This is an amendment (SF30) and Q&A document for RFQ 95332425Q0005 for Infrastructure Roads and Transport Sector Consulting Services in Nepal issued by the Millennium Challenge Corporation. The amendment provides responses to contractor questions about proposal requirements.

Key clarifications include: the Program Manager role does not require US citizenship/permanent residency but may need to attend MCC headquarters meetings; resumes and personnel matrix are excluded from the 15-page limit for Volume II; resumes are limited to 3 pages per person; the ODC total of $814,940 in Section B.4 is the correct amount to use (not the $4,134,800 in Template J.1); contractors must provide QA/QC templates showing ability to comply within 30 days of award; subcontractors billing to labor categories must provide fully loaded labor rate breakdowns; and DUNS numbers are not required. The proposal due date is January 24, 2025 at 10:00 AM Eastern Time.

View the file

Other files

File Type Posted
J.2 Past Performance Project Matrix.xlsx XLSX spreadsheet
J.1 RFQ Price Template.xlsx XLSX spreadsheet
95332425Q0005 Final.pdf PDF
J.3 Questions and Clarifications Template.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

UNCLASSIFIED

Request for Quote (RFQ)

Questions & Responses (Q&A)

RFQ Number: 95332425Q0005

Title of Requirement: Infrastructure Roads and Transport Sector Consulting Services in Nepal

Item # Document Name/Page/Paragraph Question/Response 1 95332425Q0005 Page 31 MCC 52.204-70.B.1.

“The following are requirements for a PSC or contractor employee who works under this contract and requires access to any of the following: MCC Headquarters…”

Contractor Question:

It is our understanding that the Program Manager will have access to the MCC Building in DC and must be a US Citizen or Permanent Resident. For the other 17 FTEs, will the Government accept Nepali citizens working from Nepal? Or do all FTEs have to be US Citizens or Permanent Residents?

Government Response:

The work required under this contract does not require US Citizenship or Permanent Residency. The Program Manager may come to MCC headquarters for meetings from time to time.

2 Document name: 95332425Q0005+Final (PDF)

Page 67/ Sub-factor 3: Personnel Qualifications & Matrix Page 67/ Sub-factor 3: Personnel Qualifications & Matrix Page 67/ Sub-factor 3: Sub factor 4 – Quality Control Plan (QCP)

Contractor Question:

Considering the 15-page limit for Volume II, can you please confirm the following:

a. 3-page CVs/Resume (key and non-key personnel) can be included in an annex to Volume II that does not count towards the 15-page limit.

b. Personnel matrix can be included in an annex to Volume II that does not count towards the 15-page limit.

c. Quality control plan template and corporate security plan can be included in an annex to Volume II that does not count towards the 15-page limit.

Government Response:

Yes. A, C or C do not count towards the 15-page limit.

Item # Document Name/Page/Paragraph Question/Response 3 Standard Form 1449

Solicitation/Contract/Order for Commercial Products and Commercial Services

Contractor Question: Could MCC kindly confirm whether the "local time" referenced in the Offer Due Date of "1/24/2025, 10:00 AM local time" on the Standard Form 1449 pertains to local Nepal time or Eastern Standard Time (EST)?

Eastern Time as stated in Section L.3.1.

4 Section B- Supplies or Services and Prices/Costs.

B4. Direct Labor Mix and Direct Labor Costs (page 8)

Contractor Question: Section B.4 Direct Labor Mix and Direct Labor Costs, page 8 of the solicitation provides Table 2. Other Direct Costs (ODCs) with a total of $814,940. However, the provided J.1 Price Template in MS Excel provides an ODC total of $4,134,800 for Table 2. Can MCC confirm if Offerors should use the ODC total in Section B.4?

Section B.4 is correct and should be used.

5 Section H - Special Contract Requirements. H.2, Key Personnel and Non-Key Personnel (page 25)

Contractor Question: In Section H.2, Key Personnel and Non-Key Personnel, the Program Manager description includes the statement, "Must be a senior executive in the firm to be able to access the best qualified technical specialists from the global network for each technical directive on time." Can MCC confirm what constitutes a senior executive in the firm?

An employee of the firm who has authority.

6 Section L - Instructions, Conditions and Notices to Offerors. L.2.2 Volume II: Factor 1 Technical Capability Quote Sub-factor 3: Personnel Qualifications & Matrix (page 67)

Contractor Question: Sub-factor 3: Personnel Qualifications & Matrix on page 67 stipulates that “quoters are required to submit resumes for quoted personnel,” and that “quoters shall provide a Personnel Matrix that demonstrates the bandwidth of the firm to fulfill the entire SOW. The matrix should include key and non-key personnel.” Would MCC consider permitting the inclusion of these resumes and the corresponding personnel matrix in a separate appendix?

