9726 JOC Specs_Final.pdf
PDF 984 KB Posted
- Solicitation number
- 148091
- Issued by
- Fresno County, Fremont City, California
About this file
This is a Job Order Contracting (JOC) specification and bid document issued by the City of Fresno, California for General Building Construction and HVAC Construction services. The City intends to award up to five individual contracts for General Building Construction (License Class B) and up to three individual contracts for HVAC Construction (License Class C20) to the lowest responsive and responsible bidders. The contract is an indefinite quantity contract whereby selected contractors will perform an ongoing series of individual projects at different locations within the City's jurisdiction. As projects are identified, the City will prepare a Detailed Scope of Work and issue a Request for Proposal to which the contractor will respond with a Job Order Proposal including pricing, drawings, subcontractor lists, and construction schedules. The scheduled bid opening is December 1, 2026 at 3:00 p.m., with a mandatory pre-bid conference held on November 17, 2026 at 10:00 a.m. The contract term is three years with options for five additional one-year increments. The City has selected Gordian Group's JOC Solution as its management platform, requiring contractors to execute a license agreement and pay a 1% JOC System License Fee.
Bidders must submit a $25,000 bid deposit and meet licensing requirements (California Contractor's License Class B or C20). Pricing is based on competitively bid Adjustment Factors applied to pre-priced tasks in Gordian's Construction Task Catalog, with separate factors for Normal Working Hours (7:00 a.m. to 4:00 p.m. Monday-Friday) and Other Than Normal Working Hours (4:00 p.m. to 7:00 a.m. Monday-Friday, plus all-day Saturday, Sunday, and City holidays). The maximum annual contract value is $2,000,000 per contract with no single Job Order exceeding $1,000,000. There is no minimum guaranteed contract value, though contractors are guaranteed the opportunity to perform Job Orders. The work constitutes a public work subject to California prevailing wage requirements and Labor Code Section 1771.1. Performance and Payment Bonds equal to the Maximum Annual Contract Value ($2,000,000 for General Building, $1,000,000 for HVAC) are required. HVAC contractors must self-perform at least 20% of total labor hours. National Targeted Hiring requirements mandate 15% participation for public works over $200,000. Local preference of 5% applies to businesses within a 25-mile radius of Fresno City Hall or within Fresno County, with established primary or branch offices predating the bid solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOQ Forms.pdf | ||
| HVAC C-21 Construction Task Catalog.pdf | ||
| Class B Construction Task Catalog.pdf | ||
| HVAC C-21 Technical Specifications.pdf | ||
| Class B Technical Specifications.pdf | ||
| 9726 NIB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSD JOC.pdf Rev. 08-26 767841v1
JOB ORDER CONTRACTING
for
GENERAL BUILDING CONSTRUCTION AND HVAC CONSTRUCTION
BID FILE NUMBER: 9726
PROJECT ID #FA00010
FUND/ORG:51001/530601
PROCUREMENT SPECIALIST: Veronica Brandon
PHONE: (559) 621-1131
EMAIL: Purchasing@fresno.gov
SCHEDULED BID OPENING: December 1, 2026 mailto:Purchasing@fresno.gov
GSD JOC.pdf Rev. 08-26 767841v1
TABLE OF CONTENTS
PAGE
INTRODUCTION
Notice Inviting Bids..................................................................................................... i
Instructions to Bidders................................................................................................ v
DIVISION I BIDDING AND CONTRACT DOCUMENTS
1.0
Bidder's Checklist ........................................................................................................ 1.1
Bid Proposal Form ....................................................................................................... 1.2
Time of Completion and Liquidated Damages............................................................. 1.3
Time Period to Award Bid ............................................................................................ 1.4
Certification from Comptroller ...................................................................................... 1.8
Noncollusion Declaration ............................................................................................. 1.9
Certification for Local Preference ................................................................................ 1.10
Update of Statement of Qualifications ......................................................................... 1.11
National Targeted Hiring ……………………………………………………………………... 1.12
Signature Page for Bid Proposal ................................................................................. 1.13 Sample Certification ................................................................................................ 1.15
Attachments (to be Filed after Award) ......................................................................... 1.16 Contract Fair Employment Practices Compliance Report Payment Bond Performance Bond
GSD JOC.pdf Rev. 08-26 767841v1
TABLE OF CONTENTS
(Continued)
PAGE
DIVISION II GENERAL CONDITIONS 2.0
Definitions (Nonfederal) ............................................................................................... 2.1
Insurance Requirements.............................................................................................. 2.4
Bonds .......................................................................................................................... 2.7
General Guaranty ........................................................................................................ 2.8
Precedence of Contract Documents............................................................................ 2.8
Nonfederal Labor Standards Provisions ...................................................................... 2.11
Payrolls and Basic Records......................................................................................... 2.13
Fair Employment Practices and Nondiscrimination ..................................................... 2.15
Claims for Additional Time........................................................................................... 2.19
Claims and Disputes.................................................................................................... 2.20
DIVISION III FEDERAL REQUIREMENTS
(Not required for this project.)
3.0
DIVISION IV SPECIAL CONDITIONS
4.0
DIVISION V STANDARD SPECIFICATIONS
5.0
DIVISION VI JOB ORDER CONTRACTING SPECIAL CONDITIONS
6.0
NOTICE INVITING BIDS
Sealed or electronic bids will be received at the office of the Purchasing Manager of the City of Fresno for the following:
JOB ORDER CONTRACTING for
GENERAL BUILDING CONSTRUCTION AND HVAC CONSTRUCTION
BID FILE NUMBER: 9726
A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor may perform an ongoing series of individual Projects at different locations within the City or at any location or facility under the jurisdiction of the City. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor, material and equipment prices and are for the direct cost of construction.
