Notice of Funding Opportunity for FY20 Consolidated Rail Infrastructure and Safety Improvements

View the file

Other files

File Type Posted
PKG00261195-instructions.pdf PDF
FRA F 30.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

21923 Federal Register / Vol. 85, No. 76 / Monday, April 20, 2020 / Notices driver must undergo an annual physical examination (a) by an ophthalmologist or optometrist who attests that the vision in the better eye continues to meet the requirements in 49 CFR 391.41(b)(10), and (b) by a certified medical examiner (ME), as defined by § 390.5, who attests that the driver is otherwise physically qualified under § 391.41; (2) each driver must provide a copy of the ophthalmologist’s or optometrist’s report to the ME at the time of the annual medical examination;

and (3) each driver must provide a copy of the annual medical certification to the employer for retention in the driver’s qualification file or keep a copy of his/her driver’s qualification if he/her is self-employed. The driver must also have a copy of the exemption when driving, for presentation to a duly authorized Federal, State, or local enforcement official. The exemption will be rescinded if: (1) The person fails to comply with the terms and conditions of the exemption; (2) the exemption has resulted in a lower level of safety than was maintained before it was granted; or (3) continuation of the exemption would not be consistent with the goals and objectives of 49 U.S.C.

31136(e) and 31315(b).

VI. Preemption

During the period the exemption is in effect, no State shall enforce any law or regulation that conflicts with this exemption with respect to a person operating under the exemption.

VII. Conclusion

Based upon its evaluation of the 114 exemption applications, FMCSA renews the exemptions of the aforementioned drivers from the vision requirement in § 391.41(b)(10), subject to the requirements cited above. In accordance with 49 U.S.C. 31136(e) and 31315(b), each exemption will be valid for 2 years unless revoked earlier by FMCSA.

Larry W. Minor, Associate Administrator for Policy.

[FR Doc. 2020–08206 Filed 4–17–20; 8:45 am]

BILLING CODE 4910–EX–P

DEPARTMENT OF TRANSPORTATION

Federal Railroad Administration

Notice of Funding Opportunity for Consolidated Rail Infrastructure and Safety Improvements

AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT).

ACTION: Notice of Funding Opportunity (NOFO or notice).

SUMMARY: This notice details the application requirements and procedures to obtain grant funding for eligible projects under the Consolidated Rail Infrastructure and Safety Improvements (CRISI) Program. CRISI Program funding under this notice is provided by the Further Consolidated Appropriations Act, 2020 (2020 Appropriation). The opportunities described in this notice are made available under Catalog of Federal Domestic Assistance (CFDA) number 20.325, ‘‘Consolidated Rail Infrastructure and Safety Improvements.’’ DATES: Applications for funding under this solicitation are due no later than 5:00 p.m. ET, June 19, 2020.

Applications received after 5:00 p.m. ET on June 19, 2020 will not be considered for funding. Incomplete applications will not be considered for funding. See Section D of this notice for additional information on the application process.

ADDRESSES: Applications must be submitted via www.Grants.gov. Only applicants who comply with all submission requirements described in this notice and submit applications through www.Grants.gov will be eligible for award. For any supporting application materials that an applicant is unable to submit via www.Grants.gov (such as oversized engineering drawings), an applicant may submit an original and two (2) copies to Ms.

Frances Bourne, Office of Policy and Planning, Federal Railroad Administration, 1200 New Jersey Avenue SE, Room W38–207, Washington, DC 20590. However, due to delays caused by enhanced screening of mail delivered via the U.S. Postal Service, applicants are advised to use other means of conveyance (such as courier service) to assure timely receipt of materials before the application deadline.

FOR FURTHER INFORMATION CONTACT: For further project or program-related information in this notice, please contact Ms. Frances Bourne, Office of Policy and Planning, Federal Railroad Administration, 1200 New Jersey Avenue SE, Room W38–207, Washington, DC 20590; email:

frances.bourne@dot.gov; phone: 202– 493–6366.

SUPPLEMENTARY INFORMATION:

Notice to applicants: FRA recommends that applicants read this notice in its entirety prior to preparing application materials. Definitions of key terms used throughout the NOFO are provided in Section A(2) below. These key terms are capitalized throughout the NOFO. There are several administrative prerequisites and specific eligibility requirements described herein with which applicants must comply.

Additionally, applicants should note that the required Project Narrative component of the application package may not exceed 25 pages in length.

Table of Contents

A. Program Description B. Federal Award Information C. Eligibility Information D. Application and Submission Information E. Application Review Information F. Federal Award Administration

Information G. Federal Awarding Agency Contacts H. Other Information

A. Program Description

1. Overview This program leverages private, state and local investments to support safety enhancements and general improvements to infrastructure for both intercity passenger and freight railroads.

The U.S. rail network is central to the success of the American economy, carrying more than 1.8 billion tons of freight valued at more than $830 billion annually, and over 32.5 million passengers on Intercity Rail Passenger Transportation services. Both services primarily operate over privately-owned and maintained infrastructure, allowing for strong private, capital market investment that generates public benefit, including public-private partnerships among other models.

A strong transportation network is critical to the functioning and growth of the American economy. The nation’s industry depends on the transportation network to move the goods that it produces, and facilitate the movements of the workers who are responsible for that production. When the nation’s highways, railways, and ports function well, that infrastructure connects people to jobs, increases the efficiency of delivering goods and thereby cuts the costs of doing business, reduces the burden of commuting, and improves overall well-being.

