services at Department of Defense facilities across Europe.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Country | |||||||||||
| Germany | Poland | Belgium | Netherlands | Luxembourg | Norway | Denmark | Romania | Italy | Hungary | ||
| BPA Tasks | Hazardous Material Testing | ||||||||||
| Pre-design or Independent Technical Review (ITR) Checks | |||||||||||
| Destructive structural testing and surveys | |||||||||||
| Non-destructive testing: concrete | |||||||||||
| Non-destructive testing: asphalt | |||||||||||
| Soils and aggregates | |||||||||||
| Utility Capacity and condition surveys | |||||||||||
| Fire flow testing | |||||||||||
| Roofing conditions and materials survey | |||||||||||
| As-built development/ verification | |||||||||||
| Steel reinforcment / stuctural steel | |||||||||||
| UXO Survey | |||||||||||
| Geotechnical Testing | |||||||||||
| Special Inspections / lab testing | |||||||||||
| Instructions: In each box, mark In-House or Subcontract in countries where you have the capability to perform. | |||||||||||
| Leave blank if you do not have in-house or subcontract capabilities to perform the task. |
File details come from the government source that posted it. Updated .