The Contractor will bid two Adjustment Factors to be applied to the Unit Prices. The first will be an Adjustment Factor for performing work during Normal Working Hours and the second Adjustment Factor for performing work during Other Than Normal Working Hours. The same two Adjustment Factors shall apply to every Pre-priced Task in the Construction Task Catalog®.
The City may award up to five (5) individual contracts for General Building Construction and up to three
(3) individual contracts for Heating, Ventilation, Air Conditioning (HVAC) Construction, each to the lowest responsive, responsible bids, but reserves the right to reject any and all bids, and waive any irregularities in any bid received.
The City may award Contract(s) to the lowest responsive and responsible bidder(s) but reserves the right to reject any and all bids and waive any irregularities in any bid received.
Thereafter, as projects are identified the Contractor will jointly scope the work with the City. The City will prepare a Detailed Scope of Work and issue a Request for Proposal to the Contractor. The Contractor will then prepare a Job Order Proposal for the Project including a Job Order Price Proposal, drawings and sketches, a list of subcontractors and materialmen, construction schedule, and other requested documentation. The Job Order Price shall equal the value of the approved Job Order Price Proposal. The value of the Job Order Price Proposal shall be calculated by summing the total of the calculation for each Pre-priced Task (Unit Price x quantity x Adjustment Factor) plus the value of all Non Pre-priced Tasks.
If the Job Order Proposal is found to be complete and reasonable, a Job Order may be issued.
A Job Order will reference the Detailed Scope of Work and set forth the Job Order Completion Time, and the Job Order Price. The Job Order Price shall be a lump sum, fixed price for the completion of the Detailed Scope of Work. A separate Job Order will be issued for each Project. Extra work, credits, and deletions will be contained in a Supplemental Job Order. A unique City Purchase Order will be issued for each Job Order.
The City selected The Gordian Group’s (Gordian) Job Order Contracting (JOC) Solution for their JOC program. The Gordian JOC SolutionTM includes Gordian’s proprietary JOC Management Software, construction cost data, and Construction Task Catalog®, which shall be used by the Contractor solely for the purpose of fulfilling its obligations under this Contract, including the preparation and submission of Job Order Proposals, Price Proposals, subcontractor lists, and other requirements specified by the City. The Contractor shall be required to execute Gordian’s JOC System License and Fee Agreement and pay a 1% JOC System License Fee to obtain access to the Gordian JOC SolutionTM. The JOC System License Fee applies to all Job Orders issued to the Contractor under the terms of this Contract.
GSD JOC.pdf i Rev. 08-26
Contracts Bidding under this Solicitation:
Contract
Type
License
Required
Bid
Deposit Minimum Contract
Value
Maximum Annual Value
Maximum Contract Duration
(Sum of Terms)
Payment and Performance
Bond
General Building B $25,000 $25,000 $2,000,000 3 years $2,000,000 ea
HVAC C20 $25,000 $25,000 $2,000,000 3 years $1,000,000 ea
The above table identifies the two license categories under which bidders may be qualified for this Job Order Contract (JOC). The City intends to award to multiple bidders within each category, as needed to meet operational demand.
The Successful Proposers for the Contract Type HVAC C-20 shall perform with its own organization and forces not less than 20% of the total amount of labor hours performed at the Project site through the working foreperson level. NOTE: The City has determined that the percentage of self-performance is a critical performance criterion. As such, failure to achieve or exceed the self-performance requirements will constitute a reason to terminate the Contract. As requested, the Successful Proposer shall provide a report to the City showing the amount of self-performance achieved by project and total accumulative amount. The self-performance percentage calculation does not include field superintendents or office management personnel.
Each bidder may submit one and only one bid per contract type. If a bidder submits more than one bid for a contract type, then that bidder will be disqualified for all bids submitted and those bids will be returned to the bidder.
Term of Contract and Option Periods:
1. The Contract shall be in effect for three (3) years and may be extended with mutual written consent of both parties for five (5) one-year increments.
2. All Job Orders issued during the term of this Contract shall be valid and in effect notwithstanding that the Detailed Scope of Work may be performed, payments may be made, and the guarantee period may continue, after such period has expired. All terms and conditions of the Contract apply to each Job Order.
Minimum and Maximum Annual Contract Values
1. The Contractor is guaranteed to receive the opportunity to perform Job Orders. However, there is no Minimum Contract Value for each Contract.
2. The Maximum Annual Value for each Contract is $2,000,000. The Contractor is not guaranteed to receive this volume of Job Orders. It is merely an estimate. The City has no obligation to give the Contractor the opportunity to perform Job Orders in excess of the Minimum Contract Value.
No single Job Order shall be issued in an amount equal to or above $1,000,000
Bids will be taken in accordance with Contract Documents on file in the office of the Purchasing Manager, 2101 G St., Bldg. A, Fresno California 93706-1620 or via Planet Bids, phone number (559) 621-1332.
GSD JOC.pdf ii rev. 05-23 iii GSD JOC DIV I.pdf rev. 05-23 767841v1
Specifications and bid proposal forms for these items can be downloaded at the City’s online website at: http://www.fresno.gov. Business (at the top of the screen), Bid
Opportunities in the “Additional Resources” section.
Bids will be submitted electronically via Planet Bids.
Bid Proposals must be filed electronically or with the Purchasing Manager prior to the bid opening at 3:00 p.m. on December 1, 2026, when the bids will be publicly opened and recorded. Electronically filed is defined as by means of electronic equipment or devices. Join the bid opening meeting at https://fresno.zoomgov.com/j/1619517892 or call 1 (669) 254-5252, meeting ID 161 951 7892.