Rural transportation networks play a vital role in supporting our national economic vitality. Addressing the deteriorating conditions and disproportionately high fatality rates on our rural transportation infrastructure is of critical interest to DOT, as rural transportation networks face unique challenges in safety, infrastructure condition, and passenger and freight usage. Consistent with the Rural Opportunities to Use Transportation for

VerDate Sep<11>2014 18:34 Apr 17, 2020 Jkt 250001 PO 00000 Frm 00102 Fmt 4703 Sfmt 4703 E:\FR\FM\20APN1.SGM 20APN1jb el l o n

D S

K

JL

S W

7X 2P

R O

D w ith N

O T

IC

E

S mailto:frances.bourne@dot.gov http://www.Grants.gov http://www.Grants.gov

21924 Federal Register / Vol. 85, No. 76 / Monday, April 20, 2020 / Notices

1 For any project that includes purchasing Intercity Passenger Rail equipment, applicants are encouraged to use a standardized approach to the procurement of passenger rail equipment, such as the specifications developed by the Next Generation Corridor Equipment Pool Committee or a similar uniform process.

Economic Success (R.O.U.T.E.S.)

Initiative, DOT will consider how the project will address the challenges faced by rural areas.

DOT is committed to addressing the unmet transportation infrastructure needs of rural areas. Underinvestment in rural transportation systems has allowed a slow and steady decline in the transportation routes that connect rural American communities to each other and to the rest of the country, fraying the fabric of American interconnectivity. A majority of the nation’s rail route miles are in rural America. Investment is necessary to grow rural economies, facilitate freight movement, improve access to reliable and affordable transportation options and enhance access to healthcare and safety for residents.

DOT also recognizes the importance of applying life cycle asset management principles throughout America’s infrastructure. It is important for rail infrastructure owners and operators, as well as those who may apply on their behalf, to plan for the maintenance and replacement of assets and the associated costs.

Congress authorized this grant program for the Secretary to invest in a wide range of projects within the United States to improve railroad safety, efficiency, and reliability; mitigate congestion at both intercity passenger and freight rail chokepoints; enhance multi-modal connections; and lead to new or substantially improved intercity passenger rail transportation corridors.

Rail safety projects include, but are not limited to, grade crossing enhancements, rail line relocations and improvements, and deployment of railroad safety technology. Eligible work also includes: Regional rail and corridor planning, environmental analyses, and research, workforce development, and training. The purpose of this notice is to solicit applications for the competitive CRISI Program funding provided in the 2020 Appropriation. The CRISI Program is authorized under Section 11301 of the Fixing America’s Surface Transportation (FAST) Act, Public Law 114–94 (2015);

49 U.S.C. 22907 and funds made available in this NOFO are provided in the 2020 Appropriation.

2. Definitions of Key Terms

a. ‘‘Benefit-Cost Analysis’’ (or ‘‘Cost-

Benefit Analysis’’) is a systematic, data driven, and transparent analysis comparing monetized project benefits and costs, using a no-build baseline and properly discounted present values, including concise documentation of the assumptions and methodology used to produce the analysis; a description of the baseline, data sources used to project outcomes, and values of key input parameters; basis of modeling including spreadsheets, technical memos, etc.; and presentation of the calculations in sufficient detail and transparency to allow the analysis to be reproduced and for sensitivity of results evaluated by FRA. Please refer to the Benefit-Cost Analysis Guidance for Discretionary Grant Programs prior to preparing a BCA at https:// www.transportation.gov/office-policy/ transportation-policy/benefit-cost-analysis-guidance. In addition, please also refer to the BCA FAQs on FRA’s website for rail specific examples of how to apply the BCA Guidance for Discretionary Grant Programs to CRISI applications.

b. ‘‘Capital Project’’ means a project for: Acquiring, constructing, improving, or inspecting rail equipment, track and track structures, or a rail facility;

expenses incidental to the acquisition or construction including pre-construction activities (such as designing, engineering, location surveying, mapping, acquiring rights-of-way) and related relocation costs, environmental studies, and all work necessary for FRA to approve the project under the National Environmental Policy Act;

highway-rail grade crossing improvements; communication and signalization improvements; and rehabilitating, remanufacturing or overhauling rail rolling stock and facilities.1

c. ‘‘Construction’’ means the production of fixed works and structures or substantial alterations to such structures or land and associated costs.

d. ‘‘Final Design (FD)’’ means design activities following Preliminary Engineering, and at a minimum, includes the preparation of final Construction plans, detailed specifications, and estimates sufficiently detailed to inform project stakeholders (designers, reviewers, contractors, suppliers, etc.) of the actions required to advance the project from design through completion of Construction.

e. ‘‘Improvement’’ means repair or enhancement to existing rail infrastructure, or Construction of new rail infrastructure, that results in efficiency of the rail system and the safety of those affected by the system.

f. ‘‘Intercity Rail Passenger Transportation’’ means rail passenger transportation, except commuter rail passenger transportation. See 49 U.S.C.

