A_04_2025-02-15_Air_Tanker_Base_Pilot_Trailer_Roof_Replacement_SOW_1.pdf
PDF 3 MB Posted
- Solicitation number
- 140L3925Q0009
About this file
This document is a Statement of Work (SOW) for an asphalt shingle roof replacement project for the Bureau of Land Management's Air Tanker Base Pilots Lounge in Battle Mountain, Nevada. The project involves completely removing the existing roof components, including asphalt shingles, gutters, moisture barrier underlayment, flashing, and vent boots on a trailer approximately 14 feet wide and 58 feet long. The contractor must install new 30-year shingles, 2 layers of moisture barrier, drip edge, flashing, vent covers, stack boots, and 5" K-style aluminum seamless gutters, matching the original color of the removed shingles.
Key contractual requirements include a total project duration of 42 calendar days from the Notice to Proceed, with work to be performed Monday through Friday from 7:30 AM to 4:30 PM. The project requires obtaining all necessary permits, following local and regional building codes, and providing a 1-year workmanship warranty. The estimated roof area is approximately 1,200 square feet, and the contractor must protect the trailer and surrounding areas during the project. Payment will be made as a lump sum, with progress payments not exceeding 90% of each item, and the final 10% paid after final acceptance of the completed contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BATTLE MOUNTAIN
DISTRICT OFFICE
Air Tanker Base, Pilots Lounge Battle Mountain, Nevada
Asphalt Shingle Roof Replacement February 2025
BUREAU OF LAND MANGEMENT
STATEMENT
OF
WORK
STATEMENT OF WORK
Tanker Airbase, Pilots Lounge, Battle Mountain, Nevada
Asphalt Shingle Roof Replacement
Table of Contents
1. GENERAL
1.1 Scope of Work
1.2 Background
1.3 Project Access and Location
1.4 Existing Conditions
2. PROJECT IMPERATIVES
2.1 Project Inclusions
2.2 Codes/Standards
3. CONTRACTUAL
3.1 Period of Performance
3.2 Measurement for Payment
4. ATTACHMENTS
5. PHOTOS
1. GENERAL
1.1 Scope of Work
Bureau of Land Management (BLM) owns a pilot lounge trailer located at Air Tanker Base (40° 36’ 28”N 116° 52’ 26” W) approximately 3 miles southeast of Battle Mountain NV 89820, which is in need of a roof replacement. The scope of this project involves removing the current asphalt shingles, gutters, moisture barrier underlayment, all flashing from around any roof protrusions or vertical surfaces, all rubber stack-boots from around plumbing vents, and associated roofing components, replacing them with minimum 30-Year shingle roofing materials that offer enhanced longevity and reduced maintenance needs. The trailer is approximately 14 feet wide and 58 feet long. The pitch of the roof is approximately 30 inches, high in the middle, over 7 feet (half of the width of the trailer). There are total of 9 rectangular type and round type vents on the roof. There are 2 gutters, one on each long side of the trailer.
Replace with in-kind the entire roofing shingles, moisture barrier underlayment, all vent covers, all rubber stack-boots, all gutters, and all flashings. Follow all local and regional codes for appropriate wind design and nailing.
• Install 2 new felt moisture barrier layers or a synthetic equivalent per manufacturer’s recommendations.
• Install new drip edge, flashing, step-flashing, vent covers, stack-boots, and coil stock per manufacturer’s recommendations.
• Utilize a starter strip designed for shingles per manufacturer’s recommendations or may use an equivalent quality 30-year, 3-tab shingles as a starter strip if desired.
• Install approximately 1,200 square feet 30-year shingles.
• New shingles shall match the color shade of the removed shingles. A material/color sample shall be provided to the COR for approval before shingles are purchased and applied.
• Install shingle caps along the ridge per manufacturer’s recommendations.
• Install new 5" K-style aluminum seamless gutters, 0.027 gauge minimum gutters.
• Install new Downspouts at each end of the gutters (total of four). Install Concrete Splash- Block on the ground at the end of each downspout (total of four).
• In the event of inclement weather, contractor shall be responsible for protection of the roof, and exposed building components against said weather. Damage incurred due to failure to protect will be corrected by the contractor at no additional cost to the government.
• Any components of the buildings or grounds that are damaged during the project shall be repaired and returned to its original condition by the contractor at no cost to the government.
• The newly installed roofing system and all its components shall be covered under a 1- year workmanship warranty.
• If the contractor utilizes a construction dumpster or dump truck, the contractor shall coordinate the identification of utility lines with Airport Authority representative and the city and County responsible authorities to avoid potential damage.
• If Needed: As sheeting material is exposed, the contractor shall immediately notify the COR of any noted damage, then replace any damaged sheets with in-kind OSB sheets with approval of the COR. The Contract Bid Schedule is being utilized to include the price of a full OSB Replacement, however that is not expected, but in order to prevent contract delays it is being prepared for. OSB Replacement must be approved by the appointed COR and will be determined at his/her discretion. In the event not all of the OSB that is quoted is needed, the contract will be modified and deobligated of those funds.
All established entry and exit routes shall remain open and operational for the safe means of egress in the event of emergency. Entry and Exit doors shall not be blocked during any project execution phase or task. Work shall be performed around and above entry and exit routes. The contractor shall perform tasks in a manner that the routes remain operational. For example, if a ladder is placed in front of a door to execute a task or if materials are falling from overhead, the contractor shall communicate to the COR that work is taking place around the door. The contractor shall protect pedestrians from all potential safety impacts.
