Attachment 3 - Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 95332420Q0002_0001_(Signed)_2019-10-21.pdf | ||
| 95332420Q0002_-_Attachment_2_-_BIODATA_Form.docx | DOCX document | |
| 95332420Q0002_-_Senegal_II_ME_Plan_Development_MBO_-_2019-10-08.docx | DOCX document | |
| 95332420Q0002_-_Attachment_1_Addendum_to_FAR_52.212-4_-_2019-10-08.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Consultant Services for Senegal Power Compact M&E Plan Development
A. Introduction
The Millennium Challenge Corporation (MCC) is a U.S. Government corporation whose mission is to provide assistance that will support economic growth and poverty reduction in carefully selected countries that demonstrate a commitment to just and democratic governance, economic freedom, and investments in their citizenry. For more information on the MCC, please visit www.mcc.gov.
B. Background
In December 2018, MCC signed a $600 million Compact with the Government of Senegal (GoS) of which $50 million is the Government of Senegal contribution. The Compact is expected to enter into force in mid-2020. The Compact aims to address the high cost of energy, a binding constraint to economic growth in Senegal. The compact development teams further defined this constraint as the high cost of electricity to grid-connected firms, low access to electricity outside of Dakar, and to a lesser extent, the unreliability of electricity, which reduces firms’ cost-effectiveness by increasing costs and uncertainty of production. The Compact consists of three projects:
1. Modernizing and Strengthening Senelec’s Transmission Network (“Transmission Project)
2. Increasing Access to Electricity in Rural and Peri-Urban Areas (“Access Project”)
3. Power Sector Enabling Environment and Capacity Development (“Reform Project”).
These projects are described further below.
The Transmission Project Objective is to provide quality electricity from the lowest cost sources available to Senelec to meet the growing demand on the interconnected network in Senegal. To accomplish this Objective, the Project shall support ongoing efforts by Senelec to develop a reliable high-voltage transmission network in and around greater Dakar, which accounts for roughly 60 percent of the nation’s electricity demand and 20 percent of its population. This is necessary for Senegal to effectively capitalize on private sector-led investment in generation and to ensure that electricity is reliably delivered to consumers. This is particularly important since much of the private sector interest in the sector is focused on new, lower-cost generation projects including wind, solar, and natural gas, which rely heavily on a reliable, stable transmission network. The Transmission Project has three activities: Transmission Network Build-out Activity, Transformer Replacement Program Activity, and the Grid Stabilization Activity.
The Access Project Objective is to increase the supply of and demand for quality electricity in rural and peri-urban areas of Senegal. To achieve the Access Project Objective, the Project supports the extension of the electrical grid in selected areas in the southern and central regions of Senegal. Through demand-side interventions, the Access Project also aims to increase rates of adoption and consumption of electricity, facilitate opportunities for income generating activities in these regions and improve the understanding of energy efficiency at a national level. In addition, the Project aims to improve the quality of service and reduce losses in the distribution network outside of Dakar. The Access Project has three activities: Supply-Side Activity, Consumer Demand Support Activity, and Distribution Network Reinforcement Activity.
The Reform Project Objective is to create an enabling environment to improve the financial viability of, and to ensure good governance in, the power sector, with the intent of improving the quality and quantity of the electricity supply. To accomplish the Reform Project Objective, the Project shall strengthen the laws, policies, and regulations governing Senegal’s electricity sector, as well as the institutions responsible for implementing them, particularly the utility (“Senelec”), the regulator (the Commission de Régulation du Secteur de l’Electricité or “CRSE”), and the ministry responsible for energy and petroleum (“Ministry of Energy”). The Reform Project has three activities: Sector Governance Activity, Regulatory Strengthening Activity, and Utility Strengthening Activity.
Annex III of the Compact provides a summary of the Compact’s monitoring and evaluation approach and serves as the basis for the M&E plan, which is to be completed within 90 days of entry into force.
C. Scope
The Monitoring & Evaluation Division of the MCC’s Department of Policy and Evaluation is seeking a consultant to assist in a number of monitoring and evaluation tasks related to the development of the Compact’s M&E plan.
D. Country
Senegal.
E. Tasks
The consultant’s assignments may include the following:
Task 1: Due diligence of data quality review consultancy
· Review and provide comments on consultant deliverables, such as the inception report, the data quality review report, the skills requirements and capacity development report, and the M&E and data quality review manual.
· Participate in some of the consultant’s meetings, workshops, and site visits.
· Serve as a technical resource to the contract manager (M&E Director of the GoS compact development or compact implementation unit).
Task 2: M&E plan development
· Review terms of references and reports from consultants, donors, and GoS entities to inform M&E plan development.
· Document changes and undefined aspects of project designs.
· Refine and update project logics.
· Draft and continuously update an evaluability assessment that documents the extent to which the following elements are defined: problem diagnostic, project logic, risks and assumptions, beneficiaries, and indicators with baselines, milestones, and targets.
· Update the indicator documentation table (Annex I of the M&E plan) and table of indicator baselines and targets (Annex II of the M&E plan).
· Obtain baseline values from secondary sources including administrative data and feasibility and design studies.
· Assist with definition of measurement approaches including the drafting of terms of reference for baseline data collection.
Task 3: General M&E support to the Millennium Challenge Account Senegal II (MCA Senegal II)
· Support the MCC M&E Lead’s on boarding of the MCA Senegal II M&E Director.
· Support the development of an M&E work plan for the Compact.
· Identify potential M&E capacity development support to be provided to MCA.
· Support use of project logic in technical discussions and decision making.
· Help draft terms of reference for M&E contracts.