The work hereunder constitutes a “public work” as defined in Chapter 1, Part 7, Division 2 of the California Labor Code, and Contractor shall cause the work to be performed as a “public work” in accordance with such Chapter of the California Labor Code. The Council of the City of Fresno has adopted Resolution No. 82-297 ascertaining the general prevailing rate of per diem wages and per diem wages for holidays and overtime in the Fresno area for each craft, classification, or type of worker needed in the execution of contracts for the City. A copy of the resolution is on file at the Office of the City Clerk. Actual wage schedules are available at Construction Management Office, 1721 Van Ness Avenue, Fresno, California 93721, (559) 621-5600.
Contractors and Subcontractors must meet any and all requirements of Labor Code sections 1771.1 and
1771.5 prior to submitting bids.
All proposals must be made on the Bid Proposal Form provided by the Purchasing Manager. A Bid Deposit, which can be provided separately, in the amount of $25,000 in the form of a certified or cashier’s check, an irrevocable letter of credit, or a certificate of deposit or a bidder’s bond executed by a corporate surety, admitted by the California Insurance Commissioner to do business in California, payable and acceptable to the City of Fresno; or the Bidder shall have registered with the Purchasing Manager of the City an annual bid bond sufficient to provide coverage in such amount. . All Bid Deposits will be held until a Contract has been executed with the successful Bidder or all bids have been rejected. Copies of Bid Deposits may be submitted electronically, with the exception of a certified or cashier’s check, which must be brought to the Purchasing Manager’s office and labeled accordingly with bid number prior to the bid opening.
The City of Fresno hereby notifies all Bidders that no person shall be excluded from participation in, denied any benefits of, or otherwise discriminated against in connection with the award and performance of any contract on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era or on any other basis prohibited by law.
A MANDATORY pre-bid conference will be held on Tuesday, November 17, 2026 at 10:00 AM. Join the meeting by going to https://fresno.zoomgov.com/j/1609588136 or call 1 (699) 254-5252 Meeting ID: 160 958 8136. Prospective Bidders attend City Staff and Gordian Staff will be present to answer any questions regarding the Specifications and Contract Documents.
Services of an interpreter and additional accommodations can be made available. Requests for accommodations should be made at least five working days but no later than 48 hours prior to the scheduled meeting/event. Please contact the Procurement Specialist on the cover at 559-621-1332 or through the Questions and Answers field on Planet Bids.
http://www.fresno.gov/ https://fresno.zoomgov.com/j/1619517892 https://fresno.zoomgov.com/j/1609588136 iv GSD JOC DIV I.pdf rev. 05-23 767841v1
In accordance with provisions of section 22300 of the California Public Contract Code, Contractor may substitute securities for any monies withheld by City to ensure performance under the Contract.
A Payment Bond and Performance Bond for all public works contracts must be filed with the Contract Documents and approved by the City before the Contractor enters upon performance of the Work. The Payment and Performance Bonds shall be in penal sum equal to the Maximum Annual Contract Value. In the event the parties agree to exercise the Option Term(s), the Contractor shall deliver new Payment and Performance Bonds.
Bidders are advised that as required by the Fresno Municipal Code, the City of Fresno is implementing new National Targeted Worker requirements for public work of improvement contracts over $200,000. The mandatory participation level for National Targeted Workers is 15%.
No bid will be considered for award unless the Bidder at the time of bid opening is licensed with a valid Contractor’s License as indicated in the table above, issued by the State of California.
The City reserves the right to reject any and all bids.
v GSD JOC DIV I.pdf rev. 05-23 767841v1
INSTRUCTIONS TO BIDDERS
JOB ORDER CONTRACTING for
GENERAL BUILDING CONSTRUCTION
or
HVAC CONSTRUCTION
BID FILE NUMBER: 9 7 2 6
BID PROPOSALS WILL BE CONSIDERED FOR AWARD ONLY IF THE BIDDER HAS COMPLIED WITH
THE FOLLOWING:
1. Bid Proposals shall be submitted on the forms furnished by the Purchasing Manager via Planet Bids, with all documents listed on the Bidder’s Checklist, completely filled out, properly signed by the Bidder and electronically filed utilizing Planet Bids prior to the date and time specified in the Notice Inviting Bids, when all bids will be publicly opened and recorded. Bids received at 3:00 p.m.
or after will not be accepted. The time stamp in the Purchasing Division will be the official clock for documenting the time of filing. Electronically filed is defined as by means of electronic equipment or devices.
The Contractor shall submit two Adjustment Factors. When preparing a Job Order Price Proposal, the Contractor shall select the appropriate Adjustment Factor for each task.
The Adjustment Factors are as follows:
1. Normal Working Hours: Monday through Friday 7:00 am to 4:00 pm except City observed holidays.
2. Other Than Normal Working Hours: Monday through Friday 4:00 pm to 7:00 am and all-day Saturday, Sunday and City observed holidays.
The Other than Normal Working Hours Adjustment Factor must be equal to or greater than the Normal Working Hours Adjustment Factor.
All Unit Prices listed in the Construction Task Catalog® are priced at a net value of 1.0000. The Adjustment Factors shall be an increase or decrease to all the Unit Prices listed in the Construction Task Catalog®. For example, 1.10000 would be a 10% increase to the Unit Prices and 0.9500 would be a 5% decrease to the Unit Prices. Bidders who submit separate Adjustment Factors for separate Unit Prices will be considered non-responsive and their bid will be rejected.
For bid evaluation purposes only, the following work distributions shall be used to determine the Evaluation Criteria Figure:
Adjustment
Factor % Weight
(For Bid Evaluation Only)
Normal Working Hours 80%
Other than Normal Working Hours 20%
2. A Bid Deposit has been made in accordance with the paragraph below. A bid without a proper Bid
Deposit will be automatically rejected.
(a) BID DEPOSIT. Bidders must submit a Bid Deposit, which may be provided separately, in the amount of TWENTY-FIVE THOUSAND DOLLARS ($25,000) with their Bid Proposal. Such Bid Deposit shall be in the form of a certified or cashier’s check, an irrevocable letter of credit or a certificate of deposit payable to the City of Fresno, or a bidder’s bond executed by a corporate surety, admitted by the California Insurance Commissioner to do business in vi GSD JOC DIV I.pdf rev. 05-23 767841v1
California, payable and acceptable to the City of Fresno. Such Deposit shall be retained by the City of Fresno as a guarantee that the Bidder, if awarded the Contract, will within 15 calendar days from the date the Notice of Award is mailed to the Bidder, execute and return a Contract furnished by the City. No Bid Deposits will be returned to Bidders until either a Contract has been executed or all bids have been rejected. Bid bonds will not be returned, except upon bidder’s written request. Copies of Bid Deposits may be submitted electronically, with the exception of a certified or cashier’s check, which must be brought to the Purchasing Manager’s office and labeled accordingly with bid number prior to the bid opening.
NOTARIAL ACKNOWLEDGEMENT
Each Bid Bond must be executed by a surety authorized to do business in the State of California. The bond must be originally signed by both the Principal and the Surety. Notary acknowledgements for both the Principal and the Surety must be attached if corporate seal is not visible on the bid bond. If signed by an Attorney-in-Fact, a certified and effectively dated Power of Attorney must be included with the bond.
Failure to provide properly notarized signatures or visible corporate seal will render the bid non-responsive.
CONTRACT DEFINITIONS
Attention of Bidders is especially directed to all provisions of the Contract Documents, as defined in the
GENERAL CONDITIONS.
PREVAILING WAGE
The work hereunder constitutes a “public work” as defined in Chapter 1, Part 7, Division 2 of the California Labor Code, and Contractor shall cause the work to be performed as a “public work” in accordance with such Chapter of the California Labor Code. The Council of the City of Fresno has adopted Resolution No. 82-297 ascertaining the general prevailing rate of per diem wages and per diem wages for holidays and overtime in the Fresno area for each craft, classification, or type of worker needed in the execution of Contracts for the City. Information specific to the Work to be done under this Contract can be obtained by contacting the Contract Compliance Officer at the City of Fresno office of Construction Management, (559) 621-5600.
FEDERAL IMMIGRATION REFORM AND CONTROL ACT
As a material part of any Contract for a City of Fresno project, every Contractor who has employees who will work on a City of Fresno project, is required to comply with all of the provisions of the Federal Immigration Reform and Control Act of 1986 (P.L. 99-603, 100 Stat. 3359). This requirement includes compliance with all of the employee documentation provisions. Furthermore, the Contractor will make any employee documentation required to comply with the Act immediately available to the City upon its request for each individual employee working on a City of Fresno project.
VERIFICATION OF WORK
Before submitting a Bid Proposal, Bidders should inspect the Contract Documents and become familiar with the local conditions of the City of Fresno. The submittal of a Bid Proposal shall be considered prima facie evidence that the Bidder has reviewed the Specifications, Contract Documents and local conditions, and is fully aware of the required Work and Work conditions and has included within the Bid Proposal the appropriate Adjustment Factors covering the cost of execution of the Work in accordance with such Specifications, Contract Documents and conditions.
SUBCONTRACTORS
The Prime Contractor shall include with the all Job Order Proposals the name, location and license number vii GSD JOC DIV I.pdf rev. 05-23 767841v1 of the place of business of each Subcontractor who will perform work or labor or render service to the Contractor in or about the construction of the Work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the Job Order, in an amount in excess of one-half of 1 percent of the prime contractor’s Job Order Price or, in the case of Job Orders for the construction of streets or highways, including bridges, in excess of one-half of 1 percent of the prime contractor’s Job Order Price or ten thousand dollars ($10,000), whichever is greater.
Subcontractor Information – Detail concerning any subcontractor who the prime contractor is required to list under this subdivision, other than the subcontractor’s name and location of business, shall be submitted by the prime contractor within 1 working day after the submission of the Job Order Proposal for each individual Job Order.
The Prime Contractor shall list only one subcontractor for each portion of work as is defined by the prime contractor in his/her Job Order Proposal.
MANDATORY PRE-BID CONFERENCE
A MANDATORY pre-bid conference shall be held at the time and place listed in the Notice Inviting Bids.
Prospective Bidders may attend. City Staff and Gordian Staff will be present to answer any questions regarding the Specifications, and Contract Documents.
QUESTIONS, CLARIFICATIONS AND CONCERNS
The Specifications and Contract Documents describing this contract have been carefully prepared. Any questions or concerns relating to these Specifications or any Contract Documents shall be directed in writing to the designated Procurement Specialist of the Purchasing Division (see cover page) and shall be sent by email to Purchasing@fresno.gov A Bid Question form for this purpose has been included as page xiii.
Questions will be accepted only up to 5 working days prior to the bid opening date to allow the City, if necessary, to issue an addendum to all bidders stating revisions, deletions, or additions to be made to the Specifications or any Contract Documents as a result of any questions. If questions arise after the deadline, please contact the designated Procurement Specialist of the Purchasing Division, but the City will not guarantee a response.
The City will not be responsible for verbal responses made by parties other than the Purchasing Manager or her/his designee.
CONTACTS WITH CITY STAFF
Before an award is made, any contact with City staff, other than the Purchasing Manager or designee(s), without prior written authorization is strictly prohibited and may render the Bidder non-responsible.
