A.02 Attachment Webb_lime_application_Attach_1-4.pdf
PDF 6 MB Posted
- Attached to
- Webb Lime Application
- Solicitation number
- W9127N21R0039
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.02 PWS Webb Lime Application.pdf | ||
| B.08 Solicitation W9127N21R0039 Webb Lime Application.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CathlametCathlamet
C o l u m b i a R i v e r
P u g e tP u g e t
I s l a n dI s l a n d
L i t t l e I s l a n d
L i t t l e I s l a n d
WallaceWallace Is.Is.
WhitesWhites Is.Is.
C a t h l a m e t C h a n n e l
W ah k i ak u m
C o .
C o w lit z
C o.
C la t s o p
C o .
C o l u m bi a C o.
Brown Island Brown Island
55555454
474746464545
7,460,000
7,460,000
7,480,000
7,480,000
7,500,000
7,500,000
7,520,000
7,520,000
0, 0, 0, 0, 0, 0, 123°22'38"W
123°22'38"W
123°15'8"W
123°15'8"W
°7
'1
"N
°7
'1
"N
Columbia River Channel Improvement Project Location Map
Webb Mitigation Site River Miles 37 - 55
1 0 1 20.5
Miles
1:100,000
Projection: State Plane, Oregon North Zone, NAD 83.
Map Production Date: 13 May 2004
Webb Mitigation Site
C o l u m b i a C o .
O r e g o n
C o l u m b i a C o .
O r e g o n
C o w l i t z C o .
W a s h i n g t o n C o w l i t z C o .
W a s h i n g t o n
C l a t s o p C o .
O r e g o n
C l a t s o p C o .
O r e g o n
W a h k i a k u m C o .
W a s h i n g t o n
W a h k i a k u m C o .
W a s h i n g t o n
Attachment 1 g2odnjbs Text Box Driving Directions:
Depart I-5 Take Exit 36 onto SR-432 Tennant Way for 3.1 mi Turn LEFT (South) onto SR-433 Oregon Way for 2.5 mi Entering Oregon across Longview Bridge Bear RIGHT (West) onto US-30 for 17.9 mi Turn RIGHT (North) onto Woodson Rd for 0.1 mi Turn RIGHT to stay on Woodson Rd for 0.9 mi Bear RIGHT (East) onto Webb District Rd for 0.9 mi Arrive at Webb Wildlife Mitigation Site g2odnjbs Callout Enter from Webb District Rd g2odnjbs Line g2odnjbs Typewritten Text
ATTACHMENT 2
Entrance 1 of 2
ATTACHMENT 3
ATTACHMENT 3
Entrance 2 of 2
CONTRACT DISCREPANCY REPORT
Instructions: QAP fills in blocks 1, 3, 4, 5 (prepared), and 6. Contractor fills in blocks 9 and 10.
1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY
3. TO: (Contractor and Managers Name) 4. FROM: (Name of QAE)
5. DATES
PREPARED RETURNED BY CONTRACTOR ACTION COMPLETE
6. DISCREPANCY OR PROBLEM: (Describe in detail: include applicable SOW/Contract references: attach continuation sheet if necessary.)
7. SIGNATURE OF CONTRACTING OFFICER
8. TO: (Contracting Officer) FROM: (Contractor)
9. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE: ATTACH CONTINUATION SHEET IF NECESSARY.
(Cite applicable Q.C. program procedures or new Q.C. procedures.)
10. SIGNATURE OF CONTRACTOR REPRESENTATIVE DATE
11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, rejection; attach continuation sheet if necessary.)
12. GOVERNMENT ACTIONS (Reduced payment, cure notice, show cause, other.)
CLOSE OUT
NAME-TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
QAE
ACO
Attachment 4
File details come from the government source that posted it. Updated .