22901(3). In this notice, ‘‘Intercity Passenger Rail Service’’ and ‘‘Intercity Passenger Rail Transportation’’ are equivalent terms to ‘‘Intercity Rail Passenger Transportation.’’

g. ‘‘National Environmental Policy Act (NEPA)’’ is a Federal law that requires Federal agencies to analyze and document the environmental impacts of a proposed action in consultation with appropriate Federal, state, and local authorities, and with the public. NEPA classes of action include an Environmental Impact Statement (EIS), Environmental Analysis (EA) or Categorical Exclusion (CE). The NEPA class of action depends on the nature of the proposed action, its complexity, and the potential impacts. For purposes of this NOFO, NEPA also includes all related Federal laws and regulations including the Clean Air Act, Section 4(f) of the Department of Transportation Act, Section 7 of the Endangered Species Act, and Section 106 of the National Historic Preservation Act.

Additional information regarding FRA’s environmental processes and requirements are located at https:// www.fra.dot.gov/environment.

h. ‘‘Planning’’ means activities that support the development of a state or regional rail plan or a corridor service development plan. Project-specific (e.g., rail station or port improvements) planning is not eligible.

i. ‘‘Positive Train Control (PTC) system’’ is defined by 49 CFR 270.5 to mean a system designed to prevent train-to-train collisions, overspeed derailments, incursions into established work zone limits, and the movement of a train through a switch left in the wrong position, as described in 49 CFR part 236, subpart I.

j. ‘‘Preliminary Engineering (PE)’’ means engineering design to: (1) Define a project, including identification of all environmental impacts, design of all critical project elements at a level sufficient to assure reliable cost estimates and schedules, (2) complete project management and financial plans, and (3) identify procurement requirements and strategies. The PE development process starts with specific project design alternatives that allow for the assessment of a range of rail improvements, specific alignments, and project designs. PE generally occurs concurrently with NEPA and related analyses, and prior to FD and Construction.

k. ‘‘Rail Carrier’’ means a person providing common carrier railroad

VerDate Sep<11>2014 18:34 Apr 17, 2020 Jkt 250001 PO 00000 Frm 00103 Fmt 4703 Sfmt 4703 E:\FR\FM\20APN1.SGM 20APN1jb el l o n

D S

K

JL

S W

7X 2P

R O

D w ith N

O T

IC

E

S https://www.transportation.gov/office-policy/transportation-policy/benefit-cost-analysis-guidance https://www.transportation.gov/office-policy/transportation-policy/benefit-cost-analysis-guidance https://www.transportation.gov/office-policy/transportation-policy/benefit-cost-analysis-guidance https://www.transportation.gov/office-policy/transportation-policy/benefit-cost-analysis-guidance https://www.fra.dot.gov/environment https://www.fra.dot.gov/environment

21925 Federal Register / Vol. 85, No. 76 / Monday, April 20, 2020 / Notices

2 See 74 FR 53030, 53043 (August 24, 2011) available at https://www2.census.gov/geo/pdfs/ reference/fedreg/fedregv76n164.pdf.

3 See Section D(2)(a)(iv) for supporting documentation required to demonstrate eligibility under this eligibility category.

4 See Section D(2)(a)(iv) for supporting information required to demonstrate eligibility under this eligibility category.

transportation for compensation, but does not include street, suburban, or interurban electric railways not operated as part of the general system of rail transportation. See 49 U.S.C.

10102(5).

l. ‘‘Relocation’’ is defined to mean moving a rail line vertically or laterally to a new location. Vertical Relocation refers to raising above the current ground level or sinking below the current ground level of a rail line.

Lateral Relocation refers to moving a rail line horizontally to a new location.

m. ‘‘Rural Project’’ means a project in which all or the majority of the project (determined by the geographic location or locations where the majority of the project funds will be spent) is located in a Rural Area.

n. ‘‘Rural Area’’ is defined in 49 U.S.C. 22907(g)(2) to mean any area not in an urbanized area as defined by the Census Bureau. The Census Bureau defines Urbanized Area (UA) as an area with a population of 50,000 or more people.2 Updated lists of UAs as defined by the Census Bureau are available on the Census Bureau website at http:// www2.census.gov/geo/maps/dc10map/ UAUC_RefMap/ua/.

B. Federal Award Information

1. Available Award Amount The total funding available for awards under this NOFO is $311,772,500.

Should additional CRISI funds become available after the release of this NOFO, FRA may elect to award such additional funds to applications received under this NOFO.

Of the $325,000,000 made available in the 2020 Appropriation, at least 25 percent, or $81,250,000 will be made available for Rural Projects as required by 49 U.S.C. 22907 and $45 million will be made available for projects eligible under 49 U.S.C. 22907(c)(2) that require the acquisition of rights-of-way, track, or track structure projects to support the development of new intercity passenger rail service routes. Additionally, $9,977,500 has been set aside for Special Transportation Circumstances, which will be made available under a separate NOFO. FRA will also set aside $3,250,000 for award and program oversight.

2. Award Size There are no minimum or maximum dollar thresholds for awards. FRA anticipates making multiple awards with the available funding. FRA may not be able to award grants to all eligible applications, nor even to all applications that meet or exceed the stated evaluation criteria (see Section E, Application Review Information).

Projects may require more funding than is available. FRA encourages applicants to propose projects or components of projects that have operational independence and that can be completed and implemented with CRISI funding as a part of the total project cost together with other, non-Federal sources.

FRA strongly encourages applicants to identify and include other state, local, public, or private funding or financing to support the proposed project in order to maximize competitiveness.

3. Award Type FRA will make awards for projects selected under this notice through grant agreements and/or cooperative agreements. Grant agreements are used when FRA does not expect to have substantial Federal involvement in carrying out the funded activity.

Cooperative agreements allow for substantial Federal involvement in carrying out the agreed upon investment, including technical assistance, review of interim work products, and increased program oversight. The funding provided under this NOFO will be made available to grantees on a reimbursable basis.

Applicants must certify that their expenditures are allowable, allocable, reasonable, and necessary to the approved project before seeking reimbursement from FRA. Additionally, the grantee is expected to expend matching funds at the required percentage concurrent with Federal funds throughout the life of the project.

See an example of standard terms and conditions for FRA grant awards at:

https://www.fra.dot.gov/eLib/Details/ L19057. This template is subject to revision.

4. Concurrent Applications DOT and FRA may be concurrently soliciting applications for transportation infrastructure projects for several financial assistance programs, and applicants may submit applications requesting funding for a particular project to one or more of these programs. In the application for CRISI Program funding under this NOFO, applicants must indicate other programs, including other CRISI NOFOs, to which they submitted or plan to submit an application for funding the entire project or certain project components, as well as highlight new or revised information in the application responsive to this NOFO that differs from the application(s) for other Federal financial assistance programs or other CRISI NOFOs.

C. Eligibility Information

This section of the notice explains applicant eligibility, cost sharing and matching requirements, project eligibility, and project component operational independence. Applications that do not meet the requirements in this section will be ineligible for funding. Instructions for submitting eligibility information to FRA are detailed in Section D of this NOFO.

1. Eligible Applicants

The following entities are eligible applicants for all project types permitted under this notice:

a. A State;

b. A group of States;

c. An Interstate Compact;

d. A public agency or publicly chartered authority established by one or more States; 3

e. A political subdivision of a State;

f. Amtrak or another Rail Carrier that provides Intercity Rail Passenger Transportation (as defined in 49 U.S.C.

24102);

g. A Class II railroad or Class III railroad (as those terms are defined in 49 U.S.C. 20102) or a holding company of a Class II or III railroad;

h. Any Rail Carrier or rail equipment manufacturer in partnership with at least one of the entities described in paragraph (a) through (e); 4

i. The Transportation Research Board together with any entity with which it contracts in the development of rail-related research, including cooperative research programs;

j. A University transportation center engaged in rail-related research; or

k. A non-profit labor organization representing a class or craft of employees of Rail Carriers or Rail Carrier contractors.

Applications must identify an eligible applicant as the lead applicant. The lead applicant serves as the primary point of contact for the application, and if selected, as the grantee of the CRISI Program grant award. Eligible applicants may reference entities that are not eligible applicants in an application as a project partner.

2. Cost Sharing or Matching

The Federal share of total costs for projects funded under this notice will

VerDate Sep<11>2014 18:34 Apr 17, 2020 Jkt 250001 PO 00000 Frm 00104 Fmt 4703 Sfmt 4703 E:\FR\FM\20APN1.SGM 20APN1jb el l o n

D S

K

JL

S W

7X 2P

R O

D w ith N

O T

IC

E

S https://www2.census.gov/geo/pdfs/reference/fedreg/fedregv76n164.pdf https://www2.census.gov/geo/pdfs/reference/fedreg/fedregv76n164.pdf http://www2.census.gov/geo/maps/dc10map/UAUC_RefMap/ua/ http://www2.census.gov/geo/maps/dc10map/UAUC_RefMap/ua/ http://www2.census.gov/geo/maps/dc10map/UAUC_RefMap/ua/ https://www.fra.dot.gov/eLib/Details/L19057

21926 Federal Register / Vol. 85, No. 76 / Monday, April 20, 2020 / Notices

5 See Section D(2)(a)(iii) for supporting information required to demonstrate eligibility of Federal funds for use as match.

6 Pursuant to the 2020 Appropriation, 49 U.S.C.

22905(f) shall not apply to projects for the implementation of positive train control systems, otherwise eligible under 49 U.S.C. 22907(c)(1).

7 Only costs for FD and Construction project stages and forward are eligible within this project eligibility category.

not exceed 80 percent though FRA will provide selection preference to applications where the proposed Federal share of total project costs is 50 percent or less. The estimated total cost of a project must be based on the best available information, including engineering studies, studies of economic feasibility, environmental analyses, and information on the expected use of equipment and/or facilities.

Additionally, in preparing estimates of total project costs, applicants should refer to FRA’s cost estimate guidance documentation, ‘‘Capital Cost Estimating: Guidance for Project Sponsors,’’ which is available at:

https://www.fra.dot.gov/Page/P0926.

The minimum 20 percent non-Federal match may be comprised of public sector (e.g., state or local) and/or private sector funding. FRA will not consider any Federal financial assistance 5 or any non-Federal funds already expended (or otherwise encumbered) toward the matching requirement, unless compliant with 2 CFR part 200. FRA is limiting the first 20 percent of the non-Federal match to cash contributions only.

Eligible in-kind contributions may be accepted for any non-Federal matching beyond the first 20 percent. In-kind contributions, including the donation of services, materials, and equipment, may be credited as a project cost, in a uniform manner consistent with 2 CFR

200.306. Moreover, FRA encourages

applicants to broaden their funding table in applications. Non-federal shares consisting of funding from multiple sources (e.g., a state, county, railroad, and university contributing to a grade crossing improvement) to demonstrate broad participation and cost sharing from affected stakeholders, will be given preference.