LOCAL PREFERENCE
Fresno Municipal Code Section 4-108 LOCAL PREFERENCE IN CONTRACTS REQUIRING COMPETITIVE BIDDING provides for a local preference. That applicable to public work of improvement contracts are paraphrased as follows:
Except for those contracts funded by the federal or state government when such funding would be jeopardized because of this preference, the Council authorizes the Purchasing Manager to extend a preference to a local business as expressly set forth herein. For purposes of this section, “local business” shall mean a business with a fixed primary or branch office either (i) within a twenty-five mile radius of Fresno City Hall, located at 2600 Fresno Street in the City of Fresno, or (ii) within the County of Fresno; and which fixed primary or branch office was established prior to the City inviting bids for the respective purchase.
viii GSD JOC DIV I.pdf rev. 05-23 767841v1
The Purchasing Manager, in the evaluation of any and all sealed bids for any public works construction pursuant to this section, shall extend a five percent (5%) preference to a local business in award of the Contract whenever the amount of the preference, as determined in subdivision (i) below, is less than or equal to seventy-five thousand dollars ($75,000). For the purpose of this clause, the bid price shall be calculated by multiplying the Evaluation Criteria Figure by the Maximum Annual Contract Value.
The preference shall be extended consistent with each of the following:
(i) The amount of the preference shall be equal to the amount of the percentage applied to the lowest responsive and responsible bid.
(ii) If the Bidder submitting the lowest responsive and responsible bid is not a local business, and if a local business has also submitted a responsive and responsible bid, and, with the benefit of the preference, the local business’ bid is equal to or less than the original lowest responsive and responsible bid, the City shall award the Contract to the local business at its submitted bid price.
(iii) The Bidder shall certify, under penalty of perjury, that the Bidder qualifies as a local business. The preference is waived if the certification does not appear on the bid.
Bidders shall submit the CERTIFICATION FOR LOCAL PREFERENCE form with their bid if they seek the benefit of local preference.
SUBSTITUTION OF MATERIALS
Where specific names are used in conjunction with materials, they are mentioned as standards, but this implies no right upon the part of the Contractor to substitute other materials or methods without permission of the Engineer.
If manufacturers or brands are used or listed in conjunction with products, equipment or materials in these Specifications without the words “or equal,” equals are allowed. Except in those instances where the product is designated as “No Substitution Allowed,” the Specifications will list at least two brands or trade names of comparable quality or utility followed by the words “or equal.” Where “or equal(s)” are allowed for any product, equipment or materials, they must meet all the requirements of the Specifications to the satisfaction of the City and must be in current production.
For all “or equal(s),” Contractor shall make submittals after Notice to Proceed for the Job Order for evaluation. If approval as an equal is denied by the City, Contractor shall provide one of the manufacturers/brands listed in the Specifications and/or Detailed Scope of Work without change in the Job Order Price.
STATEMENT OF QUALIFICATIONS
Bidders who desire to participate in the formal bidding process of the City of Fresno for public works projects must, (a) have on file with the Office of the Purchasing Manager of the City of Fresno; or (b) must submit with the Bid Proposal, a “Statement of Qualifications,” including Schedules “A-1” and “A-2.” The Statement must be filed annually. Statements that are older than one year are no longer valid which may render a bid nonresponsive.
EXCEPTIONS
Any exceptions taken at the time of or after bid submittal, may render the bid nonresponsive. Attachments by Bidders which include legal terms and conditions that conflict with the GENERAL CONDITIONS may be considered an exception, and Bidder may, therefore, be considered nonresponsive.
ERRORS AND OMISSIONS
ix GSD JOC DIV I.pdf rev. 05-23 767841v1
Errors and omissions by the Bidder will be dealt with in accordance with the California Public Contract Code including, but not limited to sections 4107.5 and 5103.
BID APPEAL PROCEDURE
The City has an appeal procedure in place as adopted by the City Council on May 7, 2026, in Resolution No. 2026-88. Any Bidder wishing to file an appeal should refer to that Resolution. A copy of the Resolution may be obtained from the City Clerk’s Office, 2600 Fresno Street, Fresno, California 93721.
Once City staff has reviewed and evaluated the bid proposals received and has determined the lowest responsive and responsible Bidder for award, that determination will be posted on a public bulletin board outside the Purchasing Division Office and the City’s website www.fresno.gov, Departments, General Services, Purchasing Division, a minimum of 5 working days prior to council action to award a Contract for the project/purchase. It is the sole responsibility of interested bidders to seek this information from either of these sources.
Should bidders be found non-responsible and wish to appeal the staff determination on the grounds of non-responsibility, appeals must be received in writing and conform to the requirements under Resolution No.
2026-88 within three working days from the time the determination is posted. “Working day” means a City of Fresno regular business day. Appeals must be submitted to the following:
City of Fresno Purchasing Division 2101 G Street, Bldg. A
Fresno California, 93706-1620 FAX Number (559) 457-1564
Letters of appeal must clearly follow the rules and procedures laid out in Resolution No. 2026-88. Only a bidder determined by the City to be non-responsible may file an appeal under the Resolution. Formal appeals are not permitted for bids deemed non-responsive; such determinations are subject only to internal administrative review. No appeals by non-bidders shall be accepted.
Appeals not submitted within the stated three working day timeframe will not be honored and the City will proceed to award the Contract.
REGULATED COMMUNICATIONS IN CITY PROCUREMENT PROCESS ORDINANCE
The Regulated Communications in City Procurement Process Ordinance (Article 6, Chapter 4 of the Fresno Municipal Code) became effective May 7, 2004. With certain specified exceptions, the Ordinance provides that no Respondent, Bidder, Proposer (as the case may be) shall initiate, engage in, or continue any communication to or with any City elected official concerning or touching upon any matter which is the subject of this competitive procurement process.
Any Respondent, Bidder, Proposer or elected official (as the case may be) who initiates, engages in, continues in, or receives any regulated communication shall file the written disclosure required by the Regulated Communications in City Procurement Process Ordinance.
Any Respondent, Bidder, or Proposer violating the Regulated Communications in City Procurement Process Ordinance may be disqualified from participating in this procurement process and/or determined to be non-responsible. Additionally, the City may set aside the award of a contract, prior to its execution, to a party found to have violated the Ordinance.