Obtain all required permits from City and County to perform the required work. Follow all Federal, State, and OSHA regulations.
Coordinate all work activities with the COR and Airport Authority representative and obtain all necessary permission from the COR to store any materials on the property.
Contractor shall have full use of areas needed to perform the work as stated in the contract document. Schedule and sequence operations necessary to complete the work and avoid delays to the overall project. The trailer has 2 entrance doors, 8 windows, and one small door. Protect all residents of the trailer from any debris and danger.
The stated details are only a few properties of the trailer, and the contractor must inspect and determine quantities and difficulties of the required work prior to ordering materials and start of the work.
1.2 Background
The trailer was manufactured in early 2000s. No plans of the trailer are available and contractors are highly encouraged to inspect and verify that all provided information in the contract documents are correct prior to bid on the project. A site visit for contractors is scheduled as stated in the RFQ solicitation document.
1.3 Project Access and Location
The trailer is located at Air Tanker Base in Battle Mountain Nevada 89820. Access to the project site for inspection and verification of the information provided in the contract can be arranged by attending the scheduled site visit on the date and time stated in the contract solicitation documents. See solicitation for complete information regarding the site visit time, location, and RSVP contact information. This is the ONLY opportunity for prospective bidders to view inside of the house.
1.4 Existing Conditions
a. The trailer is an older model constructed in the early 2000s.
b. No plans are available for the construction of the trailer.
c. Included within this report, for reference only, are photos of the existing condition of the trailer.
2. PROJECT IMPERATIVES
2.1 Project Inclusions
The project shall include/address:
a. Safety: The Contractor shall provide all safety equipment required by OSHA, Federal, State, County, City, and any other regulatory agency.
b. Permits: Obtain all necessary and required permits from regulatory agencies/entities such as City and County.
c. Contractor’s Site Access: All labor, equipment, supplies, and materials shall find its way onto and off the area without causing any damage to the building, roads, or landscaping.
Coordinate all activities with COR. The Contractor shall be responsible for replacing (or repairing) with in-kind any items damaged by the contractor or his/her representatives.
d. Tenant Occupancy: The trailer is occupied.
e. Recycling: Select/use products with recycled content according to the Comprehensive
Procurement Guidelines: http://www.epa.gov/. Select/use Energy Star or Federal Energy Management Program (FEMP) - designated Energy Efficient Products.
f. Salvage: Recycle as much of the construction and demolition waste generated on the project as possible.
g. New Material: All materials shall be provided in new condition, according to manufactures written details and guidelines.
h. Services: Provide services as stated in the Scope of Work above.
i. Materials: Provide materials as stated in the Scope of Work above and Specifications.
j. Warranty: Minimum of 30 years for all materials, and one year for all labor for all work performed as part of this contract.
k. Contractor License: Contractor performing work shall hold the required License (such as having license to work on trailers’ roofs) by State and any other regulatory agency and be trained in the specific product installation.
l. Submittals: Submit for review and comments schedule of work showing completion of the work within the Period of Performance. Submit for review and comments specifications, details and drawings for materials and installation of new felt, shingles, gutters, flashings, boots, and vent caps.
2.2 Codes/Standards
All services performed under this Scope of Work shall be performed in accordance with applicable building codes and industry standards. All materials used in the contract shall meet Federal, State, and County requirements.
3. CONTRACTUAL
3.1 Period of Performance
a. Work Shall commence no later than 28 calendar days from the issuance of the contract Notice to Proceed (NTP).
b. Time of work shall not be more than 14 calendar days from start/commence of the work.
http://www.epa.gov/
Time of Performance shall not be more than 42 calendars days from the issuance of the Notice To Procced (NTP).
c. Perform work Monday through Friday, from 7:30 AM to 4:30 PM, except on legal Government holidays. Other working hours and/or arrangements may be made if agreed upon by the COR. Contact COR for information regarding access to the building.
d. Delays due to matters outside of the contractor’s control may be considered by the Contracting Officer (CO), with written request by the contractor.
3.2 Measurement for Payment
a. All services, supplies, materials, and labor necessary to perform the work shall be provided under this contract.
b. The payment will be made under a lump sum item for all work described above. Progress payments will be allowed in accordance with the bid schedule items, not to exceed 90% of each item.
c. The remaining 10% of the contract amount will be paid after the final acceptance of the completed contract.
4. ATTACHMENTS
a. Specifications
5. PHOTOS
Vicinity Map
Interstate 80
To Elko
To Battle Mountain
Pilot Lounge Trailer
North View
Note: Damage on East Portion of Roof
Note: Damage on East Portion of Roof
South & West View
North Entrance Door
Note: South Side Gutter
Note: South Side Gutter
South Side Entrance Door
Note: Vents on Roof
| 1. GENERAL |
| 1.1 Scope of Work |
| 1.2 Background |
| 1.3 Project Access and Location |
| 1.4 Existing Conditions |
| 2. PROJECT IMPERATIVES |
| 2.1 Project Inclusions |
| 2.2 Codes/Standards |
| 3. CONTRACTUAL |
| 3.1 Period of Performance |
| 3.2 Measurement for Payment |
| 4. ATTACHMENTS |
| 5. PHOTOS |