A-1_SOW.docx

DOCX document 261 KB Posted

Attached to
Klamath River Complex Road Slump Repair Aggregate
Solicitation number
12970224Q0019
Issued by

About this file

This document is a Statement of Work (SOW) for a federal contract opportunity to procure and deliver aggregate and soil materials to repair a Forest Service road (38N07) in Plumas County, California.

The SOW specifies the required materials, including 90 cubic yards of bedding material, 1,800 cubic yards of backfill material, 85 cubic yards of subbase aggregate, and 30 cubic yards of class II base aggregate. The materials must conform to FP-14 standards and will be delivered on an on-call basis within 3 business days of a request, unless an alternative delivery time is approved. The delivery location and directions are provided, and the last 8 miles of the route are narrow forest roads, requiring smaller delivery vehicles. The period of performance is May 15, 2024, to August 30, 2024, with a 60-calendar-day completion time from the notice to proceed. The contractor is responsible for repairing any damage to the materials prior to payment. The applicable standard and special project specifications are listed.

The related federal contract opportunity is Solicitation Number 12970224Q0019, named "Klamath River Complex Road Slump Repair Aggregate", issued by the Department of Agriculture Forest Service.

View the file

Other files

File Type Posted
Sol_12970224Q0019_Amd_0001.pdf PDF
A-1_SOI_0001.xlsx XLSX spreadsheet
A-1_MAP_Road_38N07Location.pdf PDF
A-6_00_SOL_12970224Q0019.pdf PDF
Sol_12970224Q0019.pdf PDF
A-6_SCA_WageGrade2015-5677Rev23.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

SCOPE OF CONTRACT

This supply procurement is for repair of Forest Service road, 38N07. The procured aggregate and soil will be used to replace the washed away material within the right of way. The required material is 90 cubic yards of bedding material, 1800 cubic yards of backfill material, 85 cubic yards of subbase aggregate, and 30 cubic yards of class II base aggregate. The material will conform to FP-14 standards 704.02, 704.03(a), 703.05(b), and 703.06, respectively. Deliveries shall take place on an on-call basis. Deliveries shall be completed within 3 business days from request unless alternative delivery time is agreed upon between contractor and operator/KNF engineering. Delivery order of requested material is bedding, backfill, subbase aggregate, then aggregate base.

Delivery Location

To reach the delivery location from I-5, take either exit 751, turn left onto Jerry’s Rd and then left onto Old Highway 99 S, or exit 766, turn right onto Highway A12 and then left onto Old Highway 99 S. Take Old Highway 99 S to turn onto Gazelle Callahan Rd. About 2 miles after the road bears into S State Highway 3, turn left onto Cecilville road. After 25 miles, turn left onto Taylor Creek Road (38N04) for 5 miles and then turn right onto 38N07. After 3 miles you will arrive at the delivery location, 41.15325 N, 123.02672 W. Material shall be placed within degraded roadway unless otherwise directed by COR.

The last 8 miles of the route to project area are narrow forest roads, suggested vehicle size for delivery is 10 cubic yard dump trucks.

There is no need to access the delivery location prior to award. For questions regarding delivery of materials, contact

· Madison Foster, 530-643-9861, Madison.Foster@usda.gov

· Ben Molitor, 530-841-4447, Benjamin.Molitor@usda.gov

Period of Performance

Projected start date: May 15, 2024

Time for completion: 60 calendar days from Notice to Proceed to furnish material. Contractor will be given 2 weeks of notice before initial delivery. Deliveries shall take place as requested within 3 business days of request unless another delivery time is approved by COR. Deliveries shall take place Monday-Thursday 0600-1900 unless another delivery time is approved by COR.

Period of Performance: 05/15/2024 – 08/30/2024

Requirements

The Contractor shall furnish the necessary material and equipment to deliver the material products referenced above.

The Contractor shall repair all associated damage on materials to be furnished prior to partial or final payment.

The Contractor is required to provide delivery tickets to verify the quantity delivered.

[X] Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14)

This document is incorporated by reference and is available on the web at https://flh.fhwa.dot.gov/resources/specs/FP-14/

It is also available as a wire-bound book that can be purchased from the US Government Printing Office:

Superintendent of Documents U.S. Government Printing Office Internet: bookstore.gpo.gov Phone: (toll free) 866.512.1800 Fax: 202.512.2250 Mail: Stop SSOP, Washington, DC 20402-0001

Stock Number: 050-001-00341-4 (U.S. Customary)

The Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.

All specifications not included in the specification listing, but referenced by listed specifications, are applicable. Special Project Specifications are physically incorporated within this solicitation.

The following Standard and Special Project Specifications are applicable to this contract. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.

#
DESCRIPTION
DATE
101
TERMS, FORMAT, AND DEFINITIONS
2014
102
BID, AWARD, AND EXECUTION OF CONTRACT
2014
103
SCOPE OF WORK
2014
104
CONTROL OF WORK
2014
105
CONTROL OF MATERIAL
2014
106
ACCEPTANCE OF WORK
2014
107
LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
2014
108
PROSECUTION AND PROGRESS
2014
109
MEASUREMENT AND PAYMENT
2014
151
MOBILIZATION
2014
153
CONTRACTOR QUALITY CONTROL
2014
154
CONTRACTOR SAMPLING AND TESTING
2014
703
AGGREGATE
2014
704
SOIL
2014