Note: The full text of Fresno Municipal Code, Chapter 4, Article 6 may be viewed on the City’s website at, http://www.fresno.gov. under “Government” on the top right portion of the home page click on “City Clerk”, then click on “Fresno Municipal Code” located in the middle of the page. Or view the Fresno Municipal Code directly at http://library.municode.com/index.aspx?clientId-14478&stateId=5&stateName=California .
http://www.fresno.gov/ http://www.fresno.gov/ http://library.municode.com/index.aspx?clientId-14478&stateId=5&stateName=California x GSD JOC DIV I.pdf rev. 05-23 767841v1
DEBARMENT
A Bidder may be debarred from bidding or proposing upon or being awarded any contract with the City, or from being a subcontractor or supplier at any tier upon such contract, in accordance with the procedures in Fresno Municipal Code Section 4-104 adopted by Council on May 17, 2018. The initial period of any such debarment shall not be less than one year and may be permanent depending on the violation. A Bidder may request a hearing, in accordance with Fresno Municipal Code Section 4-104, upon receipt of a notice of proposed debarment from the City Manager or designee. A copy of the Resolution may be obtained from the City Clerk’s Office, 2600 Fresno Street, Fresno, California 93721.
OUTREACH TO SMALL BUSINESS ENTERPRISES IN SUBCONTRACTING
The City of Fresno hereby notifies all Bidders that it is the City’s policy to provide all small business enterprises, including minority, women, and disabled veteran business enterprises, equal access and opportunity for participation in the performance of all construction contracts, professional service contracts, and procurement of supplies, equipment and other services. Therefore, the City requests that a Bidder who intends to subcontract a portion of the work seek out small business enterprises that are potential subcontractors, suppliers, or consultants, and actively solicit their interest, capability and prices.
NATIONAL TARGETED HIRING (NTH)
This project is subject to Fresno Municipal Code section 4-117:
The Contractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The Contractor shall carry out applicable requirements of Fresno Municipal Code section 4-117 in the award and administration of this Contract. Failure by the Contractor to carry out these requirements is a material breach of this Contract, which may result in the termination of this Contract or such other remedy as the City deems appropriate. The Contractor shall include these requirements in all subcontracts issued pursuant to this contract.
Contractor shall take necessary and reasonable steps to ensure that NTH have opportunity to participate in the Contract.
VIOLATIONS OF NTH REQUIREMENTS. Contractor shall diligently carry out and adhere to NTH requirements as set forth in the NTH Program and in the Contract. The failure of Contractor to comply with the requirements shall be deemed a material breach of Contract and, after due notice and opportunity to cure the breach is afforded the Contractor; such breach may result in, among other remedies and sanctions, a cancellation of the Contract.
MONETARY SANCTION FOR VIOLATIONS. Upon a final determination by the City that Contractor has materially violated the NTH terms of the Contract, and after due notice of this determination is given to the Contractor, a substantial monetary penalty, on account of the NTH violation, may be withheld and set off by the Finance Department from progress payments, or the final payment, due to the Contractor for work performed under the Contract. Depending upon the seriousness or willfulness of the NTH violation, the amount of money which may be withheld may be up to, but not more than, the full amount of the liquidated damages as allowed under the Contract.
MINIMUM NTH SUBMISSION REQUIREMENTS. Submission of information required under this section shall be on a form provided by the City, or as otherwise directed.
ACH PAYMENT INITIATIVE-ELECTRONIC PAYMENT
Contractor shall provide complete and accurate billing invoices in order to receive payment. Billing invoices submitted must contain all information and supporting documentation required by the contract. Payment for invoices submitted by the contractor shall only be rendered electronically unless payment by paper check is xi GSD JOC DIV I.pdf rev. 05-23 767841v1 expressly authorized by the Controller, in the Controller’s sole discretions, due to extenuating circumstances.
Such electronic payment shall be made in accordance with ordinary City procedures and practices. The contractor shall comply with the Controller’s procedures to authorize electronic payments. Contractor acknowledges that it will not receive payment on any invoices submitted under this Contract if it does not comply with the Controller’s electronic payment procedures, except where the Controller has expressly authorized payment by paper check as set forth above.
HOT WORK SAFETY REQUIREMENTS
A. Applicability This section applies whenever Contractor's work under this Contract involves or may involve "hot work," defined as soldering, welding, pipe-cutting, heat-treating, grinding, thawing pipes, hot riveting, torch-applied roofing, or any other activity involving open flame, heat, or the production of sparks. If Contractor's work does not involve hot work, this section does not apply.
B. Compliance with City Program Where applicable, Contractor shall comply with the City of Fresno Hot Work Safety Program (Program), as may be amended, a copy of which is available upon request from the City's Personnel Services Department, Risk Management Division, or from the City's project representative. In the event of any conflict between this section and the Program, the more stringent requirement shall control.
C. Designated Roles Prior to performing any hot work, Contractor shall designate, from among its own personnel, a Supervisor, a Fire Watch, and, when City personnel are not present at the work location, a Hot Work Approver, each trained consistent with the Program's requirements for that role.
D. Permits Where hot work is to be performed at a location where City employees are present, Contractor shall obtain a hot work permit from the City's designated Hot Work Approver prior to beginning work.
Where hot work is to be performed at a location where City employees are not present, Contractor is responsible for issuing its own permit consistent with the Program.
Contractor may use its own hot work permit form in lieu of the City's, provided it contains, at minimum, the information required by the Program's standard permit and has been approved in advance by the City.
Contractor shall provide the City's project representative with copies of all revoked/closed hot work permits by the end of each business day, or within such other reasonable time as may be mutually agreed.