Amtrak or another Rail Carrier may use ticket and other non-Federal revenues generated from its operations and other sources as matching funds.

Applicants must identify the source(s) of its matching and other funds, and must clearly and distinctly reflect these funds as part of the total project cost.

Before applying, applicants should carefully review the principles for cost sharing or matching in 2 CFR 200.306.

See Section D(2)(a)(iii) for required application information on non-Federal match and Section E for further discussion of FRA’s consideration of matching funds in the review and selection process. FRA will approve pre-award costs consistent with 2 CFR 200.458, as applicable. See Section D(6).

Cost sharing or matching may be used only for authorized Federal award purposes.

3. Other

a. Project Eligibility

The following rail projects within the United States that improve the safety, efficiency, and/or reliability of passenger and/or freight rail transportation systems are eligible for funding under 49 U.S.C. 22907 and this

NOFO:

i. Deployment of railroad safety technology, including positive train control and rail integrity inspection systems.6 PTC examples include: Back office systems; wayside, communications and onboard hardware equipment; software; equipment installation; spectrum; any component, testing and training for the implementation of PTC systems; and interoperability. Maintenance and operating expenses incurred after a PTC system is placed in revenue service are ineligible. Railroad safety technology and rail integrity inspection system examples include: Broken rail detection and warning systems; track intrusion systems; and hot box detectors, wheel impact load detectors, and other safety improvements.7

ii. A capital project as defined in 49 U.S.C. 22901(2) relating to Intercity Passenger Rail Service, except that such projects are not required to be in a State rail plan under the CRISI Program.

Examples include: Acquisition, improvement, or rehabilitation of railroad equipment (locomotives and rolling stock); railroad infrastructure (grade crossings, catenary, and signals);

and rail facilities (yards, passenger stations, or maintenance and repair shops). For any project that includes purchasing Intercity Passenger Rail equipment, applicants are encouraged to use a standardized approach to the procurement of passenger rail equipment, such as the specifications developed by the Next Generation Corridor Equipment Pool Committee or a similar uniform process.

iii. A Capital Project necessary to address congestion challenges affecting rail service. Examples include: Projects addressing congestion that increase rail capacity; add or upgrade the condition, clearances, and capacity of rail mainlines; enhance capacity and service with less conflict between freight and Intercity Passenger Rail; reduce delays and risks associated with highway-rail grade crossings; and provide more effective rail equipment.

iv. A Capital Project necessary to reduce congestion and facilitate ridership growth in Intercity Passenger Rail Transportation along heavily traveled rail corridors. Examples include: Projects addressing congestion that improve stations; increase rail capacity; reduce conflict between freight and Intercity Passenger Rail; reduce delays and risks associated with highway-rail grade crossings; and provide more effective rail equipment.

v. A highway-rail grade crossing improvement project, including installation, repair, or improvement of grade separations, railroad crossing signals, gates, and related technologies;

highway traffic signalization; highway lighting and crossing approach signage;

roadway improvements such as medians or other barriers; railroad crossing panels and surfaces; and safety engineering improvements to reduce risk in quiet zones or potential quiet zones.

vi. A rail line Relocation and Improvement project. Examples include projects that: Improve the route or structure of a rail line by replacing degraded track; enhance/relocate railroad switching operations; add or lengthen passing tracks to increase capacity; improve interlockings; and relocate rail lines to alleviate congestion, and eliminate frequent rail service interruptions.

vii. A Capital Project to improve short-line or regional railroad infrastructure.

viii. The preparation of regional rail and corridor service development plans and corresponding environmental analyses. (See the examples under Track 1 and 2 below in Subsections C(3)(b)(i)–

(ii) as they apply to regional and corridor rail Planning.)

ix. A project necessary to enhance multimodal connections or facilitate service integration between rail service and other modes, including between Intercity Rail Passenger Transportation and intercity bus service or commercial air service. Examples include:

Intermodal transportation facilities projects that encourage joint scheduling, ticketing, and/or baggage handling;

freight rail intermodal connections; and rail projects improving access to ports.

x. The development and implementation of a safety program or institute designed to improve rail safety.

Examples include: Employee training;

and public safety outreach and education.

VerDate Sep<11>2014 18:34 Apr 17, 2020 Jkt 250001 PO 00000 Frm 00105 Fmt 4703 Sfmt 4703 E:\FR\FM\20APN1.SGM 20APN1jb el l o n

D S

K

JL

S W

7X 2P

R O

D w ith N

O T

IC

E

S https://www.fra.dot.gov/Page/P0926

21927 Federal Register / Vol. 85, No. 76 / Monday, April 20, 2020 / Notices

8 See Section D.2.a.vi.(D) for required application information relevant to this eligibility category.

9 The scope, schedule, and budget necessary to implement a project, as well as the definition of the project’s potential benefits, are typically informed by the work conducted in prior phases of project development (e.g., the specific elements of an FD/ Construction project and their cost estimates are developed and refined through PE.) The evaluation criteria for the CRISI Program (see Section E of this NOFO) considers the level of detail contained in the applicant’s proposed scope of work and readiness for the project to be implemented.

xi. Any research that the Secretary considers necessary to advance any particular aspect of rail related capital, operations, or safety improvements.

xii. Workforce development and training activities, coordinated to the extent practicable with the existing local training programs supported by the Department of Transportation, the Department of Labor, and the Department of Education.8

Applicants that intend to charge indirect costs through the use of a negotiated indirect cost rate must have a current, signed, federal-approved indirect cost rate agreement. Applicants that have never received a federally-approved indirect cost rate may elect to charge a de minimis rate of 10% of modified total direct costs, which may be used indefinitely. This includes state and local governments that have never negotiated an indirect cost rate with the federal government and receive less than $35 million in direct federal funding per year. Organizations that wish to negotiate an indirect cost rate should contact FRA’s Office of the Chief Financial Officer at FRA.CFO@dot.gov.

