A.02 Attachment 3 Navlock print for scaffolding location reference.pdf

PDF 179 KB Posted

Attached to
Bonneville Dam Scaffolding Requirement
Solicitation number
W9127N22Q0023
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLAN SECTION

EL.0.0

EL.-34.0

EL.-17.0

S T

A

S T

A

MITER GATE SWING

ARM BLOCKOUT

MITER GATE RECESS

N

S T

A

S T

A

MITER GATE RECESS

MITER GATE SWING

ARM BLOCKOUT

EL.-34.0

EL.-17.0

EL.0.0

A

A

EL.0.0

EL.-17.0

{ OF LOCK

TJB

MONOLITH 4

A

{ LOCK

EL.-17.0

EL.88.0 EL.88.0

EL.71.0

EL.40.0

EL.-34.0

43'-0" 43'-0" 43'-0"

EL.-12.0

TOP OF SILL

S L

O P

E

113'-0"T

T

S L

O P

E

T

T

T

T

T

T

T

T

WALL ARMOR

EL.60.92

EL.39.95

EL.76.33

46'-6"T

T

EL.-17.0 EL.-34.0

NOTES:

1. FOR GENERAL NOTES, SEE SHEET W19.

FLOW

FLOW FLOW

EL.-42.0

EL.-42.0

FOR PEDESTRIAN WALKWAY DETAILS,

2-4/134R74

R74

R74

R74

EL.40.0 FACE OF WALLEL.40.0 FACE OF WALL

EL.88.0 FACE OF WALL

GENERAL PLAN,

ELEVATIONS AND SECTION

CONTR. JT.

CONTR. JT.

CONTR. JT.

CONTR. JT.

CONTR. JT.

CONTR. JT.

S T

A

S T

A

S T

A

EL. 88.0

EL. 88.0

EL. 40.0

EL. 40.0

EL. 88.0

EL.-20.0

SCALE: ˆ" = 1'-0"

SCALE: ˆ" = 1'-0"

SCALE: ˆ" = 1'-0"SCALE: ˆ" = 1'-0"

2. FOR WATER STOPS, SEE SHEET R1.

3. FOR EXCAVATION, SEE SHEET G14.

5. ROCKLINE AS SHOWN IS APPROXIMATE.

N.C.

N.C.

AIR BUBBLER SYSTEM

N.C.

N.C.

SEE SHEET R105

TANNER CREEK A.W.S.

CROSSSOVER GALLERY DRAIN

U/S DRAINAGE SHAFT

SUMP DRAIN PIPE

SILL DRAIN

EL.35.0

JRH GJB

MITER GATE

MACHINERY HATCH

UNWATERING PUMP

ACCESS HATCH

ELEVATOR SHAFT

SOUTH STAIRWELL

ELEVATOR PIT

ELEVATOR JACK SHAFT

MECH. ROOM

FAN ROOM

LOBBY 3

LOBBY 4

NORTH STAIRWELL

FOYER

CONCRETE OUTLINE

4. DIMENSIONS SYMMETRICAL ABOUT LOCK CENTERLINE

UNLESS OTHERWISE SPECIFIED.

S U

R F

A C

E S

U R

F A

C E

EL. 88.0

EL. 81.58

D/S VISITERS

STRUCTURE

BUILDING CURB, SEE SHEET R102.

EL. 88

D/S

CONTROL

STRUCTURE

EL.-15.50

PINTLE

BLOCKOUT

SOUTH STAIRWELL

NORTH STAIRWELL

S0UTH WALL NORTH WALLLOBBY 2

PEDESTRIAN WALKWAY

EL.-15.50

PINTLE BLOUTKOUT

NORTH WALL SOUTH FACE ELEVATION SOUTH WALL NORTH FACE ELEVATION

C.J. LIFT LINE

RUSTICATION JOINTS (TYP.) RUSTICATION JOINTS (TYP.)

SEE SHEET R105

SEE SHEET S101

1 90ARP30 GENERAL DC

RESISTANCE THERMOMETER (R.T.D.)

#3-C.E. 284.

R.T.D. #4

R.T.D. #5

2X4X134.BDN

3 4

KEY PLAN

N

28 32

A

B

C

A

B

4 3

C

D D

4 3 2 1

U.S. ARMY ENGINEER DISTRICT, PORTLAND

BYDESCRIPTIONREVISION DATE

SUBMITTED:

DATE: SHEET:

CHECKED:DESIGNED: DRAWN:

U.S. ARMYCORPS OF ENGINEERS

CHIEF, DESIGN BRANCH

VOLUME

COLUMBIA RIVER OREGON - WASHINGTON

BONNEVILLE NAVIGATION LOCK

BDN-

NAVIGATION LOCK

CADD GENERATED DESIGN FILE:

W.E. DAUGHERTY, P.E.

THIS PRINT REDUCED

TO ONE-HALF SCALE

/BONN/BNL/PLANS2/

AS CONSTRUCTED

CONTRACTOR:

AS CONSTRUCTED TO: 12 MAY '94

CONTRACT N0.: DACW57-90-C-0031

KIEWIT / AL JOHNSON, A.J.V.

Scaffolding Area g2odbclc Highlight

File details come from the government source that posted it. Updated .