E. Precautions Contractor shall, at a minimum: remove or protect combustible materials within 35 feet of the hot work; confirm any applicable fire suppression system is operational; ensure a fire watch is maintained during hot work and for not less than 60 minutes after work concludes; and ensure personnel performing or exposed to hot work use PPE appropriate to the hazard.
F. Notification Contractor shall notify the City's project representative before hot work begins so the City can coordinate access, evacuate affected areas if necessary, and confirm no conflicting activity is scheduled in the vicinity.
G. No Relief from Other Requirements Nothing in this section relieves Contractor of its independent obligation to comply with all applicable fire codes, Cal/OSHA requirements, NFPA standards, and manufacturer requirements for equipment used in hot work operations.
xiii GSD JOC DIV I.pdf rev. 05-23 767841v1
PURCHASING DIVISION
TELEPHONE # (559) 621-1332
BID QUESTIONS FOR:
JOB ORDER CONTRACTING FOR GENERAL
BUILDING CONSTRUCTION AND HVAC
CONSTRUCTION
Bid File No.: 9726
ATTENTION: VERONICA BRANDON,
PROCUREMENT SPECIALIST
E-MAIL: Purchasing@fresno.gov
(FOR CITY OF FRESNO USE ONLY)
QUESTION NO:
DATE: REVIEWED BY:
RESPONSIBLE FOR RESPONSE:
[ ] CITY STAFF
[ ] CONSULTANT
FROM:
COMPANY:
CONTACT PERSON:
DATE:
PHONE No:
FAX No:
QUESTION (One question per sheet.)
ANSWER:
RESPONSE BY: DATE:
INCLUDED IN ADDENDUM NO. DATE:
One question per page - Duplicate this form as necessary.
1.0 GSD JOC DIV I.pdf rev. 05-23 767841v1
DIVISION I
BIDDING AND CONTRACT DOCUMENTS
1.1 GSD JOC DIV I.pdf rev. 05-23
BIDDER’S NAME:
(Submit with Bid Proposal)
BIDDER’S CHECKLIST
JOB ORDER CONTRACTING for:
(Indicate contract type)
Bid File No.: 9726
SUBMIT THIS BIDDER’S CHECKLIST WITH YOUR BID DOCUMENTS. Bidders shall complete and submit all documents marked with an “X” in the “REQUIRED” column. Documents required on the checklist but not included may render your bid nonresponsive and ineligible for award. Bids received by the City by the scheduled bid opening time will be opened and publicly read but are subject to verification that all the required documents have been submitted. Copies of bid Deposits may be submitted electronically and separate, with the exception of a certified or cashier’s check, which must be brought to the Purchasing Manager’s office and labeled accordingly with bid number prior to bid opening.
REQUIRED
[X] 1. A valid STATEMENT OF QUALIFICATIONS including Schedules “A-1 and “A-2” must be on file with the Office of the Purchasing Manager of the City of Fresno at the time of the bid opening.
[X] 2. BIDDER’S CHECKLIST PAGE 1.1
[X] 3. BID PROPOSAL pages 1.2 through 1.4.
[X] 4. CONTRACTOR’S LICENSE information, page 1.6 [X] 5. BID DEPOSIT, page 1.5 [ ] Certified Check [ ] Bidder’s Bond
[ ] Cashier’s Check [ ] Irrevocable Ltr of Credit [ ] Certificate of Deposit [ ] Annual Bidder’s Bond
[X] 6. CERTIFICATION, (Comptroller General’s List), page 1.8.
[X] 7. NONCOLLUSION DECLARATION, page 1.9.
[X] 8. CERTIFICATION FOR LOCAL PREFERENCE, if applicable, page 1.10.
[X] 9. UPDATE OF STATEMENT OF QUALIFICATIONS, page 1.11.
[X] 10. NATIONAL TARGETED HIRING, page 1.12 [X] 11. SIGNATURE PAGES 1.13 and 1.14.
[X] 12. ADDENDA - Signature page of all Addenda issued, Addenda No. to . (Enter numbers) [X] 13. MANDATORY PRE-BID CONFERENCE - A company representative attended the pre-bid conference held on November 17, 2026 at 10:00 AM.
SUBMITTED BY:
Name of Company Contact Name
Address City State Zip
Phone No. Fax No.
E-Mail Address:
1.2 GSD JOC DIV I.pdf rev. 05-23 767841v1
BID PROPOSAL
JOB ORDER CONTRACTING FOR
(Indicate contract type)
BID FILE NO.: 9726
TO: THE PURCHASING MANAGER OF THE CITY OF FRESNO:
The undersigned Bidder, having carefully examined the Specifications and Contract Documents, hereby proposes to furnish, all, in strict accordance with said Specifications and Contract Documents, the materials, labor, and equipment necessary to complete the work required by each Job Order using the following Adjustment Factors:
Adjustment Factor Name Adjustment Factor Bid
X Evaluation Multiplier
= Weighted Evaluation Amount
1.
Adjustment Factor for Normal Working Hours
X 0.80
2.
Adjustment Factor for Other Than Normal Working Hours
X 0.20
3. Enter the Sum Total of Items 1–2 Weighted Amounts
(This is the Evaluation Criteria Figure and basis for determining the lowest bid)
The Bidder shall set forth Adjustment Factors in legible figures in the respective space provided. Failure to submit all Adjustment Factors will result in the Bid being deemed non-responsive.
The City Council may award contract(s) to the lowest responsive and responsible bidder(s), subject to available funds at the time of award and as determined to be in the City’s best interest.
The lowest bid shall be determined by the lowest Total of Items 1 – 2 Weighted Amounts, subject to the right to reject any and all bids, pursuant to the Fresno Municipal Code, Section 4-103(c)(1).
Notes To Bidder:
1. Specify lines 1 through 3 to four (4) decimal places. Use conventional rounding methodology (i.e., if the number in the 5th decimal place is 0-4, the number in the 4th decimal remains unchanged; if the number in the 5th decimal place is 5-9, the number in the 4th decimal is rounded upward).