For a project that uses rights-of-way owned by a railroad, and the railroad is not the applicant, FRA requires that a written agreement exist between the applicant and the railroad regarding use and ownership consistent with 49 U.S.C. 22905(c)(1). This requirement is a condition to making a grant under the CRISI Program.

b. Project Tracks for Eligible Projects Applicants are not limited in the number of projects for which they seek funding. FRA will not limit eligible projects from consideration for funding for planning, environmental, engineering, design, and construction elements of the same project in the same application. Applicants are allowed to include multiple phases of a project in the same application. However, depending on the project, applications for multiple phases of project development may not contain sufficient detail with regards to scope, schedule, or budget for all phases of the application to compete well in the application review process.9

An applicant must identify one or more of the following four tracks for an eligible project: Track 1—Planning;

Track 2—PE/NEPA; Track 3—FD/ Construction; or Track 4—Research, Safety Programs and Institutes.

i. Track 1—Planning

Track 1 consists of eligible rail Planning projects. Examples include the technical analyses and associated environmental analyses that support the development of state rail plans, regional rail plans, and corridor service development plans, including:

identification of alternatives, rail network Planning, market analysis, travel demand forecasting, revenue forecasting, railroad system design, railroad operations analysis and simulation, equipment fleet Planning, station and access analysis, conceptual engineering and capital programming, operating and maintenance cost forecasting, capital replacement and renewal analysis, and economic analysis. Project-specific (e.g., rail station or port improvements) planning is not an eligible Track 1 project.

ii. Track 2—PE/NEPA

Track 2 consists of eligible PE/NEPA projects. PE examples include: PE drawings and specifications (scale drawings at the 30% design level, including track geometry as appropriate); design criteria, schematics and/or track charts that support the development of PE; and work that can be funded in conjunction with developing PE, such as operations modeling, surveying, project work/ management plans, preliminary cost estimates, and preliminary project schedules. PE/NEPA projects funded under this NOFO must be sufficiently developed to support FD or Construction activities.

iii. Track 3—FD/Construction

Track 3 consists of eligible projects for FD, Construction, and project implementation and deployment activities. Applicants must complete all necessary Planning, PE and NEPA requirements for FD/Construction projects. FD funded under this track must: Resolve remaining uncertainties or risks associated with changes to design scope; address procurement processes; and update and refine plans for financing the project or program to reflect accurately the expected year-of-expenditure costs and cash flow projections. Applicants selected for funding for FD/Construction must demonstrate the following to FRA’s satisfaction:

(A) PE is completed for the proposed project, resulting in project designs that are reasonably expected to conform to all regulatory, safety, security, and other design requirements, including those under the Americans with Disabilities Act (ADA);

(B) NEPA is completed for the proposed project;

(C) Signed agreements with key project partners, including infrastructure-owning entities; and

(D) A project management plan is in-place for managing the implementation of the proposed project, including the management and mitigation of project risks.

FD examples include: Drawings at the 100% Design Level, interim design drawings that support development (e.g., drawings at the 60% Design Level), project work/project management plan, cost estimates, project schedules, and right-of-way acquisition and relocation plans. Construction examples include:

Additions, improvements, replacements, renovations and/or repairs to track, bridge, station, rail yard, signal, and communication system infrastructure, or other railroad safety technology.

iv. Track 4—Research, Safety Programs and Institutes (Non-Railroad Infrastructure)

Track 4 consists of projects not falling within Tracks 1–3 including workforce development activities, research, safety programs or institutes designed to improve rail safety that clearly demonstrate the expected positive impact on rail safety. Sufficient detail must be provided on what the project will accomplish, as well as the applicant’s capability to achieve the proposed outcomes. Examples include:

initiatives for improving rail safety, training, public outreach, and education.

c. Project Component Operational Independence

If an applicant requests funding for a project that is a component or set of components of a larger project, the project component(s) must be attainable with the award amount, together with other funds as necessary, obtain operational independence, and must comply with all eligibility requirements described in Section C.

In addition, the component(s) must be capable of independent analysis and decision making, as determined by FRA, under NEPA (i.e., have independent utility, connect logical termini, if applicable, and not restrict the consideration of alternatives for other reasonably foreseeable rail projects.)

VerDate Sep<11>2014 18:34 Apr 17, 2020 Jkt 250001 PO 00000 Frm 00106 Fmt 4703 Sfmt 4703 E:\FR\FM\20APN1.SGM 20APN1jb el l o n

D S

K

JL

S W

7X 2P

R O

D w ith N

O T

IC

E

S mailto:FRA.CFO@dot.gov

21928 Federal Register / Vol. 85, No. 76 / Monday, April 20, 2020 / Notices

d. Rural Project FRA will consider a project to be in a Rural Area if all or the majority of the project (determined by geographic location(s) where the majority of the project funds will be spent) is located in a Rural Area. However, in the event FRA elects to fund a component of the project, then FRA will reexamine whether the project is in a Rural Area.

