A_ CanopyInstallationDavisES_MabryMS_PitnerE.pdf
PDF 157 KB Posted
- Solicitation number
- PE-63310-NONST-2024-000000032
- Issued by
- Cobb County, Georgia
About this file
This document is an Invitation for Bid (IFB) issued by the Cobb County School District (CCSD) for the construction of canopy installation projects at four schools - Davis Elementary School, Mabry Middle School, Pitner Elementary School, and Shallowford Falls Elementary School. The scope of work includes the construction of prefabricated aluminum canopy systems, new LED lighting, and associated site work such as saw cutting and patching of existing concrete walkways. Bids are due by 2:00 PM ET on January 17, 2024, and a mandatory pre-bid site visit will be held on December 19, 2023. To be eligible to bid, contractors must pre-qualify by January 8, 2024, and provide proof of previous job experience within 30% of the project cost. Bid documents can be obtained from the project architect for a non-refundable fee of $250 for hard copies or $125 for electronic copies. The successful bidder will be required to provide a 5% bid bond, and the awarded contract will require 100% performance and payment bonds.
The IFB specifies that the contract, if awarded, will be on the basis stated in the Instructions to Bidders. No bid may be withdrawn for 60 days after bid opening except within 48 hours if an appreciable error can be shown. CCSD reserves the right to accept or reject any or all bids and to waive technicalities and informalities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| D_ CanopyInstallationDavisES_MabryMS_PitnerE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00020-1 IFB B24054 – Canopy Installation for Davis ES, Mabry MS, Pitner ES, & Shallowford Falls ES
INVITATION FOR BID Cobb County School District
SECTION 00020
INVITATION FOR BID
IFB B24054
The scope of work includes but is not limited to the following:
Davis ES Bus Parking and Car Drop-Off Canopy
A. Bus Parking Area: Construction of a new prefabricated aluminum canopy U-Bent system consisting of 2 columns supporting a beam to which an extruded deck canopy roof is attached.
This project also entails saw cutting and patching of the existing concrete walkway for the installation of the foundations for the new canopy columns.
B. Car Drop-off Area: Construction of a new prefabricated aluminum canopy cantilevered bent system consisting of a single column used to support a beam to which an extruded deck canopy roof is attached. Saw cutting and patching of the existing concrete walkway will be required to accommodate installation of underground downspouts for the cantilevered bent system.
C. New LED lighting shall be included as part of the new canopy installation scope.
D. Removal of existing trees and shrubbery located directly adjacent to the building on the bus parking side is included in the scope of the work and well a providing new sod to address erosion control.
Mabry MS Front Entrance Canopy The construction of a stepped new prefabricated aluminum canopy U-Bent system consisting of 2 columns supporting a beam to which an extruded deck canopy roof is attached at the front entrance to the school.
This project also entails saw cutting and patching of the existing concrete walkway for the installation of the foundations for the new canopy columns. New LED lighting shall be included as part of the new canopy installation scope.
Pitner ES Car Drop-Off Canopy
A. Hip Canopy Roof: Construction of a new prefabricated aluminum canopy with an extruded roof deck attached to prefabricated aluminum rafters and aluminum beams supported on 4 aluminum columns at the front entry area of the school. This project also entails saw cutting and patching of the existing concrete walkway for the installation of the foundations for the new canopy columns.
B. Car Drop-off Area: Construction of a new prefabricated aluminum canopy cantilevered bent system consisting of a single column used to support a beam to which an extruded deck canopy roof is attached. Saw cutting and patching of the existing concrete walkway will be required to accommodate installation of column foundations and underground downspouts for the cantilevered bent system.
C. New LED lighting shall be included as part of the new canopy installation scope.
Shallowford Falls ES Car Drop-Off Canopy The construction of a new prefabricated aluminum canopy U-Bent system consisting of 2 columns supporting a beam to which an extruded deck canopy roof is attached. This project also entails saw cutting and patching of the existing concrete walkway for the installation of the foundations for the new canopy columns. New LED lighting shall be included as part of the new canopy installation scope.
Painting of the existing steel columns, beams and metal roof deck at the existing canopy at the building’s entry area shall be included as part of the project scope of work.
00020-2 IFB B24054 – Canopy Installation for
INVITATION FOR BID Cobb County School District
Sealed bids are requested by the Cobb County School District (CCSD) from approved vendors for construction of:
PROJECT NAME: Canopy Installation for Davis ES, Mabry MS, Pitner ES, & Shallowford Falls ES
PROJECT NUMBERS: S5K134DAVE, S5K135MABM, S5K138PITE, S5K139SHFE
BID NUMBER: IFB B24054
Bids will be received through the CCSD Bonfire Interactive Portal at https://cobbk12.bonfirehub.com/portal/?tab=openOpportunities
Due Date/Time: 2:00 PM, ET, January 17, 2024
At this time the bids will be publicly opened and read aloud by the Cobb County School District, Procurement Services Department at 6975 Cobb International Blvd. Kennesaw, Georgia 30152. Bids will be time and date stamped by the CCSD Bonfire Interactive Portal. Bids submitted in any manner other than through the CCSD Bonfire Interactive Portal will not be accepted.
Mandatory pre-bid site visit meetings will be held at each school consecutively on December 19, 2023 starting at 1:00 PM ET at Pitner Elementary School. Below is the order of the site visit meetings.
Pitner Elementary School, 4575 Wade Green Road, Acworth, GA 30102 Davis Elementary School, 2433 Jamerson Road, Marietta, GA 30066 Mabry Middle School, 2700 Jims Road, Marietta, GA 30066 Shallowford Falls Elementary School, 3529 Lassiter Road, Marietta, GA 30062
Attendance at this pre-bid conference is a mandatory prerequisite to submitting a bid. A representative from your company is required to visit the sites to confirm conditions before submitting a bid. Only interested contractors/sub-contractors shall attend the site visits.
Bid Documents may be reviewed at the Office of the Architect/Engineer and the CCSD Procurement Services Department.
To be eligible to respond to this bid, Contractors must pre-qualify as outlined in CCSD Board Administrative Rule FGC-R which is available on the CCSD website, www.cobbk12.org by selecting the “Menu”, next select “Board”, and click on “Policies & Rules”, then select Section “F” and choose FGC-R (Construction Contractor Prequalification). The deadline for submitting pre-qualification requirements for this project is 3:00 PM ET on January 8, 2024. Contractors must provide proof of previous job experience within 30% of the cost of this project. CCSD will review the pre-qualification submittal and respond within five (5) business days.
Contractor’s Pre-Qualification submittal should be emailed to Wendy Bell at: wendy.bell@cobbk12.org.
All communications concerning these documents and project must be submitted through the CCSD Bonfire Interactive Portal. Only inquiries received by 3:00 PM ET on January 8, 2024, will be considered.
Responses to all inquiries will be posted to the CCSD Bonfire Interactive Portal.
https://cobbk12.bonfirehub.com/portal/?tab=openOpportunities https://www.google.com/maps/place/2433+Jamerson+Road+Marietta,+GA+++++++++++++++++++30066 https://www.google.com/maps/place/2700+Jims+Road+Marietta,+GA+++++++++++++++++++30066 https://www.google.com/maps/place/3529+Lassiter+Road+Marietta,+GA+++++++++++++++++++30062 http://www.cobbk12.org/ mailto:wendy.bell@cobbk12.org
00020-3 IFB B24054 – Canopy Installation for
INVITATION FOR BID Cobb County School District
Bid Documents will be issued by:
Architect or Engineer: J.W. Robinson & Associated, Inc. (Contact: Franklin Dean) Address: 1020 Ralph David Abernathy Blvd. S.W Atlanta, GA 30310
Phone: 404-753-4129, Ext. 116
Email: franklin@jwrobinson.com to all interested parties upon receipt of a request accompanied by a non-refundable check made payable to the issuing party above in the amount of:
$250.00 per set for hard copy $125.00 per set for an electronic copy
Hard copy documents will be shipped postpaid, as soon as possible. Bid responses will only be accepted from companies that have purchased bid documents from the Architect/Engineer.
The contract, if awarded, will be on the basis stated in the Instructions to Bidders. No bid may be withdrawn for 60 days after bid opening except within 48 hours if an appreciable error can be shown.
Bid responses must be accompanied by a bid bond made payable to the Cobb County School District, in the amount equal to five (5) percent of the bid price. (Certified Checks Not Acceptable.) The successful bidder will be required to furnish a Performance Bond and a Payment Bond acceptable to the Cobb County School District in an amount equal to 100 percent of the contract price and executed by a Surety Company licensed to do business in the State of Georgia and listed in the Department of the Treasury Circular 570, latest edition. The Surety Company shall have an A.M. Best Company minimum rating of "A-" with a financial size of VI “6” or better. Bonds must be accompanied by a letter stating the bonding company's current rating for verification before acceptance by the Owner and execution of the formal Owner/Contractor agreement.
Bonding of Subcontractors: Include in the Base Bid, Performance and Labor and Materials Payment Bonds, each in 100% of the subcontract sum, for each Subcontractor having a contract of $50,000.00 or more for Roofing, HVAC, Plumbing, Sprinkler System and Electrical Work as required by the General Conditions.
Contractor and Subcontractors shall require the Attorney-in-Fact who executes bonds on behalf of sureties to attach a certified, current copy of his/her Power of Attorney.
Cobb County School District reserves the right to accept or reject any or all bids and to waive technicalities and informalities.
BY: Cobb County School District Barbara Bates, CPPB, NIGP-CPP Director of Procurement Services
DATE: December 12, 2023
END OF SECTION
mailto:franklin@jwrobinson.com
File details come from the government source that posted it. Updated .