A.01.28 EXHIBIT 2 - PRS.pdf
PDF 112 KB Posted
- Attached to
- DRAFT Chemical, Environmental, and Munitions (Unrestricted) - CHEM-RU Solicitation Federal contract opportunity
- Solicitation number
- Not on record
About this file
This document contains a draft performance requirements summary for a chemical, environmental, and munitions services contract and the related draft solicitation notice. The performance requirements summary outlines key contract and task order level objectives such as maintaining high quality products and services, safety standards, and performance compliance. It establishes minimum acceptance criteria and standards for measuring and monitoring performance, including customer satisfaction rates, corrective action requests, and safety violations. The summary also defines potential incentives for meeting performance thresholds as well as disincentives like cure notices, contract or task order terminations, and adverse past performance reports for failing to meet standards. The related draft solicitation concerns an unrestricted chemical, environmental, and munitions services contract opportunity issued by the U.S. Army Corps of Engineers Engineering Support Center Huntsville but provides no further salient details on required products or services, response dates, set-asides, or other contracting information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT C - Sample Task Order 12.4.2020.pdf | ||
| A.01.32 EXHIBIT 3 - QASP.pdf | ||
| EXHIBIT 7 - Small Business Participation Plan 201125.pdf | ||
| EXHIBIT 5 - CDRL 2 of 3.pdf | ||
| EXHIBIT 5 - CDRL 1 of 3.pdf | ||
| ATTACHMENT A - Past Performance Questionnaire.doc | DOC document | |
| ATTACHMENT B - Experience Reference.doc | DOC document | |
| EXHIBIT 6 - Key Subs and Personnel.pdf | ||
| EXHIBIT 1 - DIDs 9.14.2020.pdf | ||
| EXHIBIT 5 - CDRL 3 of 3.pdf | ||
| ATTACHMENT E - Letter of Commitment for Key Personnel.doc | DOC document | |
| ATTACHMENT D - Key Personnel Resume.doc | DOC document | |
| ATTACHMENT F - Letter of Commitment of Key Subcontractor.doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 2
Performance Requirements Summary
Contract Level Objectives Performance Standard Acceptance Criteria Measurement/
Monitoring Method Incentive/Disincentives For Meeting or Not Meeting the Acceptable Quality Level
Quality of Product or Service Client satisfaction
Client satisfaction and quality
80% of comments express overall satisfaction
Feedback may be obtained via CEHNC customer satisfaction survey
A Contractor not receiving satisfactory appraisals may have an adverse past performance report issued.
Quality Performance Over All Task Orders Awarded
Quality performance IAW contract PWS and Task order PWS.
80% of all final deliverables received are accepted within 2 submissions
Feedback may be obtained via CEHNC customer satisfaction survey, COR records
A Contractor not receiving satisfactory appraisals may have an adverse past performance report issued.
Project Management Key Personnel Management of Key
Personnel Contractor submits 100% of all key personnel changes to the KO for approval before changes made at the Contract and/or Task Order level.
Key personnel are not routinely changed (more than 2 times) on one or more projects (or more than 3 times for key personnel overseeing base contract requirements over the life of the contract.
COR Surveillance A Contractor not receiving satisfactory appraisals may have an adverse past performance report issued.
Task Order Level – The performance requirements in this summary will be included in every task order. Other performance requirements may be included with the task order as appropriate for the particular project.
Desired Outcomes
Required Services Performance Standards
Monitoring Method Incentive/Disincentives For Meeting or Not Meeting the Acceptable Quality Level
Quality of Product or Service Safety Maintain high safety standards Zero Class A Safety violations where the Contractor is determined at fault.
Submission of accident reports, adverse safety inspection reports, and similar documents.
Issuance of a cure notice and possible termination of task order or contract for continuous or uncorrected safety violations, and/or adverse past performance reports may be issued.
Performance Compliance with PWS and referenced applicable regulations
No more than 5 CARs received by the Contractor within a given task order
COR Submission of CARs, COR report of failure to delivery acceptable product or service in accordance with Performance-Based Milestones/Objectives.
Issuance of a cure notice and possible termination of task order or contract for continuous or uncorrected performance deficiencies, or for failure to complete Performance-Based Milestones/Objectives, and/or an adverse past performance report may be issued.
File details come from the government source that posted it. Updated .