D. Application and Submission Information

Required documents for the application are outlined in the following paragraphs. Applicants must complete and submit all components of the application. See Section D(2) for the application checklist. FRA welcomes the submission of additional relevant supporting documentation, such as planning, engineering and design documentation, and letters of support from partnering organizations that will not count against the Project Narrative 25-page limit. Consistent with the R.O.U.T.E.S. Initiative, DOT encourages applicants to consider how the project will address the challenges faced by rural areas, generally.

1. Address To Request Application Package

Applicants must submit all application materials in their entirety through www.Grants.gov no later than 5:00 p.m. ET, on June 19, 2020. FRA reserves the right to modify this deadline. General information for submitting applications through Grants.gov can be found at: https:// www.fra.dot.gov/Page/P0270.

For any supporting application materials that an applicant cannot submit via Grants.gov, such as oversized engineering drawings, an applicant may submit an original and two (2) copies to

Ms. Frances Bourne, Office of Policy and Planning, Federal Railroad Administration, 1200 New Jersey Avenue SE, Room W38–207, Washington, DC 20590. Due to delays caused by enhanced screening of mail delivered via the U.S. Postal Service, FRA advises applicants to use other means of conveyance (such as courier service) to assure timely receipt of materials before the application deadline. Additionally, if documents can be obtained online, providing instructions to FRA on how to access files on a referenced website may also be sufficient.

2. Content and Form of Application Submission

FRA strongly advises applicants to read this section carefully. Applicants must submit all required information and components of the application package to be considered for funding.

Required documents for an application package are outlined in the checklist below.

i. Project Narrative (see D.2.a)

ii. Statement of Work (see D.2.b.i)

iii. Benefit-Cost Analysis (see D.2.

b.ii)

iv. SF424—Application for Federal

Assistance

v. Either: SF 424A—Budget

Information for Non-Construction projects (required for Tracks 1, 2 and 4) or SF 424C—Budget Information for Construction (required for any application that includes Track 3)

vi. Either: SF 424B—Assurances for Non-Construction projects (required for Tracks 1, 2 and 4) or SF 424D— Assurances for Construction (required for any application that includes Track 3)

vii. FRA’s Additional Assurances and Certifications

viii. SF LLL—Disclosure of Lobbying Activities

a. Project Narrative

This section describes the minimum content required in the Project Narrative of the grant application. The Project Narrative must follow the basic outline below to address the program requirements and assist evaluators in locating relevant information.

I. Cover Page ....................... See D.2.a.i II. Project Summary ............. See D.2.a.ii III. Project Funding ............... See D.2.a.iii IV. Applicant Eligibility .......... See D.2.a.iv V. Project Eligibility .............. See D.2.a.v VI. Detailed Project Descrip-tion.

See D.2.a.vi

VII. Project Location ............. See D.2.a.vii VIII. Evaluation and Selec-tion Criteria.

See D.2.a.viii

IX. Project Implementation and Management.

See D.2.a.ix

X. Planning Readiness ......... See D.2.a.x XI. Environmental Readiness See D.2.a.xi

The above content must be provided in a narrative statement submitted by the applicant. The Project Narrative may not exceed 25 pages in length (excluding cover pages, table of contents, and supporting documentation). FRA will not review or consider Project Narratives beyond the 25-page limitation. If possible, applicants should submit supporting documents via website links rather than hard copies. If supporting documents are submitted, applicants must clearly identify the page number(s) of the relevant portion in the Project Narrative supporting documentation. The Project Narrative must adhere to the following outline.

i. Cover Page: Include a cover page that lists the following elements in a table:

Project Title Applicant Project Track ...................................................................................................................................................... 1,2,3 and/or 4 Was a Federal grant application previously submitted for this project? ........................................................... Yes/no If yes, state the name of the Federal grant program and title of the project in the previous application. ........ Federal Grant Program:

Project Title:

Is this a Rural Project? What percentage of the project cost is based in a Rural Area? ................................. Yes/no

Percentage of total project cost:

Is this a project eligible under 49 U.S.C. 22907(c)(2) that requires the acquisition of rights-of-way, track, or track structure to support the development of new intercity passenger rail service routes?.

Yes/no

City(ies), State(s) where the project is located Urbanized Area where the project is located Population of Urbanized Area Is the project currently programmed in the: State rail plan, State Freight Plan, TIP, STIP, MPO Long Range

Transportation Plan, State Long Range Transportation Plan?.

Yes/no (If yes, please specify in which plans the project is currently pro-grammed)

ii. Project Summary: Provide a brief 4–6 sentence summary of the proposed project and what the project will entail.

