Attachment_J-5_Lab_Refrigerator_Preventative_Maintenance_Services.pdf

PDF 42 KB Posted

Attached to
Facility Support Services for CSOSA Federal contract opportunity
Solicitation number
9594CS19Q0028
Issued by
Court Services and Offender Supervision Agency

About this file

Attachment J-5 Lab Refrigerator Preventative Maintenance Services

View the file

Other files for this federal contract opportunity

Other files attached to Facility Support Services for CSOSA, newest first.
File Type Posted
Amendment_0004.pdf PDF
Amendment_0005.pdf PDF
Revised_Attachment_J-15_Solicitation_Pricing_Sheet_Amend_0005.docx DOCX document
Revised_Sol_Pgs_2_thru_7_Amend_0005.pdf PDF
Attachment_J-1,_Exhibit_1,_Revised_Per_Amendment_0002_Freq_of_Work-RSC.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amd_0002_Revised_Attachment_J-8,_Facilities_Services_Building_Information.pdf PDF
Attachment_1_Q&As_to_Solicitation_9594CS19Q0028.pdf PDF
Amd_0002_Revised_Attachment_J-15_Sol_Pricing_Sheet_Page_9.docx DOCX document
Amd_0002_Revised_Attachment_J-13,_Wage_Determination.pdf PDF
Amendment_0001.pdf PDF
Attachment_J-11_SEC0010-Temp-Contractor-Form-10182013.pdf PDF
Attachment_J-2_Grounds_Maint_Services.pdf PDF
Attachment_J-9_Quality_Assurance_Surveillance_Plan.pdf PDF
Attachment_J-6_Additional_Services_Incl_Exhibit_1.pdf PDF
Attachment_J-13_Wage_Determination.pdf PDF
Attachment_J-3_Pest_Control_Services.pdf PDF
Attachment_J-7_Unit_Prices_for_Additional_Services.pdf PDF
Attachment_J-1_Janitorial_Services.pdf PDF
Attachment_J-1_Exhibit_1,_Frequency_of_Work___RSC.pdf PDF
Attachment_J-1_Exhibit_2_Frequency_of_Work__All_Sites_(Other_than_RSC)..pdf PDF
Solicitation_9594CS19Q0028.pdf PDF
Attachment_J-8_Facility_Services_Building_Information.pdf PDF
Attachment_J-15_Solicitation_Pricing_Sheet_15Apr19.docx DOCX document
Attachment_J-14_Past_Performance_Questionnaire.docx DOCX document
Attachment_J-4_Trash_Recycling_Removal_Disposal_Services.pdf PDF
Attachment_J-10_Deliverables_Table.pdf PDF
Attachment_J-12_SEC_0008_Credit_Release_Form.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J-5

LAB REFRIGERATOR PREVENTATIVE MAINTENANCE SERVICES

1. Scope of Work. The Contractor shall provide all necessary management, supervision, personnel, labor, materials, parts and equipment necessary to perform preventive maintenance, calibration, certification, and repairs on the Court Services and Offender Supervision Agency (CSOSA) Medical Lab refrigerators.

2. Equipment Covered. The below Table 1 provides the location of the equipment covered under this Attachment J-5 as well as the equipment make, model, and serial number.

Table 1: CSOSA Equipment

Site Make & Model Serial Number 633 Indiana Ave, NW Panasonic, Model #MPR721PA 15060297 3850 South Capitol St., SE Sanyo, MPR721 11010012 1230 Taylor St., NW REVCO REL230420 R30N62379nSN 2101 Martin Luther King Ave, SE Pulcir ABT0HC-19TS ABS-8910408-1702 2101 Martin Luther King Ave, SE Pulcir ABT0HC-19TS ABS-88903399-1702

3. Quarterly Inspection and Preventive Maintenance Services.

3.1 The contractor shall perform quarterly inspections as well as preventive maintenance on the CSOSA equipment identified in Table 1 above. All work shall be performed so that all equipment is maintained in operating condition as prescribed by the original equipment manufacturer recommended guidelines to include all tasks identified in this Section C.

3.2 The quarterly inspection and preventive maintenance shall include a thorough inspection of the mechanical operation, the unit, cleaning of coils and a complete calibration, utilizing National Institute of Standards and Technology (NIST) certified instruments.

3.3 Reporting.

3.3.1 Within one business day of completing each quarterly inspection and preventive maintenance service, the Contractor shall provide a written report to detailing the following:

3.3.3.1 The equipment location, make, model, and serial number serviced;

3.3.3.2 Date of service;

3.3.3.3 For each equipment identified, provide the preventive maintenance service conducted;

3.3.3.4 Whether additional repairs are needed in order to maintain reliable, continuous, and safe operation and if so, identify the repairs required.

3.3.2 The report shall be provided via email to the Contracting Officer’s Representative

(COR).

9594CS19Q0027

Attachment J-2

4. Repairs Noted During Quarterly Inspection and Preventive Maintenance.

4.1 If an issue arises during the quarterly inspection and preventive maintenance which may result in a future unit failure, or hamper its operational status, or limit the unit in maintaining regulated temperature set points, the Contractor shall provide a detailed cost estimate for the required repairs. The cost estimate shall include the following:

4.1.1 The part(s) to be purchased and associated price for each part listed;

4.1.2 The amount of labor required to complete the repair and the associated price for the labor;

4.1.3 Any additional cost elements that make up the total price of the repair.

4.2 The repair estimate shall be submitted to the COR within two business days of conducting the quarterly inspection and preventive maintenance.

4.3 No repairs are to be performed without written authorization from the COR. Once authorized, in writing, by the COR, all repairs are to be completed within two business days of the approval to proceed.

5. Emergency Service Calls. Emergency service calls for all lab refrigerators identified in this attachment shall be performed in accordance with Attachment J-6, Additional Services, Section 10, Emergency Service Calls for Lab Refrigerators.

6. Hours of Operation.

6.1 Any work outlined above shall only be performed at CSOSA between the hours of 7:00AM and 7:00PM, Eastern Time, Monday through Friday, except federal holidays. Any work outside the above identified hours of operation is not authorized unless written approval is provided by the COR.

6.2 The Contractor shall coordinate any work at CSOSA with the Contracting Officer’s Representative (COR). The Contractor shall not perform any work at CSOSA on federal holidays or other non-business days without prior approval of the COR.

File details come from the government source that posted it.