In addition to the tasks listed above, the Consultant is expected to participate in regular check-in meetings with M&E and project staff from MCC and MCA. Also see Section G – MCC Technical Direction.
F. Conflict of Interest
The consultant would be precluded from bidding on work and services (design, assessment, construction and supervision) to be procured by a local MCA accountable entity or using funds advanced under a Compact in the relevant country; unless the consultant submits a mitigation plan sufficient to ameliorate any conflict of interest pursuant to the rules applicable to the procurement process. The designated Consultant would be expected to coordinate with local authorities responsible for MCC Compact development and implementation as well as other donors, where relevant. However, designated Consultant would work directly with the designated COR/PM to receive technical directives within the scope of the contract.
G. MCC Technical Direction
(a) Performance of the work under this contract is subject to the written technical direction of the Contracting Officer Representative (COR), and any Government Project Monitors, (PM), who shall be specifically appointed, and responsibilities identified, by the Contracting Officer in writing in accordance with MCC policy. "Technical direction" means a directive to the Contractor that approves approaches, solutions, designs, or refinements; fills in details or otherwise completes the general description of work or documentation items; shifts emphasis among work areas or tasks; or furnishes similar instruction to the Contractor. Technical direction includes requiring studies and pursuit of certain lines of inquiry regarding matters within the general tasks and requirements in Section C of this contract.
(b) The COR/Government PM does not have the authority to, and shall not, issue any instruction purporting to be technical direction that—
(1) Constitutes an assignment of additional work outside the statement of work;
(2) Constitutes a change as defined in the changes clause;
(3) Constitutes a basis for any increase or decrease in the total estimated contract/Contract cost, the fixed fee (if any), or the time required for contract/Contract performance;
(4) Changes any of the expressed terms, conditions, or specifications of the contract/Contract; or
(5) Interferes with the contractor's rights to perform the terms and conditions of the contract/Contract.
(c) Technical direction may be oral or in writing; however, the COR or government PM shall confirm oral direction in writing within five workdays.
(d) The Contractor shall proceed promptly with the performance of technical direction duly issued by the COTR or PM in the manner prescribed by this clause and within the COR's/PM’s authority. If, in the Contractor's opinion, any instruction or direction by the COR/PM falls within any of the categories defined in paragraph (b) of this clause, the Contractor shall not proceed but shall notify the Contracting Officer in writing within 5 workdays after receiving it (either orally or in writing, whichever comes first) and shall request the Contracting Officer to take action as described in this clause. Upon receiving this notification, the Contracting Officer shall either issue an appropriate contract/Contract modification within a reasonable time or advise the Contractor in writing within 30 days that the instruction or direction is—
(1) Rescinded in its entirety; or
(2) Within the requirements of the contract/Contract and does not constitute a change under the changes clause of the contract/Contract, and that the Contractor should proceed promptly with its performance.
(e) A failure of the contractor and Contracting Officer to agree that the instruction or direction is both within the requirements of the contract/Contract and does not constitute a change under the changes clause, or a failure to agree upon the contract action to be taken with respect to the instruction or direction, shall be subject to the Disputes clause of this contract.
(f) Any action(s) taken by the contractor in response to any direction given by any person other than the Contracting Officer or the COR/PM shall be at the Contractor's risk.
H. Deliverables
The Consultant will provide services to MCC on an as-needed basis. No additional tasks shall imply any additional costs to the Government beyond the amount allowed for in the initial call order; however, this call order may be amended to reflect additional costs.
The specific deliverables are expected to include, but not be limited to, the following:
· Meeting notes;
· Written comments from technical review;
· Report documenting evaluability dimensions;
· Draft indicator tables; and
· As agreed-upon with the COR/PM via technical directives.
I. Period of Performance
All work under this contract will be completed over a three year period. The estimated number of hours required to complete the tasks included in this statement of work (SOW) is indicated in the following table. MCC anticipates this number of hours but does not guarantee it, as it may increase or decrease.
| Task |
| Estimated Total Working Days |
| Estimated Total Working Hours |
| Task 1: Due diligence of data quality review consultancy |
| 42 |
| 336 |
| Task 2: M&E plan development |
| 129 |
| 1,032 |
| Task 3: General M&E support to MCA |
| 135 |
| 1,080 |
| TOTAL: |
| 306 |
| 2,448 |
J. Performance Location
The Consultant shall perform the tasks under this call order in Dakar, Senegal. S/he should have his or her own access to a work space with the resources necessary to concentrate on duties without interruption.
K. Contracting Officer’s Representative (COR)/Project Monitor (PM)
The COR/PM shall have technical responsibility over the Consultant. Any change in the terms of the Call Order must be made in writing and approved by the Contracting Officer. No representation of the COR/PM shall serve as a basis for an alteration in the general scope of this Contract or of the terms and conditions of the Contract unless confirmed in writing by the Contracting Officer. The Consultant must communicate with the prime contractor (MBO Partners) on all matters that pertain to the Contract terms, and the prime contractor must in turn communicate with the Contracting Officer. Proceeding with work without proper contractual coverage could result in nonpayment for that work.
The Consultant will work closely with the M&E Director of the Unité de Formulation et de Coordination du second Programme MCA-Sénégal (UFC MCA-Sénégal) and then the Millennium Challenge Account du Sénégal ("MCA-Sénégal II") once it has recruited its Director for Monitoring, Evaluation, and Economic Analysis. The Consultant may act upon technical guidance and instructions received from these individuals as long as the COR/PM is informed in writing. Again, no representation of any individual other than the Contracting Officer shall serve as a basis for an alteration of the contract terms.