Include challenges the proposed project aims to address, and summarize the intended outcomes and anticipated

VerDate Sep<11>2014 18:34 Apr 17, 2020 Jkt 250001 PO 00000 Frm 00107 Fmt 4703 Sfmt 4703 E:\FR\FM\20APN1.SGM 20APN1jb el l o n

D S

K

JL

S W

7X 2P

R O

D w ith N

O T

IC

E

S https://www.fra.dot.gov/Page/P0270 https://www.fra.dot.gov/Page/P0270

21929 Federal Register / Vol. 85, No. 76 / Monday, April 20, 2020 / Notices benefits that will result from the proposed project.

iii. Project Funding: Indicate in table format the amount of Federal funding requested, the proposed non-Federal match, identifying contributions from the private sector if applicable, and total project cost. Describe the non-Federal funding arrangement, including multiple sources of non-Federal funding if applicable. Include funding commitment letters outlining funding agreements, as attachments or in an appendix. If federal funding is proposed as match, demonstrate the applicant’s determination of eligibility for such use and the legal basis for that determination. Identify any specific project components that the applicant proposes for partial project funding. If all or a majority of a project is located in a Rural Area, identify the Rural Area(s) and estimated percentage of project costs that will be spent in the Rural Area. Identify any previously incurred costs, as well as other sources of Federal funds committed to the project and any pending Federal requests. Also, note if the requested Federal funding under CRISI or other programs must be obligated or spent by a certain date due to dependencies or relationships with other Federal or non- Federal funding sources, related projects, law, or other factors. If applicable, provide the type and estimated value of any proposed in-kind contributions, and demonstrate how the in-kind contributions meet the requirements in 2 CFR 200.306.

EXAMPLE PROJECT FUNDING TABLE

Task # Task name/ project component Cost Percentage of total cost

1.

2.

Total Project Cost.

Federal Funds Received from Previous Grant.

CRISI Federal Funding Request.

Non-Federal Funding/Match ..................................................................... Cash: In-Kind:

Portion of Non-Federal Funding from the Private Sector.

Portion of Total Project Costs Spent in a Rural Area Pending Federal Funding Requests.

iv. Applicant Eligibility: Explain how the applicant meets the applicant eligibility criteria outlined in Section C of this notice. For public agencies and publicly chartered authorities established by one or more states, the explanation must include citations to the applicable enabling legislation. If the applicant is eligible under 49 U.S.C.

22907(b)(8) as a Rail Carrier or rail equipment manufacturer in partnership with at least one of the other eligible entities, the applicant should explain the partnership and each entity’s contribution to the partnership.

v. Project Eligibility: Identify which project eligibility category the project is eligible under in Section C(3) of this notice, and explain how the project meets the project eligibility criteria.

vi. Detailed Project Description:

Include a detailed project description that expands upon the brief project summary. This detailed description should provide, at a minimum, background on the challenges the project aims to address; the expected users and beneficiaries of the project, including all railroad operators; the specific components and elements of the project; and any other information the applicant deems necessary to justify the proposed project. If applicable, explain how the project will benefit communities in Rural Areas. An applicant should specify whether it is seeking funding for a project that has already received Federal financial assistance, and if applicable, explain how the new scope proposed to be funded under this NOFO relates to the previous scope. Consistent with DOT’s R.O.U.T.E.S. Initiative (https:// www.transportation.gov/rural), DOT encourages applicants to describe how activities proposed in their application would address the unique challenges facing rural transportation networks, regardless of the geographic location of those activities.

For all projects, applicants must provide information about proposed performance measures, as discussed in Section F(3)(c) and required in 2 CFR

200.301 and 49 U.S.C. 22907(f).

(A) Grade crossing information, if applicable: For any project that includes grade crossing components, cite specific DOT National Grade Crossing Inventory information, including the railroad that owns the infrastructure (or the crossing owner, if different from the railroad), the primary railroad operator, the DOT crossing inventory number, and the roadway at the crossing. Applicants can search for data to meet this requirement at the following link: http:// safetydata.fra.dot.gov/OfficeofSafety/ default.aspx. In addition, if applicable, applicants must cite the page number in the grade crossing action plan where the grade crossing is referenced.

(B) Heavily traveled rail corridor information, if applicable: For any project eligible under the eligibility category in Subsection C(3)(a)(iv), that reduces congestion and facilitates ridership growth in Intercity Passenger Rail Transportation, describe how the project is located on a heavily traveled rail corridor.

(C) PTC information, if applicable:

For any project that includes deploying PTC systems, applicants must:

1. Document submission of a revised Positive Train Control Implementation Plan (PTCIP) to FRA as required by 49 U.S.C. 20157(a);

2. Document that it is a tenant on one or more host railroads that submitted a revised PTCIP to FRA as required by 49 U.S.C. 20157(a), which states the tenant railroad is equipping its rolling stock with a PTC system and provides all other information required under 49 CFR 236.1011 regarding the tenant railroad; or

3. Document why the applicant is not required to submit a revised PTCIP as

VerDate Sep<11>2014 18:34 Apr 17, 2020 Jkt 250001 PO 00000 Frm 00108 Fmt 4703 Sfmt 4703 E:\FR\FM\20APN1.SGM 20APN1jb el l o n

D S

K

JL

S W

7X 2P

R O

D w ith N

O T

IC

E

S http://safetydata.fra.dot.gov/OfficeofSafety/default.aspx http://safetydata.fra.dot.gov/OfficeofSafety/default.aspx http://safetydata.fra.dot.gov/OfficeofSafety/default.aspx https://www.transportation.gov/rural

21930 Federal Register / Vol. 85, No. 76 / Monday, April 20, 2020 / Notices required by 49 U.S.C. 20157(a), and whether the proposed project will assist in the deployment (i.e., installation and/ or full implementation) of a PTC system…

This is the start of the file's text. The full file is on GovTribe.