2. The Other Than Normal Working Hours Adjustment Factor must be greater than or equal to the
Normal Working Hours Adjustment Factor.
(Continued)
3. The multipliers and weighted amounts above are for the purpose of calculating a Total Amount for determination of the lowest bid only. No assurances are made by the City that Work will be ordered under the Contract in a distribution consistent with the multipliers above.
4. When submitting Job Order Price Proposals related to specific Job Orders, the Bidder shall utilize one or more of the Adjustment Factors applicable to the Work being performed.
Completion of Bid Proposal Form to be Eligible for Award. Bidders must bid all bid items (including any Alternates). The Bidder is non-responsive and ineligible for award in the event Bidder fails to initial this paragraph on the line provided and completely fill in this Bid Proposal Form including, without limitation, all dollar amounts and information called for on this Bid Proposal Form. By his or her initials to the right hereof, Bidder represents he or she has read and understands the consequences of not completely filling in this Bid Proposal Form. Initial
The Adjustment Factors set forth herein shall include any and all applicable taxes.
GSD JOC DIV I.pdf 1.2a rev. 05-23
1.3 GSD JOC DIV I.pdf rev. 05-23 767841v1
TIME OF COMPLETION/LIQUIDATED DAMAGES
The Contractor shall diligently prosecute the work to completion for each individual Job Order before expiration of the specified working days from the date of the Notice to Proceed. For each consecutive calendar day that the Detailed Scope of Work for a Job Order shall remain incomplete after the Job Order Completion Time, liquidated damages will be deducted from any money due the Contractor.
It is agreed that the Contractor shall be liable for and shall pay to the City, as fixed, and agreed, liquidated damages, and not as a penalty, the sum of FIVE HUNDRED DOLLARS ($500.00) per day for each calendar day of delay in completion of the Detailed Scope of Work from the date for Job Order completion as specified in each individual Job Order or in any written extension of time granted by the City.
NOTE: The following shall apply to all bid items:
TIME OF COMPLETION AS SPECIFIED WILL BE ENFORCED.
LIQUIDATED DAMAGES WILL BE DEDUCTED FROM PAYMENTS.
ADDENDA
The City makes a concentrated effort to ensure any addenda issued relating to these Specifications and Contract Documents are distributed to all interested parties. It shall be the Bidder’s responsibility to inquire as to whether any addenda to the Specifications or Contract Documents have been issued. Upon issuance by the City, all Addenda are part of the Bid Proposal. Signing the Bid Proposal on the signature page thereof shall also constitute signature on all Addenda.
PRECEDENCE OF BID PRICES
In the event of discrepancies between the bid total, summaries of totals and unit price extensions, the unit price correctly extended will control over the summaries of totals, and the summaries of totals correctly added will control over the total, whether the summaries of totals are extended unit prices or lump sums.
RIGHT TO REJECT ANY AND ALL BIDS
The City reserves the right to reject any and all bids.
1.4 GSD JOC DIV I.pdf rev. 05-23 767841v1
TIME PERIOD TO AWARD/REJECT BIDS
The undersigned Bidder agrees that the City may have SIXTY-FOUR (64) DAYS from the date bids are opened to accept or reject this Bid Proposal. It is further understood that if the Bidder to whom any award is made fails to enter into a Contract as provided in the Specifications, award may be made to the next lowest responsive and responsible Bidder, who shall be bound to perform as if he/she had received the award in the first instance. No Bid Proposal may be withdrawn prior to award within that time.
AWARD OF CONTRACT(S)
The City may award Contract(s) to the lowest responsive and responsible Bidder(s), but reserves the right to reject any and all bids, and waive any irregularities in any bid received.
Each Bidder may submit one and only one bid per contract type. If a Bidder submits more than one bid for a contract type, then that Bidder will be deemed nonresponsive for all bids submitted and those bids will be returned to the Bidder.
MINOR IRREGULARITIES
The City reserves the right to waive any informality or minor irregularity that does not have a monetary consideration when it is in the best interest of the public and of the City to do so. A discrepancy that offers a Bidder an unfair advantage will cause the bid to be nonresponsive.
TIEBREAKER
In the event a tiebreaker is needed to establish the lowest responsive and responsible Bidder, the City shall, unless otherwise agreed upon by all participating parties, utilize a coin toss as a tiebreaker to be administered by a third party chosen by mutual consent of the participants. Such coin toss shall take place within 7 working days from the date of bid opening. If the City determines that a tiebreaker is necessary, each applicable Bidder agrees to participate or to indemnify the City in any litigation resulting from the utilization of the tiebreaker. If a Bidder refuses to timely participate, the City shall conduct the coin toss in a manner determined by the City to be fair to all and the results of such coin toss shall be final.
1.5 GSD JOC DIV I.pdf rev. 05-23 767841v1
BID DEPOSIT
Accompanying this bid proposal, if paper copy, is a Bid Deposit in the amount of TWENTY-FIVE THOUSAND DOLLARS ($25,000) in the following form:
[ ] Certified Check [ ] Bidder’s Bond
[ ] Cashier’s Check [ ] Irrevocable Letter of Credit
[ ] Certificate of Deposit [ ] Annual Bidder’s Bond
Copies of Bid Deposits may be submitted electronically, with the exception of a certified or cashier’s check, which must be brought to the Purchasing Manager’s office and labeled accordingly with bid number prior to the bid opening.
Bid Deposit is deposited by the undersigned Bidder with the City of Fresno as a guarantee that the Bidder, if awarded the Contract, will, within 15 calendar days from the date the Notice of Award is mailed to the Bidder, execute and return a Contract furnished by the City.
This is the start of the file's text. The full file is on GovTribe.