This pre-solicitation notice provides details about the Anan Wildlife Observatory Reconstruction - Phase I federal contract opportunity with the USDA Forest Service, Alaska Region. The Forest Service requires reconstruction of remote bear-viewing facilities at Anan Creek, including demolition and removal of upper and middle timber observation decks and stair structures, relocation of existing structures, construction of new footings, decks, shelters, aggregate trails and signs. Optional work includes temporary connector staircases, repairs and preparation of shop drawings for a metal spiral staircase. The estimated value is between $500,000 and $1,000,000. This project was previously solicited in FY2020 but not awarded, and is now broken into smaller phases to increase competition, with potential small business set-asides to be determined. Interested parties should review the attached description document for further details at this stage.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-SOLICITATION NOTICE: 1240BJ21R0005

Anan Wildlife Observatory Reconstruction Phase I Wrangell Ranger District, Tongass National Forest

This is a presolicitation notice prepared in accordance with FAR 5.201 for the Anan Wildlife Observatory Reconstruction project on the Tongass National Forest, Wrangell Ranger District. The solicitation number for this requirement is 1240BJ21R0005. The Government intends to award a single firm fixed price contract for this acquisition.

Background: The Anan Wildlife Viewing Area is located 35 miles southeast of the town of Wrangell. Anan Creek has the largest run of pink salmon in Southeast Alaska. This abundance of salmon attracts large concentrations of black bears, bald eagles, harbor seals, and several brown bears. People from around the world come to enjoy the unique experience Anan offers. Existing facilities consist of a covered viewing shelter, decks, photo blind, and an outhouse. The facilities are nearing the end of their service life and need replacement.

Objectives: The project has several objectives, all of which revolve around the demolition and reconstruction of a majority of the Anan Wildlife Observatory. Base Item work includes the demolition and removal of the upper and middle timber observation decks and stair structures, including footings; relocation of the existing timber observation structure and outhouse structure; demolition of a portion of the aggregate trail; construction of footings and structural elements, upper observation deck, timber shelter and restroom structure, aggregate trail, and signs; and other miscellaneous work. Option Item work includes construction of a temporary timber connector staircase to the existing-to-remain staircase to the lower observation deck, repairs to the existing-to-remain staircase and lower deck, preparation of shop drawings for a metal spiral staircase (fabrication & installation is not included), and other miscellaneous work.

Location: The Anan Wildlife Observatory is located 35 air miles SE of Wrangell, Alaska, on the Cleveland Peninsula. Access to Anan Bay is by a 35-minute float plane flight or 90-minute boat ride from Wrangell. The trailhead is located on the shore of Anan Bay, at the mouth of the saltwater lagoon. The half mile trail leads through the rain forest along the edge of the lagoon to Anan Creek, which it follows briefly before reaching the observatory site. The latitude and longitude of the observatory site are approximately 56.179032° N, -131.883935° W.

Anticipated period of performance: 09/15/2021 through 12/31/2022, except on-site work is not allowed from 07/01/2022 through 09/14/22 (due to the high volume of permitted visitors to the site).

Magnitude of Construction is estimated between $500,000 and $1,000,000.

Evaluation and award:

This requirement will be a Small Business set aside. The solicitation and resulting contract will include the clause 52.219-14 Limitations on Subcontracting. This clause requires (in part) that "By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for - (3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees." This means that the Prime Contractor must be able to perform at least 15 percent of the cost of contract performance incurred for personnel with their own employees.

The NAICS code for this requirement is 237990-Other Heavy and Civil Engineering Construction. The size standard to be considered a small business is $39.5 million dollars. A size standard is the largest that a concern can be and still qualify as a small business for Federal Government programs. For the most part, size standards are the average annual receipts or the average employment of a firm.

Source selection evaluation factors are anticipated to include past performance, experience, proposed approach to performing the work, and price.

image1.png

File details come from the government source that posted it. Updated .