Yes.

7 Section L - Instructions, Conditions and Notices to

Offerors. L.2.2 Volume II: Factor 1 Technical Capability Quote Sub-factor 3: Personnel Qualifications & Matrix (page 67)

Contractor Question:

Sub-factor 3: Personnel Qualifications & Matrix specifies on page 67 that "quoters are required to submit resumes for quoted personnel. The resumes should clearly outline the following: 1) availability, and 2) detailed descriptions of demonstrated experience and qualifications relevant to the position. The resumes must be presented in reverse chronological order, with the most recent employment listed first.

Each resume should include the company or agency name, period of employment, job title, job description, and level of responsibility." Additionally, Sub-factor 3 stipulates that resumes for non-key personnel must not exceed three pages. Considering the level of detail required for both key and non-key personnel resumes, as well as the page limitation, would MCC be open to excluding these resumes, along with the associated personnel matrix, from the 15-page limit specified on page 66 under L.2.2 Technical Capability Quote?

Yes, resumes and personnel matrix are not included in the 15-page limit.

8 Section L - Instructions, Conditions and Notices to

Capability Quote Sub-factor 3: Personnel Qualifications & Matrix (page 67)

Contractor Question:

Sub-factor 3: Personnel Qualifications & Matrix on page 67 specifies that resumes for non-key personnel must not exceed three pages. Could MCC please clarify whether this limit applies to each non-key personnel resume individually, or if the total combined length of all non-key personnel resumes should not exceed three pages?

Correction – Resumes shall not exceed 3 pages per person quoted.

9 Section L - Instructions, Conditions and Notices to

Capability Quote/Sub factor 4 (page 67)

Contractor Question:

Sub factor 4 of the solicitation states that “quoters must provide a copy of their QA/QC template.” Sub factor 4 also reads that, “The Contractor shall provide a copy of its QCP to the COR within 30 days of the award.” Can MCC confirm that we only need to provide a template and not a full QCP plan at this time?

Quarter shall provide a copy of their QA/QC template, however, the template should contain evidence that contractor is able to comply with 30 days after award.

10 Section L - Instructions, Conditions and Notices to Offerors. L.2.4 Volume IV: Detailed/Budget/Prices (page 67)

Contractor Question:

Please advise if we are working with subcontractors, will each subcontractor to the prime have to provide the breakdown of their fully loaded labor (i.e.-actual unloaded labor rate, fringe benefits, General and Administrative (G&A) costs, or any other indirect costs, along with profit? Or is this requirement only for the prime?

Government Response:

Yes, if the subcontractor would be billing to a labor category and it should be clearly noted who is a sub and prime.

11 Section L - Instructions, Conditions and Notices to Offerors. L.2.4 Volume IV: Detailed/Budget/Prices (page 67)

Contractor Question:

Page 67 of the solicitation states, “The Contractor shall provide / Quote the breakdown of ODCs, as specified by the Government in Section B of the RFQ and in attachment J.1 RFQ Price Template, Excel File.” Please confirm Contractors do not need to break down the ODC plug figures.

No, unless you are adding G&A or a material handling fee.

12 Section L - Instructions, Conditions and Notices to Offerors. L.3.5 NAICS: MCC 52.204-72 (page 69)

Contractor Question:

The cover letter requirements and identification of points of contact state, “The cover letter must include the Offeror/Quoter's Business Entity Name, Address, Point of Contact, Phone Number, Email, and DUNS Number, and identify all enclosures included in the quote/proposal.” Since the use of the DUNS number has been retired, could you please confirm whether MCC requires the UEI number in its place?"

DUNS is not required.

Text52:
Text54: 1
TOTAL_NO_OF_PAGES: 2
CUST_PROJ_CODE:
DOCUMENT_NUMBER: 95332425Q00050001
EFFECTIVE_DATE: 2024-12-27T06:51:08.000-07:00
REF_PR_NUM_T:
SOL_DOCUMENT_NUMBER: 95332425Q0005
SOL_OPEN_BID_DATE: 2024-12-12T09:00:18.000-07:00
NO_OF_COPIES:
Check Box91: Yes
Check Box92: Off
MANUAL_EXTEND_FLAG: N
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Text1: AMENDMENT CONTROL NUMBER :
HDR_DOCUMENT_NUMBER: 95332425Q0005
Text134: SUMMARY OF CHANGES :
AMENDMENT_DESCRIPTION: The purpose of this amendment is to provide responses to questions received.
Text2: Same As Issuing Office
AMD_ISSUING_OFFICE_LADDR:
AMD_ISSUING_OFFICE_LOCCODE: