A-2 Statement of Work-Rev2.docx
DOCX document 32 KB Posted
- Attached to
- Precision Controlled Airstream Forcing System
- Solicitation number
- 1333ND22QNB680354
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ Combined Synopsis Solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NIST Requirements
Precision-Controlled Airstream Forcing System
Background
The National Institute of Standards and Technology (NIST) Physical Measurements Laboratory (PML) high-dose dosimetry program supports radiation-processing applications by assuring that the absorbed dose to the product, often prescribed or limited by regulatory agencies, is traceable to NIST standards. Calibration services rely on Cobalt-60 irradiators. With a half-life of 5.3 years, irradiators must be continuously replaced or re-sourced to maintain appropriately high dose rates. The program maintains a series of highly uniform irradiators of different dose rates. The well-established chemical dosimeter has a complex dose-rate response at lower dose rates, increasing uncertainty values above acceptable levels. Additionally, the dosimeters often have to be irradiated in non-ambient temperature conditions (–77 °C to +19 °C or +26 °C to +70 °C) for within the irradiator and the air stream system used has to be reliable and proven for which the precision-controlled airstream forcing system has been for many years in that we use it now within our High-Dose Dosimetry Calibration Services.
Scope As NIST is acquiring a new irradiator for the continuation of the NIST high-dose calibration services, NIST also need to acquire a new precision-controlled airstream forcing system which is critically needed to accompany the irradiator.
Minimum Requirements
The system shall meet the minimum requirements identified below. All items must be new. Used or remanufactured equipment will not be considered for award. Experimental, or prototype will not be considered. The use of “gray market” components not authorized for sale in the U.S. by the proposer is not acceptable. All line items shall be shipped in the original manufacturer’s packaging and include all original documentation and software, when applicable.
Contract Line Item Number (CLIN) 0001: The Contractor shall provide one (1) precision-controlled airstream forcing system that meet the following minimum specifications:
1. Temperature:
a. Temperature range: -80C to +225C
b. Accuracy: +/-1C
c. Setability: 0.1C
d. Indication: 0.1C
e. Stability: +/-0.5C at DUT
f. Ramp Rate: 1C to 999C Min or Max
2. Dual stage mechanical refrigeration, no LN2 or CO2 required
3. No Holding Arm (includes delivery line)
4. Probe head movable mount (nozzle holder)
5. Built-in electrically grounded work surface
6. Air Filters:
a. Water, Oil, & Particle
7. Air Dryers:
a. Heatless regenerative: -85C dew point
8. Airflow (output):
a. Range: 5 - 20 SCFM
b. Setability: 1 SCFM
9. System Controller:
a. Type: Microprocessor PLC-based PID
b. Remoteable, Touch-Screen Control with auto-tuning, datalogging, and multi-level password protection
c. Program: 48 programs of 8 segments each
d. Safeties: Low flow, over temp, EMO interlock
e. Status indication: Air input, air temp, air/DUT control OK, run/idle, purge, defrost, power
f. Thermocouples: Type T Internal/external for temperature control/monitoring
g. Available limits: Ramp rate, Min/Max air temperature
h. GPIB and RS232 Interface
i. USB
10. Physical Characteristics:
a. Footprint: 21" wide x 27" deep
b. Arm reach: 55" radius
c. Work surface height: 38"
d. Weight: 425 lbs.
e. Mobility: 4 full-swivel, Easily lockable casters
f. Front mounted handle for easy mobility
11. Utility Requirements:
a. Electrical: 208-230V, 60 Hz
b. Air: 25 SCFM at 80 - 125 psig, dew point 10C
12. Environment:
a. Temperature: 12C to +28C
b. Humidity: 0% to 65% RH
c. VAC Hz Max SCFM at 225 °C (approximate)
i. 240 60; 17 scfm
ii. 208 60; 12 scfm
iii. 200 50; 10 scfm
0. Delivery:
Delivery shall be FOB destination (or equivalent terms, such as INCOTERMS Delivered Duties Paid). This delivery shall occur not later than twelve (12) months ARO.
FOB Destination means: The contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for any loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order; and pay all charges to the specified point of delivery. The contractor shall deliver to:
The National Institute of Standards and Technology 100 Bureau Drive, Building 245, Room H018 Gaithersburg, MD 20899-1640
Installation
The system requires no installation by the Contractor.
Inspection and Acceptance
In addition to the inspection and acceptance terms articulated in 52.212-4, the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.
Inspection and acceptance shall occur within 14 business days after receipt and installation of the system at NIST.
Performance tests and evaluations will be those tests as required to ensure that the irradiator meets the minimum requirement specifications as stated in the “Minimum Requirements” section. (above)
Warranty Specifications
The contractor shall warrant the entire system for a period of a minimum of twelve (12) months after installation of the equipment or a minimum of sixteen (16) months from shipment, whichever is sooner. If equipment must be stored for a period prior to installation, all shipping crates will be stored in a secure, air-conditioned facility.
Payment Schedule
The Contractor shall be paid, in accordance with Net 30-day payment terms, upon receipt and acceptance of a proper invoice, in accordance with the following schedule:
CLIN 001:
| 100% |
| Upon inspection and Site Acceptance Test (SAT) |
The Government anticipates inspection will occur upon:
a. After the testing procedures set forth in this document have been completed
File details come from the government source that posted it. Updated .